Bio-inspired computer modelling brings solutions fromthe living phenomena or biological systems to engineering domains.To overcome the obstruction problem of large-scale wind power consumption in Northwest China,this ...Bio-inspired computer modelling brings solutions fromthe living phenomena or biological systems to engineering domains.To overcome the obstruction problem of large-scale wind power consumption in Northwest China,this paper constructs a bio-inspired computer model.It is an optimal wind power consumption dispatching model of multi-time scale demand response that takes into account the involved high-energy load.First,the principle of wind power obstruction with the involvement of a high-energy load is examined in this work.In this step,highenergy load model with different regulation characteristics is established.Then,considering the multi-time scale characteristics of high-energy load and other demand-side resources response speed,a multi-time scale model of coordination optimization is built.An improved bio-inspired model incorporating particle swarm optimization is applied to minimize system operation and wind curtailment costs,as well as to find the most optimal energy configurationwithin the system.Lastly,we take an example of regional power grid in Gansu Province for simulation analysis.Results demonstrate that the suggested scheduling strategy can significantly enhance the wind power consumption level and minimize the system’s operational cost.展开更多
With the development of carbon electricity,achieving a low-carbon economy has become a prevailing and inevitable trend.Improving low-carbon expansion generation planning is critical for carbon emission mitigation and ...With the development of carbon electricity,achieving a low-carbon economy has become a prevailing and inevitable trend.Improving low-carbon expansion generation planning is critical for carbon emission mitigation and a lowcarbon economy.In this paper,a two-layer low-carbon expansion generation planning approach considering the uncertainty of renewable energy at multiple time scales is proposed.First,renewable energy sequences considering the uncertainty in multiple time scales are generated based on the Copula function and the probability distribution of renewable energy.Second,a two-layer generation planning model considering carbon trading and carbon capture technology is established.Specifically,the upper layer model optimizes the investment decision considering the uncertainty at a monthly scale,and the lower layer one optimizes the scheduling considering the peak shaving at an hourly scale and the flexibility at a 15-minute scale.Finally,the results of different influence factors on low-carbon generation expansion planning are compared in a provincial power grid,which demonstrate the effectiveness of the proposed model.展开更多
Morlet wavelet transformation is used in this paper to analyze the multi time scale characteristics of pre cipitation data series from 1957 to 2005 in Guyuan region.The results showed that(1) the annual precipitation ...Morlet wavelet transformation is used in this paper to analyze the multi time scale characteristics of pre cipitation data series from 1957 to 2005 in Guyuan region.The results showed that(1) the annual precipitation evo lution process had obvious multi time scale variation characteristics of 15 25 years,7 12 years and 3 6 years,and different time scales had different oscillation energy densities;(2) the periods at smaller time scales changed more frequently,which often nested in a biggish quasi periodic oscillations,so the concrete time domain should be ana lyzed if necessary;(3) the precipitation had three main periods(22 year,9 year and 4 year) and the 22 year period was especially outstanding,and the analysis of this main period reveals that the precipitation would be in a relative high water period until about 2012.展开更多
As the proportion of renewable energy increases, the interaction between renewable energy devices and the grid continues to enhance. Therefore, the renewable energy dynamic test in a power system has become more and m...As the proportion of renewable energy increases, the interaction between renewable energy devices and the grid continues to enhance. Therefore, the renewable energy dynamic test in a power system has become more and more important. Traditional dynamic simulation systems and digital-analog hybrid simulation systems are difficult to compromise on the economy, flexibility and accuracy. A multi-time scale test system of doubly fed induction generator based on FPGA+ CPU heterogeneous calculation is proposed in this paper. The proposed test system is based on the ADPSS simulation platform. The power circuit part of the test system is setup up using the EMT(electromagnetic transient simulation) simulation, and the control part uses the actual physical devices. In order to realize the close-loop testing for the physical devices, the power circuit must be simulated in real-time. This paper proposes a multi-time scale simulation algorithm, in which the decoupling component divides the power circuit into a large time scale system and a small time scale system in order to reduce computing effort. This paper also proposes the FPGA+CPU heterogeneous computing architecture for implementing this multitime scale simulation. In FPGA, there is a complete small time-scale EMT engine, which support the flexibly circuit modeling with any topology. Finally, the test system is connected to an DFIG controller based on Labview to verify the feasibility of the test system.展开更多
