期刊文献+
共找到8,145篇文章
< 1 2 250 >
每页显示 20 50 100
Challenging in frequent jacking force surge in rock pipe jacking project:A case study in Guanjingkou,China
1
作者 Chao Li Zuliang Zhong +2 位作者 Xinrong Liu Yi Zhang Nanyun Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 2025年第7期4559-4578,共20页
Previous studies have demonstrated that the surge in jacking force during the Guanjingkou project is caused by the contact conditions of the debris bentonite slurry outside the pipe.Therefore,this paper further system... Previous studies have demonstrated that the surge in jacking force during the Guanjingkou project is caused by the contact conditions of the debris bentonite slurry outside the pipe.Therefore,this paper further systematically investigates the influence of different debris slurry mass ratios(SLRs)and different particle size distributions(PSDs)on the pipe-rock friction characteristics using friction tests.The test results reveal that under the same PSD,an adequate amount of slurry(with an SLR of 1:4)consistently yields the lowest friction coefficient.When the SLR is between 1:2 and 1:3,the viscosity of the slurry reaches its peak,resulting in the highest friction coefficient.Additionally,when the PSD is 1:1:5 and 1:1:15,the friction coefficient is primarily governed by the plowing effect at the contact surface.When the PSD is 5:1:1 and 15:1:1,the friction coefficient is mainly controlled by the void ratio(VR)of debris.In the case of PSDs 1:5:1 and 1:15:1,the friction coefficient is jointly controlled by the adhesion effect of high-viscosity slurry and the plowing effect at the contact surface,and it gradually shifts towards being dominated by the VR as the amount of debris increases.Regardless of the SLRs and PSDs,the continuous deposition of debris and the injection of slurry incessantly exacerbate both the plowing and adhesion effects,creating a vicious cycle.This is the reason why the high-pressure water flushing method can not only fail to resolve the issue but also accelerate the occurrence of the surge in jacking force. 展开更多
关键词 Debris friction characteristic Friction test jacking force surge Mudcake Rock pipe jacking
在线阅读 下载PDF
基于Jack与NSGA-Ⅱ的井下工程机械人机布局优化设计
2
作者 李博 任重熙 +1 位作者 刘玉荣 薛艳敏 《机械设计》 北大核心 2025年第10期211-217,共7页
针对井下工程机械作业环境限制导致驾驶员承受较高精神与身体负荷问题,提出一种基于Jack软件与NSGA-Ⅱ算法的驾驶室人机布局优化设计流程。以井下铲运机为例,参考相关标准与调研结果,在Jack软件中创建虚拟“人-机-环境”仿真系统,对不... 针对井下工程机械作业环境限制导致驾驶员承受较高精神与身体负荷问题,提出一种基于Jack软件与NSGA-Ⅱ算法的驾驶室人机布局优化设计流程。以井下铲运机为例,参考相关标准与调研结果,在Jack软件中创建虚拟“人-机-环境”仿真系统,对不同体型驾驶员的可视性、可达性与舒适性进行分析,将减少视野遮挡、优化控制元件布局、提升坐姿舒适度设定为优化设计的3个方向;通过NSGA-Ⅱ求解,参考Pareto最优解制订优化方案,并进行二次迭代仿真验证。结果表明:采用该设计流程可使井下铲运机驾驶室显示器与控制元件均在驾驶员舒适操作范围内,右手控制元件均位于第5百分位驾驶员舒适可达域内,Krist舒适度评分提升9.84%,可为其他井下工程机械驾驶室人机布局优化设计提供参考。 展开更多
关键词 人机工程 jack NSGA-Ⅱ 井下铲运机 优化设计
原文传递
基于Jack仿真的超载作业工位人机工程设计研究
3
作者 严波 鲁雅楠 郑镇华 《机械设计》 北大核心 2025年第3期180-186,共7页
为降低流水线车间操作工人肌肉骨骼疾病(Musculoskeletal Disorders,MSDs)的风险,提出一种融合MSDs评价和Jack仿真的作业工位人机改良设计方法。以M公司超载作业工位为例,采用自我评价和快速上肢评估(Rapid Upper Limb Assessment,RULA... 为降低流水线车间操作工人肌肉骨骼疾病(Musculoskeletal Disorders,MSDs)的风险,提出一种融合MSDs评价和Jack仿真的作业工位人机改良设计方法。以M公司超载作业工位为例,采用自我评价和快速上肢评估(Rapid Upper Limb Assessment,RULA)分析法,发现操作工人的腰部是受MSDs影响最大的部位,其次是颈部和右肩。以此为依据对作业工位中工作台、超载机和工位布局进行针对性改良设计。通过Jack仿真软件验证了改良方案中操作工人的可视域与可达域良好,且在6个关键动作中有4个动作的RULA等级降低1级,证明改良方案的人机工程性能良好,可有效降低操作工人的MSDs患病风险。通过超载作业工位的人机改良设计案例,证明MSDs评价和Jack仿真的结合在车间作业工位设计中的实用性和可行性。 展开更多
