During the critical transformation period of landscape architecture major after the adjustment of disciplinary structure and the changes in market demand,private colleges and universities,as important places for culti...During the critical transformation period of landscape architecture major after the adjustment of disciplinary structure and the changes in market demand,private colleges and universities,as important places for cultivating local talents,have pain points such as uneven quality of teachers and students and weak innovation and practice.The practice system with“multi-dimensional Integration”integrates four dimensions:interdisciplinary integration,spatial and temporal intersection,historical inheritance,and behavioral activity,deepens the disciplinary connotation,and integrates the three elements of nature,humanity,and technology,aiming to provide a new path for private colleges and universities to cultivate application-oriented and compound talents with innovative capabilities.In terms of optimizing talent cultivation and adapting to industry changes,this system provides thinking and reference for landscape architecture major,helping the major reshape its core competitiveness and promoting educational innovation and industry development.展开更多
To fully leverage the advantages of mechanization and informatization in tunnel boring machine(TBM)operations,the authors aim to promote the advancement of tunnel construction technology toward intelligent development...To fully leverage the advantages of mechanization and informatization in tunnel boring machine(TBM)operations,the authors aim to promote the advancement of tunnel construction technology toward intelligent development.This involved exploring the deep integration of next-generation artificial intelligence technologies,such as sensing technology,automatic control technology,big data technology,deep learning,and machine vision,with key operational processes,including TBM excavation,direction adjustment,step changes,inverted arch block assembly,material transportation,and operation status assurance.The results of this integration are summarized as follows.(1)TBM key excavation parameter prediction algorithm was developed with an accuracy rate exceeding 90%.The TBM intelligent step-change control algorithm,based on machine vision,achieved an image segmentation accuracy rate of 95%and gripper shoe positioning error of±5 mm.(2)An automatic positioning system for inverted arch blocks was developed,enabling real-time perception of the spatial position and deviation during the assembly process.The system maintains an elevation positioning deviation within±3 mm and a horizontal positioning deviation within±10 mm,reducing the number of surveyors in each work team.(3)A TBM intelligent rail transportation system that achieves real-time human-machine positioning,automatic switch opening and closing,automatic obstacle avoidance,intelligent transportation planning,and integrated scheduling and command was designed.Each locomotive formation reduces one shunter and improves comprehensive transportation efficiency by more than 20%.(4)Intelligent analysis and prediction algorithms were developed to monitor and predict the trends of the hydraulic and gear oil parameters in real time,enhancing the proactive maintenance and system reliability.展开更多
The advent of parametric design has resulted in a marked increase in the complexity of building.Unfortunately,traditional construction methods make it difficult to meet the needs.Therefore,construction robots have bec...The advent of parametric design has resulted in a marked increase in the complexity of building.Unfortunately,traditional construction methods make it difficult to meet the needs.Therefore,construction robots have become a pivotal production tool in this context.Since the arm span of a single robot usually does not exceed 3 meters,it is not competent for producing large-scale building components.Accordingly,the extension of the robot,s working range is often achieved by external axes.Nevertheless,the coupling control of external axes and robots and their kinematic solution have become key challenges.The primary technical difficulties include customized construction robots,automatic solutions for external axes,fixed axis joints,and specific motion mode control.This paper proposes solutions to these difficulties,introduces the relevant basic concepts and algorithms in detail,and encapsulates these robotics principles and algorithm processes into the Grasshopper plug-in commonly used by architects to form the FURobot software platform.This platform effectively solves the above problems,lowers the threshold for architects,and improves production efficiency.The effectiveness of the algorithm and software in this paper is verified through simulation experiments.展开更多
Scientific and technological advancements are rapidly transforming underground engineering,shifting from labor-intensive,time-consuming methods to automated,real-time systems.This timely and comprehensive review cover...Scientific and technological advancements are rapidly transforming underground engineering,shifting from labor-intensive,time-consuming methods to automated,real-time systems.This timely and comprehensive review covers in-situ testing,intelligent monitoring,and geophysical testing methods,highlighting fundamental principles,testing apparatuses,data processing techniques,and engineering applications.The state-of-the-art summary emphasizes not only cutting-edge innovations for complex and harsh environments but also the transformative role of artificial intelligence and machine learning in data interpretations.The integration of big data and advanced algorithms is particularly impactful,enabling the identification,prediction,and mitigation of potential risks in underground projects.Key aspects of the discussion include detection capabilities,method integration,and data convergence of intelligent technologies to drive enhanced safety,operational efficiency,and predictive reliability.The review also examines future trends in intelligent technologies,emphasizing unified platforms that combine multiple methods,real-time data,and predictive analytics.These advancements are shaping the evolution of underground construction and maintenance,aiming for risk-free,high-efficiency underground engineering.展开更多
