The weak and broken roof,explosive control and other problems seriously restrict the promotion of non coal pillar self-forming roadway technology.In order to solve such problems,a new method of non coal pillar self-fo...The weak and broken roof,explosive control and other problems seriously restrict the promotion of non coal pillar self-forming roadway technology.In order to solve such problems,a new method of non coal pillar self-forming roadway through non-blasting roof cutting and pressure relief was proposed in this study.A systematic research system of"theoretical analysis-physical experiment-engineering verification"was constructed with the 9103 working face of Longmenta Coal Mine as the research object.Firstly,the theoretical analysis was conducted to reveal the roof cutting mechanics mechanism of rock mass weakened by dense drilling,establish the design criteria for key drilling parameters,and obtain the key design parameters of dense drilling in the test working face.Secondly,the physical model test was conducted to make clear that the dense drilling method can directionally cut off the goaf roof along the set position,reducing the stress and deformation of the roadway surrounding rock.Finally,the field engineering tests were conducted,and monitoring results showed that the pressure relief effect of the dense drilling method was comparable to that of the directional blasting method,achieving non coal pillar self-forming roadway mining under non blasting conditions.展开更多
In-situ enlargement of super-large-span tunnels can intensify excavation-induced unloading in the surrounding rock,increasing deformation demand and failure risk during construction.This study combines laboratory mode...In-situ enlargement of super-large-span tunnels can intensify excavation-induced unloading in the surrounding rock,increasing deformation demand and failure risk during construction.This study combines laboratory model tests with FLAC3D simulations to evaluate the stabilizing role of prestressed anchor cables and to establish an energy-balance framework for support optimization.Comparative model tests of existing and enlarged tunnel sections,with and without anchors,show that reinforcement increases load-carrying capacity,reduces displacement,and confines damage to more localized zones.The numerical simulations reproduce displacement fields,shear-strain localization,and plastic-zone evolution with good agreement against the experimental observations.The energy framework is implemented in the in-situ simulations by quantifying unloading-related energy release in the rock mass and reinforcement work contributed by the anchors,and by introducing an energy release–reinforcement ratio as a stability indicator.Parametric analyses indicate that anchor length,spacing,and prestress influence stability in a nonlinear manner,with diminishing returns once reinforcement extends beyond the mechanically dominant deformation zone.An efficient parameter window is identified that improves deformation and yielding control while avoiding unnecessary reinforcement.The results provide an energy-consistent and design-oriented basis for prestressed anchorage selection in large-span tunnel expansion.展开更多
The wind pressure pulse events, among the most important characteristics of wind pressure fluctuations on large-span flat roofs, were investigated by wind tunnel tests in this paper. Incorporating the formation mechan...The wind pressure pulse events, among the most important characteristics of wind pressure fluctuations on large-span flat roofs, were investigated by wind tunnel tests in this paper. Incorporating the formation mechanism of wind pressure pulse events, the peak over threshold method was employed to study properties of this kind of events. The event duration time, the energy contribution, the number of the pulse events, and the distribution of average peak pressure were calculated. Probability density functions of some typical samples in separation region were also given. Results show that the non-Gaussian roof pressure is strong in the flow separation region owing to the wind pressure pulse events. Evaluations of the extreme peak pressures, which can be determined by the peak over threshold method effectively, are important to the design of building cladding.展开更多
