Challenging in frequent jacking force surge in rock pipe jacking project:A case study in Guanjingkou,China
1
作者 Chao Li Zuliang Zhong +2 位作者 Xinrong Liu Yi Zhang Nanyun Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 2025年第7期4559-4578,共20页
Previous studies have demonstrated that the surge in jacking force during the Guanjingkou project is caused by the contact conditions of the debris bentonite slurry outside the pipe.Therefore,this paper further system... Previous studies have demonstrated that the surge in jacking force during the Guanjingkou project is caused by the contact conditions of the debris bentonite slurry outside the pipe.Therefore,this paper further systematically investigates the influence of different debris slurry mass ratios(SLRs)and different particle size distributions(PSDs)on the pipe-rock friction characteristics using friction tests.The test results reveal that under the same PSD,an adequate amount of slurry(with an SLR of 1:4)consistently yields the lowest friction coefficient.When the SLR is between 1:2 and 1:3,the viscosity of the slurry reaches its peak,resulting in the highest friction coefficient.Additionally,when the PSD is 1:1:5 and 1:1:15,the friction coefficient is primarily governed by the plowing effect at the contact surface.When the PSD is 5:1:1 and 15:1:1,the friction coefficient is mainly controlled by the void ratio(VR)of debris.In the case of PSDs 1:5:1 and 1:15:1,the friction coefficient is jointly controlled by the adhesion effect of high-viscosity slurry and the plowing effect at the contact surface,and it gradually shifts towards being dominated by the VR as the amount of debris increases.Regardless of the SLRs and PSDs,the continuous deposition of debris and the injection of slurry incessantly exacerbate both the plowing and adhesion effects,creating a vicious cycle.This is the reason why the high-pressure water flushing method can not only fail to resolve the issue but also accelerate the occurrence of the surge in jacking force. 展开更多
关键词 Debris friction characteristic Friction test jacking force surge Mudcake Rock pipe jacking
在线阅读 下载PDF
Application of ANSYS 3D FEM in Studies of Surface Deformation Caused by Pipe Jacking 被引量:10
2
作者 LI Fabin FANG Kun LI Hechao 《Wuhan University Journal of Natural Sciences》 CAS 2007年第4期633-637,共5页
By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface... By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface under different frontal resistances. Analysis of the two cases shows that soil pressure reaches its maximum point when the soil is right above machine head, and soil stress will gradually decline when machine head passes over it. It also shows that impact brought by pipe-jacking construction on stress change of the surrounding soil is limited. The thesis suggest that road surface should be consolidated and soil condition be improved before construction to prevent loss and disaster caused by road surface deformation, jacking force can be increased so that jacking efficiency can be enhanced when ground stratum is well filled with soil, but the frontal resistance facing machine head should be equal to surrounding soil pressure in order to avoid rise of ground surface. 展开更多
关键词 trenchless technology pipe jacking finite element ground settlement
在线阅读 下载PDF
Analytical solutions of vertical load on deep rectangular jacked pipe considering tunnelling-induced ground loss 被引量:2
3
作者 LI Jian-ye FANG Qian +4 位作者 LIU Xiang WANG Gan HUANG Jun DU Jian-ming ZHANG Zi-yi 《Journal of Central South University》 2025年第5期1855-1872,共18页
