Slope stability is of critical importance in the process of surface-underground mining combination. The influence of underground mining on pit slope stability was mainly discussed, and the self-stabilization of underg...Slope stability is of critical importance in the process of surface-underground mining combination. The influence of underground mining on pit slope stability was mainly discussed, and the self-stabilization of underground stopes was also studied. The random finite element method was used to analyze the probability of the rock mass stability degree of both pit slopes and underground stopes. Meanwhile, 3D elasto-plastic finite element method was used to research into the stress, strain and rock mass failure resulting from mining. The results of numerical simulation indicate that the mining of the underground test stope has certain influence on the stability of the pit slope, but the influence is not great. The safety factor of pit slope is decreased by 0.06, and the failure probability of the pit slope is increased by 1.84%. In addition, the strata yielding zone exists around the underground test stope. The results basically conform to the information coming from the field monitoring.展开更多
The connection between all the single systems iu combined technology is analysed, and the mine engineering reliability is calculated in any area of the mines using combined technololgy system. The reliability design a...The connection between all the single systems iu combined technology is analysed, and the mine engineering reliability is calculated in any area of the mines using combined technololgy system. The reliability design and distribution method in this system is put forward, thus the basis is set for the decision to raise the total production capability or the surface mines in which the combined system is used.展开更多
The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put f...The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put for-ward through analyzing the limitations of moving cone method under such conditions. With a view to recovering asmuch mineral resource as possible and making the maximum profit from the whole deposit, the new principle is tomaximize the sum of gain from both open-pit and underground mining. The mathematical models along the horizon-tal and vertical directions and modules for software package (DM&MCAD) have been developed and tested inTonglushan Copper Mine. It has been proved to be rather effective in the mining practice.展开更多
By using the continuous exploration system with multi-pipeline in the borehole, the failure cracks of cover strata (specially, the small cracks developing) after the combined mining of 16, 17 thin seams of the 4th min...By using the continuous exploration system with multi-pipeline in the borehole, the failure cracks of cover strata (specially, the small cracks developing) after the combined mining of 16, 17 thin seams of the 4th mining block in Zhaopo Mine is explored. After that, the researching result is considered as the output and the testing result of rock mechanics parameters is considered as the verifying data, the back analysis is made with the conception of the point safety degree. The relative height of the crack developing is obtaied. So, the evaluating of the safety of 16, 17 seams combined mining under the gob water with extreme distance is made and the mining has been safety. The scientific basis is provided for the evaluating of the mining safety with the similar conditions.展开更多
The drum shearer and high pressure water jet combined cutting system is an effective technology to cut hard coal-rock, but one problem of the technology is the choice of pick and nozzle location parameters. In order t...The drum shearer and high pressure water jet combined cutting system is an effective technology to cut hard coal-rock, but one problem of the technology is the choice of pick and nozzle location parameters. In order to solve the problem, the process and mechanism of combined cutting arc studied and mining seepage catastrophe theory is used to construct the mathematic and physical model of combined cutting hard coal-rock. Based on the model and detailed analysis of combined cutting mechanism, the single pick and nozzle combined cutting test-bed is built to test the main pick and nozzle location parameters of drum shearer and water jet combined cutting system. Test results show that the best vertical distance between the pick-tip and nozzle center point is the sum of cutting thickness and proper target distance in the Y axial direction; the best horizontal distance is the length between pick-tip point and coal-rock surface bursting crack point in the X axial direction. The best incident angle of water jet should be the same as the bursting crack line's angle in theory, but considering other important factors comprehensively, it is more reasonable when the incident angle of water jet is 90°.展开更多
Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which mak...Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine.展开更多
