期刊文献+
共找到1,423篇文章
< 1 2 72 >
每页显示 20 50 100
Stability and reliability of pit slopes in surface mining combined with underground mining in Tonglushan mine 被引量:10
1
作者 罗一忠 吴爱祥 +1 位作者 刘湘平 王洪江 《Journal of Central South University of Technology》 EI 2004年第4期434-439,共6页
Slope stability is of critical importance in the process of surface-underground mining combination. The influence of underground mining on pit slope stability was mainly discussed, and the self-stabilization of underg... Slope stability is of critical importance in the process of surface-underground mining combination. The influence of underground mining on pit slope stability was mainly discussed, and the self-stabilization of underground stopes was also studied. The random finite element method was used to analyze the probability of the rock mass stability degree of both pit slopes and underground stopes. Meanwhile, 3D elasto-plastic finite element method was used to research into the stress, strain and rock mass failure resulting from mining. The results of numerical simulation indicate that the mining of the underground test stope has certain influence on the stability of the pit slope, but the influence is not great. The safety factor of pit slope is decreased by 0.06, and the failure probability of the pit slope is increased by 1.84%. In addition, the strata yielding zone exists around the underground test stope. The results basically conform to the information coming from the field monitoring. 展开更多
关键词 surface-underground mining combination STABILITY RELIABILITY random finite element method (numerical simulation)
在线阅读 下载PDF
Reliability Theory Study of Combined Mining Technology System in Surface Mines
2
作者 王喜富 张达贤 彭世济 《International Journal of Mining Science and Technology》 SCIE EI 1997年第2期11-14,共4页
The connection between all the single systems iu combined technology is analysed, and the mine engineering reliability is calculated in any area of the mines using combined technololgy system. The reliability design a... The connection between all the single systems iu combined technology is analysed, and the mine engineering reliability is calculated in any area of the mines using combined technololgy system. The reliability design and distribution method in this system is put forward, thus the basis is set for the decision to raise the total production capability or the surface mines in which the combined system is used. 展开更多
关键词 RELIABILITY SURFACE MINE combined mining TECHNOLOGY
在线阅读 下载PDF
Optimization principle of combined surface and underground mining and its applications 被引量:3
3
作者 陈建宏 古德生 李建雄 《Journal of Central South University of Technology》 2003年第3期222-225,共4页
The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put f... The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put for-ward through analyzing the limitations of moving cone method under such conditions. With a view to recovering asmuch mineral resource as possible and making the maximum profit from the whole deposit, the new principle is tomaximize the sum of gain from both open-pit and underground mining. The mathematical models along the horizon-tal and vertical directions and modules for software package (DM&MCAD) have been developed and tested inTonglushan Copper Mine. It has been proved to be rather effective in the mining practice. 展开更多
关键词 surface mining UNDERGROUND mining combined mining method OPTIMIZATION MODEL open PIT limit block economic MODEL
在线阅读 下载PDF
STUDY ON THE SMALL CRACKS OF COVER STRATA AFTER THE COMBINED MINING IN THE THIN SEAMS
4
作者 张文泉 张红日 +2 位作者 刘伟韬 孔令珍 王绪成 《Journal of Coal Science & Engineering(China)》 1999年第2期13-19,共7页
