Data center industries have been facing huge energy challenges due to escalating power consumption and associated carbon emissions.In the context of carbon neutrality,the integration of data centers with renewable ene...Data center industries have been facing huge energy challenges due to escalating power consumption and associated carbon emissions.In the context of carbon neutrality,the integration of data centers with renewable energy has become a prevailing trend.To advance the renewable energy integration in data centers,it is imperative to thoroughly explore the data centers’operational flexibility.Computing workloads and refrigeration systems are recognized as two promising flexible resources for power regulationwithin data centermicro-grids.This paper identifies and categorizes delay-tolerant computing workloads into three types(long-running non-interruptible,long-running interruptible,and short-running)and develops mathematical time-shifting models for each.Additionally,this paper examines the thermal dynamics of the computer room and derives a time-varying temperature model coupled to refrigeration power.Building on these models,this paper proposes a two-stage,multi-time scale optimization scheduling framework that jointly coordinates computing workloads time-shift in day-ahead scheduling and refrigeration power control in intra-day dispatch to mitigate renewable variability.A case study demonstrates that the framework effectively enhances the renewable-energy utilization,improves the operational economy of the data center microgrid,and mitigates the impact of renewable power uncertainty.The results highlight the potential of coordinated computing workloads and thermal system flexibility to support greener,more cost-effective data center operation.展开更多
Bio-inspired computer modelling brings solutions fromthe living phenomena or biological systems to engineering domains.To overcome the obstruction problem of large-scale wind power consumption in Northwest China,this ...Bio-inspired computer modelling brings solutions fromthe living phenomena or biological systems to engineering domains.To overcome the obstruction problem of large-scale wind power consumption in Northwest China,this paper constructs a bio-inspired computer model.It is an optimal wind power consumption dispatching model of multi-time scale demand response that takes into account the involved high-energy load.First,the principle of wind power obstruction with the involvement of a high-energy load is examined in this work.In this step,highenergy load model with different regulation characteristics is established.Then,considering the multi-time scale characteristics of high-energy load and other demand-side resources response speed,a multi-time scale model of coordination optimization is built.An improved bio-inspired model incorporating particle swarm optimization is applied to minimize system operation and wind curtailment costs,as well as to find the most optimal energy configurationwithin the system.Lastly,we take an example of regional power grid in Gansu Province for simulation analysis.Results demonstrate that the suggested scheduling strategy can significantly enhance the wind power consumption level and minimize the system’s operational cost.展开更多
With the development of carbon electricity,achieving a low-carbon economy has become a prevailing and inevitable trend.Improving low-carbon expansion generation planning is critical for carbon emission mitigation and ...With the development of carbon electricity,achieving a low-carbon economy has become a prevailing and inevitable trend.Improving low-carbon expansion generation planning is critical for carbon emission mitigation and a lowcarbon economy.In this paper,a two-layer low-carbon expansion generation planning approach considering the uncertainty of renewable energy at multiple time scales is proposed.First,renewable energy sequences considering the uncertainty in multiple time scales are generated based on the Copula function and the probability distribution of renewable energy.Second,a two-layer generation planning model considering carbon trading and carbon capture technology is established.Specifically,the upper layer model optimizes the investment decision considering the uncertainty at a monthly scale,and the lower layer one optimizes the scheduling considering the peak shaving at an hourly scale and the flexibility at a 15-minute scale.Finally,the results of different influence factors on low-carbon generation expansion planning are compared in a provincial power grid,which demonstrate the effectiveness of the proposed model.展开更多
