In 1960s, Hartman and Grobman pointed out that if all eigenvalues of a matrix A have no zero real part and f(x) is small Lipchitzian, then x′=Ax+f(x) can be locally linearized on a neighborhood of the origin. Later, ...In 1960s, Hartman and Grobman pointed out that if all eigenvalues of a matrix A have no zero real part and f(x) is small Lipchitzian, then x′=Ax+f(x) can be locally linearized on a neighborhood of the origin. Later, the above result was generalized to global under the condition that f(x) is a bounded function. In this paper, we delete the condition that f(x) is a bounded function, and prove that if f(x) has suitable structure, then x′=Ax+f(x) can be linearized.展开更多
In this paper,a new parallel controller is developed for continuous-time linear systems.The main contribution of the method is to establish a new parallel control law,where both state and control are considered as the...In this paper,a new parallel controller is developed for continuous-time linear systems.The main contribution of the method is to establish a new parallel control law,where both state and control are considered as the input.The structure of the parallel control is provided,and the relationship between the parallel control and traditional feedback controls is presented.Considering the situations that the systems are controllable and incompletely controllable,the properties of the parallel control law are analyzed.The parallel controller design algorithms are given under the conditions that the systems are controllable and incompletely controllable.Finally,numerical simulations are carried out to demonstrate the effectiveness and applicability of the present method.Index Terms-Continuous-time linear systems,digital twin,parallel controller,parallel intelligence,parallel systems.展开更多
In this paper, a new class of three term memory gradient method with non-monotone line search technique for unconstrained optimization is presented. Global convergence properties of the new methods are discussed. Comb...In this paper, a new class of three term memory gradient method with non-monotone line search technique for unconstrained optimization is presented. Global convergence properties of the new methods are discussed. Combining the quasi-Newton method with the new method, the former is modified to have global convergence property. Numerical results show that the new algorithm is efficient.展开更多
As a key part of the diagnosis system in the International Thermonuclear Experimental Reactor(ITER),the neutron flux monitor(NFM),which measures the neutron intensity of the fusion reaction,is a Counting-Campbelling s...As a key part of the diagnosis system in the International Thermonuclear Experimental Reactor(ITER),the neutron flux monitor(NFM),which measures the neutron intensity of the fusion reaction,is a Counting-Campbelling system with a large dynamic counting range.A dynamic linear calibration method is proposed in this paper to solve the problem of cross-over between the different counting and Campbelling channels,and improve the accuracy of the cross-calibration for long-term operation.The experimental results show that the NFM system with the dynamic linear calibration system can obtain the neutron flux of the fusion reactor in real time and realize the seamless measurement area connection between the two channels.展开更多
In this paper, we study the consensus problem for a class of linear multi-agent systems(MASs) with consideration of input saturation under the self-triggered mechanism. In the context of discrete-time systems, a self-...In this paper, we study the consensus problem for a class of linear multi-agent systems(MASs) with consideration of input saturation under the self-triggered mechanism. In the context of discrete-time systems, a self-triggered strategy is developed to determine the time interval between the adjacent triggers. The triggering condition is designed by using the current sampled consensus error. Furthermore, the consensus control protocol is designed by means of a state feedback approach. It is shown that the considered multi-agent systems can reach consensus with the presented algorithm. Some sufficient conditions are proposed in the form of linear matrix inequalities(LMIs) to show the positively invariant property of the domain of attraction(DOA). Moreover, some sufficient conditions of controller synthesis are provided to enlarge the volume of the DOA and obtain the control gain matrix. A numerical example is simulated to demonstrate the effectiveness of the theoretical analysis results.展开更多
A 1.34 GHz-1=60 MHz low noise amplifier (LNA) designed in a 0.35 pm SiGe process is presented. The designed LNA exhibits a power gain of 21.46 dB and a noise figure (NF) of 1.27 dB at 1.34 GHz. The linearity is im...A 1.34 GHz-1=60 MHz low noise amplifier (LNA) designed in a 0.35 pm SiGe process is presented. The designed LNA exhibits a power gain of 21.46 dB and a noise figure (NF) of 1.27 dB at 1.34 GHz. The linearity is improved with an active biasing technique. The post-layout simulation shows an input referred 1-dB compression point (IPldn) of-11.52 dBm. Compared with the recent reported high gain LNAs, the proposed LNA has a much better linearity without degrading other performance. The LNA draws 10 mA current from a 3.3 V power supply.展开更多
