Memetic algorithm for multi-mode resource-constrained project scheduling problems 被引量:1
1
作者 Shixin Liu Di Chen Yifan Wang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2014年第4期609-617,共9页
A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The f... A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The fitness function makes use of a mechanism called "strategic oscillation" to make the search process have a higher probability to visit solutions around a "feasible boundary". One of the local search procedures aims at improving the lower bound of project makespan to be less than a known upper bound, and another aims at improving a solution of an MRCPSP instance accepting infeasible solutions based on the new fitness function in the search process. A detailed computational experiment is set up using instances from the problem instance library PSPLIB. Computational results show that the proposed MA is very competitive with the state-of-the-art algorithms. The MA obtains improved solutions for one instance of set J30. 展开更多
关键词 project scheduling resource-constrained multi-mode memetic algorithm (MA) local search procedure.
在线阅读 下载PDF
Multi-Mode Resource Constrained Project Scheduling Models for Progress and Equal Time Interval Payments
2
作者 Yan Shangyao Wang Sin-Siang +1 位作者 Chen Miawjane Liu Jzu-Chun 《Journal of Modern Accounting and Auditing》 2014年第12期1187-1200,共14页
This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progre... This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progress payment (PP) and the payment at an equal time interval (ETI). The objective of each model is to maximize the net present value (NPV) for all cash flows in the project, subject to the related operational constraints. The models are characterized as NP-hard. A heuristic algorithm, coupled with two upper bound solutions, is proposed to efficiently solve the models and evaluate the heuristic algorithm performance which was not performed in past studies. The results show that the performance of proposed models and heuristic algorithm is good. 展开更多
关键词 project scheduling problem multi-mode resource constrained project scheduling problem with discountedcash flows (MRCPSPDCF) progress payment (PP) payment at an equal time interval (ETI) time-precedence network
在线阅读 下载PDF
Scheduling Multi-Mode Resource-Constrained Projects Using Heuristic Rules Under Uncertainty Environment
3
作者 Mohamed Abdel-Basset Ahmed Sleem +2 位作者 Asmaa Atef Yunyoung Nam Mohamed Abouhawwash 《Computers, Materials & Continua》 SCIE EI 2022年第1期847-874,共28页
Project scheduling is a key objective of many models and is the proposed method for project planning and management.Project scheduling problems depend on precedence relationships and resource constraints,in addition t... Project scheduling is a key objective of many models and is the proposed method for project planning and management.Project scheduling problems depend on precedence relationships and resource constraints,in addition to some other limitations for achieving a subset of goals.Project scheduling problems are dependent on many limitations,including limitations of precedence relationships,resource constraints,and some other limitations for achieving a subset of goals.Deterministic project scheduling models consider all information about the scheduling problem such as activity durations and precedence relationships information resources available and required,which are known and stable during the implementation process.The concept of deterministic project scheduling conflicts with real situations,in which in many cases,some data on the activity’s durations of the project and the degree of availability of resources change or may have different modes and strategies during the process of project implementation for dealing with multi-mode conditions surrounded by projects and their activity durations.Scheduling the multi-mode resource-constrained project problem is an optimization problem whose minimum project duration subject to the availability of resources is of particular interest to us.We use the multi-mode resource allocation and schedulingmodel that takes into account the dynamicity features of all parameters,that is,the scheduling process must be flexible to dynamic environment features.In this paper,we propose five priority heuristic rules for scheduling multi-mode resource-constrained projects under dynamicity features for more realistic situations,in which we apply the proposed heuristic rules(PHR)for scheduling multi-mode resource-constrained projects.Five projects are considered test problems for the PHR.The obtained results rendered by these priority rules for the test problems are compared by the results obtained from 10 well-known heuristics rules rendered for the same test problems.The results in many cases of the proposed priority rules are very promising,where they achieve better scheduling dates in many test case problems and the same results for the others.The proposed model is based on the dynamic features for project topography. 展开更多
