This paper presents an analysis to forecast the loads of an isolated area where the history of load is not available or the history may not represent the realistic demand of electricity. The analysis is done through l...This paper presents an analysis to forecast the loads of an isolated area where the history of load is not available or the history may not represent the realistic demand of electricity. The analysis is done through linear regression and based on the identification of factors on which electrical load growth depends. To determine the identification factors, areas are selected whose histories of load growth rate known and the load growth deciding factors are similar to those of the isolated area. The proposed analysis is applied to an isolated area of Bangladesh, called Swandip where a past history of electrical load demand is not available and also there is no possibility of connecting the area with the main land grid system.展开更多
This paper is devoted to investigate the robust H∞sliding mode load frequency control(SMLFC) of multi-area power system with time delay. By taking into account stochastic disturbances induced by the integration of re...This paper is devoted to investigate the robust H∞sliding mode load frequency control(SMLFC) of multi-area power system with time delay. By taking into account stochastic disturbances induced by the integration of renewable energies,a new sliding surface function is constructed to guarantee the fast response and robust performance, then the sliding mode control law is designed to guarantee the reach ability of the sliding surface in a finite-time interval. The sufficient robust frequency stabilization result for multi-area power system with time delay is presented in terms of linear matrix inequalities(LMIs). Finally,a two-area power system is provided to illustrate the usefulness and effectiveness of the obtained results.展开更多
The paper proposes a novel H∞ load frequency control(LFC) design method for multi-area power systems based on an integral-based non-fragile distributed fixed-order dynamic output feedback(DOF) tracking-regulator cont...The paper proposes a novel H∞ load frequency control(LFC) design method for multi-area power systems based on an integral-based non-fragile distributed fixed-order dynamic output feedback(DOF) tracking-regulator control scheme. To this end, we consider a nonlinear interconnected model for multiarea power systems which also include uncertainties and timevarying communication delays. The design procedure is formulated using semi-definite programming and linear matrix inequality(LMI) method. The solution of the proposed LMIs returns necessary parameters for the tracking controllers such that the impact of model uncertainty and load disturbances are minimized. The proposed controllers are capable of receiving all or part of subsystems information, whereas the outputs of each controller are local. These controllers are designed such that the resilient stability of the overall closed-loop system is guaranteed. Simulation results are provided to verify the effectiveness of the proposed scheme. Simulation results quantify that the distributed(and decentralized) controlled system behaves well in presence of large parameter perturbations and random disturbances on the power system.展开更多
Using a plexiglass sample and by means of real-time holographic interferometry and shadow optical method of caustics, the different features of dynamic variation in stress (strain) field, plastic area and nucleation z...Using a plexiglass sample and by means of real-time holographic interferometry and shadow optical method of caustics, the different features of dynamic variation in stress (strain) field, plastic area and nucleation zone (shadow area) when the sample fractures during loading (loading-fracture) and unloading (unloading-fracture) are studied visually. The results show that the strain nuclei (zones with dense fringes) appear first at the tips of prefabricated cracks at low stress, and then the shadow areas of caustics form with the increase of load. These nuclei and shadow areas can become larger, or smaller, when the process of loading, or unloading, goes on. When the stress is kept within a certain range, the shadow areas of caustics can become larger and smaller alternatively with repeated loading and unloading (cyclic loading). However, when loading and unloading at high stress, in particular when the macrofracture is about to appear, the variations of the shadow areas of caustics are irreversible and quite different. The shadow areas of caustics expand rapidly at an increasing speed when loading-fracture appears. In contrast, the shadow areas of caustics expand at a lower speed when unloading-fracture appears; besides, there is a circular shadow in front of the sharp-angle shaped area.展开更多
This work proposes a novel nature-inspired algorithm called Ant Lion Optimizer (ALO). The ALO algorithm mimics the search mechanism of antlions in nature. A time domain based objective function is established to tune ...This work proposes a novel nature-inspired algorithm called Ant Lion Optimizer (ALO). The ALO algorithm mimics the search mechanism of antlions in nature. A time domain based objective function is established to tune the parameters of the PI controller based LFC, which is solved by the proposed ALO algorithm to reach the most convenient solutions. A three-area interconnected power system is investigated as a test system under various loading conditions to confirm the effectiveness of the suggested algorithm. Simulation results are given to show the enhanced performance of the developed ALO algorithm based controllers in comparison with Genetic Algorithm (GA), Particle Swarm Optimization (PSO), Bat Algorithm (BAT) and conventional PI controller. These results represent that the proposed BAT algorithm tuned PI controller offers better performance over other soft computing algorithms in conditions of settling times and several performance indices.展开更多
Frequency deviation can be used as an indicator of imbalance between supply and demand. When generation is insufficient, it can cause frequency decline in a power system operation. Implementing under frequency load sh...Frequency deviation can be used as an indicator of imbalance between supply and demand. When generation is insufficient, it can cause frequency decline in a power system operation. Implementing under frequency load shedding (UFLS) is one of the common methods to overcome this problem. This paper proposes a novel approach for adaptive load shedding. The concept is an extension of shared and targeted load shedding using reserve margin. The optimal system configuration is then selected from those candidates to fulfill operational objectives. Operational constraints related to system parameters, threshold frequency, total of load shed and control area including line capacity are considered. An example using four sub-areas connected to an external system shows that the proposed regional coordination as an adaptive UFLS is feasible.展开更多
