Short-term power flow analysis has a significant influence on day-ahead generation schedule. This paper proposes a time series model and prediction error distribution model of wind power output. With the consideration...Short-term power flow analysis has a significant influence on day-ahead generation schedule. This paper proposes a time series model and prediction error distribution model of wind power output. With the consideration of wind speed and wind power output forecast error’s correlation, the probabilistic distributions of transmission line flows during tomorrow’s 96 time intervals are obtained using cumulants combined Gram-Charlier expansion method. The probability density function and cumulative distribution function of transmission lines on each time interval could provide scheduling planners with more accurate and comprehensive information. Simulation in IEEE 39-bus system demonstrates effectiveness of the proposed model and algorithm.展开更多
与系统负荷不同,母线负荷水平较低,波动性强,规律性弱,可预测性差,引入虚拟母线技术有利于提高母线负荷预测的工作水平与预测精度。在电网中存在一些紧密联系的连通的局部网络,其内部各母线对关键断面具有相同或相近的发电机输出功率转...与系统负荷不同,母线负荷水平较低,波动性强,规律性弱,可预测性差,引入虚拟母线技术有利于提高母线负荷预测的工作水平与预测精度。在电网中存在一些紧密联系的连通的局部网络,其内部各母线对关键断面具有相同或相近的发电机输出功率转移分布因子(generation shift distribution factor,GSDF),同时其内部母线的负荷曲线具有一定的相似性,这些母线所组成的连通局部母线组为虚拟母线。根据虚拟母线概念,提出一种新颖的聚类预测方法:虚拟母线负荷预测方法;对虚拟母线负荷预测与独立预测的精度进行了比较,分析了预测误差的形成机理,提炼出预测误差的数学表征;针对虚拟母线聚类判据对于提高预测精度的有效性进行了分析;采用河北南网的实际数据验证了虚拟母线负荷预测方法的有效性。展开更多
在能源互联网快速发展的背景下,研究分析了综合能源系统的多元负荷预测模型及理论方法.针对传统ARIMA(Autoregressive Moving Average Model,ARMA)模型仅能处理线性关系的问题,将ARIMA模型与LSTM(Long-Short Term Memory,LSTM)网络模型...在能源互联网快速发展的背景下,研究分析了综合能源系统的多元负荷预测模型及理论方法.针对传统ARIMA(Autoregressive Moving Average Model,ARMA)模型仅能处理线性关系的问题,将ARIMA模型与LSTM(Long-Short Term Memory,LSTM)网络模型结合,提出并建立了ARIMA-LSTM模型.该模型不仅兼容冷、热、气、电等多元负荷的预测,并且可以用于风速、辐射照度等数据的预测,有较好的适应性和预测精度.展开更多
文摘Short-term power flow analysis has a significant influence on day-ahead generation schedule. This paper proposes a time series model and prediction error distribution model of wind power output. With the consideration of wind speed and wind power output forecast error’s correlation, the probabilistic distributions of transmission line flows during tomorrow’s 96 time intervals are obtained using cumulants combined Gram-Charlier expansion method. The probability density function and cumulative distribution function of transmission lines on each time interval could provide scheduling planners with more accurate and comprehensive information. Simulation in IEEE 39-bus system demonstrates effectiveness of the proposed model and algorithm.
文摘与系统负荷不同,母线负荷水平较低,波动性强,规律性弱,可预测性差,引入虚拟母线技术有利于提高母线负荷预测的工作水平与预测精度。在电网中存在一些紧密联系的连通的局部网络,其内部各母线对关键断面具有相同或相近的发电机输出功率转移分布因子(generation shift distribution factor,GSDF),同时其内部母线的负荷曲线具有一定的相似性,这些母线所组成的连通局部母线组为虚拟母线。根据虚拟母线概念,提出一种新颖的聚类预测方法:虚拟母线负荷预测方法;对虚拟母线负荷预测与独立预测的精度进行了比较,分析了预测误差的形成机理,提炼出预测误差的数学表征;针对虚拟母线聚类判据对于提高预测精度的有效性进行了分析;采用河北南网的实际数据验证了虚拟母线负荷预测方法的有效性。
文摘在能源互联网快速发展的背景下,研究分析了综合能源系统的多元负荷预测模型及理论方法.针对传统ARIMA(Autoregressive Moving Average Model,ARMA)模型仅能处理线性关系的问题,将ARIMA模型与LSTM(Long-Short Term Memory,LSTM)网络模型结合,提出并建立了ARIMA-LSTM模型.该模型不仅兼容冷、热、气、电等多元负荷的预测,并且可以用于风速、辐射照度等数据的预测,有较好的适应性和预测精度.