Experimental study on settlement of model piles in frozen soil under dynamic loading 被引量:1
1
作者 张建明 朱元林 张家懿 《Science China Earth Sciences》 SCIE EI CAS 1999年第S1期30-37,共8页
Test results show that the settlement process of model piles is mainly the rheological process of frozen soil under shear loading. The settlement rate of model piles increases with increasing temperature of frozen soi... Test results show that the settlement process of model piles is mainly the rheological process of frozen soil under shear loading. The settlement rate of model piles increases with increasing temperature of frozen soil, decreasing roughness of pile surface and increasing rigidity of pile foundation. As the water content of frozen soil reaches its saturation value, the settlement rate is the least. When the level of loading is higher, the settlement rate under dynamic loading is less than that under static loading. With the level of loading lowering, the effect between dynamic and static loading on the settlement rate becomes close gradually. Under the present test conditions, the settlement rate of model piles is independent of the frequency of dynamic loads. 展开更多
关键词 FROZEN SOIL dynamic LOAD model pile SETTLEMENT rate.
原文传递
Model tests on XCC-piled embankment under dynamic train load of high-speed railways 被引量:8
2
作者 Niu Tingting Liu Hanlong +1 位作者 Ding Xuanming Zheng Changjie 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2018年第3期581-594,共14页
Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under... Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under the dynamic train load of a high-speed railway is not yet understood.In light of this,a heavily instrumented piled embankment model was set up,and a model test was carried out,in which a servo-hydraulic actuator outputting M-shaped waves was adopted to simulate the process of a running train.Earth pressure,settlement,strain in the geogrid and pile and excess pore water pressure were measured.The results show that the soil arching height under the dynamic train load of a high-speed railway is shorter than under static loading.The growth trend for accumulated settlement slowed down after long-term vibration although there was still a tendency for it to increase.Accumulated geogrid strain has an increasing tendency after long-term vibration.The closer the embankment edge,the greater the geogrid strain over the subsoil.Strains in the pile were smaller under dynamic train loads,and their distribution was different from that under static loading.At the same elevation,excess pore water pressure under the track slab was greater than that under the embankment shoulder. 展开更多
关键词 piled embankment model test dynamic train load of high-speed railways XCC-pile M-shaped wave
在线阅读 下载PDF
Behavior of raft on settlement reducing piles:Experimental model study 被引量:4
3
作者 Basuony El-Garhy Ahmed Abdel Galil +1 位作者 Abdel-Fattah Youssef Mohamed Abo Raia 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第5期389-399,共11页