The subsided area caused by mining is expanding gradually in coal mining areas. In order to occupy less or no farmland, many mining areas are constructing or intend to erect new buildings (structures) on the ground si...The subsided area caused by mining is expanding gradually in coal mining areas. In order to occupy less or no farmland, many mining areas are constructing or intend to erect new buildings (structures) on the ground sites above the worked-out areas. The long-term safety of the new buildings is of great importance. This matter should be, therefore, handled with great care. Following an analysis of the different conditions of the worked-out areas, and the characteristics of the failure of different types of worked-out areas and their overlying strata, the cause for the occurrence of residual deformation of the surface above the worked-out area was explained. The techniques for (evaluating) the stability of ground site for erecting new buildings above worked-out area, and the technical measures for protecting such buildings were proposed. The ground stability evaluation techniques were introduced by reference to specific cases.展开更多
To restore the distribution systems in emergency states with the minimum load shedding, a novel Tabu search approach is put forward. The set of tripped switches is used as candidate solution. Some virtual tripped node...To restore the distribution systems in emergency states with the minimum load shedding, a novel Tabu search approach is put forward. The set of tripped switches is used as candidate solution. Some virtual tripped nodes are defined at the ends of the terminal nodes and by the source nodes. The neighborhood searching is committed by moving a tripped switch to the adjacent node of its upper stream and down stream, respectively. A Tabu list is formed for the tripped switches. The index is to energize as much as possible loads with as less as possible operated times. The electrical limitations and the voltage criterions are used as constrictions. The global aspiration criterion is adopted. An example is given, which shows that the proposed approach is feasible and can deal with complicated indexes.展开更多
In the framework of liberalized deregulated electricity market, dynamic competitive environment exists between wholesale and retail dealers for energy supplying and management. Smart Grids topology in form of energy m...In the framework of liberalized deregulated electricity market, dynamic competitive environment exists between wholesale and retail dealers for energy supplying and management. Smart Grids topology in form of energy management has forced power supplying agencies to become globally competitive. Demand Response (DR) Programs in context with smart energy network have influenced prosumers and consumers towards it. In this paper Fair Emergency Demand Response Program (FEDRP) is integrated for managing the loads intelligently by using the platform of Smart Grids for Residential Setup. The paper also provides detailed modelling and analysis of respective demands of residential consumers in relation with economic load model for FEDRP. Due to increased customer’s partaking in this program the load on the utility is reduced and managed intelligently during emergency hours by providing fair and attractive incentives to residential clients, thus shifting peak load to off peak hours. The numerical and graphical results are matched for intelligent load management scenario.展开更多
文摘This paper presents an analysis to forecast the loads of an isolated area where the history of load is not available or the history may not represent the realistic demand of electricity. The analysis is done through linear regression and based on the identification of factors on which electrical load growth depends. To determine the identification factors, areas are selected whose histories of load growth rate known and the load growth deciding factors are similar to those of the isolated area. The proposed analysis is applied to an isolated area of Bangladesh, called Swandip where a past history of electrical load demand is not available and also there is no possibility of connecting the area with the main land grid system.
基金supported in part by the National Natural Science Foundation of China(61673161)the Natural Science Foundation of Jiangsu Province of China(BK20161510)+2 种基金the Fundamental Research Funds for the Central Universities of China(2017B13914)the 111 Project(B14022)the Priority Academic Program Development of Jiangsu Higher Education Institutions(PAPD)
文摘This paper is devoted to investigate the robust H∞sliding mode load frequency control(SMLFC) of multi-area power system with time delay. By taking into account stochastic disturbances induced by the integration of renewable energies,a new sliding surface function is constructed to guarantee the fast response and robust performance, then the sliding mode control law is designed to guarantee the reach ability of the sliding surface in a finite-time interval. The sufficient robust frequency stabilization result for multi-area power system with time delay is presented in terms of linear matrix inequalities(LMIs). Finally,a two-area power system is provided to illustrate the usefulness and effectiveness of the obtained results.
文摘The paper proposes a novel H∞ load frequency control(LFC) design method for multi-area power systems based on an integral-based non-fragile distributed fixed-order dynamic output feedback(DOF) tracking-regulator control scheme. To this end, we consider a nonlinear interconnected model for multiarea power systems which also include uncertainties and timevarying communication delays. The design procedure is formulated using semi-definite programming and linear matrix inequality(LMI) method. The solution of the proposed LMIs returns necessary parameters for the tracking controllers such that the impact of model uncertainty and load disturbances are minimized. The proposed controllers are capable of receiving all or part of subsystems information, whereas the outputs of each controller are local. These controllers are designed such that the resilient stability of the overall closed-loop system is guaranteed. Simulation results are provided to verify the effectiveness of the proposed scheme. Simulation results quantify that the distributed(and decentralized) controlled system behaves well in presence of large parameter perturbations and random disturbances on the power system.