A series of researches on mechanical behaviors of big pipe roof for shallow large-span loess tunnel were carried out based on the Wenxiang tunnel in Zhengzhou—Xi'an Special Passenger Railway. The longitudinal def...A series of researches on mechanical behaviors of big pipe roof for shallow large-span loess tunnel were carried out based on the Wenxiang tunnel in Zhengzhou—Xi'an Special Passenger Railway. The longitudinal deformations of the pipe roofs were monitored and the mechanical behaviors of the pipe roofs were analyzed at the test section. A new double-parameter elastic foundation beam model for pipe roof in shallow tunnels was put forward in Wenxiang tunnel. The measured values and the calculation results agreed well with each other,revealing the force-deformation law of big pipe roof in loess tunnel:At about 15 m in front of the excavating face,the pipe roof starts to bear the load;at about 15 m behind the excavating face,the force of the pipe roof tends to be stabilized;the longitudinal deformation of the whole pipe roofs is groove-shaped distribution,and the largest force of pipe roofs is at the excavating face. Simultaneously,the results also indicate that mechanical behaviors of pipe roof closely relate to the location of the excavation face,the footage of the tunnelling cycle and the mechanics parameters of pipe roof and rock. The conclusions can be reference for the design parameter optimization and the construction scheme selection of pipe roofs,and have been verified by the result of numerical analysis software FLAC3Dand deformation monitoring.展开更多
The stability and fracture behavior of a goaf roof beneath an open-pit bench are critical concerns,especially under impact loading.However,the effect of the thickness-to-span ratio on dynamic failure modes remains lar...The stability and fracture behavior of a goaf roof beneath an open-pit bench are critical concerns,especially under impact loading.However,the effect of the thickness-to-span ratio on dynamic failure modes remains largely unexplored,as existing research focuses mainly on static stability.Energy dissipation and instability evolution under impact loading require further study.To address this gap,this study conducts drop-weight impact experiments on specimens with circular perforations,complemented by numerical simulations.By integrating dimensional analysis,cusp catastrophe theory,and strength reduction techniques,the dynamic instability mechanism of goaf roofs with varying thickness-to-span ratios is revealed.Results show that the thickness-to-span ratio significantly influences energy accumulation and dissipation during roof failure.A higher ratio increases both the magnitude and rate of energy dissipation,particularly during crack initiation and stable propagation,while its impact diminishes in the final failure stage.Optimizing the thickness-to-span ratio within a critical range enhances structural stability,improving the safety factor by up to 83%.However,beyond a certain threshold,additional thickness yields diminishing benefits.This study provides new insights into the energy-based instability mechanism of goaf roofs under impact loads,establishing a theoretical foundation for early warning systems and optimized safety design.展开更多
To enhance the recuperation rate of the mine and comply with the stipulations of green mining technology, it is vital to expeditiously recuperate the coal pillar resources in the final stage, thus preventing the consi...To enhance the recuperation rate of the mine and comply with the stipulations of green mining technology, it is vital to expeditiously recuperate the coal pillar resources in the final stage, thus preventing the considerable squandering of resources. The coal pillar resource of the main roadway and its branch roadway constitutes a significant recovery subject. Its coal pillar shape is regular and possesses a considerable strike distance, facilitating the arrangement of the coal pillar recovery working face (CPRWF) for mining operations. However, for the remaining coal pillars with a thick and hard roof (THF) and multiple tectonic zones, CPRWF encounters challenges in selecting an appropriate layout, managing excessive roof pressure, and predicting mining stress. Aiming at the roadway coal pillar group with THF and multi-structural areas in specific projects, a method of constructing multi-stage CPRWF by one side gob-side entry driving (GSED) and one side roadway reusing is proposed. Through theoretical calculation of roof fracture and numerical simulation verification, combined with field engineering experience and economic analysis, the width of the narrow coal pillar (NCP) in the GSED is determined to be 10 m and the length of the CPRWF is 65 m. Concurrently, the potential safety hazard that the roof will fall asymmetrically and THF is difficult to break during CPRWF mining after GSED is analyzed and verified. Then, a control method involving the pre-cutting of the roof in the reused roadway before mining is proposed. This method has been shown to facilitate the complete collapse of THF, reduce the degree of mine pressure, and facilitate the symmetrical breaking of the roof. Accordingly, a roof-cutting scheme based on a directional drilling rig, bidirectional shaped polyvinyl chloride (PVC) pipe, and emulsion explosive was devised, and the pre-splitting of 8.2 m THF was accomplished. Field observations indicate that directional cracks are evident in the roof, the coal wall is flat during CPRWF mining, and the overall level of mining pressure is within the control range. Therefore, the combined application of GSED and roof-cutting technology for coal pillar recovery has been successfully implemented, thereby providing new insights and engineering references for the construction and pressure relief mining of CPRWF.展开更多