An experimental program is conducted on model piled rafts in sand soil.The experimental program is aimed to investigate the behavior of raft on settlement reducing piles.The testing program includes tests on models of... An experimental program is conducted on model piled rafts in sand soil.The experimental program is aimed to investigate the behavior of raft on settlement reducing piles.The testing program includes tests on models of single pile,unpiled rafts and rafts on 1,4,9,or 16 piles.The model piles beneath the rafts are closed ended displacement piles installed by driving.Three lengths of piles are used in the experiments to represent slenderness ratio,L/D,of 20,30 and 50,respectively.The dimensions of the model rafts are 30 cm×30 cm with different thickness of 0.5 cm,1.0 cm or 1.5 cm.The raft-soil stiffness ratios of the model rafts ranging from 0.39 to 10.56 cover flexible to very stiff rafts.The improvement in the ultimate bearing capacity is represented by the load improvement ratio,LIR,and the reductions in average settlement and differential settlement are represented by the settlement ratio,SR,and the differential settlement ratio,DSR,respectively.The effects of the number of settlement reducing piles,raft relative stiffness,and the slenderness ratio of piles on the load improvement ratio,settlement ratio and differential settlement ratio are presented and discussed.The results of the tests show the effectiveness of using piles as settlement reduction measure with the rafts.As the number of settlement reducing piles increases,the load improvement ratio increases and the differential settlement ratio decreases. 展开更多
关键词 RAFT Settlement reducing piles piled raft model tests Sand soil
在线阅读 下载PDF
Physical modeling of behaviors of cast-in-place concrete piled raft compared to free-standing pile group in sand 被引量:1
4
作者 Mehdi Sharafkhah Issa Shooshpasha 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2018年第4期703-716,共14页
Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies i... Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies indicated that this method is too conservative. Only when the pile cap is elevated from the ground level,the raft bearing contribution can be neglected. In a piled raft foundation, pileesoileraft interaction is complicated. Although several numerical studies have been carried out to analyze the behaviors of piled raft foundations, very few experimental studies are reported in the literature. The available laboratory studies mainly focused on steel piles. The present study aims to compare the behaviors of piled raft foundations with free-standing pile groups in sand, using laboratory physical models. Cast-in-place concrete piles and concrete raft are used for the tests. The tests are conducted on single pile, single pile in pile group, unpiled raft, free-standing pile group and piled raft foundation. We examine the effects of the number of piles, the pile installation method and the interaction between different components of foundation. The results indicate that the ultimate bearing capacity of the piled raft