Building emission reduction is an important way to achieve China’s carbon peaking and carbon neutrality goals.Aiming at the problem of low carbon economic operation of a photovoltaic energy storage building system,a ...Building emission reduction is an important way to achieve China’s carbon peaking and carbon neutrality goals.Aiming at the problem of low carbon economic operation of a photovoltaic energy storage building system,a multi-time scale optimal scheduling strategy based on model predictive control(MPC)is proposed under the consideration of load optimization.First,load optimization is achieved by controlling the charging time of electric vehicles as well as adjusting the air conditioning operation temperature,and the photovoltaic energy storage building system model is constructed to propose a day-ahead scheduling strategy with the lowest daily operation cost.Second,considering inter-day to intra-day source-load prediction error,an intraday rolling optimal scheduling strategy based on MPC is proposed that dynamically corrects the day-ahead dispatch results to stabilize system power fluctuations and promote photovoltaic consumption.Finally,taking an office building on a summer work day as an example,the effectiveness of the proposed scheduling strategy is verified.The results of the example show that the strategy reduces the total operating cost of the photovoltaic energy storage building system by 17.11%,improves the carbon emission reduction by 7.99%,and the photovoltaic consumption rate reaches 98.57%,improving the system’s low-carbon and economic performance.展开更多
This paper focuses on the problem of traffic flow forecasting,with the aim of forecasting future traffic conditions based on historical traffic data.This problem is typically tackled by utilizing spatio-temporal graph...This paper focuses on the problem of traffic flow forecasting,with the aim of forecasting future traffic conditions based on historical traffic data.This problem is typically tackled by utilizing spatio-temporal graph neural networks to model the intricate spatio-temporal correlations among traffic data.Although these methods have achieved performance improvements,they often suffer from the following limitations:These methods face challenges in modeling high-order correlations between nodes.These methods overlook the interactions between nodes at different scales.To tackle these issues,in this paper,we propose a novel model named multi-scale dynamic hypergraph convolutional network(MSDHGCN)for traffic flow forecasting.Our MSDHGCN can effectively model the dynamic higher-order relationships between nodes at multiple time scales,thereby enhancing the capability for traffic forecasting.Experiments on two real-world datasets demonstrate the effectiveness of the proposed method.展开更多
The power systems economic and safety operation considering large-scale wind power penetration are now facing great challenges, which are based on reliable power supply and predictable load demands in the past. A roll...The power systems economic and safety operation considering large-scale wind power penetration are now facing great challenges, which are based on reliable power supply and predictable load demands in the past. A rolling generation dispatch model based on ultra-short-term wind power forecast was proposed. In generation dispatch process, the model rolling correct not only the conventional units power output but also the power from wind farm, simultaneously. Second order Markov chain model was utilized to modify wind power prediction error state (WPPES) and update forecast results of wind power over the remaining dispatch periods. The prime-dual affine scaling interior point method was used to solve the proposed model that taken into account the constraints of multi-periods power balance, unit output adjustment, up spinning reserve and down spinning reserve.展开更多
Continued expansion of the power grid and the increasing proportion of wind power centralized integration leads to requirements in sharing both energy and reserves among multiple areas under a hierarchical control str...Continued expansion of the power grid and the increasing proportion of wind power centralized integration leads to requirements in sharing both energy and reserves among multiple areas under a hierarchical control structure,which successively requires a correction between schedule plans within multi-time scale.In order to address this problem,this paper develops an information integration method integrating complicated relationships among fuel cost,total thermal power output,reserve capacity,owned reserves and expectations of load shedding and wind curtailment,into three types of time-related relationship curves・Furthermore,a multi-time scale tieline energy and reserves allocation model is proposed,which contains two levels in the control structure,two time scales in dispatch sequence and multiple areas integrated within wind farms as scheduling objects・The efficiency of the proposed method is tested in a 9-bus test system and IEEE 118-bus system.The results show that a cross-regional control center is able to approach the optimal scheduling results of the whole system with the integrated uploaded relationship curves.The proposed model not only relieves energy and reserve shortages in partial areas but also allocates them to more urgent need areas in a high effectivity manner in both day-ahead and intraday time scales.展开更多