基金Key project from China Seismological Bureau (9691309020301)and State Natural Sciences Foundation of China (19732060 and 46764010
文摘Using a plexiglass sample and by means of real-time holographic interferometry and shadow optical method of caustics, the different features of dynamic variation in stress (strain) field, plastic area and nucleation zone (shadow area) when the sample fractures during loading (loading-fracture) and unloading (unloading-fracture) are studied visually. The results show that the strain nuclei (zones with dense fringes) appear first at the tips of prefabricated cracks at low stress, and then the shadow areas of caustics form with the increase of load. These nuclei and shadow areas can become larger, or smaller, when the process of loading, or unloading, goes on. When the stress is kept within a certain range, the shadow areas of caustics can become larger and smaller alternatively with repeated loading and unloading (cyclic loading). However, when loading and unloading at high stress, in particular when the macrofracture is about to appear, the variations of the shadow areas of caustics are irreversible and quite different. The shadow areas of caustics expand rapidly at an increasing speed when loading-fracture appears. In contrast, the shadow areas of caustics expand at a lower speed when unloading-fracture appears; besides, there is a circular shadow in front of the sharp-angle shaped area.
文摘This work proposes a novel nature-inspired algorithm called Ant Lion Optimizer (ALO). The ALO algorithm mimics the search mechanism of antlions in nature. A time domain based objective function is established to tune the parameters of the PI controller based LFC, which is solved by the proposed ALO algorithm to reach the most convenient solutions. A three-area interconnected power system is investigated as a test system under various loading conditions to confirm the effectiveness of the suggested algorithm. Simulation results are given to show the enhanced performance of the developed ALO algorithm based controllers in comparison with Genetic Algorithm (GA), Particle Swarm Optimization (PSO), Bat Algorithm (BAT) and conventional PI controller. These results represent that the proposed BAT algorithm tuned PI controller offers better performance over other soft computing algorithms in conditions of settling times and several performance indices.
文摘Frequency deviation can be used as an indicator of imbalance between supply and demand. When generation is insufficient, it can cause frequency decline in a power system operation. Implementing under frequency load shedding (UFLS) is one of the common methods to overcome this problem. This paper proposes a novel approach for adaptive load shedding. The concept is an extension of shared and targeted load shedding using reserve margin. The optimal system configuration is then selected from those candidates to fulfill operational objectives. Operational constraints related to system parameters, threshold frequency, total of load shed and control area including line capacity are considered. An example using four sub-areas connected to an external system shows that the proposed regional coordination as an adaptive UFLS is feasible.
文摘The subsided area caused by mining is expanding gradually in coal mining areas. In order to occupy less or no farmland, many mining areas are constructing or intend to erect new buildings (structures) on the ground sites above the worked-out areas. The long-term safety of the new buildings is of great importance. This matter should be, therefore, handled with great care. Following an analysis of the different conditions of the worked-out areas, and the characteristics of the failure of different types of worked-out areas and their overlying strata, the cause for the occurrence of residual deformation of the surface above the worked-out area was explained. The techniques for (evaluating) the stability of ground site for erecting new buildings above worked-out area, and the technical measures for protecting such buildings were proposed. The ground stability evaluation techniques were introduced by reference to specific cases.
文摘To restore the distribution systems in emergency states with the minimum load shedding, a novel Tabu search approach is put forward. The set of tripped switches is used as candidate solution. Some virtual tripped nodes are defined at the ends of the terminal nodes and by the source nodes. The neighborhood searching is committed by moving a tripped switch to the adjacent node of its upper stream and down stream, respectively. A Tabu list is formed for the tripped switches. The index is to energize as much as possible loads with as less as possible operated times. The electrical limitations and the voltage criterions are used as constrictions. The global aspiration criterion is adopted. An example is given, which shows that the proposed approach is feasible and can deal with complicated indexes.
文摘In the framework of liberalized deregulated electricity market, dynamic competitive environment exists between wholesale and retail dealers for energy supplying and management. Smart Grids topology in form of energy management has forced power supplying agencies to become globally competitive. Demand Response (DR) Programs in context with smart energy network have influenced prosumers and consumers towards it. In this paper Fair Emergency Demand Response Program (FEDRP) is integrated for managing the loads intelligently by using the platform of Smart Grids for Residential Setup. The paper also provides detailed modelling and analysis of respective demands of residential consumers in relation with economic load model for FEDRP. Due to increased customer’s partaking in this program the load on the utility is reduced and managed intelligently during emergency hours by providing fair and attractive incentives to residential clients, thus shifting peak load to off peak hours. The numerical and graphical results are matched for intelligent load management scenario.