Combining the characteristics of the course“Comprehensive Training of E-Commerce Live Streaming,”this paper embeds the CDIO(Conceive-Design-Implement-Operate)method into the live streaming training process,carries o...Combining the characteristics of the course“Comprehensive Training of E-Commerce Live Streaming,”this paper embeds the CDIO(Conceive-Design-Implement-Operate)method into the live streaming training process,carries out the virtual scene“e-commerce live streaming”course design and project-based teaching reform that integrates teaching training with learning effects,and establishes a set of cross-professional student live streaming training procedures guided by the CDIO engineering method.The training results show that the CDIO practical teaching model supported by data feedback plays an important role and significance in improving students’learning effects,and also provides some new experiences for integrating engineering thinking into the construction of new liberal arts.展开更多
This paper focuses on concrete technical management in construction engineering.It explains the core elements,including production mix ratio,analyzes problems of traditional models,presents innovative management model...This paper focuses on concrete technical management in construction engineering.It explains the core elements,including production mix ratio,analyzes problems of traditional models,presents innovative management models like BIM+GIS and their applications,and covers aspects such as job competence standards and prefabricated modular construction regulations,emphasizing the significance and development direction of innovative models.展开更多
The management of large-scale architectural engineering projects(e.g.,airports,hospitals)is plagued by information silos,cost overruns,and scheduling delays.While building information modeling(BIM)has improved 3D desi...The management of large-scale architectural engineering projects(e.g.,airports,hospitals)is plagued by information silos,cost overruns,and scheduling delays.While building information modeling(BIM)has improved 3D design coordination,its static nature limits its utility in real-time construction management and operational phases.This paper proposes a novel synergistic framework that integrates the static,deep data of BIM with the dynamic,real-time capabilities of digital twin(DT)technology.The framework establishes a closed-loop data flow from design(BIM)to construction(IoT,drones,BIM 360)to operation(DT platform).We detail the technological stack required,including IoT sensors,cloud computing,and AI-driven analytics.The application of this framework is illustrated through a simulated case study of a mega-terminal airport construction project,demonstrating potential reductions in rework by 15%,improvement in labor productivity by 10%,and enhanced predictive maintenance capabilities.This research contributes to the field of construction engineering by providing a practical model for achieving full lifecycle digitalization and intelligent project management.展开更多
New energy-storage systems play a pivotal role in the development of the new power system for advancing the energy transition in China.In the“14th Five-Year Plan”for the New Energy-Storage Development,it is proposed...New energy-storage systems play a pivotal role in the development of the new power system for advancing the energy transition in China.In the“14th Five-Year Plan”for the New Energy-Storage Development,it is proposed to expand investment and construction models by promoting the deployment of energy-storage facilities through the ways of self-construction,leasing,and purchasing,and to encourage the development of the shared energy-storage.However,the current scarcity in the model of the shared energy-storage invest-ment and construction substantially restricts its development,particularly due to unclear mechanisms for cost and benefit allocation,which also discourages potential investors.To address the issue,this paper proposes investment and construction models for shared energy-storage that aligns with the present stage of energy storage development.In specific,three main models are introduced:(1)Cen-tralized Self-built Shared Energy-Storage model(CSSES),(2)Third-party Investment Shared Energy-Storage model(TISES),and(3)Distributed Self-built Shared Energy Storage(DSSES)model.The cost–benefit analysis is conducted for each model.The results indicate that the CSSES model achieves the highest internal rate of return(11.5%)and the shortest payback period,while the DSSES model per-forms acceptable with an IRR of 9.4%.In contrast,the TISES model shows the lowest IRR(6.7%)and requires higher electricity price for being feasible.Furthermore,the study employs the entropy weight method and the analytic hierarchy process(AHP)for indicator eval-uation,and integrates the technique for order preference by the similarity to an ideal solution(TOPSIS)for scheme optimization.The results show that both the CSSES model and the DSSES model achieve the highest proximity scores.Under environmental regulations,these models demonstrate superior economic benefits by optimizing energy storage utilization,reducing user costs,and enhancing overall profitability.展开更多