关键词 人机工程 作业工位 jack虚拟仿真 快速上肢评估法 肌肉骨骼疾病
原文传递
基于FMEA与JACK的野外陆地救援担架创新设计
4
作者 王秋惠 马露源 《工业设计》 2025年第1期144-147,共4页
为有效设计符合人机工程原理的陆地救援担架,降低救援人员在使用救援担架中引发骨骼肌肉损伤的风险,研究采用潜在失效模式与效应分析(FMEA)、JACK人机工程学仿真相结合的方法。首先,计算出风险优先级数(RPN),从而确定救援担架潜在失效... 为有效设计符合人机工程原理的陆地救援担架,降低救援人员在使用救援担架中引发骨骼肌肉损伤的风险,研究采用潜在失效模式与效应分析(FMEA)、JACK人机工程学仿真相结合的方法。首先,计算出风险优先级数(RPN),从而确定救援担架潜在失效模式的比重。然后,通过JACK仿真数据对比分析P5和P95救援人员的肌肉骨骼疲劳程度,如下背部分析(LBA)、静态强度预测(SSP)等,并制定相应的改进措施。最后,使用JACK仿真和FMEA分析验证改进设计后的救援担架。FMEA与JACK仿真结合可精准挖掘影响人机关系的关键因素,仿真数据表明,通过改进设计,救援人员的肌肉骨骼疲劳程度均得到了有效控制,且使下担架过程更加稳定。 展开更多
关键词 工业设计 陆地救援担架 FMEA jack仿真 计算机辅助设计
在线阅读 下载PDF
基于JACK的高层救援下肢职业损伤风险特性研究
5
作者 徐明伟 刘冠林 +4 位作者 刘昱彤 王科 余成刘 戴超 陈建武 《中国安全生产科学技术》 北大核心 2025年第2期200-207,共8页
负重登高作为高层建筑火灾救援任务中的典型任务,救援人员易产生肌肉骨骼损伤。为对救援人员从事高层救援产生的职业风险进行评估,使用JACK软件对救援人员负重登高过程进行动素分析,并从作业姿势、能量预测、作业负荷与暴露时间3个角度... 负重登高作为高层建筑火灾救援任务中的典型任务,救援人员易产生肌肉骨骼损伤。为对救援人员从事高层救援产生的职业风险进行评估,使用JACK软件对救援人员负重登高过程进行动素分析,并从作业姿势、能量预测、作业负荷与暴露时间3个角度进行下肢职业性肌肉骨骼评估。研究结果表明:救援人员在整个负重登高救援任务过程中存在一定的肌肉骨骼疾病风险,尤其下肢罹患肌肉骨骼疾病概率较高。脊柱压力峰值超过3400 N,臀部、膝关节、脚踝存在极限预警,肌肉骨骼损伤风险高。且起始登第1级台阶和结束登高前1级台阶时,有职业性肌肉骨骼损伤的概率相对较大。救援人员整个负重登高任务中能量消耗较高,长期作业易造成下肢职业性损伤。 展开更多
关键词 救援人员 负重登高 jack仿真 职业风险 肌肉骨骼损伤
在线阅读 下载PDF
基于JACK仿真的10 kV配网带电作业人员生物力学分析
6
作者 蓝剑 王旭杰 +4 位作者 郑扬义 赵一帆 肖坤 万亚旭 吴田 《电工材料》 2025年第3期87-91,95,共6页
绝缘杆作业法是10 kV配网带电作业的常用方法,但在实际作业时缺少有效的舒适度评估手段。针对目前绝缘杆类工器具作业效率低、舒适性差的问题,使用JACK人机工效学仿真软件建立典型作业场景进行模拟作业,研究绝缘杆质量、作业姿势和人员... 绝缘杆作业法是10 kV配网带电作业的常用方法,但在实际作业时缺少有效的舒适度评估手段。针对目前绝缘杆类工器具作业效率低、舒适性差的问题,使用JACK人机工效学仿真软件建立典型作业场景进行模拟作业,研究绝缘杆质量、作业姿势和人员体型对人体下背部压力、作业姿势和关节舒适度等工效学指标的影响。结果表明:使用绝缘操作杆在同一条件下作业时,低百分位体型的作业人员和轻质工器具在舒适度方面更具优势;绝缘杆与工作点铅垂线呈30°站位时,人-机工效最佳。本研究为改善绝缘杆作业时的人机工效提供了参考依据。 展开更多
关键词 带电作业 jack 绝缘杆作业法 人机工效学 模拟作业
在线阅读 下载PDF
基于JACK仿真的列车高级软卧卧铺舒适度优化设计研究
7
作者 赵光宇 牛青 《工业设计》 2025年第1期148-151,共4页
目前乘客对于火车高级软卧卧铺出行的需求正从功能型向体验型转变,为了更好地满足乘客的需求,文章以人机工程仿真软件JACK为工具,建立了仿真数字人模型和高级软卧卧铺仿真环境模型,分析了乘客上铺行为的舒适度、乘客下铺行为的可视域、... 目前乘客对于火车高级软卧卧铺出行的需求正从功能型向体验型转变,为了更好地满足乘客的需求,文章以人机工程仿真软件JACK为工具,建立了仿真数字人模型和高级软卧卧铺仿真环境模型,分析了乘客上铺行为的舒适度、乘客下铺行为的可视域、依墙壁坐姿下的静态强度、卧铺的私密性及置物设施的易用性,通过上述分析得出高级软卧卧铺的设计缺陷,从人机工程学的角度对高级软卧卧铺提出设计策略,以期为高级软卧卧铺向体验型转变提供一定的参考。 展开更多
关键词 工业设计 高级软卧 jack人因工程 仿真技术 舒适度优化
在线阅读 下载PDF
Application Strategies of Pipe Jacking Technology in Municipal Rainwater Pipeline Engineering
8
作者 Yao Tong Xiaoqing Hu +1 位作者 Yuwenhui Guo Minjun Gao 《Journal of Architectural Research and Development》 2024年第6期5-10,共6页
Traditional construction techniques have a significant impact on the environment and are associated with long construction durations in the construction of municipal rainwater pipelines.Pipe jacking technology,a new t... Traditional construction techniques have a significant impact on the environment and are associated with long construction durations in the construction of municipal rainwater pipelines.Pipe jacking technology,a new type of pipeline construction method,enables non-excavation construction and can address the shortcomings of traditional pipeline construction.This article analyzes the concept and application advantages of pipe jacking technology.Combining engineering examples,it explores the application strategies of pipe jacking technology in the construction process of municipal rainwater pipelines for reference. 展开更多
关键词 Municipal engineering Rainwater pipeline Pipe jacking construction