Determining earth pressure on jacked pipes is essential for ensuring lining safety and calculating jacking force,especially for deep-buried pipes.To better reflect the soil arching effect resulting from the excavation... Determining earth pressure on jacked pipes is essential for ensuring lining safety and calculating jacking force,especially for deep-buried pipes.To better reflect the soil arching effect resulting from the excavation of rectangular jacked pipes and the distribution of the earth pressure on jacked pipes,we present an analytical solution for predicting the vertical earth pressure on deep-buried rectangular pipe jacking tunnels,incorporating the tunnelling-induced ground loss distribution.Our proposed analytical model consists of the upper multi-layer parabolic soil arch and the lower friction arch.The key parameters(i.e.,width and height of friction arch B and height of parabolic soil arch H 1)are determined according to the existing research,and an analytical solution for K l is derived based on the distribution characteristics of the principal stress rotation angle.With consideration for the transition effect of the mechanical characteristics of the parabolic arch zone,an analytical solution for soil load transfer is derived.The prediction results of our analytical solution are compared with tests and simulation results to validate the effectiveness of the proposed analytical solution.Finally,the effects of different parameters on the soil pressure are discussed. 展开更多
关键词 rectangular pipe jacking tunnel vertical load multi-layer parabolic soil arch model soil arching
在线阅读 下载PDF
Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata 被引量:3
4
作者 Takashi Senda Hideki Shimada +1 位作者 Takashi Sasaoka Kikuo Matsui 《Open Journal of Geology》 2013年第2期44-48,共5页
In Japan when urban infrastructures need to be constructed, the difficulty of utilizing the ground or shallow strata will lead to a more frequent use of the deep strata. The common construction methods are open-cut, p... In Japan when urban infrastructures need to be constructed, the difficulty of utilizing the ground or shallow strata will lead to a more frequent use of the deep strata. The common construction methods are open-cut, pipe jacking, and shield methods. In recent years, a new pipe jacking method has been established that can be adapted to 20 m below the ground or more. Using this method, the drivage machine and the jacking pipe continue to move an underground until the completion of the driving. Therefore an over-cutting area (so-called tail-void) must be formed to lower the friction between the ground and the pipe. The tail-void is filled with lubrications. However, because the stress release from the ground continues to advance when the tail-void is formed, hence there are some challenges required to cope with the stability of the surrounding ground. In order to utilize the pipe jacking method in the deeper strata layers, the theory, analysis and installation of tail-void have to be systemized, and such systematic data must be stored. Therefore, the conditions of tail-void in the deep pipe jacking method are discussed using numerical analyses. 展开更多
关键词 pipe jacking System DEEP STRATA Tail-Void
暂未订购
Effect of Application of Pipe Roof Method by Using Pipe Jacking on Behavior of Surrounding Soil 被引量:3
5
作者 Hideki Shimada Akihiro Hamanakal +2 位作者 Takashi Sasaoka Kikuo Matsui Toru Sato 《Journal of Physical Science and Application》 2013年第6期353-358,共6页
Tunnels in an urban area, in many cases, are constructed in soft ground which contains underground water, near existing facilities and structures. Structural stability for the tunnel and also the nearby structures and... Tunnels in an urban area, in many cases, are constructed in soft ground which contains underground water, near existing facilities and structures. Structural stability for the tunnel and also the nearby structures and facilities is vital in this kind of work. Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of underground pipelines of sewage systems. This method utilizes mud slurry that is formed around the pipes in order to stabilize the surrounding soil. In the pipe roof method the tubing elements that are constructed by slurry pipe jacking are near each other longitudinally, and create a rigid and stable lining before the excavation of the main tunnel. This paper discusses 'the application of a slurry pipe jacking system on 'the pipe roof method by means of numerical analysis. Because of the rigid behavior of the lining, the results show little subsidence, making this method a reliable method of constructing large tunnels with small cover in an urban area. 展开更多
关键词 pipe roof method pipe jacking TUNNEL Urban area.