Electric power infrastructure has recently undergone a comprehensive transformation from electromagnetics to semiconductors. Such a development is attributed to the rapid growth of power electronic converter applicati...Electric power infrastructure has recently undergone a comprehensive transformation from electromagnetics to semiconductors. Such a development is attributed to the rapid growth of power electronic converter applications in the load side to realize energy conservation and on the supply side for renewable generations and power transmissions using high voltage direct current transmission. This transformation has altered the fundamental mechanism of power system dynamics, which demands the establishment of a new theory for power system control and protection. This paper presents thoughts on a theoretical framework for the coming semiconducting power systems.展开更多
The increasing integration of renewable energy sources and power electronic devices has significantly increased the complexity of modern power systems,making modeling and simulation challenging due to multi-time scale...The increasing integration of renewable energy sources and power electronic devices has significantly increased the complexity of modern power systems,making modeling and simulation challenging due to multi-time scale dynamics and multi-physics coupling.To address these challenges,this paper proposes a multi-level simulation framework based on unified energy flow theory.The framework structures systems hierarchically using energy transmission functions and unified energy information flow-based surrogate models with defined ports,ensuring compatibility with artificial intelligence algorithms.By integrating AI techniques,such as back propagation neural networks,the framework predicts variables with high computational complexity,improving accuracy and simulation efficiency.A multi-level simulation architecture leveraging Field Programmable Gate Arrays(FPGAs)enables faster-than-real-time system-level simulation and real-time component-level modeling with time resolution as small as 5 nanoseconds.A DC microgrid case study with photovoltaic generation,battery storage,and power electronic converters demonstrates the proposed method,achieving up to a 500×speedup over traditional Simulink models while maintaining high accuracy.The results confirm the framework’s ability to capture multiphysics interactions,optimize energy distribution,and ensure system stability under dynamic conditions,providing an efficient and scalable solution for advanced DC microgrid simulations.展开更多
基金supported by the Program for Innovative Research Team(in Science and Technology)in University of Henan Province(No.22IRTSTHN016)the Hubei Natural Science Foundation(No.2021CFB156)the Japan Society for the Promotion of Science(JSPS)Grants-in-Aid for Scientific Research(KAKENHI)(No.JP21K17737).
文摘Bio-inspired computer modelling brings solutions fromthe living phenomena or biological systems to engineering domains.To overcome the obstruction problem of large-scale wind power consumption in Northwest China,this paper constructs a bio-inspired computer model.It is an optimal wind power consumption dispatching model of multi-time scale demand response that takes into account the involved high-energy load.First,the principle of wind power obstruction with the involvement of a high-energy load is examined in this work.In this step,highenergy load model with different regulation characteristics is established.Then,considering the multi-time scale characteristics of high-energy load and other demand-side resources response speed,a multi-time scale model of coordination optimization is built.An improved bio-inspired model incorporating particle swarm optimization is applied to minimize system operation and wind curtailment costs,as well as to find the most optimal energy configurationwithin the system.Lastly,we take an example of regional power grid in Gansu Province for simulation analysis.Results demonstrate that the suggested scheduling strategy can significantly enhance the wind power consumption level and minimize the system’s operational cost.
基金supported partly by the National Key R&D Program of China(2018YFA0702200)the Science and Technology Project of State Grid Shandong Electric Power Company(520604190002)。
文摘With the development of carbon electricity,achieving a low-carbon economy has become a prevailing and inevitable trend.Improving low-carbon expansion generation planning is critical for carbon emission mitigation and a lowcarbon economy.In this paper,a two-layer low-carbon expansion generation planning approach considering the uncertainty of renewable energy at multiple time scales is proposed.First,renewable energy sequences considering the uncertainty in multiple time scales are generated based on the Copula function and the probability distribution of renewable energy.Second,a two-layer generation planning model considering carbon trading and carbon capture technology is established.Specifically,the upper layer model optimizes the investment decision considering the uncertainty at a monthly scale,and the lower layer one optimizes the scheduling considering the peak shaving at an hourly scale and the flexibility at a 15-minute scale.Finally,the results of different influence factors on low-carbon generation expansion planning are compared in a provincial power grid,which demonstrate the effectiveness of the proposed model.