foundation is considerably higher than that of the free-standing pile group with the same number of piles. With installation of the single pile in the group, the pile bearing capacity and stiffness increase. Installation of the piles beneath the raft decreases the bearing capacity of the raft. When the raft bearing capacity is not included in the design process, the allowable bearing capacity of the piled raft is underestimated by more than 200%. This deviation intensifies with increasing spacing of the piles. 展开更多
关键词 Free-standing pile group piled raft pileesoileraft interaction Physical modeling Cast-in-place concrete piles
在线阅读 下载PDF
Numerical modeling of an advancing hydraulically-driven pile in sand
5
作者 Meen-wah GUI 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2011年第1期15-23,共9页
The penetration of a model pile through sand was investigated via a numerical analysis. Data from nine triaxial compression tests on dense specimens at different stress levels was generalized and used to create an emp... The penetration of a model pile through sand was investigated via a numerical analysis. Data from nine triaxial compression tests on dense specimens at different stress levels was generalized and used to create an empirical non-linear plastic hardening stress-strain relation for use in the analysis. As the computer program used is capable of large displacement analyses in radial symmetry, we expected that the analysis would easily reproduce the tip resistance penetration profile of the model pile in sand of known density and stress. However, initial attempts led to over-prediction. Successful analyses required both successive reformations of the mesh and the complete elimination of the dilatant peak in soil strength, which is naturally eliminated under large confining stress directly beneath the advancing tip, and that soil in the far-field had strained insufficiently to reach peak strength. Thus, the soil around the shaft must have been sheared to a critical state as it flowed past the tip. The hypothesis that the resistance to displacement piles in sand is mainly a function of the deformability of the sand was again proven, and the use of peak strength in the traditional bearing capacity formulae was found to be inappropriate. Independent investigation in this direction is needed to quantify the hypothesis. 展开更多
关键词 Hydraulic pile Tip resistance SAND Double yield (DY) model pile penetration Grid re-meshing
原文传递
Study of Physical Modelling for Piles
6
作者 Roya Momeni Vahid Rostami Javad Khazaei 《Open Journal of Geology》 2017年第8期1160-1175,共16页
Physical modeling due to its simulation ability of real conditions has been developed as a proper method to study engineering issues. In this paper after the introduction of usual physical modeling systems in geotechn... Physical modeling due to its simulation ability of real conditions has been developed as a proper method to study engineering issues. In this paper after the introduction of usual physical modeling systems in geotechnical engineering, we focused