在线阅读 下载PDF
Discussion on the Application of Pipe Jacking Construction Technology in Municipal Road Drainage Projects 被引量:1
6
作者 Liang Liu Lizhao Zhao 《Journal of Architectural Research and Development》 2023年第6期29-35,共7页
In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage co... In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage construction efficiency,avoid large-scale damage to the road surface,and exert small traffic impact.Therefore,it is currently widely used in drainage construction,but judging from the current actual application situation,there are still many problems that require further improvement.This article mainly analyzes the advantages of and current technical problems in pipe jacking construction technology in detail,explores corresponding solutions,and lays a foundation for the optimization of municipal road drainage engineering construction. 展开更多
关键词 Municipal roads Drainage projects pipe jacking construction Advantages
在线阅读 下载PDF
Long-Distance Pipe Jacking in Complex Urban Geological Environment 被引量:1
7
作者 Yi Gong Yang Liu Qigao Li 《Journal of Architectural Research and Development》 2022年第1期7-12,共6页
A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m(plate thickness of 26 mm)has been constructed in a city in central Hubei,and the engineering,procurement,and construction(EPC)project... A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m(plate thickness of 26 mm)has been constructed in a city in central Hubei,and the engineering,procurement,and construction(EPC)project has been lifted from the upstream channel to supplement water to the downstream lake inside the city.Through preliminary geological survey data,site topographic and geomorphic survey,urban construction,as well as the requirements of the construction party,the preliminary arrangement of working wells and receiving wells as well as the selection and customization of pipe jacking machines have been proposed.Frequency conversion motor and remote monitoring technology are adopted for geotechnical change and long-distance pipe jacking.Through detailed survey,the rock and soil change section as well as gradual change conditions have been determined,the accuracy of construction mechanics calculation and construction operation control have improved,the basis and analysis basis are provided,and some experiences in construction operation are summarized. 展开更多
关键词 Long-distance pipe jacking Complex geology Urban area New technology
在线阅读 下载PDF
Optimization Design of Multi-hole and Varied Diameter Pipe Based on RAGA
8
作者 WANGLi-kun WEIYong-xia FUQiang 《Journal of Northeast Agricultural University(English Edition)》 CAS 2004年第1期84-86,共3页