在线阅读 下载PDF
Analytical solutions of vertical load on deep rectangular jacked pipe considering tunnelling-induced ground loss
9
作者 LI Jian-ye FANG Qian +4 位作者 LIU Xiang WANG Gan HUANG Jun DU Jian-ming ZHANG Zi-yi 《Journal of Central South University》 2025年第5期1855-1872,共18页
Determining earth pressure on jacked pipes is essential for ensuring lining safety and calculating jacking force,especially for deep-buried pipes.To better reflect the soil arching effect resulting from the excavation... Determining earth pressure on jacked pipes is essential for ensuring lining safety and calculating jacking force,especially for deep-buried pipes.To better reflect the soil arching effect resulting from the excavation of rectangular jacked pipes and the distribution of the earth pressure on jacked pipes,we present an analytical solution for predicting the vertical earth pressure on deep-buried rectangular pipe jacking tunnels,incorporating the tunnelling-induced ground loss distribution.Our proposed analytical model consists of the upper multi-layer parabolic soil arch and the lower friction arch.The key parameters(i.e.,width and height of friction arch B and height of parabolic soil arch H 1)are determined according to the existing research,and an analytical solution for K l is derived based on the distribution characteristics of the principal stress rotation angle.With consideration for the transition effect of the mechanical characteristics of the parabolic arch zone,an analytical solution for soil load transfer is derived.The prediction results of our analytical solution are compared with tests and simulation results to validate the effectiveness of the proposed analytical solution.Finally,the effects of different parameters on the soil pressure are discussed. 展开更多
关键词 rectangular pipe jacking tunnel vertical load multi-layer parabolic soil arch model soil arching
在线阅读 下载PDF
Predicting habitat suitability of Chilean jack mackerel under different climate scenarios
10
作者 Zhiping FENG Wei YU 《Journal of Oceanology and Limnology》 2025年第4期1361-1373,共13页
As an economically crucial species in the southeast Pacific Ocean,understanding the spatiotemporal distribution changes of the habitat of Trachurus murphyi under the influence of climate change is essential for effect... As an economically crucial species in the southeast Pacific Ocean,understanding the spatiotemporal distribution changes of the habitat of Trachurus murphyi under the influence of climate change is essential for effective resource assessment and management.The spatiotemporal changes in suitable habitats of T.murphyi under three climate change scenarios(SSP 126,SSP 370,and SSP 585)of Phase 6 of the Coupled Model Intercomparison Project(CMIP 6)were explored based on key environmental factors affecting the potential distribution of the species in a habitat suitability index(HSI)model.Results show that seawater temperature would increase under different scenarios,while the mixed layer depths would decrease under SSP 370 and SSP 585 scenarios but vary slightly under the SSP 126 scenario,which is similar to the variation in different climate periods.The positive difference in seawater temperature will be distributed in the central,southern,and offshore regions of