on a low known device of physical modeling in geotechnical practice, especially applicable in deep foundations. It is named Frustum Confining Vessel (FCV) that is one of the calibration chamber forms. It can apply high stress level by a relatively linear stress distribution. Thus, it can simulate actual states for piles in laboratory controlled conditions. The FCV test results can be used for real project by multiply scale factors. Scale factors can be explained by dimensional and similar analyses in every model and apparatus. In this study the relatively largest size of FCV among others in the world, which called FCV-AUT, was used to study physical purposes. Several various model piles (deep foundations) were made by 4 mm thick steel plate with height of 750 mm. All model piles tested in Babolsar sand as surrounding soil via FCV, and two full scale piles tested in similar conditions in the field. The experimental results and outcomes indicated the FCV can be used as a suitable device for physical modelling aims. Thus, it can be realized the FCV is more effective than simple and calibration chambers as well as laminar boxes and more economic than centrifuges. 展开更多
关键词 PHYSICAL modeling Frustum CONFINING VESSEL (FCV) model pile Stress Level
暂未订购
Model Tests of Pile Defect Detection
7
作者 Li Guocheng Wang Jingtao School of Civil Engineering , Huazhong University of Science and Technology , Wuhan 430074 《Journal of China University of Geosciences》 SCIE CSCD 2001年第4期321-324,共4页
The pile, as an important foundation style, is being used in engineering practice. Defects of different types and damages of different degrees easily occur during the process of pile construction. So, dietecting defec... The pile, as an important foundation style, is being used in engineering practice. Defects of different types and damages of different degrees easily occur during the process of pile construction. So, dietecting defects of the pile is very important. As so far, there are some difficult problems in pile defect detection. Based on stress wave theory, some of these typical difficult problems were studied through model tests. The analyses of the test results are carried out and some significant results of the low-strain method are obtained, when a pile has a gradually-decreasing crosssection part, the amplitude of the reflective signal originating from the defect is dependent on the decreasing value of the rate of crosssection β. No apparent signal reflected from the necking appeares on the velocity response curve when the value of β is less than about 3. 5 %. 展开更多
关键词 model tests pile defect detection stress wave responses.
在线阅读 下载PDF
Optimization Mathematical Model of Pile Forces for Offshore Piled Breasting Dolphins 被引量:1
8
作者 周锡礽 王乐芹 +1 位作者 王晖 朱福明 《海洋工程:英文版》 EI 2004年第4期567-575,共9页