Morlet wavelet transformation is used in this paper to analyze the multi time scale characteristics of pre cipitation data series from 1957 to 2005 in Guyuan region.The results showed that(1) the annual precipitation ...Morlet wavelet transformation is used in this paper to analyze the multi time scale characteristics of pre cipitation data series from 1957 to 2005 in Guyuan region.The results showed that(1) the annual precipitation evo lution process had obvious multi time scale variation characteristics of 15 25 years,7 12 years and 3 6 years,and different time scales had different oscillation energy densities;(2) the periods at smaller time scales changed more frequently,which often nested in a biggish quasi periodic oscillations,so the concrete time domain should be ana lyzed if necessary;(3) the precipitation had three main periods(22 year,9 year and 4 year) and the 22 year period was especially outstanding,and the analysis of this main period reveals that the precipitation would be in a relative high water period until about 2012.展开更多
As the proportion of renewable energy increases, the interaction between renewable energy devices and the grid continues to enhance. Therefore, the renewable energy dynamic test in a power system has become more and m...As the proportion of renewable energy increases, the interaction between renewable energy devices and the grid continues to enhance. Therefore, the renewable energy dynamic test in a power system has become more and more important. Traditional dynamic simulation systems and digital-analog hybrid simulation systems are difficult to compromise on the economy, flexibility and accuracy. A multi-time scale test system of doubly fed induction generator based on FPGA+ CPU heterogeneous calculation is proposed in this paper. The proposed test system is based on the ADPSS simulation platform. The power circuit part of the test system is setup up using the EMT(electromagnetic transient simulation) simulation, and the control part uses the actual physical devices. In order to realize the close-loop testing for the physical devices, the power circuit must be simulated in real-time. This paper proposes a multi-time scale simulation algorithm, in which the decoupling component divides the power circuit into a large time scale system and a small time scale system in order to reduce computing effort. This paper also proposes the FPGA+CPU heterogeneous computing architecture for implementing this multitime scale simulation. In FPGA, there is a complete small time-scale EMT engine, which support the flexibly circuit modeling with any topology. Finally, the test system is connected to an DFIG controller based on Labview to verify the feasibility of the test system.展开更多
Building emission reduction is an important way to achieve China’s carbon peaking and carbon neutrality goals.Aiming at the problem of low carbon economic operation of a photovoltaic energy storage building system,a ...Building emission reduction is an important way to achieve China’s carbon peaking and carbon neutrality goals.Aiming at the problem of low carbon economic operation of a photovoltaic energy storage building system,a multi-time scale optimal scheduling strategy based on model predictive control(MPC)is proposed under the consideration of load optimization.First,load optimization is achieved by controlling the charging time of electric vehicles as well as adjusting the air conditioning operation temperature,and the photovoltaic energy storage building system model is constructed to propose a day-ahead scheduling strategy with the lowest daily operation cost.Second,considering inter-day to intra-day source-load prediction error,an intraday rolling optimal scheduling strategy based on MPC is proposed that dynamically corrects the day-ahead dispatch results to stabilize system power fluctuations and promote photovoltaic consumption.Finally,taking an office building on a summer work day as an example,the effectiveness of the proposed scheduling strategy is verified.The results of the example show that the strategy reduces the total operating cost of the photovoltaic energy storage building system by 17.11%,improves the carbon emission reduction by 7.99%,and the photovoltaic consumption rate reaches 98.57%,improving the system’s low-carbon and economic performance.展开更多
This paper focuses on the problem of traffic flow forecasting,with the aim of forecasting future traffic conditions based on historical traffic data.This problem is typically tackled by utilizing spatio-temporal graph...This paper focuses on the problem of traffic flow forecasting,with the aim of forecasting future traffic conditions based on historical traffic data.This problem is typically tackled by utilizing spatio-temporal graph neural networks to model the intricate spatio-temporal correlations among traffic data.Although these methods have achieved performance improvements,they often suffer from the following limitations:These methods face challenges in modeling high-order correlations between nodes.These methods overlook the interactions between nodes at different scales.To tackle these issues,in this paper,we propose a novel model named multi-scale dynamic hypergraph convolutional network(MSDHGCN)for traffic flow forecasting.Our MSDHGCN can effectively model the dynamic higher-order relationships between nodes at multiple time scales,thereby enhancing the capability for traffic forecasting.Experiments on two real-world datasets demonstrate the effectiveness of the proposed method.展开更多