To understand the smoke level and NO_(x)emission characteristics of in-use construction machinery in Beijing,we selected 905 construction machines in Beijing from August 2022 to April 2023 to monitor the emission leve...To understand the smoke level and NO_(x)emission characteristics of in-use construction machinery in Beijing,we selected 905 construction machines in Beijing from August 2022 to April 2023 to monitor the emission level of smoke and NO_(x).The exhaust smoke level and excessive emission situation of different machinery types were identified,and their NO_(x)emission levels were monitored according to the free acceleration method.We investigated the correlation of NO_(x)and smoke emission,and proposed suggestions for controlling pollution discharge from construction machinery in the future.The results show that the exhaust smoke level was 0–2.62 m^(−1),followed a log-normal distribution(μ=-1.73,δ=1.09,R^(2)=0.99),with a 5.64%exceedance rate.Differenceswere observed amongmachinery types,with low-power engine forklifts showing higher smoke levels.The NO_(x)emission range was 71–1516 ppm,followed a normal distribution(μ=565.54,δ=309.51,R^(2)=0.83).Differences among machinery types were relatively small.Engine rated net power had the most significant impact on NO_(x)emissions.Thus,NO_(x)emissions from construction machinery need further attention.Furthermore,we found a weak negative correlation(p<0.05)between the emission level of smoke and NO_(x),that is the synergic emission reduction effect is poor,emphasizing the need for NO_(x)emission limits.In the future,the oversight in Beijing should prioritize phasing out ChinaⅠand ChinaⅡmachinery,and monitor emissions from highpower engine ChinaⅢmachinery.展开更多
Construction engineering and management(CEM)has become increasingly complicated with the increasing size of engineering projects under different construction environments,motivating the digital transformation of CEM.T...Construction engineering and management(CEM)has become increasingly complicated with the increasing size of engineering projects under different construction environments,motivating the digital transformation of CEM.To contribute to a better understanding of the state of the art of smart techniques for engineering projects,this paper provides a comprehensive review of multi-criteria decision-making(MCDM)techniques,intelligent techniques,and their applications in CEM.First,a comprehensive framework detailing smart technologies for construction projects is developed.Next,the characteristics of CEM are summarized.A bibliometric review is then conducted to investigate the keywords,journals,and clusters related to the application of smart techniques in CEM during 2000-2022.Recent advancements in intelligent techniques are also discussed under the following six topics:①big data technology;②computer vision;③speech recognition;④natural language processing;⑤machine learning;and⑥knowledge representation,understanding,and reasoning.The applications of smart techniques are then illustrated via underground space exploitation.Finally,future research directions for the sustainable development of smart construction are highlighted.展开更多
The risk prevention and control in construction projects heavily relies on the systematic optimization of on-site safety management measures.Studies show that technical means such as safety education and training,dyna...The risk prevention and control in construction projects heavily relies on the systematic optimization of on-site safety management measures.Studies show that technical means such as safety education and training,dynamic monitoring of hazard sources directly reduce the probability of accidents.The full-staff responsibility system and performance evaluation indirectly enhance the resilience of risk prevention and control by shaping a culture of risk awareness.Based on the new local safety officer qualification regulations and the mandatory promotion of digital tools by 2025,case analysis indicates that the collaborative application of BIM and AI early warning platforms can reduce the risk of falls from height by 45%.The rigid constraints of systems,technological innovation and iteration,and the cultivation of cultural ecosystems form a multi-dimensional collaborative mechanism.In the future,it is necessary to integrate intelligent perception with green construction standards to achieve an upgrade in risk management efficiency.展开更多
With the rapid development of globalization and information technology,intellectual property has been one of the key drivers of economic growth,and the construction of intellectual property system has become an import...With the rapid development of globalization and information technology,intellectual property has been one of the key drivers of economic growth,and the construction of intellectual property system has become an important criterion for measuring the quality of business environment.This article is intended to explore the current status of intellectual property system construction in China,the challenges,and its relationship with the business environment,to propose the corresponding countermeasures and suggestions.The study finds that the legal system of intellectual property in China is gradually improving,and judicial and administrative protection are continuously strengthened.However,the challenges still remain such as frequent infringements,rights hard to protect and insufficient international cooperation.These issues not only affect the legitimate rights and interests of innovation entities,but also for the market fairness and the level of the business environment.Therefore,this article proposes that strengthening the perfection of the intellectual property legal system,enhancing intellectual property services and support capabilities,strengthening international cooperation and exchanges,and accelerating the cultivation of composite talents.It aims to provide theoretical references for the construction of intellectual property system and the optimization of the business environment,promote the high-quality development of economy and enhance the global competitiveness of the country.展开更多
The ancient tacit knowledge behind the logic system permeated the culture and promoted numerous impactful inventions throughout the history. Traditional Chinese medicine with its effectiveness should also have stemmed...The ancient tacit knowledge behind the logic system permeated the culture and promoted numerous impactful inventions throughout the history. Traditional Chinese medicine with its effectiveness should also have stemmed out from such logic system. This article aims to rearticulate the underlying lucid multi-dimensional logic system, which faded in obscurity only because of time-out loss of the mid-right concept. Retracing this past tacit but important concept could uncover a multi-dimensional system over a point relating to all matters while capturing the central core of the matter. The seemingly unmanageable multidimensional logic was strengthened by verification processes which affirmed its further extensions, and made up the language of the people, the concepts of yin-yang(阴阳), and the development of extensions of Ba Gua(八卦) derivatives, which furthered the interpretation of the space-time properties and Chinese medicine.展开更多