An optimization mathematical model of the pile forces for piled breasting dolphins in the open sea under various loading conditions is presented. The optimum layout with the well distributed pile forces and the least ... An optimization mathematical model of the pile forces for piled breasting dolphins in the open sea under various loading conditions is presented. The optimum layout with the well distributed pile forces and the least number of piles is achieved by the multiplier penalty function method. Several engineering cases have been calculated and compared with the result of the conventional design method. It is shown that the number of piles can be reduced at least by 10%~20% and the piles' bearing state is improved greatly. 展开更多
关键词 piled breasting dolphin mathematical model multiplier penalty function method optimization design
在线阅读 下载PDF
Numerical modeling of centrifuge cyclic lateral pile load experiments 被引量:8
9
作者 Nikos Gerolymos Sandra Escoffier +1 位作者 George Gazetas Jacques Garnier 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2009年第1期61-76,共16页
To gain insight into the inelastic behavior of piles, the response of a vertical pile embedded in dry sand and subjected to cyclic lateral loading was studied experimentally in centrifuge tests conducted in Laboratoir... To gain insight into the inelastic behavior of piles, the response of a vertical pile embedded in dry sand and subjected to cyclic lateral loading was studied experimentally in centrifuge tests conducted in Laboratoire Central des Ponts et Chaussees. Three types of cyclic loading were applied, two asymmetric and one symmetric with respect to the unloaded pile. An approximately square-root variation of soil stiffness with depth was obtained from indirect in-flight density measurements, laboratory tests on reconstituted samples, and well-established empirical correlations. The tests were simulated using a cyclic nonlinear Winkler spring model, which describes the full range of inelastic phenomena, including separation and re-attachment of the pile from and to the soil. The model consists of three mathematical expressions capable of reproducing a wide variety of monotonic and cyclic experimentalp-y curves. The physical meaning of key model parameters is graphically explained and related to soil behavior. Comparisons with the centrifuge test results demonstrate the general validity of the model and its ability to capture several features of pile-soil interaction, including: soil plastification at an early stage of loading, "pinching" behavior due to the formation of a relaxation zone around the upper part of the pile, and stiffness and strength changes due to cyclic loading. A comparison of the p-y curves derived from the test results and the proposed model, as well as those from the classical curves of Reese et al. (1974) for sand, is also presented. 展开更多
关键词 centrifuge test Winkler model p-y curves cyclic loading pile-soil separation/gapping nonlinear response experimental validation
在线阅读 下载PDF
Study on soil-pile-structure-TMD interaction system by shaking table model test 被引量:3
10
作者 楼梦麟 王文剑 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2004年第1期127-137,共11页