By using the continuous exploration system with multi-pipeline in the borehole, the failure cracks of cover strata (specially, the small cracks developing) after the combined mining of 16, 17 thin seams of the 4th min... By using the continuous exploration system with multi-pipeline in the borehole, the failure cracks of cover strata (specially, the small cracks developing) after the combined mining of 16, 17 thin seams of the 4th mining block in Zhaopo Mine is explored. After that, the researching result is considered as the output and the testing result of rock mechanics parameters is considered as the verifying data, the back analysis is made with the conception of the point safety degree. The relative height of the crack developing is obtaied. So, the evaluating of the safety of 16, 17 seams combined mining under the gob water with extreme distance is made and the mining has been safety. The scientific basis is provided for the evaluating of the mining safety with the similar conditions. 展开更多
关键词 gob water small cracks combined mining evaluating of the safety
全文增补中
Reasonable location parameters of pick and nozzle in combined cutting system 被引量:5
5
作者 曾锐 杜长龙 +1 位作者 陈荣俊 王文娟 《Journal of Central South University》 SCIE EI CAS 2014年第3期1067-1076,共10页
The drum shearer and high pressure water jet combined cutting system is an effective technology to cut hard coal-rock, but one problem of the technology is the choice of pick and nozzle location parameters. In order t... The drum shearer and high pressure water jet combined cutting system is an effective technology to cut hard coal-rock, but one problem of the technology is the choice of pick and nozzle location parameters. In order to solve the problem, the process and mechanism of combined cutting arc studied and mining seepage catastrophe theory is used to construct the mathematic and physical model of combined cutting hard coal-rock. Based on the model and detailed analysis of combined cutting mechanism, the single pick and nozzle combined cutting test-bed is built to test the main pick and nozzle location parameters of drum shearer and water jet combined cutting system. Test results show that the best vertical distance between the pick-tip and nozzle center point is the sum of cutting thickness and proper target distance in the Y axial direction; the best horizontal distance is the length between pick-tip point and coal-rock surface bursting crack point in the X axial direction. The best incident angle of water jet should be the same as the bursting crack line's angle in theory, but considering other important factors comprehensively, it is more reasonable when the incident angle of water jet is 90°. 展开更多
关键词 combined cutting location parameter water jet mining seepage theory hard coal-rock
在线阅读 下载PDF
Study on the Law of the Movement and Damage to Slope with the Combination of Underground Mining and Open-Pit Mining 被引量:1
6
作者 Gaofeng Ren Xingkui Fang 《Engineering(科研)》 2010年第3期201-204,共4页
Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which mak... Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine. 展开更多
关键词 combinATION of UNDERGROUND and Open-Pit mining mining DAMAGE Deformation Mechanism Numerical Simulation
暂未订购
Modular Combination Design of Mine Rescue Capsule Based on Load Simulation
7
作者 LI Zhongkai MIAO Lei SONG Ying 《Journal of Donghua University(English Edition)》 EI CAS 2019年第2期117-128,共12页