Combining real accelerating genetic algorithm(RAGA) with the optimization design of multi-hole and varied diameter pipe, the authors solved the problem of optimizing multi-dimensional parameters at the same time. In w... Combining real accelerating genetic algorithm(RAGA) with the optimization design of multi-hole and varied diameter pipe, the authors solved the problem of optimizing multi-dimensional parameters at the same time. In which the advanced convergence and easily to run into partial optimization were avoid. Applied the RAGA to solving the problem in the optimization design of fixed piping sprinkler irrigation system. The optimized parameters, such as diameters and the length of pipe were calculated and the result was reasonable, which provides as a reference to readers who work at related research. 展开更多
关键词 spray irrigation multi-hole and varied diameter pipes accelerating genetic algorithm optimization design
在线阅读 下载PDF
Application Strategies of Pipe Jacking Technology in Municipal Rainwater Pipeline Engineering
9
作者 Yao Tong Xiaoqing Hu +1 位作者 Yuwenhui Guo Minjun Gao 《Journal of Architectural Research and Development》 2024年第6期5-10,共6页
Traditional construction techniques have a significant impact on the environment and are associated with long construction durations in the construction of municipal rainwater pipelines.Pipe jacking technology,a new t... Traditional construction techniques have a significant impact on the environment and are associated with long construction durations in the construction of municipal rainwater pipelines.Pipe jacking technology,a new type of pipeline construction method,enables non-excavation construction and can address the shortcomings of traditional pipeline construction.This article analyzes the concept and application advantages of pipe jacking technology.Combining engineering examples,it explores the application strategies of pipe jacking technology in the construction process of municipal rainwater pipelines for reference. 展开更多
关键词 Municipal engineering Rainwater pipeline pipe jacking construction
在线阅读 下载PDF
Brief Introduction of Shallow Soil Jacking Construction Method of Large Section Rectangular Pipe Jacking Machine
10
作者 CHAIJianping 《外文科技期刊数据库(文摘版)工程技术》 2022年第3期065-069,共5页