为应对配电网络低碳化运行的挑战,并充分挖掘系统中分布式资源的灵活调控潜力,文中构建一种基于电碳综合边际定价的虚拟电厂(virtual power plant,VPP)双层点对点(peer-to-peer,P2P)交易模型。上层由配电网运营商(distribution system o...为应对配电网络低碳化运行的挑战,并充分挖掘系统中分布式资源的灵活调控潜力,文中构建一种基于电碳综合边际定价的虚拟电厂(virtual power plant,VPP)双层点对点(peer-to-peer,P2P)交易模型。上层由配电网运营商(distribution system operator,DSO)建立基于碳排放流(carbon emission flow,CEF)技术的碳感知最优潮流模型,在此基础上计算出电碳综合边际价格,DSO可利用该价格信号协调VPP低碳调度。下层组建多VPP合作联盟,可将电动汽车规模化整合并引入碳信号引导的电动汽车灵活调度机制,建立基于贡献度的非对称纳什议价交易模型,各VPP在价格信号的引导下平衡个体与联盟利益,制定生产与交易的最优策略。然后,采用自适应交替方向乘子法(adaptive-scaling alternating direction method of multipliers,AS-ADMM)对模型进行求解,解决变量耦合导致的收敛速度问题。最后,采用改进的IEEE 33节点配电系统进行仿真验证。案例分析结果表明,所提交易模型可以通过提高分布式能源利用效率并优化负荷分布,在降低VPP运营成本的同时减少配电网碳排放。展开更多
The power systems economic and safety operation considering large-scale wind power penetration are now facing great challenges, which are based on reliable power supply and predictable load demands in the past. A roll...The power systems economic and safety operation considering large-scale wind power penetration are now facing great challenges, which are based on reliable power supply and predictable load demands in the past. A rolling generation dispatch model based on ultra-short-term wind power forecast was proposed. In generation dispatch process, the model rolling correct not only the conventional units power output but also the power from wind farm, simultaneously. Second order Markov chain model was utilized to modify wind power prediction error state (WPPES) and update forecast results of wind power over the remaining dispatch periods. The prime-dual affine scaling interior point method was used to solve the proposed model that taken into account the constraints of multi-periods power balance, unit output adjustment, up spinning reserve and down spinning reserve.展开更多
Continued expansion of the power grid and the increasing proportion of wind power centralized integration leads to requirements in sharing both energy and reserves among multiple areas under a hierarchical control str...Continued expansion of the power grid and the increasing proportion of wind power centralized integration leads to requirements in sharing both energy and reserves among multiple areas under a hierarchical control structure,which successively requires a correction between schedule plans within multi-time scale.In order to address this problem,this paper develops an information integration method integrating complicated relationships among fuel cost,total thermal power output,reserve capacity,owned reserves and expectations of load shedding and wind curtailment,into three types of time-related relationship curves・Furthermore,a multi-time scale tieline energy and reserves allocation model is proposed,which contains two levels in the control structure,two time scales in dispatch sequence and multiple areas integrated within wind farms as scheduling objects・The efficiency of the proposed method is tested in a 9-bus test system and IEEE 118-bus system.The results show that a cross-regional control center is able to approach the optimal scheduling results of the whole system with the integrated uploaded relationship curves.The proposed model not only relieves energy and reserve shortages in partial areas but also allocates them to more urgent need areas in a high effectivity manner in both day-ahead and intraday time scales.展开更多
Electric power infrastructure has recently undergone a comprehensive transformation from electromagnetics to semiconductors. Such a development is attributed to the rapid growth of power electronic converter applicati...Electric power infrastructure has recently undergone a comprehensive transformation from electromagnetics to semiconductors. Such a development is attributed to the rapid growth of power electronic converter applications in the load side to realize energy conservation and on the supply side for renewable generations and power transmissions using high voltage direct current transmission. This transformation has altered the fundamental mechanism of power system dynamics, which demands the establishment of a new theory for power system control and protection. This paper presents thoughts on a theoretical framework for the coming semiconducting power systems.展开更多
基金supported by Science and Technology Standard Project of Guangdong Electric Power Design Institute(ER11301W,ER11811W).