Mine rescue capsule is a typical emergency equipment in a coal mine.It provides a safe and confined space for miners when mining disasters occurred.The length of the passenger survival cell is suitable to be adjusted ... Mine rescue capsule is a typical emergency equipment in a coal mine.It provides a safe and confined space for miners when mining disasters occurred.The length of the passenger survival cell is suitable to be adjusted with several predefined modular cells according to various numbers of passengers.Aiming at the shortage of guidance rules for the modular combination design of mine rescue capsule,the configuration situations of survival cells are experimented with static and impact load analysis in ANSYS Workbench.The length range of a single cell,the combination schemes of miner survival section,and the effectiveness proof of assembled rescue capsules were solved sequentially by simulated load analysis on constructed structural models.The modular combination rules of the survival section are developed for variant passenger number ranging from 8 to 20.It also provides a reference for the optimal selection of rescue capsules with the same capacity.The proposed modular rules are effective for the rapid configuration design for mine rescue capsule driven by the number of passengers. 展开更多
关键词 MINE RESCUE CAPSULE MODULAR CONFIGURATION MODULAR design load simulation combinATION scheme
在线阅读 下载PDF
中国原地浸出采铀发展史——第三部分:技术进步,创新发展
8
作者 王海峰 《有色金属(冶炼部分)》 北大核心 2026年第1期160-173,共14页
地浸采铀技术从无到有已完全成熟,并进入创新发展阶段。但在几十年的地浸采铀试验和生产中科技人员发现,中国矿山钻孔抽注液量和浸出液铀浓度普遍偏低、人均劳动生产率有待提高以及矿山经济效果不理想。为解决这些问题,探寻地浸采铀新... 地浸采铀技术从无到有已完全成熟,并进入创新发展阶段。但在几十年的地浸采铀试验和生产中科技人员发现,中国矿山钻孔抽注液量和浸出液铀浓度普遍偏低、人均劳动生产率有待提高以及矿山经济效果不理想。为解决这些问题,探寻地浸采铀新工艺、新方法和开创企业发展生机,他们在钻孔施工、成井和洗井工艺、地下浸出方法、水冶工艺、环境保护和污染控制等方面提出并践行一个又一个新思路、新技术。正是这种执着奋进,敢想敢干的精神,完善了中国地浸采铀工艺,推动了地浸采铀的技术进步。实践证明,新技术的追求永无止境,而“技术进步,创新发展”永远是地浸采铀的命脉。 展开更多
关键词 反渗透 淋萃流程 探采结合 分布式
在线阅读 下载PDF
MINE方案治疗难治性侵袭性非霍奇金淋巴瘤的临床研究 被引量:3
9
作者 罗盛 陈怡 +2 位作者 俞康 胡旭东 孙岚 《中国热带医学》 CAS 2007年第3期367-368,共2页
目的观察MINE方案作为解救化疗方案治疗复发或难治性侵袭性非霍奇金淋巴瘤(NHL)的疗效和安全性。方法选取46例复发或难治性侵袭性NHL患者,使用MINE作为解救方案进行化疗。结果46例患者各接受了2-6个周期该方案化疗,总的客观有效率... 目的观察MINE方案作为解救化疗方案治疗复发或难治性侵袭性非霍奇金淋巴瘤(NHL)的疗效和安全性。方法选取46例复发或难治性侵袭性NHL患者,使用MINE作为解救方案进行化疗。结果46例患者各接受了2-6个周期该方案化疗,总的客观有效率为54.4%,完全缓解率17.4%;主要不良反应为骨髓抑制伴感染,均可耐受。结论MINE方案是治疗复发或难治性侵袭性NHL安全有效的解救方案之一。 展开更多
关键词 MINE方案 非霍奇金淋巴瘤 联合化疗 解救治疗
暂未订购
厚煤层复杂应力条件下侵蚀巷道支护技术研究与实践
10
作者 常超 《煤》 2026年第1期58-61,共4页
虎龙沟煤矿81507工作面运输巷在原有支护体系下出现了显著的围岩变形。为应对这一工程难题,本研究首先通过现场监测手段,详细记录了巷道围岩的变形数据,并深入分析了其失稳机理。在此基础上,设计了一套融合“锚杆-锚索-金属网-注浆”的... 虎龙沟煤矿81507工作面运输巷在原有支护体系下出现了显著的围岩变形。为应对这一工程难题,本研究首先通过现场监测手段,详细记录了巷道围岩的变形数据,并深入分析了其失稳机理。在此基础上,设计了一套融合“锚杆-锚索-金属网-注浆”的协同支护体系。为验证该方案的有效性,采用FLAC 3D数值模拟软件,对比分析了原支护与优化支护方案下围岩的变形响应。模拟结果证实了优化方案的可行性,随后进行了现场工业性试验。监测数据表明:实施新支护方案60 d后,围岩变形速率明显减缓并逐渐趋于稳定;90 d的观测期内,巷道顶底板累计移近量控制在190 mm以内,两帮移近量为134 mm,底鼓量为93 mm.上述结果证明,该联合支护技术能够有效维持复杂应力条件下巷道的长期稳定。 展开更多
关键词 深部开采 软岩巷道 失稳机制 联合支护技术
在线阅读 下载PDF
短壁联采密实充填工艺的提效措施及研究应用
11
作者 郑晨 尹鹏飞 +3 位作者 夏延峰 耿华锋 李明明 邢大千 《煤矿现代化》 2026年第1期64-69,共6页
针对短壁联采密实充填工艺在推广应用过程中存在的出煤能力小、运输不连续、支护效率低、封堵效果差及智能化水平不足等问题,本研究通过现场调研、工艺优化及高效设备引入等技术手段,提出系统性提效措施。具体包括:改进采掘设备,采用伸... 针对短壁联采密实充填工艺在推广应用过程中存在的出煤能力小、运输不连续、支护效率低、封堵效果差及智能化水平不足等问题,本研究通过现场调研、工艺优化及高效设备引入等技术手段,提出系统性提效措施。具体包括:改进采掘设备,采用伸缩截割机构、横轴式综合机械化掘进机等替代纵轴式设备,并引入双机协同作业模式;优化支护方式,应用机载支架提升临时支护效率;研发连续运输装备,采用弯曲带式输送机、梭车、伸缩皮带等改善充填面运输环境;开发轻量化组合模板及液压封堵支架,实现充填面下端头高效封堵;推进智能化建设,实现制浆与充填系统联动控制。上述措施在新汶矿业集团部分矿井应用后,短壁联采密实充填工作面月产量显著提升,为充填工艺的高效化与智能化发展奠定了技术基础。 展开更多
关键词 短壁联采 密实充填 提效措施 整体封堵 智能化发展
在线阅读 下载PDF
Support technologies for deep and complex roadways in underground coal mines:a review 被引量:135
12
作者 Hongpu Kang 《International Journal of Coal Science & Technology》 EI CAS 2014年第3期261-277,共17页