Construction work is an important component of social development,and its safety management is crucial for the protection of employees’lives,the efficient development of enterprises,and the social harmony and stabili...Construction work is an important component of social development,and its safety management is crucial for the protection of employees’lives,the efficient development of enterprises,and the social harmony and stability.Therefore,this paper explores the risk identification,risk estimation,risk evaluation,and control strategies of construction sites.It analyzes the research progress,current issues that need optimization,and future development directions,aiming to provide insights for the development of risk evaluation in construction sites.展开更多
Professional and trade skills are required for handling the construction related projects;Construction industries of the present day however lack useful information concerning different practices,patterns and trends i...Professional and trade skills are required for handling the construction related projects;Construction industries of the present day however lack useful information concerning different practices,patterns and trends involved in risk management.Considering this,the present study focuses on the aforementioned variables of risk management by quantitative analysis specifically in the domain of construction industry.This study has used IBM’s SPSS(Statistical Package for Social Sciences)version 25.0 to analyze the results.This study is an initiative to assess the impact of risk management in the construction sector of Jordan.It will assist the construction sector for exploring the limitations with respect to integrate effective risk management.A sense of competition will be developed through a comparison of risk factors of construction projects among the project stakeholders such as contractors should enhance their risk management practices.展开更多
Stress accumulation is a key factor leading to sodium storage performance deterioration for NiSe_(2)-based anodes.Therefore,inhibiting the concentrated local stress during the sodiataion/desodiation process is crucial...Stress accumulation is a key factor leading to sodium storage performance deterioration for NiSe_(2)-based anodes.Therefore,inhibiting the concentrated local stress during the sodiataion/desodiation process is crucial for acquiring stable NiSe2-based materials for sodium-ion batteries(SIBs),Herein,a stress dissipation strategy driven by architecture engineering is proposed,which can achieve ultrafast and ultralong sodium storage properties.Different from the conventional sphere-like or rod-like architecture,the three-dimensional(3D)flower-like NiSe_(2)@C composite is delicately designed and assembled with onedimensional nanorods and carbon framework.More importantly,the fundamental mechanism of improved structure stability is unveiled by simulations and experimental results simultaneously.It demonstrates that this designed multidimensional flower-like architecture with dispersed nanorods can balance the structural mismatch,avoid concentrated local strain,and relax the internal stress,mainly induced by the unavoidable volume variation during the repeated conversion processes.Moreover,it can provide more Na^(+)-storage sites and multi-directional migration pathways,leading to a fast Na^(+)-migration channel with boosted reaction kinetic.As expected,it delivers superior rate performance(441 mA h g^(-1)at 5.0 A g^(-1))and long cycling stability(563 mA h g^(-1)at 1.0 A g^(-1)over 1000 cycles)for SIBs.This work provides useful insights for designing high-performance conversion-based anode materials for SIBs.展开更多
The cost and strict input format requirements of GraphRAG make it less efficient for processing large documents. This paper proposes an alternative approach for constructing a knowledge graph (KG) from a PDF document ...The cost and strict input format requirements of GraphRAG make it less efficient for processing large documents. This paper proposes an alternative approach for constructing a knowledge graph (KG) from a PDF document with a focus on simplicity and cost-effectiveness. The process involves splitting the document into chunks, extracting concepts within each chunk using a large language model (LLM), and building relationships based on the proximity of concepts in the same chunk. Unlike traditional named entity recognition (NER), which identifies entities like “Shanghai”, the proposed method identifies concepts, such as “Convenient transportation in Shanghai” which is found to be more meaningful for KG construction. Each edge in the KG represents a relationship between concepts occurring in the same text chunk. The process is computationally inexpensive, leveraging locally set up tools like Mistral 7B openorca instruct and Ollama for model inference, ensuring the entire graph generation process is cost-free. A method of assigning weights to relationships, grouping similar pairs, and summarizing multiple relationships into a single edge with associated weight and relation details is introduced. Additionally, node degrees and communities are calculated for node sizing and coloring. This approach offers a scalable, cost-effective solution for generating meaningful knowledge graphs from large documents, achieving results comparable to GraphRAG while maintaining accessibility for personal machines.展开更多
Taking modern indoor building construction as an example,this study analyzes the path planning and navigation of a smart plastering robot.It includes a basic introduction to smart plastering robots,an analysis of mult...Taking modern indoor building construction as an example,this study analyzes the path planning and navigation of a smart plastering robot.It includes a basic introduction to smart plastering robots,an analysis of multi-sensor fusion localization algorithms for smart plastering robots,and an analysis of path planning and navigation functions for smart plastering robots.It is hoped that through this analysis,a reference is provided for the path planning and navigation design of such robots to meet their practical application needs.展开更多
This paper explores whole-process engineering consulting,including its application models in public buildings and elderly-friendly projects,such as service integration and whole lifecycle management.It also addresses ...This paper explores whole-process engineering consulting,including its application models in public buildings and elderly-friendly projects,such as service integration and whole lifecycle management.It also addresses the construction of multi-dimensional collaborative theoretical models,public space streamline organization,and other aspects,emphasizing the importance of multi-dimensional collaboration.Additionally,it highlights the role of talent cultivation and digital transformation in enhancing project efficiency.展开更多