The development of many estimators of parameters of linear regression model is traceable to non-validity of the assumptions under which the model is formulated, especially when applied to real life situation. This not...The development of many estimators of parameters of linear regression model is traceable to non-validity of the assumptions under which the model is formulated, especially when applied to real life situation. This notwithstanding, regression analysis may aim at prediction. Consequently, this paper examines the performances of the Ordinary Least Square (OLS) estimator, Cochrane-Orcutt (COR) estimator, Maximum Likelihood (ML) estimator and the estimators based on Principal Component (PC) analysis in prediction of linear regression model under the joint violations of the assumption of non-stochastic regressors, independent regressors and error terms. With correlated stochastic normal variables as regressors and autocorrelated error terms, Monte-Carlo experiments were conducted and the study further identifies the best estimator that can be used for prediction purpose by adopting the goodness of fit statistics of the estimators. From the results, it is observed that the performances of COR at each level of correlation (multicollinearity) and that of ML, especially when the sample size is large, over the levels of autocorrelation have a convex-like pattern while that of OLS and PC are concave-like. Also, as the levels of multicollinearity increase, the estimators, except the PC estimators when multicollinearity is negative, rapidly perform better over the levels autocorrelation. The COR and ML estimators are generally best for prediction in the presence of multicollinearity and autocorrelated error terms. However, at low levels of autocorrelation, the OLS estimator is either best or competes consistently with the best estimator, while the PC estimator is either best or competes with the best when multicollinearity level is high(λ>0.8 or λ-0.49).展开更多
对已有梯级水电站进行融合改造,增建抽水蓄能机组形成梯级混合式抽水蓄能电站,是加快抽水蓄能发展的有效途径之一。梯级混合式抽水蓄能电站相较于常规梯级电站,新增具备抽水运行工况,相较于传统抽水蓄能电站,又具有更加复杂梯级水力联系...对已有梯级水电站进行融合改造,增建抽水蓄能机组形成梯级混合式抽水蓄能电站,是加快抽水蓄能发展的有效途径之一。梯级混合式抽水蓄能电站相较于常规梯级电站,新增具备抽水运行工况,相较于传统抽水蓄能电站,又具有更加复杂梯级水力联系,灵活的运行模式需要更为精细化的调度建模方法。为探索其典型调峰运行模式,提出了梯级混合式抽水蓄能电站短期调峰优化模型。该模型以电网剩余负荷峰谷差最小为目标,以机组为最小调度单元,针对不同类型机组的抽-发运行工况采用差异化建模。在模型求解方面,通过线性转换方法将原有非线性模型转化为混合整数线性规划(mixed integer linear programming,MILP)模型,然后在JAVA环境中运用CPLEX数学工具进行求解。以西南某梯级水电站为实例的分析结果表明,梯级混合式抽水蓄能电站相较于常规梯级电站电网剩余负荷峰谷差减少4.6%。展开更多
基金NSFC!( 1 9671 0 1 7) and NSF!( A970 1 2 ) of Fujian.
文摘In 1960s, Hartman and Grobman pointed out that if all eigenvalues of a matrix A have no zero real part and f(x) is small Lipchitzian, then x′=Ax+f(x) can be locally linearized on a neighborhood of the origin. Later, the above result was generalized to global under the condition that f(x) is a bounded function. In this paper, we delete the condition that f(x) is a bounded function, and prove that if f(x) has suitable structure, then x′=Ax+f(x) can be linearized.
基金supported in part by the National Key Research and Development Program of China(2018AAA0101502,2018YFB1702300)the National Natural Science Foundation of China(61722312,61533019,U1811463,61533017)。
文摘In this paper,a new parallel controller is developed for continuous-time linear systems.The main contribution of the method is to establish a new parallel control law,where both state and control are considered as the input.The structure of the parallel control is provided,and the relationship between the parallel control and traditional feedback controls is presented.Considering the situations that the systems are controllable and incompletely controllable,the properties of the parallel control law are analyzed.The parallel controller design algorithms are given under the conditions that the systems are controllable and incompletely controllable.Finally,numerical simulations are carried out to demonstrate the effectiveness and applicability of the present method.Index Terms-Continuous-time linear systems,digital twin,parallel controller,parallel intelligence,parallel systems.
文摘In this paper, a new class of three term memory gradient method with non-monotone line search technique for unconstrained optimization is presented. Global convergence properties of the new methods are discussed. Combining the quasi-Newton method with the new method, the former is modified to have global convergence property. Numerical results show that the new algorithm is efficient.
基金Supported by ITER Plan National Major Project(No.2008GB109000)
文摘As a key part of the diagnosis system in the International Thermonuclear Experimental Reactor(ITER),the neutron flux monitor(NFM),which measures the neutron intensity of the fusion reaction,is a Counting-Campbelling system with a large dynamic counting range.A dynamic linear calibration method is proposed in this paper to solve the problem of cross-over between the different counting and Campbelling channels,and improve the accuracy of the cross-calibration for long-term operation.The experimental results show that the NFM system with the dynamic linear calibration system can obtain the neutron flux of the fusion reactor in real time and realize the seamless measurement area connection between the two channels.