In tomographic statics seismic data processing, it 1s crucial to cletermme an optimum base for a near-surface model. In this paper, we consider near-surface model base determination as a global optimum problem. Given ...In tomographic statics seismic data processing, it 1s crucial to cletermme an optimum base for a near-surface model. In this paper, we consider near-surface model base determination as a global optimum problem. Given information from uphole shooting and the first-arrival times from a surface seismic survey, we present a near-surface velocity model construction method based on a Monte-Carlo sampling scheme using a layered equivalent medium assumption. Compared with traditional least-squares first-arrival tomography, this scheme can delineate a clearer, weathering-layer base, resulting in a better implementation of damming correction. Examples using synthetic and field data are used to demonstrate the effectiveness of the proposed scheme.展开更多
It has been a focus of debate for a large time on construction methods for large-span loess tunnel.Reasonable construction method has much effect on stability of tunnel and construction schedule.Deformation and failur...It has been a focus of debate for a large time on construction methods for large-span loess tunnel.Reasonable construction method has much effect on stability of tunnel and construction schedule.Deformation and failure of surrounding rock are quite complex.Associating with the large-span loess tunnel of Zhengzhou- Xi'an high-speed passenger rail line in China,large scale model test with geometric proportion 1:20 is applied to study on dynamic mechanical behavior of various construction methods.They include full-face excavation with support and no support,and benching method with support.It is found that pre-deformation and stress accumulation take place ahead of working face.The effects of three construction methods are further studied,particularly in terms of tunnel displacement and stress changes.It is revealed that benching method transfers load to an unexcavated area,limits horizontal deformation,reduces stress concentration effectively,lengthens the distance between location of peak for stress concentration and working face,and consequently increases stability.The model test results not only supply theoretical foundation for determination of reasonable construction method,but also can act as reference for similar tunnel and underground engineering construction.展开更多
This study aims to reveal the macroscopic permanent deformation(PD)behavior and the internal structural evolution of construction and demolition waste(CDW)under loading.Firstly,the initial matric suction of CDW was me...This study aims to reveal the macroscopic permanent deformation(PD)behavior and the internal structural evolution of construction and demolition waste(CDW)under loading.Firstly,the initial matric suction of CDW was measured by the filter paper method.Secondly,the PD of CDW with different humidity and stress states was investigated by repeated load triaxial tests,and a comprehensive prediction model was established.Finally,the discrete element method was performed to analyze the internal structural evolution of CDW during deformation.These results showed that the VAN-GENUCHTEN model could describe the soil-water characteristic curve of CDW well.The PD increases with the increase of the deviator stress and the number of cyclic loading,but the opposite trend was observed when the initial matric suction and confining pressure increased.The proposed model in this study provides a satisfactory prediction of PD.The discrete element method could accurately simulate the macroscopic PD of CDW,and the shear force,interlock force and sliding content increase with the increase of deviator stress during the deformation.The research could provide useful reference for the deformation stability analysis of CDW under cyclic loading.展开更多
The method of building 3D model was discussed at first. Aiming at the feature of mine vacant place,a method to build the 3D vacant place model based on multi TIN (triangular irregular network) was put forward, and the...The method of building 3D model was discussed at first. Aiming at the feature of mine vacant place,a method to build the 3D vacant place model based on multi TIN (triangular irregular network) was put forward, and the data structure and visualization of vacant place were discussed. Then some crucial technologies of realizing function in 3D-GIS were proposed. In addition,the software about special 3D mapping and assaying was introduced.展开更多
More space truss construction has been planned to develop and utilize space resources.These trusses are designed in the way of large-scale,complex,modular,and on-orbit assembly.To meet the upcoming challenge of large-...More space truss construction has been planned to develop and utilize space resources.These trusses are designed in the way of large-scale,complex,modular,and on-orbit assembly.To meet the upcoming challenge of large-scale space infrastructure construction,it is necessary to study space truss automation design and robotic construction.This paper proposes an ordinal finite screw adjacency matrix model(OFSAMM),focusing on the relationship between assembly motions,to express and compute a space truss structure.In this model,a space truss is abstracted as a set of ordered assembly motions,each of which is recorded as a finite screw as the basic element of the truss and its assembly.The operation of truss transformation is also derived under this model.Therefore,the truss configuration,the assembly sequence,the truss sub-assembly,the truss components,and the on-orbit assembly task can be expressed and calculated in a unified model,which is calculated and stores the truss topology and assembly with the minimum storage cost.At the end of this paper,we introduce how to synthesize and optimize space truss design through two cases.The study will help to improve design efficiency.Furthermore,it provides a theoretical basis for the automatic construction of space truss structures,especially in the next stage.展开更多