Chile,and the negative difference in mixed layer depths be accounted for a large region.Under different climate scenarios,the HSI value for fishing ground and the overall proportion of suitable habitat area of T.murphyi will be decreased over the forecasted period.The suitable habitat of T.murphyi is concentrated in the 42°S-47°S area and will move to the southwest in different climate periods.Based on short-term climate change,the proportion of suitable habitat areas in the high seas of Chile is larger than in the exclusive economic zone under medium-and long-term climate change under different scenarios.The results of the gravity center of suitable T.murphyi habitat indicates that the spatial distribution of T.murphyi might be related to variations in oceanic currents.These findings provide insights for the effective fisheries resource management of T.murphyi in the Southeast Pacific Ocean. 展开更多
关键词 southeastern Pacific Ocean Chilean jack mackerel environment variation climate change habitat change spatio-temporal variation
暂未订购
基于JACK虚拟仿真的学龄前脑瘫儿童助行器人机优化设计
11
作者 付晓莉 王腾腾 +1 位作者 张斌 党娜 《包装工程》 CAS 北大核心 2024年第10期15-22,59,共9页
目的减少学龄前脑瘫儿童助行器的安全隐患,解决患儿在训练过程中的肢体二次损伤问题,提升助行器人机舒适性,对学龄前脑瘫儿童助行器进行优化设计。方法通过JACK虚拟仿真软件的RULA工具,分析得到学龄前脑瘫儿童在使用助行器过程中存在的... 目的减少学龄前脑瘫儿童助行器的安全隐患,解决患儿在训练过程中的肢体二次损伤问题,提升助行器人机舒适性,对学龄前脑瘫儿童助行器进行优化设计。方法通过JACK虚拟仿真软件的RULA工具,分析得到学龄前脑瘫儿童在使用助行器过程中存在的不合理姿势,并对其进行人机工学与受力分析,提出改进方法并进行设计优化,最后导入JACK虚拟仿真软件进行风险与舒适性验证。结果优化后的学龄前脑瘫儿童助行器的使用受伤风险从4级降低到1级,患儿躯干弯曲力矩、L4/L5脊柱压缩力、剪切力的姿势载荷指数分别降低53%、47%、81%,上身各关节处于舒适角度。结论经过JACK仿真分析及人机优化后的助行器,有效降低了学龄前脑瘫儿童在康复训练中的二次损伤风险,减轻了患儿步行训练中的身体负担,提升了助行器使用的舒适性。 展开更多
关键词 jack仿真 助行器 学龄前脑瘫儿童 人机工学
在线阅读 下载PDF
A study of jacking force for a curved pipejacking 被引量:12
12
作者 K.J.Shou J.M.Jiang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2010年第4期298-304,共7页
For a pipejacking, the jacking force is critical to balance the resistance force and to move the pipe string forwards. The driving mechanism of a curved pipejacking is more complicated than a straight-line pipejacking... For a pipejacking, the jacking force is critical to balance the resistance force and to move the pipe string forwards. The driving mechanism of a curved pipejacking is more complicated than a straight-line pipejacking, and its jacking force is also more difficult to be determined. The paper theoretically studies the jacking force of a curved pipejacking by considering the static equilibrium of earth pressure, resistance at cutting face, friction at pipe surface, and the driving force behind the pipe string. The derived theoretical formula can be used to estimate the driving forces of a straight-line or a curved pipejacking. Case study was performed by applying the theoretical and empirical formulae. After calibration, the corrected formula is more accurate and more applicable. 展开更多
关键词 pipejacking curved pipejacking jacking force statics analysis
在线阅读 下载PDF
Application of ANSYS 3D FEM in Studies of Surface Deformation Caused by Pipe Jacking 被引量:10
13
作者 LI Fabin FANG Kun LI Hechao 《Wuhan University Journal of Natural Sciences》 CAS 2007年第4期633-637,共5页