The success of the tuned mass damper (TMD) in reducing wind-induced structural vibrations has been well established. However, from most of the recent numerical studies, it appears that for a structure situated on very... The success of the tuned mass damper (TMD) in reducing wind-induced structural vibrations has been well established. However, from most of the recent numerical studies, it appears that for a structure situated on very soft soil, soil-structure interaction (SSI) could render a damper on the structure totally ineffective. In order to experimentally verify the SSI effect on the seismic performance of TMD, a series of shaking table model tests have been conducted and the results are presented in this paper. It has been shown that the TMD is not as effective in controlling the seismic responses of structures built on soft soil sites due to the SSI effect. Some test results also show that a TMD device might have a negative impact if the SSI effect is neglected and the structure is built on a soft soil site. For structures constructed on a soil foundation, this research verifies that the SSI effect must be carefully understood before a TMD control system is designed to determine if the control is necessary and if the SSI effect must be considered when choosing the optimal parameters of the TMD device. 展开更多
关键词 soil-pile-structure interaction TMD’s performance structural control shaking table model test
在线阅读 下载PDF
Influence of pile spacing on seismic response of piled raft in soft clay: centrifuge modeling 被引量:1
11
作者 Yang Jun Yang Min Chen Haibing 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2019年第4期719-733,共15页
In order to study the infl uence of pile spacing on the seismic response of piled raft in soft clay, a series of shaking table tests were conducted by using a geotechnical centrifuge. The dynamic behavior of accelerat... In order to study the infl uence of pile spacing on the seismic response of piled raft in soft clay, a series of shaking table tests were conducted by using a geotechnical centrifuge. The dynamic behavior of acceleration, displacement and internal forces was examined. The test results indicate that the seismic acceleration responses of models are generally greater than the surrounding soil surface in the period ranges of 2–10 seconds. Foundation instant settlements for 4×4 and 3×3 piled raft (with pile spacing equal to 4 and 6 times pile diameter) are somewhat close to each other at the end of the earthquake, but reconsolidation settlements are greater for 3×3 piled raft. The seismic acceleration of superstructure, the uneven settlement of the foundation and the maximum bending moment of pile are relatively lower for 3×3 piled raft. Successive earthquakes lead to the softening behavior of soft clay, which causes a reduction of the pile bearing capacity and thus loads are transferred from the pile group to the raft. For the case of a 3×3 piled raft, there is relatively smaller change of the load sharing ratio of the pile group and raft after the earthquake and the distribution of maximum bending moments at the pile head is more uniform. 展开更多