基金National Key Project of ScientificTechnical Supporting Programs Funded by Ministry of Science & Technology of China during the 11th Five-Year Plan Period (Grant No. 2006BCA01A07-2).
文摘Morlet wavelet transformation is used in this paper to analyze the multi time scale characteristics of pre cipitation data series from 1957 to 2005 in Guyuan region.The results showed that(1) the annual precipitation evo lution process had obvious multi time scale variation characteristics of 15 25 years,7 12 years and 3 6 years,and different time scales had different oscillation energy densities;(2) the periods at smaller time scales changed more frequently,which often nested in a biggish quasi periodic oscillations,so the concrete time domain should be ana lyzed if necessary;(3) the precipitation had three main periods(22 year,9 year and 4 year) and the 22 year period was especially outstanding,and the analysis of this main period reveals that the precipitation would be in a relative high water period until about 2012.
基金supported by the State Grid Science and Technology Project (Title: Technology Research On Large Scale EMT Real-time simulation customized platform, FX71-17-001)
文摘As the proportion of renewable energy increases, the interaction between renewable energy devices and the grid continues to enhance. Therefore, the renewable energy dynamic test in a power system has become more and more important. Traditional dynamic simulation systems and digital-analog hybrid simulation systems are difficult to compromise on the economy, flexibility and accuracy. A multi-time scale test system of doubly fed induction generator based on FPGA+ CPU heterogeneous calculation is proposed in this paper. The proposed test system is based on the ADPSS simulation platform. The power circuit part of the test system is setup up using the EMT(electromagnetic transient simulation) simulation, and the control part uses the actual physical devices. In order to realize the close-loop testing for the physical devices, the power circuit must be simulated in real-time. This paper proposes a multi-time scale simulation algorithm, in which the decoupling component divides the power circuit into a large time scale system and a small time scale system in order to reduce computing effort. This paper also proposes the FPGA+CPU heterogeneous computing architecture for implementing this multitime scale simulation. In FPGA, there is a complete small time-scale EMT engine, which support the flexibly circuit modeling with any topology. Finally, the test system is connected to an DFIG controller based on Labview to verify the feasibility of the test system.
文摘Building emission reduction is an important way to achieve China’s carbon peaking and carbon neutrality goals.Aiming at the problem of low carbon economic operation of a photovoltaic energy storage building system,a multi-time scale optimal scheduling strategy based on model predictive control(MPC)is proposed under the consideration of load optimization.First,load optimization is achieved by controlling the charging time of electric vehicles as well as adjusting the air conditioning operation temperature,and the photovoltaic energy storage building system model is constructed to propose a day-ahead scheduling strategy with the lowest daily operation cost.Second,considering inter-day to intra-day source-load prediction error,an intraday rolling optimal scheduling strategy based on MPC is proposed that dynamically corrects the day-ahead dispatch results to stabilize system power fluctuations and promote photovoltaic consumption.Finally,taking an office building on a summer work day as an example,the effectiveness of the proposed scheduling strategy is verified.The results of the example show that the strategy reduces the total operating cost of the photovoltaic energy storage building system by 17.11%,improves the carbon emission reduction by 7.99%,and the photovoltaic consumption rate reaches 98.57%,improving the system’s low-carbon and economic performance.