This study analyzes the energy impact of applying green roofs on flat roofs of existing buildings,assessing their potential to reduce the demand for non-renewable primary energy for heating and cooling.Through dynamic...This study analyzes the energy impact of applying green roofs on flat roofs of existing buildings,assessing their potential to reduce the demand for non-renewable primary energy for heating and cooling.Through dynamic numerical simulations conducted on two real buildings located near Florence,Italy,and modeled in 130 different European locations,with a particular focus on the Mediterranean climate,it was possible to quantify the energy benefits derived from the application of green roofs on existing structures.The results show that,while the effect on heating is limited,with an average reduction in energy demand of only a few percentage points,the impact on cooling is significantly more pronounced,with average savings of 20%in non-renewable primary energy,particularly in Mediterranean climates with high CDD(cooling degree days)values.The study confirms that green roofs can be an effective solution to improve the energy efficiency of existing buildings with flat roofs in the Mediterranean climate,in line with European goals for reducing CO_(2) emissions and promoting renewable energy.展开更多
Phillip Katuve,a landlord who owns a six-storey apartment complex in Kileleshwa,an upmarket Nairobi suburb,embraced green roofing two years ago.His building now boasts a vibrant rooftop garden with integrated solar pa...Phillip Katuve,a landlord who owns a six-storey apartment complex in Kileleshwa,an upmarket Nairobi suburb,embraced green roofing two years ago.His building now boasts a vibrant rooftop garden with integrated solar panels,supplying energy to all 24 units.“Initially,the idea sounded expensive,but the long-term benefits have been remarkable,”said Katuve.展开更多
The steel tube arch rib in a large-span concrete-filled steel tube arch bridge has a large span and diameter,which also leads to a larger weld seam scale.Large-scale welding seams will inevitably cause more obvious we...The steel tube arch rib in a large-span concrete-filled steel tube arch bridge has a large span and diameter,which also leads to a larger weld seam scale.Large-scale welding seams will inevitably cause more obvious welding residual stress(WRS).For the purpose of studying the influence of WRS from large-scale welding seam on the mechanical properties of steel tube arch rib during arch rib splicing,test research and numerical simulation analysis on the WRS in arch rib splicing based on the Guangxi Pingnan Third Bridge,which is the world’s largest span concrete-filled steel tube arch bridge,were conducted in this paper,and the distribution pattern of WRS at the arch rib splicing joint was obtained.Subsequently,the WRS was introduced into the mechanical performance analysis of joints and structures to analyze its effects.The findings reveal that the distribution of WRS in the arch rib is greatly influenced by the rib plate,and the axial WRS in the heat-affected zone are primarily tensile,while the circumferential WRS are distributed in an alternating pattern of tensile and compressive stresses along the circumferential direction of the main tube.Under the influence of WRS,the ultimate bearing capacity of the joint is reduced by 29.4%,the initial axial stiffness is reduced by 4.32%,and the vertical deformation of the arch rib structure is increased by 4.7%.展开更多
As complex and diverse ecosystems,cities encounter numerous challenges posed by both nature and humanity.Architecture,serving as the framework and texture of the city,has undoubtedly emerged as a crucial guide in addr...As complex and diverse ecosystems,cities encounter numerous challenges posed by both nature and humanity.Architecture,serving as the framework and texture of the city,has undoubtedly emerged as a crucial guide in addressing urban resilience issues.Roof greening and vertical greening of buildings,as ecofriendly urban green infrastructures,hold significant potential for mitigating these challenges.This paper explores the methods and strategies for implementing roof greening and vertical greening as solutions to enhance urban resilience.The objective is to offer valuable insights for sustainable urban development,encourage the widespread adoption of these greening techniques in urban construction,and ultimately strengthen urban resilience.展开更多