The first permanent magnet driven rectangular pipe jacking machine independently developed in China is used for the construction of pedestrian passage in Banxuegang Science and Technology City area of Shenzhen. The re... The first permanent magnet driven rectangular pipe jacking machine independently developed in China is used for the construction of pedestrian passage in Banxuegang Science and Technology City area of Shenzhen. The rectangular pipe jacking machine occupies a small area during the initial excavation. It is suitable for shallow soil covering and short-distance excavation. It is more economical and applicable than shield machine and has high construction efficiency. During the construction process, technical measures such as attitude measurement and adjustment of pipe jacking machine, surrounding rock grouting and friction reduction can effectively ensure the smooth construction of pipe jacking machine, and provide reference for large section pipe jacking machine in shallow soil construction. 展开更多
关键词 large section rectangular pipe jacking machine shallow overburden construction method
原文传递
Effective Application of Pipe Jacking Construction Technology in Municipal Water Supply and Drainage Construction
11
作者 ZHANGGongyu 《外文科技期刊数据库(文摘版)工程技术》 2022年第1期075-079,共5页
In the municipal engineering construction, with the promotion of mechanized construction mode and the increasingly mature and perfect construction technical conditions, the pipe jacking construction gradually develops... In the municipal engineering construction, with the promotion of mechanized construction mode and the increasingly mature and perfect construction technical conditions, the pipe jacking construction gradually develops and progresses in the exploration of construction. In the municipal water supply and drainage construction, we should pay more attention to the application of pipe jacking technology, strictly implement various construction plans, improve the construction effect of water supply and drainage, and give full play to the application value and advantages of pipe jacking technology, which is beneficial to the healthy and stable development of municipal construction in China. 展开更多
关键词 pipe jacking construction MUNICIPAL water supply and drainage
原文传递
Effect of soil set-up on the capacity of jacked concrete pipe piles in mixed soils 被引量:3
12
作者 Jun-wei LIU Zhong-miao ZHANG Feng YU Cun-gang LIN 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2011年第8期637-644,共8页
The increase in capacity of displacement piles with time after installation is typically known as soil/pile set-up. A full-scale field test is carried out to observe the set-up effect for open-ended concrete pipe pile... The increase in capacity of displacement piles with time after installation is typically known as soil/pile set-up. A full-scale field test is carried out to observe the set-up effect for