关键词 piled RAFT pile SPACING soft clay dynamic CENTRIFUGE model test seismic response SUBSIDENCE load sharing bending moment
在线阅读 下载PDF
基坑开挖对邻近桥梁桩基的影响研究
12
作者 欧明喜 刘昊颜 戴志峰 《建筑技术》 2026年第1期15-21,共7页
为了研究基坑开挖对邻近双桩基础的影响,开展室内模型试验,得出了桩身弯矩和水平位移随开挖深度的变化规律。针对模型试验建立数值模型,在验证模型合理性的基础上开展了桩顶约束条件、桩身刚度、桩身长度和坑桩距离的影响研究。计算结... 为了研究基坑开挖对邻近双桩基础的影响,开展室内模型试验,得出了桩身弯矩和水平位移随开挖深度的变化规律。针对模型试验建立数值模型,在验证模型合理性的基础上开展了桩顶约束条件、桩身刚度、桩身长度和坑桩距离的影响研究。计算结果表明:当桩顶约束由承台变为系梁时,前后桩最大弯矩约分别为原来的56%和47.7%,桩身最大水平位移所在位置发生变化,但在量值上基本保持不变;随着桩身刚度的增大,桩身弯矩和水平位移均减小,但在刚度超过一定值后这种变化趋势不再明显;桩长增加会导致桩身最大弯矩的位置和桩身水平位移发生变化,当桩长增加60%时,桩身水平位移仅为原来的20%左右;随着坑桩距离的增加,桩身弯矩和水平位移均出现递减的趋势,桩身弯矩在2.0倍的开挖深度以内影响较大,桩身水平位移在超过1.0倍开挖深度之后影响较小。 展开更多
关键词 基坑开挖 双桩基础 模型试验 数值模拟 附加效应
在线阅读 下载PDF
冻融环境下岩堆体细宏观损伤演化模型研究
13
作者 陈志敏 张政 +3 位作者 易明炀 孙勇 李开哲 张溢博 《岩土力学》 北大核心 2026年第1期198-208,共11页
冻融损伤是寒区工程研究的关键问题。岩堆体是一种特殊岩土混合体,为更好地了解寒区岩堆体的力学性质和冻融侵蚀引起的细观损伤,开展了不同冻融条件及不同含水率作用下岩堆体的三轴压缩试验。提出孔隙损伤增量模型,利用颗粒(孔隙)及裂... 冻融损伤是寒区工程研究的关键问题。岩堆体是一种特殊岩土混合体,为更好地了解寒区岩堆体的力学性质和冻融侵蚀引起的细观损伤,开展了不同冻融条件及不同含水率作用下岩堆体的三轴压缩试验。提出孔隙损伤增量模型,利用颗粒(孔隙)及裂隙图像识别与分析系统(particles(pores)and cracks anlysis system,简称PCAS)深入研究冻融过程中孔隙结构的变化趋势。以孔隙度分形维数为核心,建立冻融-损伤模型系统地分析冻融循环次数对岩堆体损伤的关系。结合材料的细观与宏观参数变化趋势,验证模型合理性及全面揭示岩堆体在冻融作用下的损伤模型。结果表明:(1)在冻融循环过程中细观损伤对宏观强度的影响显著,孔隙损伤增量增加导致应力峰值下降,两者呈负相关;(2)岩堆体的峰值应力随着冻融循环次数的增加而降低,且降低幅度在冻融循环次数为4次前逐渐增大,随后幅度逐渐减小;(3)利用孔隙度分形维数建立的孔隙增量模型,从细观层面有效地验证了岩堆体的冻融损伤是随着冻融损伤次数的增加而增加,该模型的参数数据与实测数据高度一致,且相比传统模型计算更简便。 展开更多
关键词 岩堆体 细宏观 孔隙损伤增量模型 分形维数 冻融损伤
原文传递
基于改进U-Net与RGB-D图像的青花椒枝条“下桩”剪切点定位
14
作者 蒲应俊 张文州 +3 位作者 李金广 赵立军 陈子文 杨明金 《农业工程学报》 北大核心 2026年第1期160-170,共11页
青花椒枝条“下桩”是通过剪下带鲜果的枝条并保留一定长度短桩的采摘收获方法。为实现青花椒采摘机器人精准识别枝条并确定最佳剪切点以达到高效“下桩”作业,该研究提出了一种基于U-Net深度学习网络和RGB-D相机相结合的青花椒主枝“... 青花椒枝条“下桩”是通过剪下带鲜果的枝条并保留一定长度短桩的采摘收获方法。为实现青花椒采摘机器人精准识别枝条并确定最佳剪切点以达到高效“下桩”作业,该研究提出了一种基于U-Net深度学习网络和RGB-D相机相结合的青花椒主枝“下桩”剪切点定位方法。首先,通过改进传统U-Net模型,将其主干网络替换为嵌入CA注意力机制的ResNet50网络,同时在U-Net模型的特征拼接阶段中增加SE注意力机制,从而构建针对青花椒主枝和树干的分割模型。然后,将分割后的图像利用二值化与骨架线提取方法得到主枝中心线,结合RGB-D相机的深度信息与OpenCV图像处理算法,完成世界坐标系与像素坐标系间长度的映射。随后,将短桩预设的40 mm长度从世界坐标系映射至RGB图像中的像素长度,最终确定每根主枝的“下桩”剪切点位置。试验结果表明,改进后的U-Net模型在分割性能上优于DeeplabV3+和PSPNet,平均交并比(MIoU)、平均像素准确率(mPA)和召回率(recall)分别达到87.58%、93.76%和96.24%。在晴天顺光、逆光及阴天条件下,“下桩”剪切点识别定位的成功率分别达到90.81%、84.88%、80.52%。采摘点定位试验中,定位成功率为90%,单根花椒枝平均识别过程耗时1.93 s。该研究结果可为青花椒采摘机器人“下桩”采收提供技术支撑。 展开更多
关键词 图像处理 青花椒 采摘 U-Net网络模型 下桩采摘法 剪切点定位
在线阅读 下载PDF
布桩形式对边坡变形特性影响的透明土试验研究
15
作者 张秀勇 张百红 尹海峰 《防灾减灾工程学报》 北大核心 2026年第1期200-210,共11页
原稳定边坡坡顶受工程作用影响会产生附加变形甚至失稳,针对抗滑桩布置方案问题,进行了三种工况的透明土模型试验,位移场采集数据显示:随着坡顶竖向位移荷载的施加,土体变形量逐渐增大,变形区域由桩前逐渐传递至桩后;不同水平剖面土体... 原稳定边坡坡顶受工程作用影响会产生附加变形甚至失稳,针对抗滑桩布置方案问题,进行了三种工况的透明土模型试验,位移场采集数据显示:随着坡顶竖向位移荷载的施加,土体变形量逐渐增大,变形区域由桩前逐渐传递至桩后;不同水平剖面土体的变形规律也不同,加载区域的土体受到挤压向侧面移动,但变形量逐渐减小,加载平台前的土体和加载平台下的部分土体受到挤压向平台与桩体之间的区域移动,位移先增大后减小,三种布桩形式下的土体变形规律不尽相同,单桩布置在坡顶时,荷载较大时,桩体附近土颗粒会出现绕流作用,坡体产生较大水平位移且靠近坡面土体有向上位移;排桩布置在坡顶时,选择适当桩距,桩前土出现压力拱,阻隔压力传递,坡脚平台面以下土体受到加载平台的影响很小,而坡脚平台以上斜坡区域的土体与下部土体变形较大,排桩结构把外荷载作用效应向深部转移,深部桩及土体抗力较大,群桩效应明显,加固效果较好;排桩布置在坡中时,排桩不在平台加载主要影响区内,桩前土体位移没有有效控制,下滑力增加,滑动面在桩前已经形成,加载平台下沉一定深度后坡脚发生剪切破坏,滑裂面从桩身下部穿过,排桩加固失效,桩间距及布桩位置是影响边坡体加固效果的关键因素。 展开更多
关键词 透明土 抗滑桩 堆载 挤土效应 模型试验
原文传递
风积沙长短桩复合地基承载性能试验研究
16