In the process of cultural and tourism project construction,intelligent construction technology has gradually shown strong advantages.The effective application of this technology not only greatly improves the construc...In the process of cultural and tourism project construction,intelligent construction technology has gradually shown strong advantages.The effective application of this technology not only greatly improves the construction efficiency and quality of cultural and tourism projects,but also effectively controls construction costs,laying a solid foundation for the green,low-carbon,and sustainable development of the cultural and tourism industry.The article analyzes the current situation of cultural and tourism project construction,proposes the advantages of intelligent construction and its application in the construction mode of cultural and tourism projects,aiming to provide reliable guidance for the sustainable development of cultural and tourism projects.展开更多
The basement was located at the bottom of the building,which not only affected the quality of the whole construction project but also had special requirements for construction technology and construction requirements....The basement was located at the bottom of the building,which not only affected the quality of the whole construction project but also had special requirements for construction technology and construction requirements.In modern times,with the increasing height of the building,the pressure on the ground has grown,and the demands for basements in construction projects have also steadily increased.With the development of modern technology,various construction techniques for basements emerged within the construction industry.Thus,this paper analyses the type of basement floor construction technologies,highlighting the application of these methods,and points out critical issues to consider.By examining frequent basement leakage problems,the paper proposed several measures to improve the quality if basement construction,aiming to better protect the service life of the building and further improve overall quality,and offering valuable insights for future projects.展开更多
The multi-dimensional interactive teaching model significantly enhances the effectiveness of college English instruction by emphasizing dynamic engagement between teachers and students,as well as among students themse...The multi-dimensional interactive teaching model significantly enhances the effectiveness of college English instruction by emphasizing dynamic engagement between teachers and students,as well as among students themselves.This paper explores practical strategies for implementing this model,focusing on four key aspects:deepening teachers’understanding of the model through continuous learning,innovating interactive methods such as questioning techniques and practical activities,leveraging modern technology to integrate resources and track learning progress,and establishing a communication platform that centers on student participation.By adopting these approaches,the model fosters a student-centered classroom environment,improves comprehensive English application skills,and optimizes overall teaching quality.展开更多
The increasing cost of infrastructure development risks stifling national investment plans.Many projects in Uganda have suffered because of the frequency and magnitude of claims made by parties involved especially the...The increasing cost of infrastructure development risks stifling national investment plans.Many projects in Uganda have suffered because of the frequency and magnitude of claims made by parties involved especially the contractors.As a result,the construction industry is plagued with claims which quite often lead to adversarial relationships.The major grounds for claims were identified through studying the contract documents where claims had been made.Increase in scope;change orders;errors in contract documents;inclement weather;inflation;delay in possessing the site;and change in the tax policy were the most prevalent grounds for making claims.Problems identified in claiming process include delays in getting approval;information on claims not reliable;hostility from the parties involved;pricing of claims;delays in effecting payment when approved;and overzealous contract interpretation leading to misunderstanding and delays Using a survey on project managers for 64 contractors and their corresponding clients or their representatives,the major ways in which it can be reduced were identified as being thoroughness during the design phase;providing for inflation;proper planning of works;using prequalified contractors;and proper documentation of records.Clients have a big role to play in reducing claims.展开更多
A composite anti-disturbance predictive control strategy employing a Multi-dimensional Taylor Network(MTN)is presented for unmanned systems subject to time-delay and multi-source disturbances.First,the multi-source di...A composite anti-disturbance predictive control strategy employing a Multi-dimensional Taylor Network(MTN)is presented for unmanned systems subject to time-delay and multi-source disturbances.First,the multi-source disturbances are addressed according to their specific characteristics as follows:(A)an MTN data-driven model,which is used for uncertainty description,is designed accompanied with the mechanism model to represent the unmanned systems;(B)an adaptive MTN filter is used to remove the influence of the internal disturbance;(C)an MTN disturbance observer is constructed to estimate and compensate for the influence of the external disturbance;(D)the Extended Kalman Filter(EKF)algorithm is utilized as the learning mechanism for MTNs.Second,to address the time-delay effect,a recursiveτstep-ahead MTN predictive model is designed utilizing recursive technology,aiming to mitigate the impact of time-delay,and the EKF algorithm is employed as its learning mechanism.Then,the MTN predictive control law is designed based on the quadratic performance index.By implementing the proposed composite controller to unmanned systems,simultaneous feedforward compensation and feedback suppression to the multi-source disturbances are conducted.Finally,the convergence of the MTN and the stability of the closed-loop system are established utilizing the Lyapunov theorem.Two exemplary applications of unmanned systems involving unmanned vehicle and rigid spacecraft are presented to validate the effectiveness of the proposed approach.展开更多
基金Sponsored by the Quality Engineering Project of Education Department of Anhui Province(2022jyxm671)Research Team Project of Anhui Xinhua University(kytd202202)+1 种基金Key Project of Scientific Research(Natural Science)of Higher Education Institutions in Anhui Province(2022AH051861)Teaching Reform Research and Practice Quality Engineering Project of Anhui Xinhua University(2024jy035).