文摘Data center industries have been facing huge energy challenges due to escalating power consumption and associated carbon emissions.In the context of carbon neutrality,the integration of data centers with renewable energy has become a prevailing trend.To advance the renewable energy integration in data centers,it is imperative to thoroughly explore the data centers’operational flexibility.Computing workloads and refrigeration systems are recognized as two promising flexible resources for power regulationwithin data centermicro-grids.This paper identifies and categorizes delay-tolerant computing workloads into three types(long-running non-interruptible,long-running interruptible,and short-running)and develops mathematical time-shifting models for each.Additionally,this paper examines the thermal dynamics of the computer room and derives a time-varying temperature model coupled to refrigeration power.Building on these models,this paper proposes a two-stage,multi-time scale optimization scheduling framework that jointly coordinates computing workloads time-shift in day-ahead scheduling and refrigeration power control in intra-day dispatch to mitigate renewable variability.A case study demonstrates that the framework effectively enhances the renewable-energy utilization,improves the operational economy of the data center microgrid,and mitigates the impact of renewable power uncertainty.The results highlight the potential of coordinated computing workloads and thermal system flexibility to support greener,more cost-effective data center operation.
基金supported by the Program for Innovative Research Team(in Science and Technology)in University of Henan Province(No.22IRTSTHN016)the Hubei Natural Science Foundation(No.2021CFB156)the Japan Society for the Promotion of Science(JSPS)Grants-in-Aid for Scientific Research(KAKENHI)(No.JP21K17737).
文摘Bio-inspired computer modelling brings solutions fromthe living phenomena or biological systems to engineering domains.To overcome the obstruction problem of large-scale wind power consumption in Northwest China,this paper constructs a bio-inspired computer model.It is an optimal wind power consumption dispatching model of multi-time scale demand response that takes into account the involved high-energy load.First,the principle of wind power obstruction with the involvement of a high-energy load is examined in this work.In this step,highenergy load model with different regulation characteristics is established.Then,considering the multi-time scale characteristics of high-energy load and other demand-side resources response speed,a multi-time scale model of coordination optimization is built.An improved bio-inspired model incorporating particle swarm optimization is applied to minimize system operation and wind curtailment costs,as well as to find the most optimal energy configurationwithin the system.Lastly,we take an example of regional power grid in Gansu Province for simulation analysis.Results demonstrate that the suggested scheduling strategy can significantly enhance the wind power consumption level and minimize the system’s operational cost.
基金supported partly by the National Key R&D Program of China(2018YFA0702200)the Science and Technology Project of State Grid Shandong Electric Power Company(520604190002)。
文摘With the development of carbon electricity,achieving a low-carbon economy has become a prevailing and inevitable trend.Improving low-carbon expansion generation planning is critical for carbon emission mitigation and a lowcarbon economy.In this paper,a two-layer low-carbon expansion generation planning approach considering the uncertainty of renewable energy at multiple time scales is proposed.First,renewable energy sequences considering the uncertainty in multiple time scales are generated based on the Copula function and the probability distribution of renewable energy.Second,a two-layer generation planning model considering carbon trading and carbon capture technology is established.Specifically,the upper layer model optimizes the investment decision considering the uncertainty at a monthly scale,and the lower layer one optimizes the scheduling considering the peak shaving at an hourly scale and the flexibility at a 15-minute scale.Finally,the results of different influence factors on low-carbon generation expansion planning are compared in a provincial power grid,which demonstrate the effectiveness of the proposed model.
