Memetic algorithm for multi-mode resource-constrained project scheduling problems 被引量:1
1
作者 Shixin Liu Di Chen Yifan Wang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2014年第4期609-617,共9页
A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The f... A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The fitness function makes use of a mechanism called "strategic oscillation" to make the search process have a higher probability to visit solutions around a "feasible boundary". One of the local search procedures aims at improving the lower bound of project makespan to be less than a known upper bound, and another aims at improving a solution of an MRCPSP instance accepting infeasible solutions based on the new fitness function in the search process. A detailed computational experiment is set up using instances from the problem instance library PSPLIB. Computational results show that the proposed MA is very competitive with the state-of-the-art algorithms. The MA obtains improved solutions for one instance of set J30. 展开更多
关键词 project scheduling resource-constrained multi-mode memetic algorithm (MA) local search procedure.
在线阅读 下载PDF
Scheduling Rules Based on Gene Expression Programming for Resource-Constrained Project Scheduling Problem 被引量:3
2
作者 贾艳 李晋航 《Journal of Donghua University(English Edition)》 EI CAS 2015年第1期91-96,共6页
In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select... In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances. 展开更多
关键词 resource-constrained project scheduling problem(RCPSP) gene expression programming(GEP) scheduling rules(SRs)
在线阅读 下载PDF
Solving Resource-constrained Multiple Project Scheduling Problem Using Timed Colored Petri Nets
3
作者 吴瑜 庄新村 +2 位作者 宋国辉 许晓栋 李从心 《Journal of Shanghai Jiaotong university(Science)》 EI 2009年第6期713-719,共7页
To solve the resource-constrained multiple project scheduling problem(RCMPSP) more effectively,a method based on timed colored Petri net(TCPN) was proposed.In this methodology,firstly a novel mapping mechanism between... To solve the resource-constrained multiple project scheduling problem(RCMPSP) more effectively,a method based on timed colored Petri net(TCPN) was proposed.In this methodology,firstly a novel mapping mechanism between traditional network diagram such as CPM(critical path method)/PERT(program evaluation and review technique) and TCPN was presented.Then a primary TCPN(PTCPN) for solving RCMPSP was modeled based on the proposed mapping mechanism.Meanwhile,the object PTCPN was used to simulate the multiple projects scheduling and to find the approximately optimal value of RCMPSP.Finally,the performance of the proposed approach for solving RCMPSP was validated by executing a mould manufacturing example. 展开更多
关键词 timed colored Petri nets resource-constrained multiple project scheduling problem (RCMPSP) mapping mechanism
原文传递
Multi-Mode Resource Constrained Project Scheduling Models for Progress and Equal Time Interval Payments
4
作者 Yan Shangyao Wang Sin-Siang +1 位作者 Chen Miawjane Liu Jzu-Chun 《Journal of Modern Accounting and Auditing》 2014年第12期1187-1200,共14页
This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progre... This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progress payment (PP) and the payment at an equal time interval (ETI). The objective of each model is to maximize the net present value (NPV) for all cash flows in the project, subject to the related operational constraints. The models are characterized as NP-hard. A heuristic algorithm, coupled with two upper bound solutions, is proposed to efficiently solve the models and evaluate the heuristic algorithm performance which was not performed in past studies. The results show that the performance of proposed models and heuristic algorithm is good. 展开更多
关键词 project scheduling problem multi-mode resource constrained project scheduling problem with discountedcash flows (MRCPSPDCF) progress payment (PP) payment at an equal time interval (ETI) time-precedence network
在线阅读 下载PDF
Hybrid genetic algorithm for bi-objective resourceconstrained project scheduling 被引量:1
5
作者 Fikri KUCUKSAYACIGIL Gündüz ULUSOY 《Frontiers of Engineering Management》 2020年第3期426-446,共21页
In this study,we considered a bi-objective,multi-project,multi-mode resource-constrained project scheduling problem.We adopted three objective pairs as combinations of the net present value(NPV)as a financial performa... In this study,we considered a bi-objective,multi-project,multi-mode resource-constrained project scheduling problem.We adopted three objective pairs as combinations of the net present value(NPV)as a financial performance measure with one of the time-based performance measures,namely,makespan(Cmax),mean completion time(MCT),and mean flow time(MFT)(i.e.,minCmax/maxA^PF,minA/Cr/max7VPF,and min MFTI mdixNPV).We developed a hybrid non-dominated sorting genetic algorithm Ⅱ(hybrid-NSGA-Ⅱ)as a solution method by introducing a backward-forward pass(BFP)procedure and an injection procedure into NSGA-Ⅱ.The BFP was proposed for new population generation and post-processing.Then,an injection procedure was introduced to increase diversity.The BFP and injection procedures led to improved objective functional values.The injection procedure generated a significantly high number of non-dominated solutions,thereby resulting in great diversity.An extensive computational study was performed.Results showed that hybrid-NSGA-Ⅱ surpassed NSGA-Ⅱ in terms of the performance metrics hypervolume,maximum spread,and the number of nondominated solutions.Solutions were obtained for the objective pairs using hybrid-NSGA-Ⅱ and three different test problem sets with specific properties.Further analysis was performed by employing cash balance,which was another financial performance measure of practical importance.Several managerial insights and extensions for further research were presented. 展开更多
关键词 backward-forward scheduling hybrid biobjective genetic algorithm injection procedure maximum cash balance multi-objective multi-project multi-mode resource-constrained project scheduling problem
原文传递
Project Scheduling Using Hybrid Genetic Algorithm with Fuzzy Logic Controller in SCM Environment 被引量:1
6
作者 Mitsuo Gen KwanWoo Kim Genji Yamazaki 《Tsinghua Science and Technology》 SCIE EI CAS 2003年第1期19-29,共11页
In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We de... In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We develop a hybrid genetic algorithm (hGA) with a fuzzy logic controller (FLC) to solve the rcPSP which is the well known NP-hard problem. This new approach is based on the design of genetic operators with FLC through initializing the serial method which is superior for a large rcPSP scale. For solving these rcPSP problems, we first demonstrate that our hGA with FLC (flc-hGA) yields better results than several heuristic procedures presented in the literature. We have revealed a fact that flc-hGA has the evolutionary behaviors of average fitness better than hGA without FLC. 展开更多
关键词 resource-constrained project scheduling problem (rcPSP) priority rule method (PRM) hybrid genetic algorithm (hGA) fuzzy logic controller (FLC)
原文传递
Heuristic algorithm for RCPSP with the objective of minimizing activities' cost 被引量:5
7
作者 Liu Zhenyuan Wang Hongwei 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2006年第1期96-102,共7页
Resource-constrained project scheduling problem(RCPSP) is an important problem in research on project management. But there has been little attention paid to the objective of minimizing activities' cost with the re... Resource-constrained project scheduling problem(RCPSP) is an important problem in research on project management. But there has been little attention paid to the objective of minimizing activities' cost with the resource constraints that is a critical sub-problem in partner selection of construction supply chain management because the capacities of the renewable resources supplied by the partners will effect on the project scheduling. Its mathematic model is presented firstly, and analysis on the characteristic of the problem shows that the objective function is non-regular and the problem is NP-complete following which the basic idea for solution is clarified. Based on a definition of preposing activity cost matrix, a heuristic algorithm is brought forward. Analyses on the complexity of the heuristics and the result of numerical studies show that the heuristic algorithm is feasible and relatively effective. 展开更多
关键词 systems engineering resource-constrained project scheduling problem activities' cost preposing activity cost matrix heuristic algorithm.
在线阅读 下载PDF