文摘During the critical transformation period of landscape architecture major after the adjustment of disciplinary structure and the changes in market demand,private colleges and universities,as important places for cultivating local talents,have pain points such as uneven quality of teachers and students and weak innovation and practice.The practice system with“multi-dimensional Integration”integrates four dimensions:interdisciplinary integration,spatial and temporal intersection,historical inheritance,and behavioral activity,deepens the disciplinary connotation,and integrates the three elements of nature,humanity,and technology,aiming to provide a new path for private colleges and universities to cultivate application-oriented and compound talents with innovative capabilities.In terms of optimizing talent cultivation and adapting to industry changes,this system provides thinking and reference for landscape architecture major,helping the major reshape its core competitiveness and promoting educational innovation and industry development.
文摘To fully leverage the advantages of mechanization and informatization in tunnel boring machine(TBM)operations,the authors aim to promote the advancement of tunnel construction technology toward intelligent development.This involved exploring the deep integration of next-generation artificial intelligence technologies,such as sensing technology,automatic control technology,big data technology,deep learning,and machine vision,with key operational processes,including TBM excavation,direction adjustment,step changes,inverted arch block assembly,material transportation,and operation status assurance.The results of this integration are summarized as follows.(1)TBM key excavation parameter prediction algorithm was developed with an accuracy rate exceeding 90%.The TBM intelligent step-change control algorithm,based on machine vision,achieved an image segmentation accuracy rate of 95%and gripper shoe positioning error of±5 mm.(2)An automatic positioning system for inverted arch blocks was developed,enabling real-time perception of the spatial position and deviation during the assembly process.The system maintains an elevation positioning deviation within±3 mm and a horizontal positioning deviation within±10 mm,reducing the number of surveyors in each work team.(3)A TBM intelligent rail transportation system that achieves real-time human-machine positioning,automatic switch opening and closing,automatic obstacle avoidance,intelligent transportation planning,and integrated scheduling and command was designed.Each locomotive formation reduces one shunter and improves comprehensive transportation efficiency by more than 20%.(4)Intelligent analysis and prediction algorithms were developed to monitor and predict the trends of the hydraulic and gear oil parameters in real time,enhancing the proactive maintenance and system reliability.
基金National Key R&D Program of China(Nos.2023YFC3806900,2022YFE0141400)。
文摘The advent of parametric design has resulted in a marked increase in the complexity of building.Unfortunately,traditional construction methods make it difficult to meet the needs.Therefore,construction robots have become a pivotal production tool in this context.Since the arm span of a single robot usually does not exceed 3 meters,it is not competent for producing large-scale building components.Accordingly,the extension of the robot,s working range is often achieved by external axes.Nevertheless,the coupling control of external axes and robots and their kinematic solution have become key challenges.The primary technical difficulties include customized construction robots,automatic solutions for external axes,fixed axis joints,and specific motion mode control.This paper proposes solutions to these difficulties,introduces the relevant basic concepts and algorithms in detail,and encapsulates these robotics principles and algorithm processes into the Grasshopper plug-in commonly used by architects to form the FURobot software platform.This platform effectively solves the above problems,lowers the threshold for architects,and improves production efficiency.The effectiveness of the algorithm and software in this paper is verified through simulation experiments.
基金supported by Ministry of Education of Singapore,under Academic Research Fund Tier 1(Grant Number RG143/23).
文摘Scientific and technological advancements are rapidly transforming underground engineering,shifting from labor-intensive,time-consuming methods to automated,real-time systems.This timely and comprehensive review covers in-situ testing,intelligent monitoring,and geophysical testing methods,highlighting fundamental principles,testing apparatuses,data processing techniques,and engineering applications.The state-of-the-art summary emphasizes not only cutting-edge innovations for complex and harsh environments but also the transformative role of artificial intelligence and machine learning in data interpretations.The integration of big data and advanced algorithms is particularly impactful,enabling the identification,prediction,and mitigation of potential risks in underground projects.Key aspects of the discussion include detection capabilities,method integration,and data convergence of intelligent technologies to drive enhanced safety,operational efficiency,and predictive reliability.The review also examines future trends in intelligent technologies,emphasizing unified platforms that combine multiple methods,real-time data,and predictive analytics.These advancements are shaping the evolution of underground construction and maintenance,aiming for risk-free,high-efficiency underground engineering.