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
Basic conditions and new countryside construction of Ganlu Town, Zizhong County, Neijiang City were analyzed, SWOT adopted to analyze internal strengths, weaknesses, external opportunities and threats of its new count...Basic conditions and new countryside construction of Ganlu Town, Zizhong County, Neijiang City were analyzed, SWOT adopted to analyze internal strengths, weaknesses, external opportunities and threats of its new countryside construction. On this basis, positive and practical strategies were put forward to promote the new countryside construction in the local area, and provide references for the new countryside construction in other regions.展开更多
Geometric model construction is the basis of infrared image theory simulation. Taking the construction of the geometric model of one building in Harbin as an example, this paper analyzes the theoretical groundings of ...Geometric model construction is the basis of infrared image theory simulation. Taking the construction of the geometric model of one building in Harbin as an example, this paper analyzes the theoretical groundings of simplification and principles of geometric model construction of buildings. It then discusses some particular treatment methods in calculating the radiation transfer coefficient in geometric model construction using the Monte Carlo Method.展开更多
In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific ...In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.展开更多
Vocational education is an important way in the current talent training.It shoulders the heavy responsibility of transporting talents for the society.With the acceleration of urbanization construction and the developm...Vocational education is an important way in the current talent training.It shoulders the heavy responsibility of transporting talents for the society.With the acceleration of urbanization construction and the development of industrial technology,the demand for High Tech Talents in construction projects is constantly increasing.It is necessary to strengthen the improvement of vocational education in construction engineering.This paper mainly analyzes the mode of vocational education in construction engineering.展开更多
The cost and strict input format requirements of GraphRAG make it less efficient for processing large documents. This paper proposes an alternative approach for constructing a knowledge graph (KG) from a PDF document ...The cost and strict input format requirements of GraphRAG make it less efficient for processing large documents. This paper proposes an alternative approach for constructing a knowledge graph (KG) from a PDF document with a focus on simplicity and cost-effectiveness. The process involves splitting the document into chunks, extracting concepts within each chunk using a large language model (LLM), and building relationships based on the proximity of concepts in the same chunk. Unlike traditional named entity recognition (NER), which identifies entities like “Shanghai”, the proposed method identifies concepts, such as “Convenient transportation in Shanghai” which is found to be more meaningful for KG construction. Each edge in the KG represents a relationship between concepts occurring in the same text chunk. The process is computationally inexpensive, leveraging locally set up tools like Mistral 7B openorca instruct and Ollama for model inference, ensuring the entire graph generation process is cost-free. A method of assigning weights to relationships, grouping similar pairs, and summarizing multiple relationships into a single edge with associated weight and relation details is introduced. Additionally, node degrees and communities are calculated for node sizing and coloring. This approach offers a scalable, cost-effective solution for generating meaningful knowledge graphs from large documents, achieving results comparable to GraphRAG while maintaining accessibility for personal machines.展开更多
Starting with the Aalen (1989) version of Cox (1972) 'regression model' we show the method for construction of "any" joint survival function given marginal survival functions. Basically, however, we restrict o...Starting with the Aalen (1989) version of Cox (1972) 'regression model' we show the method for construction of "any" joint survival function given marginal survival functions. Basically, however, we restrict ourselves to model positive stochastic dependences only with the general assumption that the underlying two marginal random variables are centered on the set of nonnegative real values. With only these assumptions we obtain nice general characterization of bivariate probability distributions that may play similar role as the copula methodology. Examples of reliability and biomedical applications are given.展开更多