Based on geological and mining characteristics,coal mine roadways under complex conditions were divided into five types,for each type the deformation and damage characteristics of rocks surrounding roadways were analy... Based on geological and mining characteristics,coal mine roadways under complex conditions were divided into five types,for each type the deformation and damage characteristics of rocks surrounding roadways were analyzed.The recent developments of roadway support technologies were introduced abroad,based on the experiences of supports for deep and complex roadways from Germany,the United States and Australia.The history and achievements of roadway support technologies in China were detailed,including rock bolting,steel supports,grouting reinforcement and combined supports.Four typical support and reinforcement case studies were analyzed,including a high stressed roadway 1,000 m below the surface,a roadway surrounded by severely weak and broken rocks,a chamber surrounded by weak and broken rocks,and a roadway with very soft and swelling rocks.Based on studies and practices in many years,rock bolting has become the mainstream roadway support form in China coal mines,and steel supports,grouting reinforcement and combined supports have also been applied at proper occasions,which have provided reliable technical measures for the safe and high effective construction and mining of underground coal mines. 展开更多
关键词 Coal mines Deep and complex roadways Rock bolts Steel supports GROUTING combined supports
在线阅读 下载PDF
基于区域供热方案的高级㶲分析模型
13
作者 柯一鸿 林艺龙 +2 位作者 林周勇 易秉恒 王炯铭 《电子设计工程》 2026年第2期192-196,共5页
为了评估热电联产系统在区域供热中的性能和效率,构建了基于区域供热方案的高级㶲分析模型。利用普通类间距离准则和加权类间距离准则,挖掘用于供暖潜能评估的频繁项集条件模式基,将条件fg-tree的构建与挖掘过程视为一种递归处理过程。以... 为了评估热电联产系统在区域供热中的性能和效率,构建了基于区域供热方案的高级㶲分析模型。利用普通类间距离准则和加权类间距离准则,挖掘用于供暖潜能评估的频繁项集条件模式基,将条件fg-tree的构建与挖掘过程视为一种递归处理过程。以㶲效率指标和能级平衡系数指标为度量依据,分析了基于热电联产系统的高级㶲分析模型的性能,从而实现热电联产系统中的热能评估。实验结果表明,正常生产工况下,文中模型计算得到的㶲效率为0.65,能级平衡系数为0.82,优于对比方法,并具有更高的评估效率。 展开更多
关键词 大数据频繁项集挖掘算法 热电联产 㶲效率 区域供热
在线阅读 下载PDF
Predicting the sinkage of a moving tracked mining vehicle using a new rheological formulation for soft deep-sea sediment 被引量:5
14
作者 许锋 饶秋华 马雯波 《Journal of Oceanology and Limnology》 SCIE CAS CSCD 2018年第2期230-237,共8页
The sinkage of a moving tracked mining vehicle is greatly af fected by the combined compression-shear rheological properties of soft deep-sea sediments. For test purposes, the best sediment simulant is prepared based ... The sinkage of a moving tracked mining vehicle is greatly af fected by the combined compression-shear rheological properties of soft deep-sea sediments. For test purposes, the best sediment simulant is prepared based on soft deep-sea sediment from a C-C poly-metallic nodule mining area in the Pacific Ocean. Compressive creep tests and shear creep tests are combined to obtain compressive and shear rheological parameters to establish a combined compressive-shear rheological constitutive model and a compression-sinkage rheological constitutive model. The combined compression-shear rheological sinkage of the tracked mining vehicle at dif ferent speeds is calculated using the Recur Dyn software with a selfprogrammed subroutine to implement the combined compression-shear rheological constitutive model. The model results are compared with shear rheological sinkage and ordinary sinkage(without consideration of rheological properties). These results show that the combined compression-shear rheological constitutive model must be taken into account when calculating the sinkage of a tracked mining vehicle. The combined compression-shear rheological sinkage decrease with vehicle speed and is the largest among the three types of sinkage. The developed subroutine in the Recur Dyn software can be used to study the performance and structural optimization of moving tracked mining vehicles. 展开更多
关键词 SINKAGE RECURDYN soft deep-sea sediment combined compression-shear rheology tracked mining vehicle
在线阅读 下载PDF
基于3DMine软件的复杂矿体三维建模及储量估算 被引量:23
15
作者 邵亚建 饶运章 何少博 《有色金属科学与工程》 CAS 2016年第4期98-102,共5页