关键词 constrained resource scheduling multi-mode durations dynamic scheduling resource allocation heuristic rules
在线阅读 下载PDF
Scheduling Rules Based on Gene Expression Programming for Resource-Constrained Project Scheduling Problem 被引量:3
4
作者 贾艳 李晋航 《Journal of Donghua University(English Edition)》 EI CAS 2015年第1期91-96,共6页
In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select... In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances. 展开更多
关键词 resource-constrained project scheduling problem(RCPSP) gene expression programming(GEP) scheduling rules(SRs)
在线阅读 下载PDF
Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
5
作者 王宏 李同玲 林丹 《Transactions of Tianjin University》 EI CAS 2010年第5期376-382,共7页
This paper presents a new genetic algorithm for the resource-constrained project scheduling problem(RCPSP).The algorithm employs a standardized random key(SRK) vector representation with an additional gene that determ... This paper presents a new genetic algorithm for the resource-constrained project scheduling problem(RCPSP).The algorithm employs a standardized random key(SRK) vector representation with an additional gene that determines whether the serial or parallel schedule generation scheme(SGS) is to be used as the decoding procedure.The iterative forward-backward improvement as the local search procedure is applied upon all generated solutions to schedule the project three times and obtain an SRK vector,which is rese... 展开更多
关键词 project management resource constrained scheduling genetic algorithm
在线阅读 下载PDF
An Evolutionary Algorithm with Multi-Local Search for the Resource-Constrained Project Scheduling Problem
6
作者 Zhi-Jie Chen Chiuh-Cheng Chyu 《Intelligent Information Management》 2010年第3期220-226,共7页
This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable dec... This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable decoding scheme. Then a multi-pass biased sampling method followed up by a multi-local search is used to generate a diverse and good quality initial population. The population then evolves through modified order-based recombination and mutation operators to perform exploration for promising solutions within the entire region. Mutation is performed only if the current population has converged or the produced offspring by recombination operator is too similar to one of his parents. Finally the algorithm performs an intensified local search on the best solution found in the evolutionary stage. Computational experiments using standard instances indicate that the proposed algorithm works well in both computational time and solution quality. 展开更多
关键词 resource-constrained project scheduling EVOLUTIONARY ALGORITHMS Local SEARCH HYBRIDIZATION
在线阅读 下载PDF
A New Algorithm for Resource Constraint Project Scheduling Problem Based on Multi-Agent Systems 被引量:1
7
作者 何曙光 齐二石 李钢 《Transactions of Tianjin University》 EI CAS 2003年第4期348-352,共5页
The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocatio... The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given. 展开更多
关键词 resource constrained project scheduling problem multi-agent systems general equilibrium market ALGORITHM
在线阅读 下载PDF
Solving resource availability cost problem in project scheduling by pseudo particle swarm optimization 被引量:4
8
作者 Jianjun Qi Bo Guo +1 位作者 Hongtao Lei Tao Zhang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2014年第1期69-76,共8页
This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations amo... This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations among the activities which require some kinds of renewable resources. We predigest the process of sol-ving the resource availability cost problem (RACP) by using start time of each activity to code the schedule. Then, a novel heuris-tic algorithm is proposed to make the process of looking for the best solution efficiently. And then pseudo particle swarm optimiza-tion (PPSO) combined with PSO and path relinking procedure is presented to solve the RACP. Final y, comparative computational experiments are designed and the computational results show that the proposed method is very effective to solve RACP. 展开更多
关键词 project scheduling resource availability cost problem(RACP) HEURISTICS particle swarm optimization (PSO) path relin-king.