Traditional research believes that the filling body can effectively control stress concentration while ignoring the problems of unknown stability and the complex and changeable stress distribution of the filling body...Traditional research believes that the filling body can effectively control stress concentration while ignoring the problems of unknown stability and the complex and changeable stress distribution of the filling body–surrounding rock combination under high-stress conditions.Current monitoring data processing methods cannot fully consider the complexity of monitoring objects,the diversity of monitoring methods,and the dynamics of monitoring data.To solve this problem,this paper proposes a phase space reconstruction and stability prediction method to process heterogeneous information of backfill–surrounding rock combinations.The three-dimensional monitoring system of a large-area filling body–surrounding rock combination in Longshou Mine was constructed by using drilling stress,multipoint displacement meter,and inclinometer.Varied information,such as the stress and displacement of the filling body–surrounding rock combination,was continuously obtained.Combined with the average mutual information method and the false nearest neighbor point method,the phase space of the heterogeneous information of the filling body–surrounding rock combination was then constructed.In this paper,the distance between the phase point and its nearest point was used as the index evaluation distance to evaluate the stability of the filling body–surrounding rock combination.The evaluated distances(ED)revealed a high sensitivity to the stability of the filling body–surrounding rock combination.The new method was then applied to calculate the time series of historically ED for 12 measuring points located at Longshou Mine.The moments of mutation in these time series were at least 3 months ahead of the roadway return dates.In the ED prediction experiments,the autoregressive integrated moving average model showed a higher prediction accuracy than the deep learning models(long short-term memory and Transformer).Furthermore,the root-mean-square error distribution of the prediction results peaked at 0.26,thus outperforming the no-prediction method in 70%of the cases.展开更多
Mine rescue capsule is a typical emergency equipment in a coal mine.It provides a safe and confined space for miners when mining disasters occurred.The length of the passenger survival cell is suitable to be adjusted ...Mine rescue capsule is a typical emergency equipment in a coal mine.It provides a safe and confined space for miners when mining disasters occurred.The length of the passenger survival cell is suitable to be adjusted with several predefined modular cells according to various numbers of passengers.Aiming at the shortage of guidance rules for the modular combination design of mine rescue capsule,the configuration situations of survival cells are experimented with static and impact load analysis in ANSYS Workbench.The length range of a single cell,the combination schemes of miner survival section,and the effectiveness proof of assembled rescue capsules were solved sequentially by simulated load analysis on constructed structural models.The modular combination rules of the survival section are developed for variant passenger number ranging from 8 to 20.It also provides a reference for the optimal selection of rescue capsules with the same capacity.The proposed modular rules are effective for the rapid configuration design for mine rescue capsule driven by the number of passengers.展开更多
文摘Slope stability is of critical importance in the process of surface-underground mining combination. The influence of underground mining on pit slope stability was mainly discussed, and the self-stabilization of underground stopes was also studied. The random finite element method was used to analyze the probability of the rock mass stability degree of both pit slopes and underground stopes. Meanwhile, 3D elasto-plastic finite element method was used to research into the stress, strain and rock mass failure resulting from mining. The results of numerical simulation indicate that the mining of the underground test stope has certain influence on the stability of the pit slope, but the influence is not great. The safety factor of pit slope is decreased by 0.06, and the failure probability of the pit slope is increased by 1.84%. In addition, the strata yielding zone exists around the underground test stope. The results basically conform to the information coming from the field monitoring.
文摘The connection between all the single systems iu combined technology is analysed, and the mine engineering reliability is calculated in any area of the mines using combined technololgy system. The reliability design and distribution method in this system is put forward, thus the basis is set for the decision to raise the total production capability or the surface mines in which the combined system is used.
基金Project (59704004) supported by the National Natural Science Foundation of ChinaProject (2000) supported by Foundation for University Key Teacher by the Ministry of Education
文摘The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put for-ward through analyzing the limitations of moving cone method under such conditions. With a view to recovering asmuch mineral resource as possible and making the maximum profit from the whole deposit, the new principle is tomaximize the sum of gain from both open-pit and underground mining. The mathematical models along the horizon-tal and vertical directions and modules for software package (DM&MCAD) have been developed and tested inTonglushan Copper Mine. It has been proved to be rather effective in the mining practice.
文摘By using the continuous exploration system with multi-pipeline in the borehole, the failure cracks of cover strata (specially, the small cracks developing) after the combined mining of 16, 17 thin seams of the 4th mining block in Zhaopo Mine is explored. After that, the researching result is considered as the output and the testing result of rock mechanics parameters is considered as the verifying data, the back analysis is made with the conception of the point safety degree. The relative height of the crack developing is obtaied. So, the evaluating of the safety of 16, 17 seams combined mining under the gob water with extreme distance is made and the mining has been safety. The scientific basis is provided for the evaluating of the mining safety with the similar conditions.