数字矿山的核心任务之一是构建集成化的矿山真三维模型,其难点则是建立精确、完整的三维地质模型,即矿体建模和储量估算.为快捷地建立三维模型并能在其上进行开采设计及查明矿床资源储量,提出了基于3DMine软件的三维矿体建模及储量估算... 数字矿山的核心任务之一是构建集成化的矿山真三维模型,其难点则是建立精确、完整的三维地质模型,即矿体建模和储量估算.为快捷地建立三维模型并能在其上进行开采设计及查明矿床资源储量,提出了基于3DMine软件的三维矿体建模及储量估算方法.首先依据地质资料和钻孔数据建立了地质数据库和三维地表/矿体模型;然后将矿体模型分解离散为矿块组合模型,采用距离幂次反比法估算矿山资源储量.结果表明:软件可便捷地构建直观反映矿体形状、大小及矿体与储量块体空间相关性、连续性的真三维模型,并且能够为矿山设计与规划提供操作平台;与传统地质块段法相比,对样品点进行无偏估计的距离幂次反比法在软件上易于实现且结果较为可靠. 展开更多
关键词 数字矿山 3DMine 矿体模型 矿块组合模型 距离幂次反比法 储量估算
在线阅读 下载PDF
Optimization methods of production layer combination for coalbed methane development in multi-coal seams 被引量:4
16
作者 YANG Zhaobiao ZHANG Zhengguang +5 位作者 QIN Yong WU Congcong YI Tongsheng LI Yangyang TANG Jun CHEN Jie 《Petroleum Exploration and Development》 2018年第2期312-320,共9页
Based on the productivity equation of coalbed methane(CBM) wells, three indexes, main production layer optimization index, main production layer expansion index and capacity contribution index are proposed, with which... Based on the productivity equation of coalbed methane(CBM) wells, three indexes, main production layer optimization index, main production layer expansion index and capacity contribution index are proposed, with which the three-step optimization method of production-layer combination is established. In selecting main production layer, the coal seam thickness, CBM content, coal seam permeability, coal seam reservoir pressure and coal structure are considered comprehensively to evaluate the potential of the production layer. In selecting expansion of the main production layer combination, on the premise of ensuring full and slow desorption of the main production layer and non-exposure of the main production layer out of liquid surface, the degree of mutual interference between the main and non-main production layers is comprehensively evaluated by coupling the critical desorption pressure, layer spacing and reservoir pressure gradient difference. In optimizing production layer combination, the main concern is the economic efficiency of the combined layers. Only when the contribution coefficient of the main production layer is greater than 30% and the contribution index of the other production layers is more than 10%, the economic benefit of a CBM well after being put into production can be ensured. Based on the comparative analysis of the development effect of the development test wells in Songhe of Guizhou province, it is proved that the "three-step method" for the optimization of production-layer combination is scientific and practical, and can be used to design the multi-layer commingling scheme of coalbed methane. 展开更多
关键词 CBM multi-layer commingled PRODUCTION selection of main PRODUCTION LAYER combinATION optimization PRODUCTION CONTRIBUTION
在线阅读 下载PDF
SOME KEY ISSUES ON THE APPLICATION OF SATELLITE REMOTE SENSING TO MINING AREAS 被引量:1
17
作者 DUPein-jun ZHOUXing-dong GUODa-zhi 《Chinese Geographical Science》 SCIE CSCD 2003年第1期79-83,共5页
In order to apply Satellite Remote Sensing (RS) to mining areas, some key issues should be solved. Based on an introduction to relative studying background, related key issues are proposed and analyzed oriented to the... In order to apply Satellite Remote Sensing (RS) to mining areas, some key issues should be solved. Based on an introduction to relative studying background, related key issues are proposed and analyzed oriented to the development of RS information science and demands of mining areas. Band selection and combination optimization of Landsat TM is discussed firstly, and it proved that the combination of Band 3, Band 4 and Band 5 has the largest information amount in all three-band combination schemes by both N-dimensional entropy method and Genetic Algorithm (GA). After that the filtering of Radarsat image is discussed. Different filtering methods are experimented and compared, and adaptive methods are more efficient than others. Finally the classification of satellite RS image is studied, and some new methods including classification by improved BPNN(Back Propagation Neural Network) and classification based on GIS and knowledge are proposed. 展开更多