The effectiveness of horizontal well multi-stage and multi-cluster fracturing in the fractured soft coal seam roof for coalbed methane(CBM) extraction has been demonstrated.This study focuses on the geological charact...The effectiveness of horizontal well multi-stage and multi-cluster fracturing in the fractured soft coal seam roof for coalbed methane(CBM) extraction has been demonstrated.This study focuses on the geological characteristics of the No.5 and No.11 coal seams in the Hancheng Block,Ordos Basin,China.A multi-functional,variable-size rock sample mold capable of securing the wellbore was developed to simulate layered formations comprising strata of varying lithology and thicknesses.A novel segmented fracturing simulation method based on an expandable pipe plugging technique is proposed.Large-scale true triaxial experiments were conducted to investigate the effects of horizontal wellbore location,perforation strategy,roof lithology,and vertical stress difference on fracture propagation,hydraulic energy variation,and the stimulated reservoir volume in horizontal wells targeting the soft coal seam roof.The results indicate that bilateral downward perforation with a phase angle of 120° optimizes hydraulic energy conservation,reduces operational costs,enhances fracture formation,and prevents fracturing failure caused by coal powder generation and migration.This perforation mode is thus considered optimal for coal seam roof fracturing.When the roof consists of sandstone,each perforation cluster tends to initiate a single dominant fracture with a regular geometry.In contrast,hydraulic fractures formed in mudstone roofs display diverse morphology.Due to its high strength,the sandstone roof requires significantly higher pressure for crack initiation and propagation,whereas the mudstone roof,with its strong water sensitivity,exhibits lower fracturing pressures.To mitigate inter-cluster interference,cluster spacing in mudstone roofs should be greater than that in sandstone roofs.Horizontal wellbore placement critically influences fracturing effectiveness.For indirect fracturing in sandstone roofs,an optimal position is 25 mm away from the lithological interface.In contrast,the optimal location for indirect fracturing in mudstone roofs is directly at the lithological interface with the coal seam.Higher vertical stress coefficients lead to increased fractu ring pressures and promote vertical,layer-penetrating fractures.A coefficient of 0.5 is identified as optimal for achieving effective indirect fracturing.This study provides valuable insights for the design and optimization of staged fracturing in horizontal wells targeting crushed soft coal seam roofs.展开更多
Crack control of basement roof slab is a key technical challenge to ensure building safety and durability.Based on the requirements of“General Specification for Concrete Structures”(GB55008-2021),this paper systemat...Crack control of basement roof slab is a key technical challenge to ensure building safety and durability.Based on the requirements of“General Specification for Concrete Structures”(GB55008-2021),this paper systematically analyses the causes of cracks,and puts forward a whole-process prevention and control system covering design optimization,low-shrinkage material proportioning,fine control of construction technology,and dynamic monitoring and repair.Through structural finite element simulation,wireless sensor network real-time monitoring,and carbon fibre fabric reinforcement test,the effectiveness of the multi-technology synergistic control framework is verified,and the engineering cases show that the crack width after repair is stable within 0.1mm,and the bearing capacity is increased by more than 30%.The study provides theoretical support for crack prevention and control in super-long underground projects,and looks forward to the direction of integration application of BIM technology and intelligent materials.展开更多
A steel-concrete composite cable-stayed bridge features integrated steel girders and concrete decks linked by shear connectors to support loads,but stress concentration in wet joints can lead to cracking.In-situ tests...A steel-concrete composite cable-stayed bridge features integrated steel girders and concrete decks linked by shear connectors to support loads,but stress concentration in wet joints can lead to cracking.In-situ tests were conducted on key sections of steel-concrete composite cable-stayed bridges to analyze the stress-strain evolution of wet joints under environmental factors,constraints,and complex construction processes.The coordinated working performance of the bridge decks was also analyzed.The results indicate that temperature is the key factor affecting the stresses and strains in wet joint concrete.Approximately 7 days after casting the wet joint concrete,the strains at each measurement point of the wet joint are approximately negatively correlated with the temperature change at the measurement point.Different