By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface... By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface under different frontal resistances. Analysis of the two cases shows that soil pressure reaches its maximum point when the soil is right above machine head, and soil stress will gradually decline when machine head passes over it. It also shows that impact brought by pipe-jacking construction on stress change of the surrounding soil is limited. The thesis suggest that road surface should be consolidated and soil condition be improved before construction to prevent loss and disaster caused by road surface deformation, jacking force can be increased so that jacking efficiency can be enhanced when ground stratum is well filled with soil, but the frontal resistance facing machine head should be equal to surrounding soil pressure in order to avoid rise of ground surface. 展开更多
关键词 trenchless technology pipe jacking finite element ground settlement
在线阅读 下载PDF
基于Jack的老年电动代步车人机工程设计与优化 被引量:7
14
作者 朱桐 宋端树 +2 位作者 张善超 白道靖 刘立 《包装工程》 CAS 北大核心 2024年第4期107-114,共8页
目的满足行动不便的老年用户群体复杂的出行需求,提高电动代步车类工具使用过程中的舒适度。方法在传统老年电动代步车的基础上附加辅助站立结构,创新设计出一款坐、立两用的新型电动代步车,并借助Jack仿真软件,对老年用户坐姿驾驶和辅... 目的满足行动不便的老年用户群体复杂的出行需求,提高电动代步车类工具使用过程中的舒适度。方法在传统老年电动代步车的基础上附加辅助站立结构,创新设计出一款坐、立两用的新型电动代步车,并借助Jack仿真软件,对老年用户坐姿驾驶和辅助站立支撑状态下的舒适度、可达域、可视域,以及上车过程中L4/L5下背部的受力情况进行分析,以验证关键人机交互结构、尺寸设计的合理性及舒适性。结论通过验证和调整,对电动代步车的初期设计方案进行改进,优化后的方案为老年电动代步工具的设计提供了参考,可以为满足老年用户复杂的出行需求、提高电动代步车类工具使用过程中的舒适度和安全性提供帮助。 展开更多
关键词 工业设计 人机工程学 老年代步车 jack
在线阅读 下载PDF
Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata 被引量:3
15
作者 Takashi Senda Hideki Shimada +1 位作者 Takashi Sasaoka Kikuo Matsui 《Open Journal of Geology》 2013年第2期44-48,共5页
In Japan when urban infrastructures need to be constructed, the difficulty of utilizing the ground or shallow strata will lead to a more frequent use of the deep strata. The common construction methods are open-cut, p... In Japan when urban infrastructures need to be constructed, the difficulty of utilizing the ground or shallow strata will lead to a more frequent use of the deep strata. The common construction methods are open-cut, pipe jacking, and shield methods. In recent years, a new pipe jacking method has been established that can be adapted to 20 m below the ground or more. Using this method, the drivage machine and the jacking pipe continue to move an underground until the completion of the driving. Therefore an over-cutting area (so-called tail-void) must be formed to lower the friction between the ground and the pipe. The tail-void is filled with lubrications. However, because the stress release from the ground continues to advance when the tail-void is formed, hence there are some challenges required to cope with the stability of the surrounding ground. In order to utilize the pipe jacking method in the deeper strata layers, the theory, analysis and installation of tail-void have to be systemized, and such systematic data must be stored. Therefore, the conditions of tail-void in the deep pipe jacking method are discussed using numerical analyses. 展开更多
关键词 Pipe jacking System DEEP STRATA Tail-Void
暂未订购
基于Jack的挖掘装载机驾驶室人机工程分析与改进设计 被引量:12
16
作者 王沈策 梁嘉豪 史雨霖 《机械设计》 CSCD 北大核心 2024年第2期170-176,共7页
为提高挖掘装载机驾驶室的舒适性,采用人体模型建模分析法确定H点位置,并建立挖掘装载机驾驶室人机仿真系统。以人机分析软件Jack为工具,从驾驶员可视性、可达性及舒适性3方面进行挖掘装载机多作业姿势的人机合理性分析,根据仿真结果对... 为提高挖掘装载机驾驶室的舒适性,采用人体模型建模分析法确定H点位置,并建立挖掘装载机驾驶室人机仿真系统。以人机分析软件Jack为工具,从驾驶员可视性、可达性及舒适性3方面进行挖掘装载机多作业姿势的人机合理性分析,根据仿真结果对中控台界面及控制部件布局进行改进设计,改进方案的分析校核结果表明:驾驶员可视域得到提升,常用控制部件位于驾驶员舒适可达范围内,改进后驾驶员的多个作业姿势舒适性得到提升。通过人机仿真软件对驾驶员多作业姿势进行人机合理性分析,较准确地发现了挖掘装载机驾驶室存在的设计缺陷,为具有复杂人机系统的工程装备驾驶室布局设计研究提供一定参考。 展开更多
