Planning urban megaprojects in the Gulf: The international consultancy firms in urban planning between global and contingent 被引量:1
1
作者 Oula Aoun Jacques Teller 《Frontiers of Architectural Research》 CSCD 2016年第2期254-264,共11页
Driven by globalization and market openings, many architecture and engineering firms have become global. By focusing on the urban megaprojects in the Gulf, a particular culturat and political context, this paper argue... Driven by globalization and market openings, many architecture and engineering firms have become global. By focusing on the urban megaprojects in the Gulf, a particular culturat and political context, this paper argues that such firms have a major role in the rapid urban transformation of Gulf countries and act as transfer agents of an international knowledge in the urban planning domain. However, the transfer is adapted by several context-related char- acteristics, such as local governance, urban knowledge, and regulatory framework. This paper explores the procedural adaptation of these firms to the Gulf Cooperation Council (GCC) in terms of internal structure, methodology, adopted tools, and interaction with the context. The level of learning that results from this transfer is also investigated. 展开更多
关键词 Architecture andensineering firms Construction market GCC Urban megaprojects
原文传递
Causations of failure in megaprojects:A case study of the Ajaokuta Steel Plant project 被引量:1
2
作者 Oluwole Alfred OLATUNJI 《Frontiers of Engineering Management》 2018年第3期334-346,共13页
This paper uses project organizational theories to draw lessons from a historic megaproject, the Ajaokuta Steel Plant (ASP). Archival reports on the ASP were explored to identify the unique attributes of the project... This paper uses project organizational theories to draw lessons from a historic megaproject, the Ajaokuta Steel Plant (ASP). Archival reports on the ASP were explored to identify the unique attributes of the project; the political wrangling that underplayed its evolution, its economic significance and organizational impacts. Findings suggest the goals of the ASP project were, and still are, unambiguous. Failure occurred as soeio-political forces aggravated the project's complex milestones. Stakeholders were impatient with pre-project investigations. During planning, owners ignored opinions that were contrary to their expectations. While delays lingered, pressures from the global economy weakened the project's motivation to succeed. These combined to turn the project's outcomes into a chaotic situation that triggered dire implications. Despite about 1400% overrun in cost, the success achieved on the plant was 28% at commission- ing. Contractors remained on site until eight years after commissioning. Six key elements of the 482 items in the ASP project contract were not delivered nearly 40 years on. A simplistic look at these suggests poor planning is the main problem. However, planning issues is not entirely strange in greenfield projects. The paper draws strength from project organization theories to explain what was poor about the planning. Socrates' generic management theory was used to explain the role of leadership in the failure of the ASP project. McGregor's Theory X and Theory Y explain the significance of stakeholders' integration in megaprojects. Systems and chaos theories were used to explain the sensitivity of the ASP project to uncertainties. Narratives on these combine well to inspire stakeholders of megaprojects on where and how to seek courage in making effective plans that can help achieve success in complex projects. While normative literature only recognizes project success in a definitive perspective, this study provides insights from failure as an instrument to trigger sublime reflections. 展开更多
关键词 industrial projects megaprojects NIGERIA project organizational theories steel plant
原文传递
Organizational evolution of project management teams over the whole lifecycle of megaprojects:Case study of the Hong Kong-Zhuhai-Macao Bridge 被引量:2
3
作者 Zeyu WANG Huan LAN +2 位作者 Minggong ZHANG Weirui XUE Xiaolong XUE 《Frontiers of Engineering Management》 CSCD 2023年第3期439-454,共16页
Project management teams are critical in the implementation of megaprojects,but their evolution throughout the project lifecycle has not been clearly explained.This paper explores the organizational evolution of megap... Project management teams are critical in the implementation of megaprojects,but their evolution throughout the project lifecycle has not been clearly explained.This paper explores the organizational evolution of megaproject management teams through a longitudinal retrospective case study of the Hong Kong–Zhuhai–Macao Bridge(HZMB)project.The organizational evolution is examined in terms of management objectives,management content,and organizational structure.The organizational evolution of the HZMB project management team exhibits stage differentiation with the coexistence of turbulence and stability.Changes in the external environment are the driving force for organizational evolution,whereas a flexible organizational strategy is critical in promoting this evolution.Basing on the HZMB case study,this paper summarizes six critical measures that facilitate the organizational evolution of megaproject management teams.Our findings add value to megaproject management theory and provide a better understanding of the dynamics and complexity of megaproject organizational management. 展开更多