locations within the wet joints have respective impacts,presenting potential weak points.Construction conditions have a certain impact on the stress and strain of the wet joint.The top deck of the steel box girder is not fully bonded to the bottom surface of the wet joints,resulting in a certain strain difference after loading.To further analyze the cooperative working performance of steel box girders and concrete wet joint bridge deck systems,finite element analysis was conducted on composite girder structures.A stiffness calculation method for shear connectors based on numerical simulation was proposed.The results indicate that strain differences can cause interface slip in composite girders.This slip leads to increased deflection of the composite girders and increased tensile stress in the bottom plate of the steel box girders.This study clarifies the stress conditions and factors affecting wet joints during construction,preventing early cracking,and offers precise data for a full bridge finite element model.展开更多
The surrounding rock is prone to large-scale loosening and failure after the excavation of shallow large-span caverns because of the thin overlying strata and large cross-section span.The rational design of bolt suppo...The surrounding rock is prone to large-scale loosening and failure after the excavation of shallow large-span caverns because of the thin overlying strata and large cross-section span.The rational design of bolt support is very important to the safety control of surrounding rock as a common support means.The control mechanism and design method of bolt support for shallow-buried large-span caverns is carried out.The calculation method of bolt prestress and length based on arched failure and collapsed failure mode is established.The influence mechanism of different influencing factors on the bolt prestress and length is clarified.At the same time,the constant resistance energy-absorbing bolt with high strength and high toughness is developed,and the comparative test of mechanical properties is carried out.On this basis,the design method of high prestressed bolt support for shallow-buried large-span caverns is put forward,and the field test is carried out in Qingdao metro station in China.The monitoring results show that the maximum roof settlement is 6.8 mm after the new design method is adopted,and the effective control of the shallow-buried large-span caverns is realized.The research results can provide theoretical and technical support for the safety control of shallow-buried large-span caverns.展开更多
The present paper investigates the methods for estimating the maximum(positive)and the minimum(negative)peak wind force coefficients on domed free roofs based on the quasi-steady theory and the peak factor method,in w...The present paper investigates the methods for estimating the maximum(positive)and the minimum(negative)peak wind force coefficients on domed free roofs based on the quasi-steady theory and the peak factor method,in which the experimental results obtained from our previous studies(2019,2025)are used.Focus is on the distributions of the peak wind force coefficients along the centerline parallel to the wind direction considering that domed free roof is an axisymmetric body.Empirical formulas are provided to the distributions of mean wind force coefficient,RMS(root mean square)fluctuating wind force coefficient and peak factors as a function of the rise/span ratio of the roof and the turbulence intensity of the approach flow in the along-wind direction at the mean roof height.The proposed methods are validated by the experimental results for the peak wind force coefficients.The methods would provide useful information to structural engineers when estimating the design wind loads on cladding/components of domed free roofs.展开更多
Affected by the geological characteristics of coal bearing strata in western mining areas of China,the double soft composite roof has low strength and poor integrity,which is prone to induce disasters such as large de...Affected by the geological characteristics of coal bearing strata in western mining areas of China,the double soft composite roof has low strength and poor integrity,which is prone to induce disasters such as large deformation and roof collapse.Four-point bending tests were conducted on anchored double-layer rock beams with different pre tightening force and upper/lower rock strength ratios(Ⅰ/Ⅱ)based on the digital speckle correlation method(DSCM).The research results indicate that the instability process of anchored roof can be divided into stages of elastic deformation,crack propagation,alternating fracture,and failure collapse.The proportion of crack propagation and alternating fracture processes increased with the increase of pre-tightening force and Ⅰ/Ⅱ.The pre-tightening force can suppress the sliding of the upper/lower rock interface,and delay the initiation and propagation of cracks.As Ⅰ/Ⅱ increases,the failure mode changes from tensile failure steel strip to shear failure anchor rod.Steel strip can improve the continued bearing effect of anchored roof during crack propagation and alternating fracture processes.展开更多