关键词 人机工程 挖掘装载机 仿真分析 jack 舒适度
原文传递
Effect of Application of Pipe Roof Method by Using Pipe Jacking on Behavior of Surrounding Soil 被引量:3
17
作者 Hideki Shimada Akihiro Hamanakal +2 位作者 Takashi Sasaoka Kikuo Matsui Toru Sato 《Journal of Physical Science and Application》 2013年第6期353-358,共6页
Tunnels in an urban area, in many cases, are constructed in soft ground which contains underground water, near existing facilities and structures. Structural stability for the tunnel and also the nearby structures and... Tunnels in an urban area, in many cases, are constructed in soft ground which contains underground water, near existing facilities and structures. Structural stability for the tunnel and also the nearby structures and facilities is vital in this kind of work. Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of underground pipelines of sewage systems. This method utilizes mud slurry that is formed around the pipes in order to stabilize the surrounding soil. In the pipe roof method the tubing elements that are constructed by slurry pipe jacking are near each other longitudinally, and create a rigid and stable lining before the excavation of the main tunnel. This paper discusses 'the application of a slurry pipe jacking system on 'the pipe roof method by means of numerical analysis. Because of the rigid behavior of the lining, the results show little subsidence, making this method a reliable method of constructing large tunnels with small cover in an urban area. 展开更多
关键词 Pipe roof method pipe jacking TUNNEL Urban area.
在线阅读 下载PDF
Discussion on the Application of Pipe Jacking Construction Technology in Municipal Road Drainage Projects 被引量:1
18
作者 Liang Liu Lizhao Zhao 《Journal of Architectural Research and Development》 2023年第6期29-35,共7页
In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage co... In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage construction efficiency,avoid large-scale damage to the road surface,and exert small traffic impact.Therefore,it is currently widely used in drainage construction,but judging from the current actual application situation,there are still many problems that require further improvement.This article mainly analyzes the advantages of and current technical problems in pipe jacking construction technology in detail,explores corresponding solutions,and lays a foundation for the optimization of municipal road drainage engineering construction. 展开更多
关键词 Municipal roads Drainage projects Pipe jacking construction Advantages
在线阅读 下载PDF
基于JACK的不同身高笔记本电脑使用者的脊椎受力状态研究
19
作者 郭增辉 方斌 +1 位作者 梁文昊 陈志远 《人类工效学》 2024年第4期42-47,54,共7页
目的在探讨笔记本电脑放置位置对使用者胸椎、腰椎受力和头部屈曲的影响。方法通过Jack软件构建了P 1、P 5、P 50、P 95和P 99的数字人仿真办公模型,分析了屏幕在不同垂直距离和水平距离下人体spinetT1/T2、spineL4/L5受到的力矩和Head ... 目的在探讨笔记本电脑放置位置对使用者胸椎、腰椎受力和头部屈曲的影响。方法通过Jack软件构建了P 1、P 5、P 50、P 95和P 99的数字人仿真办公模型,分析了屏幕在不同垂直距离和水平距离下人体spinetT1/T2、spineL4/L5受到的力矩和Head Flexion的角度,使用SPSS对获得的数据进行相关性分析。结果在坐姿使用笔记本电脑时,用户的身高越高,其胸椎和腰椎所承受的力矩也越大。笔记本电脑屏幕的高度对使用者的影响显著高于水平距离的影响。结论通过调整笔记本电脑的放置位置,特别是屏幕的高度,可以有效降低不同身高群体颈部和腰部的疲劳和疼痛症状,减少对身体的损伤。 展开更多
关键词 职业健康 人因工程 笔记本电脑 jack 脊椎受力 仿真 相关性分析
在线阅读 下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部