基金supported by the Energy Foundation(No.G-2203-33693).
文摘To understand the smoke level and NO_(x)emission characteristics of in-use construction machinery in Beijing,we selected 905 construction machines in Beijing from August 2022 to April 2023 to monitor the emission level of smoke and NO_(x).The exhaust smoke level and excessive emission situation of different machinery types were identified,and their NO_(x)emission levels were monitored according to the free acceleration method.We investigated the correlation of NO_(x)and smoke emission,and proposed suggestions for controlling pollution discharge from construction machinery in the future.The results show that the exhaust smoke level was 0–2.62 m^(−1),followed a log-normal distribution(μ=-1.73,δ=1.09,R^(2)=0.99),with a 5.64%exceedance rate.Differenceswere observed amongmachinery types,with low-power engine forklifts showing higher smoke levels.The NO_(x)emission range was 71–1516 ppm,followed a normal distribution(μ=565.54,δ=309.51,R^(2)=0.83).Differences among machinery types were relatively small.Engine rated net power had the most significant impact on NO_(x)emissions.Thus,NO_(x)emissions from construction machinery need further attention.Furthermore,we found a weak negative correlation(p<0.05)between the emission level of smoke and NO_(x),that is the synergic emission reduction effect is poor,emphasizing the need for NO_(x)emission limits.In the future,the oversight in Beijing should prioritize phasing out ChinaⅠand ChinaⅡmachinery,and monitor emissions from highpower engine ChinaⅢmachinery.
基金funded by the project of Guangdong Provincial Basic and Applied Basic Research Fund Committee(2022A1515240073)the Pearl River Talent Recruitment Program(2019CX01G338),Guangdong Province.
文摘Construction engineering and management(CEM)has become increasingly complicated with the increasing size of engineering projects under different construction environments,motivating the digital transformation of CEM.To contribute to a better understanding of the state of the art of smart techniques for engineering projects,this paper provides a comprehensive review of multi-criteria decision-making(MCDM)techniques,intelligent techniques,and their applications in CEM.First,a comprehensive framework detailing smart technologies for construction projects is developed.Next,the characteristics of CEM are summarized.A bibliometric review is then conducted to investigate the keywords,journals,and clusters related to the application of smart techniques in CEM during 2000-2022.Recent advancements in intelligent techniques are also discussed under the following six topics:①big data technology;②computer vision;③speech recognition;④natural language processing;⑤machine learning;and⑥knowledge representation,understanding,and reasoning.The applications of smart techniques are then illustrated via underground space exploitation.Finally,future research directions for the sustainable development of smart construction are highlighted.
文摘The risk prevention and control in construction projects heavily relies on the systematic optimization of on-site safety management measures.Studies show that technical means such as safety education and training,dynamic monitoring of hazard sources directly reduce the probability of accidents.The full-staff responsibility system and performance evaluation indirectly enhance the resilience of risk prevention and control by shaping a culture of risk awareness.Based on the new local safety officer qualification regulations and the mandatory promotion of digital tools by 2025,case analysis indicates that the collaborative application of BIM and AI early warning platforms can reduce the risk of falls from height by 45%.The rigid constraints of systems,technological innovation and iteration,and the cultivation of cultural ecosystems form a multi-dimensional collaborative mechanism.In the future,it is necessary to integrate intelligent perception with green construction standards to achieve an upgrade in risk management efficiency.
基金Guizhou Provincial University Humanities and Social Sciences Research Project in 2024"Enhancing the Development of New Productive Forces through University Technological Innovation and Intellectual Property Management"(2024RW256)Guizhou University of Commerce Research Project in 2022"Study on the Ideas and Pathways to Drive Agricultural Powerhouse through Digital Economy"(2022XJZX315)。
文摘With the rapid development of globalization and information technology,intellectual property has been one of the key drivers of economic growth,and the construction of intellectual property system has become an important criterion for measuring the quality of business environment.This article is intended to explore the current status of intellectual property system construction in China,the challenges,and its relationship with the business environment,to propose the corresponding countermeasures and suggestions.The study finds that the legal system of intellectual property in China is gradually improving,and judicial and administrative protection are continuously strengthened.However,the challenges still remain such as frequent infringements,rights hard to protect and insufficient international cooperation.These issues not only affect the legitimate rights and interests of innovation entities,but also for the market fairness and the level of the business environment.Therefore,this article proposes that strengthening the perfection of the intellectual property legal system,enhancing intellectual property services and support capabilities,strengthening international cooperation and exchanges,and accelerating the cultivation of composite talents.It aims to provide theoretical references for the construction of intellectual property system and the optimization of the business environment,promote the high-quality development of economy and enhance the global competitiveness of the country.