基金National Key Project of ScientificTechnical Supporting Programs Funded by Ministry of Science & Technology of China during the 11th Five-Year Plan Period (Grant No. 2006BCA01A07-2).
文摘Morlet wavelet transformation is used in this paper to analyze the multi time scale characteristics of pre cipitation data series from 1957 to 2005 in Guyuan region.The results showed that(1) the annual precipitation evo lution process had obvious multi time scale variation characteristics of 15 25 years,7 12 years and 3 6 years,and different time scales had different oscillation energy densities;(2) the periods at smaller time scales changed more frequently,which often nested in a biggish quasi periodic oscillations,so the concrete time domain should be ana lyzed if necessary;(3) the precipitation had three main periods(22 year,9 year and 4 year) and the 22 year period was especially outstanding,and the analysis of this main period reveals that the precipitation would be in a relative high water period until about 2012.
基金supported by the State Grid Science and Technology Project (Title: Technology Research On Large Scale EMT Real-time simulation customized platform, FX71-17-001)
文摘As the proportion of renewable energy increases, the interaction between renewable energy devices and the grid continues to enhance. Therefore, the renewable energy dynamic test in a power system has become more and more important. Traditional dynamic simulation systems and digital-analog hybrid simulation systems are difficult to compromise on the economy, flexibility and accuracy. A multi-time scale test system of doubly fed induction generator based on FPGA+ CPU heterogeneous calculation is proposed in this paper. The proposed test system is based on the ADPSS simulation platform. The power circuit part of the test system is setup up using the EMT(electromagnetic transient simulation) simulation, and the control part uses the actual physical devices. In order to realize the close-loop testing for the physical devices, the power circuit must be simulated in real-time. This paper proposes a multi-time scale simulation algorithm, in which the decoupling component divides the power circuit into a large time scale system and a small time scale system in order to reduce computing effort. This paper also proposes the FPGA+CPU heterogeneous computing architecture for implementing this multitime scale simulation. In FPGA, there is a complete small time-scale EMT engine, which support the flexibly circuit modeling with any topology. Finally, the test system is connected to an DFIG controller based on Labview to verify the feasibility of the test system.
文摘Building emission reduction is an important way to achieve China’s carbon peaking and carbon neutrality goals.Aiming at the problem of low carbon economic operation of a photovoltaic energy storage building system,a multi-time scale optimal scheduling strategy based on model predictive control(MPC)is proposed under the consideration of load optimization.First,load optimization is achieved by controlling the charging time of electric vehicles as well as adjusting the air conditioning operation temperature,and the photovoltaic energy storage building system model is constructed to propose a day-ahead scheduling strategy with the lowest daily operation cost.Second,considering inter-day to intra-day source-load prediction error,an intraday rolling optimal scheduling strategy based on MPC is proposed that dynamically corrects the day-ahead dispatch results to stabilize system power fluctuations and promote photovoltaic consumption.Finally,taking an office building on a summer work day as an example,the effectiveness of the proposed scheduling strategy is verified.The results of the example show that the strategy reduces the total operating cost of the photovoltaic energy storage building system by 17.11%,improves the carbon emission reduction by 7.99%,and the photovoltaic consumption rate reaches 98.57%,improving the system’s low-carbon and economic performance.
基金the National Key Research and Development Program of China(No.2021ZD0112400)。
文摘This paper focuses on the problem of traffic flow forecasting,with the aim of forecasting future traffic conditions based on historical traffic data.This problem is typically tackled by utilizing spatio-temporal graph neural networks to model the intricate spatio-temporal correlations among traffic data.Although these methods have achieved performance improvements,they often suffer from the following limitations:These methods face challenges in modeling high-order correlations between nodes.These methods overlook the interactions between nodes at different scales.To tackle these issues,in this paper,we propose a novel model named multi-scale dynamic hypergraph convolutional network(MSDHGCN)for traffic flow forecasting.Our MSDHGCN can effectively model the dynamic higher-order relationships between nodes at multiple time scales,thereby enhancing the capability for traffic forecasting.Experiments on two real-world datasets demonstrate the effectiveness of the proposed method.