作者 严小婷 薛凯喜 +3 位作者 易光胜 朱小伟 司鹏超 胡艳香 《建筑结构》 北大核心 2026年第4期122-129,共8页
为了解决湿陷性黄土易发生土层变形、沉降等问题,通过室内长短桩黄土复合地基模型试验,对比了不同风积沙掺量时长短桩复合地基的承载性能差异,分析了风积沙掺量对长短桩复合地基性能的影响机制。研究结果表明:在长短桩复合地基湿陷与非... 为了解决湿陷性黄土易发生土层变形、沉降等问题,通过室内长短桩黄土复合地基模型试验,对比了不同风积沙掺量时长短桩复合地基的承载性能差异,分析了风积沙掺量对长短桩复合地基性能的影响机制。研究结果表明:在长短桩复合地基湿陷与非湿陷工况下,风积沙掺量50%与风积沙掺量0%的长短桩复合地基在沉降量、桩身轴力和桩土应力等变化趋势基本一致。长短桩复合地基未湿陷工况下,与风积沙掺量0%时相比,风积沙掺量为50%时,长短桩复合地基的沉降量增加了28.05%~38.80%,桩土应力比减小了12.5%~21.2%,长桩桩身轴力相差10.77%~15.73%,短桩桩身轴力相差9.25%~21.06%。长短桩复合地基湿陷工况下,与风积沙掺量0%时相比,风积沙掺量为50%时,长桩桩身轴力相差4.67%~26.45%,短桩桩身轴力相差4.70%~15.15%。风积沙掺量0%和风积沙掺量50%的长短桩复合地基在浸水湿陷后桩顶轴力增加了275%和272%。研究表明,风积沙掺量0%和风积沙掺量50%的两种长短桩复合地基承载特性相近,验证了风积沙作为替代材料的可行性,为风积沙的工程应用提供了参考。 展开更多
关键词 复合地基 风积沙混凝土 刚性长短桩 模型试验 承载性能
在线阅读 下载PDF
偏心激振下大直径桩中弯曲波传播特征
17
作者 李子卓 卢志堂 +1 位作者 马海春 阳栋 《合肥工业大学学报(自然科学版)》 北大核心 2026年第1期94-101,共8页
文章基于有限差分法对大直径桩中弯曲波传播特征开展了数值研究。在试验验证数值模型的基础上,分别采用截断三正弦脉冲和升余弦脉冲进行激振,研究偏心激振下桩中弯曲波的传播特性,并对模拟结果进行离散傅里叶变换,在频域内分析桩周土对... 文章基于有限差分法对大直径桩中弯曲波传播特征开展了数值研究。在试验验证数值模型的基础上,分别采用截断三正弦脉冲和升余弦脉冲进行激振,研究偏心激振下桩中弯曲波的传播特性,并对模拟结果进行离散傅里叶变换,在频域内分析桩周土对弯曲波传播的衰减作用。结果表明:在偏心激振下,桩周土刚度越大,弯曲波的衰减越强烈;在同一土层中,桩中弯曲波衰减程度大于纵波,并且随着频率增高或桩径变小,弯曲波衰减变弱;缩径会引起弯曲波的反射,但其反射波的波形杂乱;缩径程度越大,缩径处反射弯曲波的幅值越大;利用桩顶采集到的弯曲波信号具有识别缺陷位置和缺陷程度的潜力。 展开更多
关键词 低应变检测 弯曲波 反射 桩身完整性 模型试验
在线阅读 下载PDF
考虑群桩作用的抽水型地面沉降试验研究
18
作者 苏智聪 张云 +2 位作者 李勇 苗晨阳 戴文杰 《高校地质学报》 北大核心 2026年第1期109-118,共10页
随着城市地下空间的利用率不断提高,地下大型构筑物成为区域地面沉降发展不可忽视的影响因素。为了揭示群桩基础对抽水型地面沉降的影响机理,文章开展了物理模型试验,分析了桩间距和桩的平面布置方式对土层孔压和沉降的影响。试验结果表... 随着城市地下空间的利用率不断提高,地下大型构筑物成为区域地面沉降发展不可忽视的影响因素。为了揭示群桩基础对抽水型地面沉降的影响机理,文章开展了物理模型试验,分析了桩间距和桩的平面布置方式对土层孔压和沉降的影响。试验结果表明,桩间距和桩布置方式影响群桩阻挡渗流和阻碍土体沉降的效果,从而影响地面沉降发展。较小的桩间距和梅花形布置方式具有较大的面积置换率和较长的渗流路径,对水流和土体沉降的阻挡效果显著。因桩群的阻挡作用,抽水时位于群桩和抽水井之间区域的地下水难以得到及时补充,孔压下降明显,沉降梯度也较大。 展开更多
关键词 地下构筑物 模型试验 地面沉降 抽水 群桩作用
在线阅读 下载PDF
路基帮宽段群桩施工挤土效应模型试验研究
19
作者 赵文辉 许锦江 +1 位作者 户军杰 张珂 《铁道学报》 北大核心 2026年第1期160-169,共10页
随着我国铁路交通运输量的不断递增,既有铁路扩能改建工程越来越多,鉴于高速铁路运营时对线路沉降控制的高标准,铁路路基帮宽段复合地基施工对既有线的影响备受关注。采用铝制闭口管桩开展黄土路基帮宽段静压群桩施工挤土效应模型试验,... 随着我国铁路交通运输量的不断递增,既有铁路扩能改建工程越来越多,鉴于高速铁路运营时对线路沉降控制的高标准,铁路路基帮宽段复合地基施工对既有线的影响备受关注。采用铝制闭口管桩开展黄土路基帮宽段静压群桩施工挤土效应模型试验,深入分析群桩施工过程中桩土变形、附加挤土侧压力、既有路基隆起量以及桩身轴力等参数的响应规律。结果表明:沉桩时桩端土体沿球孔呈向外扩张的趋势,桩周土体沿桩身径向扩张;附加挤土侧压力沿深度递增,并在既有桩桩端及以下深度消减;既有路基变形主要发生在坡脚处,连续施工下既有路基隆起最大值为1.33 mm,跳桩法施工既有路基隆起最大值为0.92 mm,相比连续施工减小了35.2%;邻桩的存在对沉桩轴力的影响并不显著。建议实际工程中从靠近既有路基侧开始施工,采用跳桩法的方式减小挤土效应对既有路基的影响,且重点监测临近侧两排桩施工引起的影响。 展开更多
关键词 路基帮宽 静压管桩 模型试验 挤土效应
在线阅读 下载PDF
滑坡作用下抗滑桩及桥梁桩基变形机制模型试验研究
20
作者 宁峙名 吴红刚 +3 位作者 刘旭 李凯 徐汶瀚 庞军 《铁道标准设计》 北大核心 2026年第1期101-109,142,共10页
为研究滑坡作用下桥梁桩基的承载机理及受力模式,分析有无抗滑桩加固时各结构物的变形机制,以兰新高铁二十里铺特大桥25号桥墩滑坡典型断面为背景,开展大型室内模型试验,对比分析有无抗滑桩支护时桥梁桩基的桩顶位移、桩周土压力及弯矩... 为研究滑坡作用下桥梁桩基的承载机理及受力模式,分析有无抗滑桩加固时各结构物的变形机制,以兰新高铁二十里铺特大桥25号桥墩滑坡典型断面为背景,开展大型室内模型试验,对比分析有无抗滑桩支护时桥梁桩基的桩顶位移、桩周土压力及弯矩分布规律。研究结果表明:(1)有抗滑桩支护时桥梁桩基桩顶位移大大减小,抗滑桩对桥梁桩基有明显的加固作用;(2)无桩组桥梁桩基山侧土压力沿桩深呈“R”形分布,河侧土压力沿桩深呈“D”形分布,桥基承受荷载能力有限,土压力分布形式发生改变,桩体中上部桩周土压力较大,在设计时应重点考虑优化;(3)有桩组桥梁桩基山侧及河侧土压力桩深均呈“S”形分布,抗滑桩承担绝大部分的滑坡推力,经抗滑桩传递至桥梁桩基的剩余滑坡推力大大降低,桥梁桩基有足够的能力抵抗滑坡作用,使其山侧和河侧的土体变形表现出协调一致性,桥梁桩基得到很好的保护;(4)各级滑坡推力作用下,有、无桩组桩身弯矩分布特征基本一致,沿深度方向均呈“S”形分布,弯矩最大值均位于滑带处。相同荷载有桩侧弯矩差值较无桩侧得到很大改善,桥基受力分布更加均匀,抗滑桩桩身最大弯矩值是有桩侧桥梁桩基最大弯矩值的13.5倍,抗滑桩支护效果显著。 展开更多
关键词 铁路桥梁 边坡工程 群桩基础 抗滑桩 变形机制 模型试验