在线阅读 下载PDF
SOLVING RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS WITH BI-CRITERIA HEURISTIC SEARCH TECHNIQUES
9
作者 M Kamrul AHSAN De-bi TSAO 《Systems Science and Systems Engineering》 CSCD 2003年第2期190-203,共14页
In this paper we formulate a bi-criteria search strategy of a heuristic learning algorithm for solving multiple resource-constrained project scheduling problems. The heuristic solves problems in two phases. In the pre... In this paper we formulate a bi-criteria search strategy of a heuristic learning algorithm for solving multiple resource-constrained project scheduling problems. The heuristic solves problems in two phases. In the pre-processing phase, the algorithm estimates distance between a state and the goal state and measures complexity of problem instances. In the search phase, the algorithm uses estimates of the pre-processing phase to further estimate distances to the goal state. The search continues in a stepwise generation of a series of intermediate states through search path evaluation process with backtracking. Developments of intermediate states are exclusively based on a bi-criteria new state selection technique where we consider resource utilization and duration estimate to the goal state. We also propose a variable weighting technique based on initial problem complexity measures. Introducing this technique allows the algorithm to efficiently solve complex project scheduling problems. A numerical example illustrates the algorithm and performance is evaluated by extensive experimentation with various problem parameters. Computational results indicate significance of the algorithm in terms of solution quality and computational performance. 展开更多
关键词 resource-constrained project scheduling search algorithm HEURISTICS state-space representation
原文传递
Hybrid genetic algorithm for bi-objective resourceconstrained project scheduling 被引量:1
10
作者 Fikri KUCUKSAYACIGIL Gündüz ULUSOY 《Frontiers of Engineering Management》 2020年第3期426-446,共21页