基金supported by the National Natural Science Foundation of China(61921004,61520106009,U1713209,61973074)the Project Funded by the Priority Academic Program Development of Jiangsu Higher Education Institutions
文摘In this paper, we study the consensus problem for a class of linear multi-agent systems(MASs) with consideration of input saturation under the self-triggered mechanism. In the context of discrete-time systems, a self-triggered strategy is developed to determine the time interval between the adjacent triggers. The triggering condition is designed by using the current sampled consensus error. Furthermore, the consensus control protocol is designed by means of a state feedback approach. It is shown that the considered multi-agent systems can reach consensus with the presented algorithm. Some sufficient conditions are proposed in the form of linear matrix inequalities(LMIs) to show the positively invariant property of the domain of attraction(DOA). Moreover, some sufficient conditions of controller synthesis are provided to enlarge the volume of the DOA and obtain the control gain matrix. A numerical example is simulated to demonstrate the effectiveness of the theoretical analysis results.
文摘A 1.34 GHz-1=60 MHz low noise amplifier (LNA) designed in a 0.35 pm SiGe process is presented. The designed LNA exhibits a power gain of 21.46 dB and a noise figure (NF) of 1.27 dB at 1.34 GHz. The linearity is improved with an active biasing technique. The post-layout simulation shows an input referred 1-dB compression point (IPldn) of-11.52 dBm. Compared with the recent reported high gain LNAs, the proposed LNA has a much better linearity without degrading other performance. The LNA draws 10 mA current from a 3.3 V power supply.
文摘The development of many estimators of parameters of linear regression model is traceable to non-validity of the assumptions under which the model is formulated, especially when applied to real life situation. This notwithstanding, regression analysis may aim at prediction. Consequently, this paper examines the performances of the Ordinary Least Square (OLS) estimator, Cochrane-Orcutt (COR) estimator, Maximum Likelihood (ML) estimator and the estimators based on Principal Component (PC) analysis in prediction of linear regression model under the joint violations of the assumption of non-stochastic regressors, independent regressors and error terms. With correlated stochastic normal variables as regressors and autocorrelated error terms, Monte-Carlo experiments were conducted and the study further identifies the best estimator that can be used for prediction purpose by adopting the goodness of fit statistics of the estimators. From the results, it is observed that the performances of COR at each level of correlation (multicollinearity) and that of ML, especially when the sample size is large, over the levels of autocorrelation have a convex-like pattern while that of OLS and PC are concave-like. Also, as the levels of multicollinearity increase, the estimators, except the PC estimators when multicollinearity is negative, rapidly perform better over the levels autocorrelation. The COR and ML estimators are generally best for prediction in the presence of multicollinearity and autocorrelated error terms. However, at low levels of autocorrelation, the OLS estimator is either best or competes consistently with the best estimator, while the PC estimator is either best or competes with the best when multicollinearity level is high(λ>0.8 or λ-0.49).
文摘对已有梯级水电站进行融合改造,增建抽水蓄能机组形成梯级混合式抽水蓄能电站,是加快抽水蓄能发展的有效途径之一。梯级混合式抽水蓄能电站相较于常规梯级电站,新增具备抽水运行工况,相较于传统抽水蓄能电站,又具有更加复杂梯级水力联系,灵活的运行模式需要更为精细化的调度建模方法。为探索其典型调峰运行模式,提出了梯级混合式抽水蓄能电站短期调峰优化模型。该模型以电网剩余负荷峰谷差最小为目标,以机组为最小调度单元,针对不同类型机组的抽-发运行工况采用差异化建模。在模型求解方面,通过线性转换方法将原有非线性模型转化为混合整数线性规划(mixed integer linear programming,MILP)模型,然后在JAVA环境中运用CPLEX数学工具进行求解。以西南某梯级水电站为实例的分析结果表明,梯级混合式抽水蓄能电站相较于常规梯级电站电网剩余负荷峰谷差减少4.6%。
文摘准确预测台区的电力负荷,能够促使电力企业合理安排调度计划,保障台区电力安全和经济稳定运行。为了充分挖掘电力负荷数据的特征,提高预测的精度,提出一种基于自适应辛几何模态分解(adaptive symplectic geometry mode decomposition,ASGMD)、多元线性回归(multiple linear regression,MLR)和卷积长短时记忆(convolutional long short-term memory,CLSTM)网络的电力负荷预测方法。首先,应用ASGMD将台区负荷数据分解为弱相关和强相关两种分量;然后,利用MLR和CLSTM分别对上述两种分量分别进行预测;最后,组合各模型结果,得到最终负荷预测值。实例分析结果表明,所提模型较其他模型具有更高的预测准确度。