期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Optimal control system of the intermittent bus-only approach 被引量:1
1
作者 Jie Jiang Yulin Chang 《Journal of Modern Transportation》 2014年第3期167-173,共7页
To guarantee bus priority with a minimum impact on car traffic at intersections, an optimal control system of the intermittent bus-only approach (IBA) was proposed. The problems of the existing system are first solv... To guarantee bus priority with a minimum impact on car traffic at intersections, an optimal control system of the intermittent bus-only approach (IBA) was proposed. The problems of the existing system are first solved through optimization: the judgment time of the IBA system was advanced to allow a bus to jump car queues if the bus was detected to arrive at the intersection, and the instant that the IBA lane became available to cars was controlled dynamically to increase the capacity of the IBA lane. The total car delay in one cycle was then analyzed quantitatively when implementing the optimal control system. The results show that in comparison with the existing system of the IBA, the car delay is greatly reduced and the probability of a car stopping twice is low after optimizing the IBA system. 展开更多
关键词 Intermittent bus-only approach Bus priority Optimal control Car delay Bus detection
在线阅读 下载PDF
Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm 被引量:1
2
作者 Muhammad Farhan AUSAF Liang GAO Xinyu LI 《Frontiers of Mechanical Engineering》 SCIE CSCD 2015年第4期392-404,共13页
For increasing the overall performance of modem manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the com... For increasing the overall performance of modem manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatch- ing rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem. 展开更多
关键词 multi-objective optimization integrated process planning and scheduling (IPPS) dispatching rules priority based optimization algorithm
原文传递
Optimal Unit Commitment with Renewable Energy in Regulated and Deregulated Systems
3
作者 Adel A. Abou El-Ela Sohir M. Allam Amira S. Doso 《Energy and Power Engineering》 CAS 2022年第8期420-442,共23页
In this paper, the impact of the wind power generation system on the total cost and profit of the system is studied by using the proposed procedure of binary Sine Cosine (BSC) optimization algorithm with optimal prior... In this paper, the impact of the wind power generation system on the total cost and profit of the system is studied by using the proposed procedure of binary Sine Cosine (BSC) optimization algorithm with optimal priority list (OPL) algorithm. As well, investigate the advantages of system transformation from a regulated system to a deregulated system and the difference in the objective functions of the two systems. The suggested procedure is carried out in two parallel algorithms;The goal of the first algorithm is to reduce the space of searching by using OPL, while the second algorithm adjusts BSC to get the optimal economic dispatch with minimum operation cost of the unit commitment (UCP) problem in the regulated system. But, in the deregulated system, the second algorithm adopts the BSC technique to find the optimal solution to the profit-based unit commitment problem (PBUCP), through the fast of researching the BSC technique. The proposed procedure is applied to IEEE 10-unit test system integrated with the wind generator system. While the second is an actual system in the Egyptian site at Hurghada. The results of this algorithm are compared with previous literature to illustrate the efficiency and capability of this algorithm. Based on the results obtained in the regulated system, the suggested procedure gives better results than the algorithm in previous literature, saves computational efforts, and increases the efficiency of the output power of each unit in the system and lowers the price of kWh. Besides, in the deregulated system the profit is high and the system is more reliable. 展开更多
关键词 Profit Based Unit Commitment Problem Binary Sine Cosine Optimal priority List Regulated and Deregulated System
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部