In this study,we considered a bi-objective,multi-project,multi-mode resource-constrained project scheduling problem.We adopted three objective pairs as combinations of the net present value(NPV)as a financial performa... In this study,we considered a bi-objective,multi-project,multi-mode resource-constrained project scheduling problem.We adopted three objective pairs as combinations of the net present value(NPV)as a financial performance measure with one of the time-based performance measures,namely,makespan(Cmax),mean completion time(MCT),and mean flow time(MFT)(i.e.,minCmax/maxA^PF,minA/Cr/max7VPF,and min MFTI mdixNPV).We developed a hybrid non-dominated sorting genetic algorithm Ⅱ(hybrid-NSGA-Ⅱ)as a solution method by introducing a backward-forward pass(BFP)procedure and an injection procedure into NSGA-Ⅱ.The BFP was proposed for new population generation and post-processing.Then,an injection procedure was introduced to increase diversity.The BFP and injection procedures led to improved objective functional values.The injection procedure generated a significantly high number of non-dominated solutions,thereby resulting in great diversity.An extensive computational study was performed.Results showed that hybrid-NSGA-Ⅱ surpassed NSGA-Ⅱ in terms of the performance metrics hypervolume,maximum spread,and the number of nondominated solutions.Solutions were obtained for the objective pairs using hybrid-NSGA-Ⅱ and three different test problem sets with specific properties.Further analysis was performed by employing cash balance,which was another financial performance measure of practical importance.Several managerial insights and extensions for further research were presented. 展开更多
关键词 backward-forward scheduling hybrid biobjective genetic algorithm injection procedure maximum cash balance multi-objective multi-project multi-mode resource-constrained project scheduling problem
原文传递
数据驱动的资源受限项目调度问题求解器推荐研究
11
作者 曾鸣 戴业东 刘万安 《计算机工程与应用》 北大核心 2026年第5期346-363,共18页
资源受限项目调度问题(RCPSP)广泛存在于工程管理等领域,高效求解该问题对项目管理至关重要。然而,RCPSP固有的NP-hard特性,使得现有求解方法的性能表现出强烈的项目实例依赖性,难以找到一种通用的高效算法。为此,提出一种基于数据驱动... 资源受限项目调度问题(RCPSP)广泛存在于工程管理等领域,高效求解该问题对项目管理至关重要。然而,RCPSP固有的NP-hard特性,使得现有求解方法的性能表现出强烈的项目实例依赖性,难以找到一种通用的高效算法。为此,提出一种基于数据驱动的RCPSP求解器推荐框架,实现针对不同项目实例的智能化算法选择,从而克服现有算法选择方案的盲目性,提升求解效率。该框架的构建源于对RCPSP问题特征与算法性能之间复杂关系的洞察,试图利用机器学习方法挖掘这种潜在关系,并将其转化为指导算法选择的知识。构建了包含网络拓扑、资源和时间三个维度特征集的RCPSP求解算法推荐数据集;结合特征选择方法提取最优特征子集,构建基于树集成算法的推荐模型,以学习这种复杂映射关系的内在规律,实现精准的算法推荐;利用SHAP模型对推荐模型进行归因分析,剖析影响算法选择的关键项目特征,为项目管理人员提供更具解释性的决策支持。实验结果表明,所提出的推荐框架在四个数据集上的推荐准确率均超过70%,且在各项指标上均优于其他推荐算法。资源强度、项目工期下界和网络宽度等特征被证实对算法选择具有重要影响,该研究验证了数据驱动方法在破解RCPSP算法选择难题方面的可行性和有效性,为项目管理人员提供了科学化、智能化的算法选择方案,有效降低了决策难度,有助于提升项目管理效率。 展开更多