文摘The ancient tacit knowledge behind the logic system permeated the culture and promoted numerous impactful inventions throughout the history. Traditional Chinese medicine with its effectiveness should also have stemmed out from such logic system. This article aims to rearticulate the underlying lucid multi-dimensional logic system, which faded in obscurity only because of time-out loss of the mid-right concept. Retracing this past tacit but important concept could uncover a multi-dimensional system over a point relating to all matters while capturing the central core of the matter. The seemingly unmanageable multidimensional logic was strengthened by verification processes which affirmed its further extensions, and made up the language of the people, the concepts of yin-yang(阴阳), and the development of extensions of Ba Gua(八卦) derivatives, which furthered the interpretation of the space-time properties and Chinese medicine.
文摘Construction work is an important component of social development,and its safety management is crucial for the protection of employees’lives,the efficient development of enterprises,and the social harmony and stability.Therefore,this paper explores the risk identification,risk estimation,risk evaluation,and control strategies of construction sites.It analyzes the research progress,current issues that need optimization,and future development directions,aiming to provide insights for the development of risk evaluation in construction sites.
文摘Professional and trade skills are required for handling the construction related projects;Construction industries of the present day however lack useful information concerning different practices,patterns and trends involved in risk management.Considering this,the present study focuses on the aforementioned variables of risk management by quantitative analysis specifically in the domain of construction industry.This study has used IBM’s SPSS(Statistical Package for Social Sciences)version 25.0 to analyze the results.This study is an initiative to assess the impact of risk management in the construction sector of Jordan.It will assist the construction sector for exploring the limitations with respect to integrate effective risk management.A sense of competition will be developed through a comparison of risk factors of construction projects among the project stakeholders such as contractors should enhance their risk management practices.
基金the financial support from the Guangxi Natural Science Foundation(grant no.2021GXNSFDA075012,2023GXNSFGA026002)National Natural Science Foundation of China(52104298,22075073,52362027,52462029)Fundamental Research Funds for the Central Universities(531107051077).
文摘Stress accumulation is a key factor leading to sodium storage performance deterioration for NiSe_(2)-based anodes.Therefore,inhibiting the concentrated local stress during the sodiataion/desodiation process is crucial for acquiring stable NiSe2-based materials for sodium-ion batteries(SIBs),Herein,a stress dissipation strategy driven by architecture engineering is proposed,which can achieve ultrafast and ultralong sodium storage properties.Different from the conventional sphere-like or rod-like architecture,the three-dimensional(3D)flower-like NiSe_(2)@C composite is delicately designed and assembled with onedimensional nanorods and carbon framework.More importantly,the fundamental mechanism of improved structure stability is unveiled by simulations and experimental results simultaneously.It demonstrates that this designed multidimensional flower-like architecture with dispersed nanorods can balance the structural mismatch,avoid concentrated local strain,and relax the internal stress,mainly induced by the unavoidable volume variation during the repeated conversion processes.Moreover,it can provide more Na^(+)-storage sites and multi-directional migration pathways,leading to a fast Na^(+)-migration channel with boosted reaction kinetic.As expected,it delivers superior rate performance(441 mA h g^(-1)at 5.0 A g^(-1))and long cycling stability(563 mA h g^(-1)at 1.0 A g^(-1)over 1000 cycles)for SIBs.This work provides useful insights for designing high-performance conversion-based anode materials for SIBs.
文摘The cost and strict input format requirements of GraphRAG make it less efficient for processing large documents. This paper proposes an alternative approach for constructing a knowledge graph (KG) from a PDF document with a focus on simplicity and cost-effectiveness. The process involves splitting the document into chunks, extracting concepts within each chunk using a large language model (LLM), and building relationships based on the proximity of concepts in the same chunk. Unlike traditional named entity recognition (NER), which identifies entities like “Shanghai”, the proposed method identifies concepts, such as “Convenient transportation in Shanghai” which is found to be more meaningful for KG construction. Each edge in the KG represents a relationship between concepts occurring in the same text chunk. The process is computationally inexpensive, leveraging locally set up tools like Mistral 7B openorca instruct and Ollama for model inference, ensuring the entire graph generation process is cost-free. A method of assigning weights to relationships, grouping similar pairs, and summarizing multiple relationships into a single edge with associated weight and relation details is introduced. Additionally, node degrees and communities are calculated for node sizing and coloring. This approach offers a scalable, cost-effective solution for generating meaningful knowledge graphs from large documents, achieving results comparable to GraphRAG while maintaining accessibility for personal machines.