Safety accidents occure frequently during metro construction, which are mainly caused by human factors, and the incidence of accidents can be increased due to the overlap of human factors and physical factors. The hum...Safety accidents occure frequently during metro construction, which are mainly caused by human factors, and the incidence of accidents can be increased due to the overlap of human factors and physical factors. The human factors are taken as breakthrough to make early warning for the human insecurity factors in the metro construction, which can effectively reduce the occurrence of safety accidents. This paper proposes the principle of total monitoring and early-warning management. The unsafe behaviors in metro construction when approaching the hazardous area and non-standard safety prevention measures are analyzed to design and model the early warning process of unsafe behaviors in metro construction. Finally, the model is analyzed and verified using actual examples.展开更多
This article analyzes the application strategies of Building Information Modeling(BIM)support technology in a first-class highway reconstruction and expansion project based on its actual situation.According to the bas...This article analyzes the application strategies of Building Information Modeling(BIM)support technology in a first-class highway reconstruction and expansion project based on its actual situation.According to the basic situation of BIM technology and its application goals in this project,it explores application strategies such as BIM model construction,BIM prefabricated structural model deepening and schedule simulation,BIM collision detection,and BIM tunnel pre-construction simulation.Through this analysis,it is hoped to provide a reference for the rational application of BIM support technology and ensure the high-quality and efficient completion of first-class highway reconstruction and expansion projects.展开更多
In view of the TIN_DDM buffer surface existing in the construction and application of special data type,algorithm efficiency and precision are not matching;the paper applied the rolling ball model in the process of TI...In view of the TIN_DDM buffer surface existing in the construction and application of special data type,algorithm efficiency and precision are not matching;the paper applied the rolling ball model in the process of TIN_DDM buffer surface construction.Based on the precision limitation analysis of rolling ball model,the overall precision control method of rolling ball model has been established.Considering the efficiency requirement of TIN_DDM buffer surface construction,the influence principle of key sampling points and rolling ball radius to TIN_DDM buffer surface construction efficiency has been elaborated,and the rule of identifying key sampling points has also been designed.Afterwards,by erecting the numerical relationship between key sampling points and rolling ball radius,a TIN_DDM buffer surface construction algorithm based on rolling ball acceleration optimization model has been brought forward.The time complexity of the algorithm is O(n).The experiments show that the algorithm could realize the TIN_DDM buffer surface construction with high efficiency,and the algorithm precision is controlled with in 2σ.展开更多
基金phased research achievement of the Major Project of Philosophy and Social Sciences Research in Jiangsu Universities“Research on the Intervention Mechanism of Short Video Addiction”(2024SJZD145)。
文摘Combining the characteristics of the course“Comprehensive Training of E-Commerce Live Streaming,”this paper embeds the CDIO(Conceive-Design-Implement-Operate)method into the live streaming training process,carries out the virtual scene“e-commerce live streaming”course design and project-based teaching reform that integrates teaching training with learning effects,and establishes a set of cross-professional student live streaming training procedures guided by the CDIO engineering method.The training results show that the CDIO practical teaching model supported by data feedback plays an important role and significance in improving students’learning effects,and also provides some new experiences for integrating engineering thinking into the construction of new liberal arts.
文摘This paper focuses on concrete technical management in construction engineering.It explains the core elements,including production mix ratio,analyzes problems of traditional models,presents innovative management models like BIM+GIS and their applications,and covers aspects such as job competence standards and prefabricated modular construction regulations,emphasizing the significance and development direction of innovative models.
文摘The management of large-scale architectural engineering projects(e.g.,airports,hospitals)is plagued by information silos,cost overruns,and scheduling delays.While building information modeling(BIM)has improved 3D design coordination,its static nature limits its utility in real-time construction management and operational phases.This paper proposes a novel synergistic framework that integrates the static,deep data of BIM with the dynamic,real-time capabilities of digital twin(DT)technology.The framework establishes a closed-loop data flow from design(BIM)to construction(IoT,drones,BIM 360)to operation(DT platform).We detail the technological stack required,including IoT sensors,cloud computing,and AI-driven analytics.The application of this framework is illustrated through a simulated case study of a mega-terminal airport construction project,demonstrating potential reductions in rework by 15%,improvement in labor productivity by 10%,and enhanced predictive maintenance capabilities.This research contributes to the field of construction engineering by providing a practical model for achieving full lifecycle digitalization and intelligent project management.