关键词 资源受限项目调度 求解器推荐 数据驱动 树集成算法 SHAP模型
在线阅读 下载PDF
面向随机柔性项目调度问题的优先规则探究
12
作者 余春来 王小明 陈庆新 《工业工程》 2026年第1期110-119,共10页
对求解具有柔性网络与随机工期和返工的资源受限项目调度问题的多种经典优先规则的表现作了比较分析。柔性项目调度问题涉及活动选择和活动排序两个子问题,可由相同或不同的优先规则进行求解。为了更准确地测度随机返工对活动优先级的影... 对求解具有柔性网络与随机工期和返工的资源受限项目调度问题的多种经典优先规则的表现作了比较分析。柔性项目调度问题涉及活动选择和活动排序两个子问题,可由相同或不同的优先规则进行求解。为了更准确地测度随机返工对活动优先级的影响,介绍了一种基于聚合剩余工期估计的优先级计算方法。构造涵盖不同问题特征的测试算例,通过大量仿真实验对比了单一优先规则和配对优先规则在不同问题环境下的表现。结果表明,配对规则显著优于单一规则,且表现最好的规则与现有文献在确定性问题环境下所得结论不同。此外,还发现项目柔性和资源强度对优先规则的表现有显著影响,而其他因素的影响则相对较小。总体而言,TTSL-MSLK配对规则在资源较充足时表现最好,而TTSL-LFT配对规则在其他情形下表现最好。所得结论对于工程实际选择合适的项目调度规则,具有重要参考价值。 展开更多
关键词 资源受限项目调度问题 柔性网络 随机工期 随机返工 优先规则
在线阅读 下载PDF
考虑恢复过程的桥梁抗震韧性评估方法
13
作者 李廷辉 刘金龙 +2 位作者 李晓丽 王燕 计静 《振动与冲击》 北大核心 2025年第7期132-145,共14页
提出了一种考虑恢复过程的混凝土桥梁结构抗震概率韧性评估方法,该方法基于暴露在恶劣环境下的混凝土结构生命周期分析的一般方法,以各破坏状态下的时变抗震能力作为功能指标,将灾害发生后残余功能和恢复过程与地震事件发生的时间联系... 提出了一种考虑恢复过程的混凝土桥梁结构抗震概率韧性评估方法,该方法基于暴露在恶劣环境下的混凝土结构生命周期分析的一般方法,以各破坏状态下的时变抗震能力作为功能指标,将灾害发生后残余功能和恢复过程与地震事件发生的时间联系起来。通过对时变桥梁易损性模型进行抽样获得桥梁地震破坏样本,结合时变功能指标,采用遗传算法(genetic algorithm,GA)解决资源约束调度问题(resource constrained project scheduling problem,RCPSP),给出了桥梁震后的具体恢复过程,最终得到了桥梁结构服役期间的抗震韧性。结果发现,当不考虑时变功能时,计算得到的桥梁抗震韧性要明显大于考虑时变功能计算得到的抗震韧性,这样会高估桥梁抵抗地震灾害及从中恢复的能力,不利于震后恢复工作的展开。选取的控制时间(t_(h)-t_(0))要合理,如果使控制时间(t_(h)-t_(0))过小,计算得到的桥梁抗震韧性普遍为0,此时就不能很好地表达桥梁的抗震韧性。 展开更多
关键词 时变功能 抗震韧性 遗传算法(GA) 资源约束调度问题(RCPSP)
在线阅读 下载PDF
拖期无知型多模式资源受限项目调度方法及应用
14
作者 杜元伟 袁也 《运筹与管理》 北大核心 2025年第1期148-155,I0071-I0076,共8页
多模式资源受限项目调度已被应用于多个领域,但由于项目实施环境的不确定性,活动面临时间估计不准确、资源更新不足以及其他人为因素的扰动,使得项目活动出现拖期无知的情况。活动拖期将造成项目不确定风险与成本升高,甚至对后续活动产... 多模式资源受限项目调度已被应用于多个领域,但由于项目实施环境的不确定性,活动面临时间估计不准确、资源更新不足以及其他人为因素的扰动,使得项目活动出现拖期无知的情况。活动拖期将造成项目不确定风险与成本升高,甚至对后续活动产生“涟漪效应”,影响项目整体的稳定运行,因此需要专家对无知情境下的拖期概率进行预估。通过定义拖期无知型多模式资源受限项目调度问题,结合广义的证据融合规则得出拖期概率区间,并在此基础上构建项目鲁棒性的替代性衡量指标优化模型并结合遗传算法以降低拖期造成的影响。为检验模型准确性和实用性,建立海洋牧场生态安全监管网络并进行模拟仿真,以期为海洋牧场建设及拖期无知型多模式资源受限项目调度问题提供解决方案。扩展了多模式资源受限项目调度问题的应用范围,旨在提高项目调度的有效性和适应性,使其能够更好地应对复杂多变的实际环境。 展开更多
关键词 拖期无知 资源受限项目调度 多模式调度 广义证据融合规则
在线阅读 下载PDF
存储空间受限下资源约束型项目调度与材料采购集成优化 被引量:1
15