基金the National Key Research and Development Program of China(No.2021ZD0112400)。
文摘This paper focuses on the problem of traffic flow forecasting,with the aim of forecasting future traffic conditions based on historical traffic data.This problem is typically tackled by utilizing spatio-temporal graph neural networks to model the intricate spatio-temporal correlations among traffic data.Although these methods have achieved performance improvements,they often suffer from the following limitations:These methods face challenges in modeling high-order correlations between nodes.These methods overlook the interactions between nodes at different scales.To tackle these issues,in this paper,we propose a novel model named multi-scale dynamic hypergraph convolutional network(MSDHGCN)for traffic flow forecasting.Our MSDHGCN can effectively model the dynamic higher-order relationships between nodes at multiple time scales,thereby enhancing the capability for traffic forecasting.Experiments on two real-world datasets demonstrate the effectiveness of the proposed method.
文摘The power systems economic and safety operation considering large-scale wind power penetration are now facing great challenges, which are based on reliable power supply and predictable load demands in the past. A rolling generation dispatch model based on ultra-short-term wind power forecast was proposed. In generation dispatch process, the model rolling correct not only the conventional units power output but also the power from wind farm, simultaneously. Second order Markov chain model was utilized to modify wind power prediction error state (WPPES) and update forecast results of wind power over the remaining dispatch periods. The prime-dual affine scaling interior point method was used to solve the proposed model that taken into account the constraints of multi-periods power balance, unit output adjustment, up spinning reserve and down spinning reserve.
基金supported in part by the Science and Technology Project of Central Branch of SGCC(SGHZ0000DKJS 1900228)in part by the National Natural Science Foundation of China(51707136).
文摘Continued expansion of the power grid and the increasing proportion of wind power centralized integration leads to requirements in sharing both energy and reserves among multiple areas under a hierarchical control structure,which successively requires a correction between schedule plans within multi-time scale.In order to address this problem,this paper develops an information integration method integrating complicated relationships among fuel cost,total thermal power output,reserve capacity,owned reserves and expectations of load shedding and wind curtailment,into three types of time-related relationship curves・Furthermore,a multi-time scale tieline energy and reserves allocation model is proposed,which contains two levels in the control structure,two time scales in dispatch sequence and multiple areas integrated within wind farms as scheduling objects・The efficiency of the proposed method is tested in a 9-bus test system and IEEE 118-bus system.The results show that a cross-regional control center is able to approach the optimal scheduling results of the whole system with the integrated uploaded relationship curves.The proposed model not only relieves energy and reserve shortages in partial areas but also allocates them to more urgent need areas in a high effectivity manner in both day-ahead and intraday time scales.
基金This work was supported in part by the National Basic Research Program of China (973 Program) (Grant No. 2012CB215100), and the Major Program of the National Natural Science Foundation of China (Grant No. 51190104).
文摘Electric power infrastructure has recently undergone a comprehensive transformation from electromagnetics to semiconductors. Such a development is attributed to the rapid growth of power electronic converter applications in the load side to realize energy conservation and on the supply side for renewable generations and power transmissions using high voltage direct current transmission. This transformation has altered the fundamental mechanism of power system dynamics, which demands the establishment of a new theory for power system control and protection. This paper presents thoughts on a theoretical framework for the coming semiconducting power systems.
基金support by National Natural Science Foundation of China,Grant agreement No:52107216.
文摘The increasing integration of renewable energy sources and power electronic devices has significantly increased the complexity of modern power systems,making modeling and simulation challenging due to multi-time scale dynamics and multi-physics coupling.To address these challenges,this paper proposes a multi-level simulation framework based on unified energy flow theory.The framework structures systems hierarchically using energy transmission functions and unified energy information flow-based surrogate models with defined ports,ensuring compatibility with artificial intelligence algorithms.By integrating AI techniques,such as back propagation neural networks,the framework predicts variables with high computational complexity,improving accuracy and simulation efficiency.A multi-level simulation architecture leveraging Field Programmable Gate Arrays(FPGAs)enables faster-than-real-time system-level simulation and real-time component-level modeling with time resolution as small as 5 nanoseconds.A DC microgrid case study with photovoltaic generation,battery storage,and power electronic converters demonstrates the proposed method,achieving up to a 500×speedup over traditional Simulink models while maintaining high accuracy.The results confirm the framework’s ability to capture multiphysics interactions,optimize energy distribution,and ensure system stability under dynamic conditions,providing an efficient and scalable solution for advanced DC microgrid simulations.