基金supported by the Humanities and Social Sciences of Ministry of Education Planning Fund of China(Grant No.21YJA790009)the National Natural Science Foundation of China(Grant No.72140001).
文摘New energy-storage systems play a pivotal role in the development of the new power system for advancing the energy transition in China.In the“14th Five-Year Plan”for the New Energy-Storage Development,it is proposed to expand investment and construction models by promoting the deployment of energy-storage facilities through the ways of self-construction,leasing,and purchasing,and to encourage the development of the shared energy-storage.However,the current scarcity in the model of the shared energy-storage invest-ment and construction substantially restricts its development,particularly due to unclear mechanisms for cost and benefit allocation,which also discourages potential investors.To address the issue,this paper proposes investment and construction models for shared energy-storage that aligns with the present stage of energy storage development.In specific,three main models are introduced:(1)Cen-tralized Self-built Shared Energy-Storage model(CSSES),(2)Third-party Investment Shared Energy-Storage model(TISES),and(3)Distributed Self-built Shared Energy Storage(DSSES)model.The cost–benefit analysis is conducted for each model.The results indicate that the CSSES model achieves the highest internal rate of return(11.5%)and the shortest payback period,while the DSSES model per-forms acceptable with an IRR of 9.4%.In contrast,the TISES model shows the lowest IRR(6.7%)and requires higher electricity price for being feasible.Furthermore,the study employs the entropy weight method and the analytic hierarchy process(AHP)for indicator eval-uation,and integrates the technique for order preference by the similarity to an ideal solution(TOPSIS)for scheme optimization.The results show that both the CSSES model and the DSSES model achieve the highest proximity scores.Under environmental regulations,these models demonstrate superior economic benefits by optimizing energy storage utilization,reducing user costs,and enhancing overall profitability.
基金funded by the National Science VIP specialized project of China(Grant No.2011ZX05025-001-03)by the National Science Foundation of China(Grant No.41274117)
文摘In tomographic statics seismic data processing, it 1s crucial to cletermme an optimum base for a near-surface model. In this paper, we consider near-surface model base determination as a global optimum problem. Given information from uphole shooting and the first-arrival times from a surface seismic survey, we present a near-surface velocity model construction method based on a Monte-Carlo sampling scheme using a layered equivalent medium assumption. Compared with traditional least-squares first-arrival tomography, this scheme can delineate a clearer, weathering-layer base, resulting in a better implementation of damming correction. Examples using synthetic and field data are used to demonstrate the effectiveness of the proposed scheme.
基金the National Natural Science Foundation of China(Nos. 50978172 and 51078318)the New Century Excellent Talents in University(No. 10-0667)
文摘It has been a focus of debate for a large time on construction methods for large-span loess tunnel.Reasonable construction method has much effect on stability of tunnel and construction schedule.Deformation and failure of surrounding rock are quite complex.Associating with the large-span loess tunnel of Zhengzhou- Xi'an high-speed passenger rail line in China,large scale model test with geometric proportion 1:20 is applied to study on dynamic mechanical behavior of various construction methods.They include full-face excavation with support and no support,and benching method with support.It is found that pre-deformation and stress accumulation take place ahead of working face.The effects of three construction methods are further studied,particularly in terms of tunnel displacement and stress changes.It is revealed that benching method transfers load to an unexcavated area,limits horizontal deformation,reduces stress concentration effectively,lengthens the distance between location of peak for stress concentration and working face,and consequently increases stability.The model test results not only supply theoretical foundation for determination of reasonable construction method,but also can act as reference for similar tunnel and underground engineering construction.