作者 田宝峰 张静文 +1 位作者 李鲁波 陈俊杰 《中国管理科学》 北大核心 2025年第8期144-155,共12页
由于材料需求总量大、强度高,装配式建筑项目需要大量的材料存储空间。然而,施工场地存储空间通常极其有限。从存储空间受限的特定场景切入,研究一类资源约束型项目调度和材料采购的集成优化问题,旨在获得拥有最小成本的活动调度计划和... 由于材料需求总量大、强度高,装配式建筑项目需要大量的材料存储空间。然而,施工场地存储空间通常极其有限。从存储空间受限的特定场景切入,研究一类资源约束型项目调度和材料采购的集成优化问题,旨在获得拥有最小成本的活动调度计划和材料采购方案。剖析模型结构和决策变量的高维复杂性,针对性地开发出一种内嵌遗传算法和精确算法交互的双层启发式求解算法。基于正交实验法配置算法参数,并实施大规模数值实验。结果表明:在存储空间受限情形下,相比将项目调度和材料采购割裂的分散决策方式,集成优化模型能平均降低项目总成本12%以上;与Cplex优化软件和模拟退火算法相比,双层启发式算法的求解效率更高。 展开更多
关键词 空间受限 资源约束型项目调度 材料采购 集成优化模型 双层启发式算法
原文传递
基于Langrange分解的反应性资源受限项目调度建模与优化 被引量:1
16
作者 魏亚锋 张梦茹 +1 位作者 苏志雄 魏汉英 《系统管理学报》 北大核心 2025年第4期1046-1060,共15页
针对不确定环境下的资源受限项目调度问题(RCPSP),研究工序工期不确定的反应性调度方法,重点研究项目基线计划中断时,如何快速生成新的最优计划。由于新计划将不可避免地偏离基线计划并对项目造成一定影响和损失,因此,以最小化影响与损... 针对不确定环境下的资源受限项目调度问题(RCPSP),研究工序工期不确定的反应性调度方法,重点研究项目基线计划中断时,如何快速生成新的最优计划。由于新计划将不可避免地偏离基线计划并对项目造成一定影响和损失,因此,以最小化影响与损失为调度目标。首先,通过引入资源流表示资源约束,构建0-1混合整数线性规划模型(MILP);其次,针对该问题的NP-hard属性,结合Langrange松弛、对偶分解和Benders分解法,并运用次梯度法,对该模型进行优化以降低求解难度,设计出能够以较高的效率和精确度求解该问题的迭代算法。最后,通过数值实验测试该算法的有效性,结果表明该算法能有效求解中型甚至较大型规模问题案例,并获得更精确的解。 展开更多
关键词 反应性资源受限项目调度 0-1混合线性规划 Langrange分解 Benders分解 次梯度
在线阅读 下载PDF
基于可变作业流程的舰载机机务勤务保障作业调度 被引量:1
17
作者 郭放 韩维 +3 位作者 刘玉杰 刘洁 苏析超 程亮亮 《航空学报》 北大核心 2025年第13期26-46,共21页
随着现代海战对航母作战能力要求的提高,舰载机机务勤务保障作业的效率直接影响航母作战效能的发挥,为优化保障作业流程,进一步提升作业效率,研究了基于可变作业流程的舰载机机务勤务保障作业调度优化问题,提出了相应的调度优化算法。首... 随着现代海战对航母作战能力要求的提高,舰载机机务勤务保障作业的效率直接影响航母作战效能的发挥,为优化保障作业流程,进一步提升作业效率,研究了基于可变作业流程的舰载机机务勤务保障作业调度优化问题,提出了相应的调度优化算法。首先,分析了甲板作业环境和机务勤务保障作业特点,构建了甲板作业环境中保障人员和设备的转移路径库;其次,以最小化保障完工时间为优化目标,构建了基于可变作业流程的舰载机机务勤务保障作业调度模型,模型中考虑了保障人员、保障设备和流程约束,以及武器的协同取送过程;进一步,将问题抽象为基于可变作业流程的资源受限多项目—资源转运集成调度问题,基于考虑资源、人员转移的串行调度生成机制,提出了一种改进粒子群优化算法(IPSO)对调度模型进行优化求解;最后,通过典型保障任务场景仿真和算法对比,验证了调度模型和算法的有效性,以及算法的高效性和鲁棒性。在相同条件下,相对于基于固定流程的保障作业调度方法,文中提出的基于可变作业流程的机务勤务保障作业调度方法能够有效缩短保障完工时间,在武器配送作业场景中保障作业平均完成时间至少可减少25.50%,在武器取送协同作业场景中保障作业平均完成时间至少可减少25.96%。 展开更多
关键词 舰载机 可变作业流程 机务勤务保障作业 武器转运 集成调度 资源受限多项目调度 粒子群优化算法
原文传递
具备“平行结构”的局域性资源受限项目调度问题的新模型
18
作者 魏汉英 原梦迪 苏志雄 《系统管理学报》 北大核心 2025年第2期428-445,共18页