关键词 Satellite Remote Sensing mining areas band combination FILTERING image classification
在线阅读 下载PDF
Diesel generator exhaust heat recovery fully-coupled with intake air heating for off-grid mining operations:An experimental,numerical,and analytical evaluation 被引量:1
18
作者 Durjoy Baidya Marco Antonio Rodrigues de Brito +1 位作者 Agus PSasmito Seyed Ali Ghoreishi-Madiseh 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2022年第1期155-169,共15页
The customarily discarded exhaust from the fossil fuel-based power plants of the off-grid mines holds the thermal potential to fulfill the heating requirement of the underground operation.This present research fills i... The customarily discarded exhaust from the fossil fuel-based power plants of the off-grid mines holds the thermal potential to fulfill the heating requirement of the underground operation.This present research fills in an important research gap by investigating the coupling effect between a diesel exhaust heat recovery and an intake air heating system employed in a remote mine.An integrative approach comprising analytical,numerical,and experimental assessment has been adapted.The novel analytical model developed here establishes the reliability of the proposed mine heating system by providing comparative analysis between a coupled and a decoupled system.The effect of working fluid variation has been examined by the numerical analysis and the possible improvement has been identified.Experimental investigations present a demonstration of the successful lab-scale implementation of the concept and validate the numerical and analytical models developed.Successful deployment of the fully coupled mine heating system proposed here will assist the mining industry on its journey towards energy-efficient,and sustainable mining practices through nearly 70%reduction in fossil fuel consumption for heating intentions. 展开更多
关键词 Remote mines Waste heat utilization Diesel exhaust combined heat and power generation Clean energy in mining Coupled heating system
在线阅读 下载PDF
Analysis on the rules of acupoint combination in treatment of pseudobulbar palsy based on co-occurrence relationship 被引量:1
19
作者 Xiao-yu SUN Dian-hui YANG Feng DUAN 《World Journal of Acupuncture-Moxibustion》 CSCD 2022年第3期237-244,共8页
Objective:To explore the rules of acupoint combination in acupuncture treatment of post-stroke pseudobulbar palsy(PBP),based on acupuncture prescriptions retrieved from literature and using complex network analysis.Me... Objective:To explore the rules of acupoint combination in acupuncture treatment of post-stroke pseudobulbar palsy(PBP),based on acupuncture prescriptions retrieved from literature and using complex network analysis.Methods:The articles were searched from China National Knowledge Infrastructure(CNKI),Wanfang and VIP databases as the source of data.The eligible articles were selected in accordance with inclusion and exclusion criteria.The relevant data were extracted to set up the acupoint prescription database in acupuncture treatment of PBP.By using co-occurrence relationship in acupoint prescriptions,the core acupoints and the combination rules were analyzed in acupuncture treatment of PBP.Results:A total of 194 articles were eligible finally,with 202 acupoint prescriptions extracted.19 core acupoints were collected in