基金Project(2012AA062104) supported by the National High Technology Research and Development Program of ChinaProject(201104583) supported by the Postdoctoral Special Funded Projects,China
文摘The drum shearer and high pressure water jet combined cutting system is an effective technology to cut hard coal-rock, but one problem of the technology is the choice of pick and nozzle location parameters. In order to solve the problem, the process and mechanism of combined cutting arc studied and mining seepage catastrophe theory is used to construct the mathematic and physical model of combined cutting hard coal-rock. Based on the model and detailed analysis of combined cutting mechanism, the single pick and nozzle combined cutting test-bed is built to test the main pick and nozzle location parameters of drum shearer and water jet combined cutting system. Test results show that the best vertical distance between the pick-tip and nozzle center point is the sum of cutting thickness and proper target distance in the Y axial direction; the best horizontal distance is the length between pick-tip point and coal-rock surface bursting crack point in the X axial direction. The best incident angle of water jet should be the same as the bursting crack line's angle in theory, but considering other important factors comprehensively, it is more reasonable when the incident angle of water jet is 90°.
文摘Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine.
基金the National Key R&D Program of China(No.2022YFC2904103)the Key Program of the National Natural Science Foundation of China(No.52034001)+1 种基金the 111 Project(No.B20041)the China National Postdoctoral Program for Innovative Talents(No.BX20230041)。
文摘Traditional research believes that the filling body can effectively control stress concentration while ignoring the problems of unknown stability and the complex and changeable stress distribution of the filling body–surrounding rock combination under high-stress conditions.Current monitoring data processing methods cannot fully consider the complexity of monitoring objects,the diversity of monitoring methods,and the dynamics of monitoring data.To solve this problem,this paper proposes a phase space reconstruction and stability prediction method to process heterogeneous information of backfill–surrounding rock combinations.The three-dimensional monitoring system of a large-area filling body–surrounding rock combination in Longshou Mine was constructed by using drilling stress,multipoint displacement meter,and inclinometer.Varied information,such as the stress and displacement of the filling body–surrounding rock combination,was continuously obtained.Combined with the average mutual information method and the false nearest neighbor point method,the phase space of the heterogeneous information of the filling body–surrounding rock combination was then constructed.In this paper,the distance between the phase point and its nearest point was used as the index evaluation distance to evaluate the stability of the filling body–surrounding rock combination.The evaluated distances(ED)revealed a high sensitivity to the stability of the filling body–surrounding rock combination.The new method was then applied to calculate the time series of historically ED for 12 measuring points located at Longshou Mine.The moments of mutation in these time series were at least 3 months ahead of the roadway return dates.In the ED prediction experiments,the autoregressive integrated moving average model showed a higher prediction accuracy than the deep learning models(long short-term memory and Transformer).Furthermore,the root-mean-square error distribution of the prediction results peaked at 0.26,thus outperforming the no-prediction method in 70%of the cases.
基金National Natural Science Foundation of China(No.51475459)Fundamental Research Funds for the Central Universities of China(No.2017XKQY040)Priority Academic Program Development of Jiangsu Higher Education Institutions of China(No.PAPD)
文摘Mine rescue capsule is a typical emergency equipment in a coal mine.It provides a safe and confined space for miners when mining disasters occurred.The length of the passenger survival cell is suitable to be adjusted with several predefined modular cells according to various numbers of passengers.Aiming at the shortage of guidance rules for the modular combination design of mine rescue capsule,the configuration situations of survival cells are experimented with static and impact load analysis in ANSYS Workbench.The length range of a single cell,the combination schemes of miner survival section,and the effectiveness proof of assembled rescue capsules were solved sequentially by simulated load analysis on constructed structural models.The modular combination rules of the survival section are developed for variant passenger number ranging from 8 to 20.It also provides a reference for the optimal selection of rescue capsules with the same capacity.The proposed modular rules are effective for the rapid configuration design for mine rescue capsule driven by the number of passengers.