经典资源受限项目调度问题(RCPSP)以“资源全局受限”为特征。随着生产力发展、项目规模增大、资源供需多样化和复杂化,项目面临的资源供应逐渐呈现出“局域受限”特征,如一般性资源有条件供应充足,但稀缺、昂贵资源供应有限,影响对其... 经典资源受限项目调度问题(RCPSP)以“资源全局受限”为特征。随着生产力发展、项目规模增大、资源供需多样化和复杂化,项目面临的资源供应逐渐呈现出“局域受限”特征,如一般性资源有条件供应充足,但稀缺、昂贵资源供应有限,影响对其有需求的部分工序。RCPSP的最新拓展问题也普遍体现出资源受限的“局域性”特征,如反应性RCPSP、资源供应/需求非定额RCPSP、多项目环境下的RCPSP等,由于现有方法对该“局域性”特征探索不足,求解问题最优解的效率明显受限。鉴于此,将具有“局域性”特征的RCPSP归类为局域性RCPSP,进行统一分析,揭示其共同特性,并开发适用于此类问题的有效方法。重点考虑一类问题:项目中受局域性资源限制的工序具备“平行结构”,即工序相互平行(港口船舶调度等问题也等价于具备“平行结构”的RCPSP),且资源为单产能类型资源。如何安排受限资源完成该局部工序,从而使项目全局工期最短。探索问题的“局域性”特征,量化“局域调度”对“项目全局”的影响,并基于此构建“用局部调度实现全局最优化”的基于工序排序位置的新0-1混合线性规划模型,该模型具有更强的优化潜力。算例测试表明,该模型在计算较大型案例的最优解方面具有显著的竞争力。 展开更多
关键词 资源受限项目调度 局域性调度 0-1混合线性规划 网络计划技术 项目工期
在线阅读 下载PDF
资源约束下的动态反应式项目调度方法研究
19
作者 彭武良 林雪俊 《中国管理科学》 北大核心 2025年第7期200-209,共10页
在不确定性环境下,项目调度通常采取的实际做法是在项目启动之前制订一个基准调度计划,项目执行过程中,在不确定因素的干扰下,项目参考基准调度进行动态调整。所以,在绝大多数不确定性程度较高的情况下,项目调度都是按照“制定基准调度... 在不确定性环境下,项目调度通常采取的实际做法是在项目启动之前制订一个基准调度计划,项目执行过程中,在不确定因素的干扰下,项目参考基准调度进行动态调整。所以,在绝大多数不确定性程度较高的情况下,项目调度都是按照“制定基准调度→执行→调整调度→执行→调整调度……”这样的循环来执行,直至项目完工。但到目前为止,还没有关于这方面的系统研究。本文针对这种实际应用场景,融合反应式项目调度和随机项目调度两种不确定性项目调度问题,提出一种新的资源约束动态反应式项目调度方法。在实际调度前,应用基于优先级规则的启发式算法生成一个基准调度计划。在该基准调度的基础上,以对基准调度的调整成本最小为目标进行动态随机调度。首先,通过离散时间马尔可夫决策过程(DT-MDP)对随机反应式资源约束项目调度问题进行建模。然后,通过蒙特卡洛仿真模拟各活动的工期,并基于强化学习理论设计一种查找表方法对问题进行求解。最后,采用标准算例对所提出的方法进行了大量的计算实验。结果表明,与既有的随机调度方法相比,本文提出的方法具有明显的优势。该方法综合了反应式调度和随机调度的优势,与不确定性项目调度问题的实际场景更为贴近,是一种高效并且非常实用的方法。 展开更多
关键词 反应式项目调度 随机项目调度 资源约束项目调度问题 查找表方法
原文传递
Project Scheduling Using Hybrid Genetic Algorithm with Fuzzy Logic Controller in SCM Environment 被引量:1
20
作者 Mitsuo Gen KwanWoo Kim Genji Yamazaki 《Tsinghua Science and Technology》 SCIE EI CAS 2003年第1期19-29,共11页
In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We de... In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We develop a hybrid genetic algorithm (hGA) with a fuzzy logic controller (FLC) to solve the rcPSP which is the well known NP-hard problem. This new approach is based on the design of genetic operators with FLC through initializing the serial method which is superior for a large rcPSP scale. For solving these rcPSP problems, we first demonstrate that our hGA with FLC (flc-hGA) yields better results than several heuristic procedures presented in the literature. We have revealed a fact that flc-hGA has the evolutionary behaviors of average fitness better than hGA without FLC. 展开更多
关键词 resource-constrained project scheduling problem (rcPSP) priority rule method (PRM) hybrid genetic algorithm (hGA) fuzzy logic controller (FLC)
原文传递