total,i.e.Liánquán(廉泉CV23),Fēngchí(风池GB20),Bǎihuì(百会GV20),Jīnjīn(金津EX-HN12),Yùyè(玉液EX-HN13),Fēngfǔ(风府GV16),Yǎmén(哑门GV15),Shuǐgōu(水沟GV26),Nèiguān(内关PC6),Fēnglóng(丰隆ST40),Wángǔ(完骨GB12),Sānyīnjiāo(三阴交SP16),Yìfēng(翳风TE17),Tōnglǐ(通里HT5),Tàichōng(太冲LR3),Hégǔ(合谷LI4),Hǎiquán(海泉EX-HN11),Jùquán(聚泉EX-HN10)and Yìntáng(印堂EX-HN3).The core acupoint groups were CV23-GB20,EX-HN12-EX-HN13 and GV26-PC6-SP6.Acupoints were mostly selected from governor vessel.The methods of acupoint combination included the combination of distal and nearby points,and the combination of the acupoints located in the front and on the back.Conclusions:In treatment of PBP with acupuncture,biaoben(manifestation and root cause)theory is emphasized,the methods for dispelling wind,resolving phlegm,regaining consciousness,and opening orifices are recommended.Moreover,the attentions are paid on spirit regulation,holistic adjustment,and syndrome differentiation in treatment. 展开更多
关键词 ACUPUNCTURE Pseudobulbar palsy(PBP) Acupoint combination Co-word analysis Data mining Gephi
原文传递
Heterogeneous information phase space reconstruction and stability prediction of filling body–surrounding rock combination 被引量:1
20
作者 Dapeng Chen Shenghua Yin +5 位作者 Weiguo Long Rongfu Yan Yufei Zhang Zepeng Yan Leiming Wang Wei Chen 《International Journal of Minerals,Metallurgy and Materials》 SCIE EI CAS CSCD 2024年第7期1500-1511,共12页
Traditional research believes that the filling body can effectively control stress concentration while ignoring the problems of unknown stability and the complex and changeable stress distribution of the filling body... Traditional research believes that the filling body can effectively control stress concentration while ignoring the problems of unknown stability and the complex and changeable stress distribution of the filling body–surrounding rock combination under high-stress conditions.Current monitoring data processing methods cannot fully consider the complexity of monitoring objects,the diversity of monitoring methods,and the dynamics of monitoring data.To solve this problem,this paper proposes a phase space reconstruction and stability prediction method to process heterogeneous information of backfill–surrounding rock combinations.The three-dimensional monitoring system of a large-area filling body–surrounding rock combination in Longshou Mine was constructed by using drilling stress,multipoint displacement meter,and inclinometer.Varied information,such as the stress and displacement of the filling body–surrounding rock combination,was continuously obtained.Combined with the average mutual information method and the false nearest neighbor point method,the phase space of the heterogeneous information of the filling body–surrounding rock combination was then constructed.In this paper,the distance between the phase point and its nearest point was used as the index evaluation distance to evaluate the stability of the filling body–surrounding rock combination.The evaluated distances(ED)revealed a high sensitivity to the stability of the filling body–surrounding rock combination.The new method was then applied to calculate the time series of historically ED for 12 measuring points located at Longshou Mine.The moments of mutation in these time series were at least 3 months ahead of the roadway return dates.In the ED prediction experiments,the autoregressive integrated moving average model showed a higher prediction accuracy than the deep learning models(long short-term memory and Transformer).Furthermore,the root-mean-square error distribution of the prediction results peaked at 0.26,thus outperforming the no-prediction method in 70%of the cases. 展开更多
关键词 deep mining filling body–surrounding rock combination phase space reconstruction multiple time series stability prediction
在线阅读 下载PDF
上一页 1 2 72 下一页 到第
使用帮助 返回顶部