基金Project(52025085)supported by the National Science Fund for Distinguished Young Scholars,ChinaProjects(51927814,51878078)supported by the National Natural Science Foundation of China+3 种基金Project(2018-025)supported by the Training Program for High-level Technical Personnel in Transportation Industry,ChinaProject(CTKY-PTRC 2018-003)supported by the Design Theory,Method and Demonstration of Durability Asphalt Pavement Based on Heavy-duty Traffic Conditions in Shanghai Area,ChinaProject(2020RC4048)supported by the Science and Technology Innovation Program of Hunan Province,ChinaProject(SJCX202001)supported by the Construction Project for Graduate Students of Changsha University of Science&Technology,China。
文摘This study aims to reveal the macroscopic permanent deformation(PD)behavior and the internal structural evolution of construction and demolition waste(CDW)under loading.Firstly,the initial matric suction of CDW was measured by the filter paper method.Secondly,the PD of CDW with different humidity and stress states was investigated by repeated load triaxial tests,and a comprehensive prediction model was established.Finally,the discrete element method was performed to analyze the internal structural evolution of CDW during deformation.These results showed that the VAN-GENUCHTEN model could describe the soil-water characteristic curve of CDW well.The PD increases with the increase of the deviator stress and the number of cyclic loading,but the opposite trend was observed when the initial matric suction and confining pressure increased.The proposed model in this study provides a satisfactory prediction of PD.The discrete element method could accurately simulate the macroscopic PD of CDW,and the shear force,interlock force and sliding content increase with the increase of deviator stress during the deformation.The research could provide useful reference for the deformation stability analysis of CDW under cyclic loading.
文摘The method of building 3D model was discussed at first. Aiming at the feature of mine vacant place,a method to build the 3D vacant place model based on multi TIN (triangular irregular network) was put forward, and the data structure and visualization of vacant place were discussed. Then some crucial technologies of realizing function in 3D-GIS were proposed. In addition,the software about special 3D mapping and assaying was introduced.
基金financial support under the Manned Aerospace Research Project(Grant No.040102)。
文摘More space truss construction has been planned to develop and utilize space resources.These trusses are designed in the way of large-scale,complex,modular,and on-orbit assembly.To meet the upcoming challenge of large-scale space infrastructure construction,it is necessary to study space truss automation design and robotic construction.This paper proposes an ordinal finite screw adjacency matrix model(OFSAMM),focusing on the relationship between assembly motions,to express and compute a space truss structure.In this model,a space truss is abstracted as a set of ordered assembly motions,each of which is recorded as a finite screw as the basic element of the truss and its assembly.The operation of truss transformation is also derived under this model.Therefore,the truss configuration,the assembly sequence,the truss sub-assembly,the truss components,and the on-orbit assembly task can be expressed and calculated in a unified model,which is calculated and stores the truss topology and assembly with the minimum storage cost.At the end of this paper,we introduce how to synthesize and optimize space truss design through two cases.The study will help to improve design efficiency.Furthermore,it provides a theoretical basis for the automatic construction of space truss structures,especially in the next stage.
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘Basic conditions and new countryside construction of Ganlu Town, Zizhong County, Neijiang City were analyzed, SWOT adopted to analyze internal strengths, weaknesses, external opportunities and threats of its new countryside construction. On this basis, positive and practical strategies were put forward to promote the new countryside construction in the local area, and provide references for the new countryside construction in other regions.
文摘Geometric model construction is the basis of infrared image theory simulation. Taking the construction of the geometric model of one building in Harbin as an example, this paper analyzes the theoretical groundings of simplification and principles of geometric model construction of buildings. It then discusses some particular treatment methods in calculating the radiation transfer coefficient in geometric model construction using the Monte Carlo Method.
基金Key Subject of Ministry of Railway Technology Research and Development Program(No.2011G010-D)Central University Funds for Basic Research(No.SWJTU12ZT12)
文摘In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.
文摘Vocational education is an important way in the current talent training.It shoulders the heavy responsibility of transporting talents for the society.With the acceleration of urbanization construction and the development of industrial technology,the demand for High Tech Talents in construction projects is constantly increasing.It is necessary to strengthen the improvement of vocational education in construction engineering.This paper mainly analyzes the mode of vocational education in construction engineering.