关键词 megaproject organizational evolution whole lifecycle management project management team
原文传递
The Urban Reset
4
《Beijing Review》 2025年第49期30-31,共2页
As China's cities shift from breakneck expansion to improving the layout and functions of existing urban spaces,the questions facing policymakers are no longer how to attract migrants,but how to integrate them;not... As China's cities shift from breakneck expansion to improving the layout and functions of existing urban spaces,the questions facing policymakers are no longer how to attract migrants,but how to integrate them;not how to build new megaprojects,but how to make cities more livable and inclusive.These themes were front and center at the China Sustainable Urbanization Forum:Theory,Policy and Practice2025,held at Tsinghua University on November 13,where officials,scholars and industry experts gathered to weigh the challenges facing the next planning cycle and the reforms needed to meet them. 展开更多
关键词 improving layout functions existing policy reforms sustainable urbanization livable cities urban reset migrant integration inclusivity megaprojects
原文传递
WOMAN ARCHITECT PARTICIPATES IN GBA MEGAPROJECT,HELPS ADVANCE CHINA'S ARCHITECTURE INDUSTRY
5
作者 Chen Liang Ye Shan 《Women of China》 2025年第7期16-19,共4页
Construction of Hong Kong-Zhuhai-Macao Bridge(known as HZMB or HZM Bridge)was one of the worlds most challenging sea-based megaprojects.Built in the Guangdong-Hong Kong-Macao Greater Bay Area(GBA),in South China,the b... Construction of Hong Kong-Zhuhai-Macao Bridge(known as HZMB or HZM Bridge)was one of the worlds most challenging sea-based megaprojects.Built in the Guangdong-Hong Kong-Macao Greater Bay Area(GBA),in South China,the bridge was formally opened to traffic in October 2018.Today,winding through Lingdingyang Bay like a giant dragon,HZM Bridge connects Guangdong Province with the special administrative regions of Hong Kong and Macao. 展开更多
关键词 hzm bridge Hong Kong Zhuhai Macao Bridge sea based megaproject HZMB hong kong GBA megaproject HZM Bridge lingdingyang bay
原文传递
Application of intensive construction technology in the grand Paris express project:A review
6
作者 Yi ZHANG 《Frontiers of Structural and Civil Engineering》 2025年第3期488-501,共14页
With 200 km of new lines and 68 new stations,the Grand Paris Express(GPE)project is currently the biggest transport project under construction in Europe.Starting in 2010,the GPE project involves an ambitious schedule ... With 200 km of new lines and 68 new stations,the Grand Paris Express(GPE)project is currently the biggest transport project under construction in Europe.Starting in 2010,the GPE project involves an ambitious schedule with major milestones planned between 2022 and 2030.To meet these deadlines as well as the associated cost,quality and safety goals,intensive construction technology is needed in this once-in-a-century megaproject,but this project also provides ideal opportunities to apply this technology.This paper offers a review of the new and innovative construction technologies used during the GPE project’s design and construction stages.Such a large project certainly presents a range of complexities and poses many technical,material,human and environmental challenges.Due to its high-risk nature,the risk management plan that applies throughout the whole GPE project,along with the contractual and insurance conditions,is introduced first.Then,an overview is provided of the design principles and construction methods selected to overcome the engineering challenges and reduce the technical risks,all of which are accompanied by monitoring methods and digital approaches.In addition,several new and innovative construction technologies adopted in this project are illustrated.The paper concludes with the project’s environmental protection. 展开更多
关键词 megaproject underground works construction method innovative technology environment
原文传递
Megaproject responsible innovation:Concept,framework,and governance
7
作者 Han LIN Shangyao NIE +3 位作者 Pingping WU Ming YUAN Mingchuan YU Vivian TAM 《Frontiers of Engineering Management》 2025年第3期653-668,共16页
The reliability and sustainability of innovation in megaprojects are of critical importance with complex stakeholders and substantial resource investments.In that respect,responsible innovation management is the key t... The reliability and sustainability of innovation in megaprojects are of critical importance with complex stakeholders and substantial resource investments.In that respect,responsible innovation management is the key to the sustainable development of megaprojects.This paper proposes the concept of megaproject responsible innovation(MRI)and develops a holistic framework for MRI with four dimensions:(1)anticipation across the megaproject life cycle,(2)inclusion of various parties in a relationship of symbiosis,competition,and cooperation,(3)reflexivity of social responsibility,and(4)responsiveness to social expectations.Based on an ecosystem approach to megaproject innovation,we propose an ecological governance strategy for MIR.Moreover,different approaches are needed in innovation organizations which are part of specific ecological niches for effective and efficient governance. 展开更多