文摘为应对配电网络低碳化运行的挑战,并充分挖掘系统中分布式资源的灵活调控潜力,文中构建一种基于电碳综合边际定价的虚拟电厂(virtual power plant,VPP)双层点对点(peer-to-peer,P2P)交易模型。上层由配电网运营商(distribution system operator,DSO)建立基于碳排放流(carbon emission flow,CEF)技术的碳感知最优潮流模型,在此基础上计算出电碳综合边际价格,DSO可利用该价格信号协调VPP低碳调度。下层组建多VPP合作联盟,可将电动汽车规模化整合并引入碳信号引导的电动汽车灵活调度机制,建立基于贡献度的非对称纳什议价交易模型,各VPP在价格信号的引导下平衡个体与联盟利益,制定生产与交易的最优策略。然后,采用自适应交替方向乘子法(adaptive-scaling alternating direction method of multipliers,AS-ADMM)对模型进行求解,解决变量耦合导致的收敛速度问题。最后,采用改进的IEEE 33节点配电系统进行仿真验证。案例分析结果表明,所提交易模型可以通过提高分布式能源利用效率并优化负荷分布,在降低VPP运营成本的同时减少配电网碳排放。
文摘The power systems economic and safety operation considering large-scale wind power penetration are now facing great challenges, which are based on reliable power supply and predictable load demands in the past. A rolling generation dispatch model based on ultra-short-term wind power forecast was proposed. In generation dispatch process, the model rolling correct not only the conventional units power output but also the power from wind farm, simultaneously. Second order Markov chain model was utilized to modify wind power prediction error state (WPPES) and update forecast results of wind power over the remaining dispatch periods. The prime-dual affine scaling interior point method was used to solve the proposed model that taken into account the constraints of multi-periods power balance, unit output adjustment, up spinning reserve and down spinning reserve.
基金supported in part by the Science and Technology Project of Central Branch of SGCC(SGHZ0000DKJS 1900228)in part by the National Natural Science Foundation of China(51707136).
文摘Continued expansion of the power grid and the increasing proportion of wind power centralized integration leads to requirements in sharing both energy and reserves among multiple areas under a hierarchical control structure,which successively requires a correction between schedule plans within multi-time scale.In order to address this problem,this paper develops an information integration method integrating complicated relationships among fuel cost,total thermal power output,reserve capacity,owned reserves and expectations of load shedding and wind curtailment,into three types of time-related relationship curves・Furthermore,a multi-time scale tieline energy and reserves allocation model is proposed,which contains two levels in the control structure,two time scales in dispatch sequence and multiple areas integrated within wind farms as scheduling objects・The efficiency of the proposed method is tested in a 9-bus test system and IEEE 118-bus system.The results show that a cross-regional control center is able to approach the optimal scheduling results of the whole system with the integrated uploaded relationship curves.The proposed model not only relieves energy and reserve shortages in partial areas but also allocates them to more urgent need areas in a high effectivity manner in both day-ahead and intraday time scales.
基金This work was supported in part by the National Basic Research Program of China (973 Program) (Grant No. 2012CB215100), and the Major Program of the National Natural Science Foundation of China (Grant No. 51190104).
文摘Electric power infrastructure has recently undergone a comprehensive transformation from electromagnetics to semiconductors. Such a development is attributed to the rapid growth of power electronic converter applications in the load side to realize energy conservation and on the supply side for renewable generations and power transmissions using high voltage direct current transmission. This transformation has altered the fundamental mechanism of power system dynamics, which demands the establishment of a new theory for power system control and protection. This paper presents thoughts on a theoretical framework for the coming semiconducting power systems.