文摘The cost and strict input format requirements of GraphRAG make it less efficient for processing large documents. This paper proposes an alternative approach for constructing a knowledge graph (KG) from a PDF document with a focus on simplicity and cost-effectiveness. The process involves splitting the document into chunks, extracting concepts within each chunk using a large language model (LLM), and building relationships based on the proximity of concepts in the same chunk. Unlike traditional named entity recognition (NER), which identifies entities like “Shanghai”, the proposed method identifies concepts, such as “Convenient transportation in Shanghai” which is found to be more meaningful for KG construction. Each edge in the KG represents a relationship between concepts occurring in the same text chunk. The process is computationally inexpensive, leveraging locally set up tools like Mistral 7B openorca instruct and Ollama for model inference, ensuring the entire graph generation process is cost-free. A method of assigning weights to relationships, grouping similar pairs, and summarizing multiple relationships into a single edge with associated weight and relation details is introduced. Additionally, node degrees and communities are calculated for node sizing and coloring. This approach offers a scalable, cost-effective solution for generating meaningful knowledge graphs from large documents, achieving results comparable to GraphRAG while maintaining accessibility for personal machines.
文摘Starting with the Aalen (1989) version of Cox (1972) 'regression model' we show the method for construction of "any" joint survival function given marginal survival functions. Basically, however, we restrict ourselves to model positive stochastic dependences only with the general assumption that the underlying two marginal random variables are centered on the set of nonnegative real values. With only these assumptions we obtain nice general characterization of bivariate probability distributions that may play similar role as the copula methodology. Examples of reliability and biomedical applications are given.
基金Supported by the National Natural Science Foundation of China(71603284)the Humanity and Social Science Research Foundation of Ministry of Education PRC(16YJC630068)the China Postdoctoral Science Foundation(2019T120718,2018M630918).
文摘Safety accidents occure frequently during metro construction, which are mainly caused by human factors, and the incidence of accidents can be increased due to the overlap of human factors and physical factors. The human factors are taken as breakthrough to make early warning for the human insecurity factors in the metro construction, which can effectively reduce the occurrence of safety accidents. This paper proposes the principle of total monitoring and early-warning management. The unsafe behaviors in metro construction when approaching the hazardous area and non-standard safety prevention measures are analyzed to design and model the early warning process of unsafe behaviors in metro construction. Finally, the model is analyzed and verified using actual examples.
文摘This article analyzes the application strategies of Building Information Modeling(BIM)support technology in a first-class highway reconstruction and expansion project based on its actual situation.According to the basic situation of BIM technology and its application goals in this project,it explores application strategies such as BIM model construction,BIM prefabricated structural model deepening and schedule simulation,BIM collision detection,and BIM tunnel pre-construction simulation.Through this analysis,it is hoped to provide a reference for the rational application of BIM support technology and ensure the high-quality and efficient completion of first-class highway reconstruction and expansion projects.
基金National Natural Science Foundation of China(Nos.41601498,41471380)National Key R&D Program of China(No.2017YFC1405505)。
文摘In view of the TIN_DDM buffer surface existing in the construction and application of special data type,algorithm efficiency and precision are not matching;the paper applied the rolling ball model in the process of TIN_DDM buffer surface construction.Based on the precision limitation analysis of rolling ball model,the overall precision control method of rolling ball model has been established.Considering the efficiency requirement of TIN_DDM buffer surface construction,the influence principle of key sampling points and rolling ball radius to TIN_DDM buffer surface construction efficiency has been elaborated,and the rule of identifying key sampling points has also been designed.Afterwards,by erecting the numerical relationship between key sampling points and rolling ball radius,a TIN_DDM buffer surface construction algorithm based on rolling ball acceleration optimization model has been brought forward.The time complexity of the algorithm is O(n).The experiments show that the algorithm could realize the TIN_DDM buffer surface construction with high efficiency,and the algorithm precision is controlled with in 2σ.