基金Science and Technology Research Project of Chongqing Education Commission(Project No.:KJQN202401902)Chongqing Construction Science and Technology Plan Project(Project No.:Chinese Society For Urban Studies,2024:3-24)+1 种基金cientific Research Fund Project of Chongqing Institute of Engineering(Project No.:2022gcky01)College Student Innovation and Entrepreneurship Training Program Project of Chongqing Institute of Engineering(Project No.:CXCY2024018)。
文摘Taking modern indoor building construction as an example,this study analyzes the path planning and navigation of a smart plastering robot.It includes a basic introduction to smart plastering robots,an analysis of multi-sensor fusion localization algorithms for smart plastering robots,and an analysis of path planning and navigation functions for smart plastering robots.It is hoped that through this analysis,a reference is provided for the path planning and navigation design of such robots to meet their practical application needs.
文摘This paper explores whole-process engineering consulting,including its application models in public buildings and elderly-friendly projects,such as service integration and whole lifecycle management.It also addresses the construction of multi-dimensional collaborative theoretical models,public space streamline organization,and other aspects,emphasizing the importance of multi-dimensional collaboration.Additionally,it highlights the role of talent cultivation and digital transformation in enhancing project efficiency.
文摘In the process of cultural and tourism project construction,intelligent construction technology has gradually shown strong advantages.The effective application of this technology not only greatly improves the construction efficiency and quality of cultural and tourism projects,but also effectively controls construction costs,laying a solid foundation for the green,low-carbon,and sustainable development of the cultural and tourism industry.The article analyzes the current situation of cultural and tourism project construction,proposes the advantages of intelligent construction and its application in the construction mode of cultural and tourism projects,aiming to provide reliable guidance for the sustainable development of cultural and tourism projects.
文摘The basement was located at the bottom of the building,which not only affected the quality of the whole construction project but also had special requirements for construction technology and construction requirements.In modern times,with the increasing height of the building,the pressure on the ground has grown,and the demands for basements in construction projects have also steadily increased.With the development of modern technology,various construction techniques for basements emerged within the construction industry.Thus,this paper analyses the type of basement floor construction technologies,highlighting the application of these methods,and points out critical issues to consider.By examining frequent basement leakage problems,the paper proposed several measures to improve the quality if basement construction,aiming to better protect the service life of the building and further improve overall quality,and offering valuable insights for future projects.
文摘The multi-dimensional interactive teaching model significantly enhances the effectiveness of college English instruction by emphasizing dynamic engagement between teachers and students,as well as among students themselves.This paper explores practical strategies for implementing this model,focusing on four key aspects:deepening teachers’understanding of the model through continuous learning,innovating interactive methods such as questioning techniques and practical activities,leveraging modern technology to integrate resources and track learning progress,and establishing a communication platform that centers on student participation.By adopting these approaches,the model fosters a student-centered classroom environment,improves comprehensive English application skills,and optimizes overall teaching quality.
文摘The increasing cost of infrastructure development risks stifling national investment plans.Many projects in Uganda have suffered because of the frequency and magnitude of claims made by parties involved especially the contractors.As a result,the construction industry is plagued with claims which quite often lead to adversarial relationships.The major grounds for claims were identified through studying the contract documents where claims had been made.Increase in scope;change orders;errors in contract documents;inclement weather;inflation;delay in possessing the site;and change in the tax policy were the most prevalent grounds for making claims.Problems identified in claiming process include delays in getting approval;information on claims not reliable;hostility from the parties involved;pricing of claims;delays in effecting payment when approved;and overzealous contract interpretation leading to misunderstanding and delays Using a survey on project managers for 64 contractors and their corresponding clients or their representatives,the major ways in which it can be reduced were identified as being thoroughness during the design phase;providing for inflation;proper planning of works;using prequalified contractors;and proper documentation of records.Clients have a big role to play in reducing claims.
基金co-supported by the National Key R&D Program of China(No.2023YFB4704400)the Zhejiang Provincial Natural Science Foundation of China(No.LQ24F030012)the National Natural Science Foundation of China General Project(No.62373033)。
文摘A composite anti-disturbance predictive control strategy employing a Multi-dimensional Taylor Network(MTN)is presented for unmanned systems subject to time-delay and multi-source disturbances.First,the multi-source disturbances are addressed according to their specific characteristics as follows:(A)an MTN data-driven model,which is used for uncertainty description,is designed accompanied with the mechanism model to represent the unmanned systems;(B)an adaptive MTN filter is used to remove the influence of the internal disturbance;(C)an MTN disturbance observer is constructed to estimate and compensate for the influence of the external disturbance;(D)the Extended Kalman Filter(EKF)algorithm is utilized as the learning mechanism for MTNs.Second,to address the time-delay effect,a recursiveτstep-ahead MTN predictive model is designed utilizing recursive technology,aiming to mitigate the impact of time-delay,and the EKF algorithm is employed as its learning mechanism.Then,the MTN predictive control law is designed based on the quadratic performance index.By implementing the proposed composite controller to unmanned systems,simultaneous feedforward compensation and feedback suppression to the multi-source disturbances are conducted.Finally,the convergence of the MTN and the stability of the closed-loop system are established utilizing the Lyapunov theorem.Two exemplary applications of unmanned systems involving unmanned vehicle and rigid spacecraft are presented to validate the effectiveness of the proposed approach.