open-ended concrete pipe piles jacked into mixed soils. Both the total capacity and the average unit shaft resistance increase approximately linearly with logarithmic time. The average increase rate for unit shaft resistance is 44% per log cycle, while the average increase for total capacity is approximately 21%. A review on case histories for long-term set-up indicates an average set-up rate of approximately 40%. Based on this, the mechanism of pile set-up is discussed in detail and a three-phase model is suggested. 展开更多
关键词 Concrete pipe pile jack piling SET-UP Pile capacity
原文传递
超大直径双圆顶管施工对地下管线沉降变形的影响
13
作者 于英霞 苗冰阳 +1 位作者 李文杰 唐刚 《长江科学院院报》 北大核心 2026年第2期130-139,147,共11页
为了探究超大直径双圆顶管施工对地下管线沉降变形的影响,以深圳市铁岗-石岩水库水质保障工程为依托,基于修正Peck公式,采用数值模拟和现场监测结合的方法,通过改变管线埋深、材质、管径、顶管净间距及管线空间位置,采用变量归一化方法... 为了探究超大直径双圆顶管施工对地下管线沉降变形的影响,以深圳市铁岗-石岩水库水质保障工程为依托,基于修正Peck公式,采用数值模拟和现场监测结合的方法,通过改变管线埋深、材质、管径、顶管净间距及管线空间位置,采用变量归一化方法分析各因素对管线影响程度,并评价其安全性能。结果表明:顶管选择垂直下穿较为合理,改变管线埋深、材质、管径参数时,位移场最终均呈现“V”形,当两顶管净间距增大至1.5倍顶管管径时,位移场开始呈现“W”形,管线变形范围增大。经过敏感度分析,对管线沉降变形影响最大的是两顶管净间距,最小的是管线管径,敏感度分别为0.54、0.06。通过转角允许值对污水管线安全性能进行评价,根据现场监测值计算得到污水管线接头转角0.54°,在控制标准范围内,保证双圆顶管施工过程中管线不会因不均匀沉降而被破坏。研究成果可为类似大直径顶管下穿管线工程提供参考。 展开更多
关键词 超大直径双圆顶管 下穿管线 沉降变形 敏感度分析 现场监测
在线阅读 下载PDF
地铁站出入口下穿既有铁路顶管施工关键技术研究
14
作者 李延超 姜安民 +4 位作者 王虎志 张升 张福天 肖佳 李涛 《山西建筑》 2026年第6期129-132,共4页
顶管施工是一种非开挖施工方法,施工优势明显,为降低下穿既有铁路顶管施工风险,对顶管施工关键技术展开研究。结合具体工程实例,对顶管施工机械进行选择,分析了泥水平衡顶管机及土压平衡顶管机的适用性;介绍了下穿既有铁路施工关键技术... 顶管施工是一种非开挖施工方法,施工优势明显,为降低下穿既有铁路顶管施工风险,对顶管施工关键技术展开研究。结合具体工程实例,对顶管施工机械进行选择,分析了泥水平衡顶管机及土压平衡顶管机的适用性;介绍了下穿既有铁路施工关键技术及施工工艺流程,并总结了土压平衡与管道推进精度控制、土体加固与监测预警的技术要点;对类似下穿既有铁路顶管施工具有重要的借鉴意义。 展开更多
关键词 地铁站 顶管施工 下穿铁路 监测系统
在线阅读 下载PDF
软弱地层中顶管施工对既有城市桥梁的影响分析
15
作者 朱坤 韦修箭 梁亚兰 《建筑机械》 2026年第2期300-305,共6页
为探究软弱地层中顶管施工对临近桥梁的扰动影响,建立桥梁-桩基-土层-顶管耦合有限元模型,综合考虑掘进、桩土接触面、土材料非线性参数的耦合效应,系统分析顶管掘进施工对周围土体、主梁、桩基的变形和受力影响规律。结果表明:顶管施... 为探究软弱地层中顶管施工对临近桥梁的扰动影响,建立桥梁-桩基-土层-顶管耦合有限元模型,综合考虑掘进、桩土接触面、土材料非线性参数的耦合效应,系统分析顶管掘进施工对周围土体、主梁、桩基的变形和受力影响规律。结果表明:顶管施工导致上部土体沉降,下部土体隆起,最大值出现在管顶和管底与土层交界处,两侧土体受到挤压作用;对主梁和桥墩的位移影响小,不会引起过大的附加内力;桩身的最大位移出现在与软弱土层交界处,桩身最大轴力、剪力、弯矩均出现在桩顶,最大应力出现在桩身中部单元;对主梁和桩基的影响均进行了验算,符合规范。为进一步增强施工安全性,提出了改进的顶管施工防护措施。 展开更多
关键词 顶管施工 软弱地层 有限元 城市桥梁 非线性分析
在线阅读 下载PDF
软土地层双线顶管施工地表沉降预测模型
16
作者 郭耀耀 周爱兆 +1 位作者 涂可诚 翁晓峰 《科学技术与工程》 北大核心 2026年第5期2121-2129,共9页
针对软土地层双线顶管施工中地表沉降形态演化机制不明确、传统Peck公式预测精度不足等问题,通过三维数值分析、理论解析与实例验证相结合的研究方法,探究了顶管埋深与间距耦合效应下的地表沉降槽形态演化规律,并建立地表沉降高精度预... 针对软土地层双线顶管施工中地表沉降形态演化机制不明确、传统Peck公式预测精度不足等问题,通过三维数值分析、理论解析与实例验证相结合的研究方法,探究了顶管埋深与间距耦合效应下的地表沉降槽形态演化规律,并建立地表沉降高精度预测模型。结果表明,随顶管间距增大或顶管埋深降低,地表沉降槽形态逐渐从V形向U形及W形演变。基于参数敏感性分析,提出形态系数K,通过K的取值判断沉降曲线的形状。针对传统Peck公式对双线顶管沉降预测精度的问题,引入沉降槽宽度修正系数与最大沉降修正系数,使V形与U形沉降曲线预测误差从70%降至5%以内;进一步增设隆起修正项,构建W形沉降曲线预测模型。经工程实例验证,该模型对浅埋顶管施工地表沉降曲线较好,研究成果为软土地区双线顶管施工沉降控制提供了理论依据与技术支撑。 展开更多