关键词 megaproject innovation responsible innovation FRAMEWORK GOVERNANCE
原文传递
Identifying the driving factors of successful megaproject construction management:Findings from three Chinese cases 被引量:6
8
作者 Qinghua HE Junyan XU +1 位作者 Ting WANG Albert P.C.CHAN 《Frontiers of Engineering Management》 2021年第1期5-16,共12页
The construction of megaprojects has always resulted in extensive and long-term impacts on the society.However,the performance of megaproject management is poor,and improving it remains an urgent and necessary issue.A... The construction of megaprojects has always resulted in extensive and long-term impacts on the society.However,the performance of megaproject management is poor,and improving it remains an urgent and necessary issue.Although many studies on megaproject success have been conducted,existing studies on the driving factors of successful megaproject construction are rather limited.Therefore,this study aims to systematically explore the key factors that can lead to successful megaproject construction management based on three cases:The Beijing-Shanghai High-Speed Railway,the Three Gorges Dam,and the Hong Kong-Zhuhai-Macao Bridge.Mixed research methods,such as literature review,case studies,and expert interviews,were used in this study.Consequently,11 driving factors,namely,government support,public support,accumulation and application of technology and experience,development and innovation of technology,innovation and application of management system,organizational mode and structure,top management support,project culture,megaproject citizenship behavior,corporate reputation,and fulfillment of social responsibilities,were identified and grouped into five categories,namely,project environment,construction capabilities,organization,positive culture and behavior,and requirements for sustainable development.The contributions of this study lie in two aspects.First,the driving factors of successful megaproject construction are identified to deepen the understanding of industrial practitioners,assist them in focusing on key factors,and aid them in effectively managing megaprojects.Second,researchers could use the identified driving factors in conducting further empirical studies and apply them in future projects to enhance their chances of success. 展开更多
关键词 megaproject management driving factors project success case study China
原文传递
Understanding innovation diffusion and adoption strategies in megaproject networks through a fuzzy system dynamic model
9
作者 Yan ZHANG His-Hsien WEI +2 位作者 Dong ZHAO Yilong HAN Jiayu CHEN 《Frontiers of Engineering Management》 2021年第1期32-47,共16页
Innovation and knowledge diffusion in megaprojects is one of the most complicated issues in project management.Compared with conventional projects,megaprojects typically entail large-scale investments,long constructio... Innovation and knowledge diffusion in megaprojects is one of the most complicated issues in project management.Compared with conventional projects,megaprojects typically entail large-scale investments,long construction periods,and conflicting stakeholder interests,which result in a distinctive pattern of innovation diffusion.However,traditional investigation of innovation diffusion relies on subjective feedback from experts and frequently neglects inter-organizational knowledge creation,which frequently emerges in megaprojects.Therefore,this study adopted project network theory and modeled innovation diffusion in megaprojects as intra-and interorganizational learning processes.In addition,system dynamics and flizzy systems were combined to interpret experts9 subject options as quantitative coefficients of the project network model.This integrated model will assist in developing an insightful understanding of the mechanisms of innovation diffusion in megaprojects.Three typical network structures,namely,a traditional megaproject procurement organization(TMO),the environ megaproject organization(EMO),and an integrated megaproject organization(IMO),were examined under six management scenarios to verify the proposed analytic paradigm.Assessment of project network productivity suggested that the projectivity of the TMO was insensitive to technical and administrative innovations,the EMO could achieve substantial improvement from technical innovations,and the 1MO trended incompatibly with administrative innovations.Thus,industry practitioners and project managers can design and reform agile project coordination by using the proposed quantitative model to encourage innovation adoption and reduce productivity loss at the start of newly established collaborations. 展开更多
关键词 megaproject innovation adoption project network system dynamic fuzzy logic
原文传递