关键词 平行顶管 修正Peck公式 地表沉降曲线 软土地层
在线阅读 下载PDF
复合地层下穿高速铁路矩形顶管盾构隧道开挖面稳定性研究
17
作者 同庆 庄永香 +2 位作者 宁茂权 刘炳杰 崔光耀 《高速铁路技术》 2026年第1期99-104,117,共7页
为保证矩形顶管盾构隧道开挖面稳定,以某矩形顶管盾构隧道工程为背景,采用有限元软件Abaqus建立了复合地层下穿高速铁路矩形顶管盾构隧道模型,定义了无量纲参数支护应力差率(m)及硬岩比(n),分析了硬岩比、支护应力差率和埋深因子对复合... 为保证矩形顶管盾构隧道开挖面稳定,以某矩形顶管盾构隧道工程为背景,采用有限元软件Abaqus建立了复合地层下穿高速铁路矩形顶管盾构隧道模型,定义了无量纲参数支护应力差率(m)及硬岩比(n),分析了硬岩比、支护应力差率和埋深因子对复合地层矩形顶管盾构施工开挖面失稳范围、开挖面位移及轨道沉降的影响。结果表明,随着复合地层硬岩比的增加,矩形顶管盾构隧道开挖面在相同支护应力差率下失稳范围逐渐减小,失稳位移逐渐减小,轨道沉降逐渐减小;埋深因子越大,开挖面失稳位移越大,轨道沉降越大;当n<0.75时,高速铁路轨道沉降易大于沉降阈值,在穿越待建高速铁路线路时可采用桩板结构加固方案,在下穿既有高速铁路段采用人工挖孔桩+D型便梁加固方案来满足施工安全稳定要求。研究成果可为类似工程提供参考。 展开更多
关键词 隧道工程 矩形顶管盾构 复合地层 开挖面稳定性 近接施工
在线阅读 下载PDF
顶管隧道施工掌子面极限支护压力计算及影响因素研究
18
作者 张江红 徐前卫 《水力发电》 2026年第1期59-65,共7页
基于极限平衡理论,提出了考虑掌子面分层条件下的开挖面失稳破坏模型,并推导了掌子面临界支护力计算公式,依托合肥引江济淮项目顶管隧道区间工程,建立了相关的有限元模型对理论公式进行了验证,并且分析了地层参数对极限支护力的影响。... 基于极限平衡理论,提出了考虑掌子面分层条件下的开挖面失稳破坏模型,并推导了掌子面临界支护力计算公式,依托合肥引江济淮项目顶管隧道区间工程,建立了相关的有限元模型对理论公式进行了验证,并且分析了地层参数对极限支护力的影响。结果表明:理论公式计算得到的掌子面极限支护力与数值模拟结果相比差距在10%以内,验证了理论模型及计算公式的合理性;掌子面上半区土体变形相对较大,随着内摩擦角的增大,黏聚力对支护力的影响逐渐减小,并且内摩擦角和黏聚力的增加均会导致极限支护力降低;埋深比的增加尽管会引起更大的应力释放,但土体强度也会同时增加,从而导致极限支护应力比逐渐降低。 展开更多
关键词 顶管隧道 掌子面稳定性 极限支护力 极限平衡理论 数值模拟
在线阅读 下载PDF
路基帮宽段群桩施工挤土效应模型试验研究
19
作者 赵文辉 许锦江 +1 位作者 户军杰 张珂 《铁道学报》 北大核心 2026年第1期160-169,共10页
随着我国铁路交通运输量的不断递增,既有铁路扩能改建工程越来越多,鉴于高速铁路运营时对线路沉降控制的高标准,铁路路基帮宽段复合地基施工对既有线的影响备受关注。采用铝制闭口管桩开展黄土路基帮宽段静压群桩施工挤土效应模型试验,... 随着我国铁路交通运输量的不断递增,既有铁路扩能改建工程越来越多,鉴于高速铁路运营时对线路沉降控制的高标准,铁路路基帮宽段复合地基施工对既有线的影响备受关注。采用铝制闭口管桩开展黄土路基帮宽段静压群桩施工挤土效应模型试验,深入分析群桩施工过程中桩土变形、附加挤土侧压力、既有路基隆起量以及桩身轴力等参数的响应规律。结果表明:沉桩时桩端土体沿球孔呈向外扩张的趋势,桩周土体沿桩身径向扩张;附加挤土侧压力沿深度递增,并在既有桩桩端及以下深度消减;既有路基变形主要发生在坡脚处,连续施工下既有路基隆起最大值为1.33 mm,跳桩法施工既有路基隆起最大值为0.92 mm,相比连续施工减小了35.2%;邻桩的存在对沉桩轴力的影响并不显著。建议实际工程中从靠近既有路基侧开始施工,采用跳桩法的方式减小挤土效应对既有路基的影响,且重点监测临近侧两排桩施工引起的影响。 展开更多
关键词 路基帮宽 静压管桩 模型试验 挤土效应
在线阅读 下载PDF
矩形顶管减摩注浆扩散机制SPH模拟及试验验证
20
作者 李培楠 刘雨晴 +3 位作者 邱龑 甄亮 张中杰 王长虹 《铁道工程学报》 北大核心 2026年第1期74-81,共8页
研究目的:为解决超大断面矩形顶管由于自身断面的几何特性,减摩注浆扩散效率较低,浆液容易产生淤积的问题,本文研究减摩泥浆不同组成成分的含量变化对浆液性能的影响。同时借助光滑粒子流体动力学方法,对矩形顶管减摩注浆的运动特征和... 研究目的:为解决超大断面矩形顶管由于自身断面的几何特性,减摩注浆扩散效率较低,浆液容易产生淤积的问题,本文研究减摩泥浆不同组成成分的含量变化对浆液性能的影响。同时借助光滑粒子流体动力学方法,对矩形顶管减摩注浆的运动特征和扩散模式进行数值模拟,分析浆液在管土间隙中的运动机制。最后通过对比可视化大型模型试验结果,对数值仿真结果的合理性进行验证。研究结论:(1)当膨润土含量大于4%时,才能有效发挥其他添加剂的作用,其中CMC(羧甲基纤维素钠)可以显著降低泥浆滤失量,而HS-3(高性能盾构泥浆专用材料)可以显著提高动切力和触变性,PAM(聚丙烯酰胺)可以提高各项性能指标,不过变化幅度较缓;(2)减摩泥浆在从注浆孔注出后,会首先顺着沟槽流动下来,迅速填充整个底面,从而在底面形成一层浆土混合物,有效降低管土摩阻力;(3)初始注浆阶段,建议上部和侧部以及底部注浆孔同时注浆;持续顶进过程中,改为上部和侧部注浆孔同时注浆;注浆过程中,随着管片的不断移动,会对周围土体与管片的接触形态造成改变,并且随着泥浆的渗透和流失,应及时补浆,保证泥浆套的完整性;(4)本研究结果可为矩形顶管工程的设计和施工提供理论支持和数据参考。 展开更多
关键词 隧道 矩形顶管 减摩注浆 扩散运动机制 SPH模拟 可视化试验
在线阅读 下载PDF