Considering the characteristics of deep thick top coal roadway,in which the high ground stress,coal seam with low strength,and a large range of surrounding rock fragmentation,the pressure relief anchor box beam suppor...Considering the characteristics of deep thick top coal roadway,in which the high ground stress,coal seam with low strength,and a large range of surrounding rock fragmentation,the pressure relief anchor box beam support system with high strength is developed.The high-strength bearing characteristics and coupling yielding support mechanism of this support system are studied by the mechanical tests of composite members and the combined support system.The test results show that under the coupling effect of support members,the peak stress of the box-shaped support beam in the anchor box beam is reduced by 21.9%,and the average deformation is increased by 135.0%.The ultimate bending bearing capacity of the box-shaped support beam is 3.5 times that of traditional channel beam.The effective compressive stress zone applied by the high prestressed cable is expanded by 26.4%.On this basis,the field support comparison test by the anchor channel beam,the anchor I-shaped beam and the anchor box beam are carried out.Compared with those of the previous two,the surrounding rock convergence of the latter is decreased by 41.2%and 22.2%,respectively.The field test verifies the effectiveness of the anchor box beam support system.展开更多
The fracture and migration patterns of direct roofs play a critical role in excavation stability and mining pressure.However,current methods fail to capture the irregular three-dimensional(3D)behavior of these roofs.I...The fracture and migration patterns of direct roofs play a critical role in excavation stability and mining pressure.However,current methods fail to capture the irregular three-dimensional(3D)behavior of these roofs.In this study,the problem was solved by introducing an innovative 2.5-dimensional(2.5D)Voronoi numerical simulation method,dividing rock layers into 2.5D Voronoi blocks and developing cohesive element-based failure models,supported by a strain-softening HoekeBrown model.The method was applied to the 8311 working face in the Taishan Mine in China,and its accuracy was confirmed through physical experiments.The following conclusions were drawn.The first roof break typically followed an"O-X"pattern.The direct roof did not break randomly over time;instead,it followed three distinct scenarios:(1)A complete break of the direct roof occurred,followed by a sequential collapse(ScenarioⅠ).(2)Regional irregular stacking in one area was followed by sequential collapse in other zones(ScenarioⅡ).(3)The staged breakdown of the direct roof led to separate and sequential collapses on the left and right flanks(ScenarioⅢ).Scenario I was quite common during the 400 m advance of the working face and occurred five times.The fracture characteristics in Scenario I led to widespread pressure on the hydraulic supports in the middle of the working face.Finally,the direct roof from the working face towards the goaf area underwent phases of overhanging,hinging,and collapsing plates.After the first and periodic breaks,the basic roof formed stable hinged plate structures reinforced by overhanging plates and irregular accumulations of the direct roof.展开更多
The intersection is a widely used traffic line structure from the shallow tunnel to the deep roadway,and determining the subsidence hidden danger area of the roof is the key to its stability control.However,applying t...The intersection is a widely used traffic line structure from the shallow tunnel to the deep roadway,and determining the subsidence hidden danger area of the roof is the key to its stability control.However,applying traditional maximum equivalent span beam(MESB)theory to determine deformation range,peak point,and angle influence poses a challenge.Considering the overall structure of the intersection roof,the maximum equivalent triangular plate(METP)theory is proposed,and its geometric parameter calculation formula and deflection calculation formula are obtained.The application of the two theories in 18 models with different intersection angles,roadway types,and surrounding rock lithology is verified by numerical analysis.The results show that:1)The METP structure of the intersection roof established by the simulation results of each model successfully determined the location of the roof’s high displacement zone;2)The area comparison method of the METP theory can be reasonably explained:①The roof subsidence of the intersection decreases with the increase of the intersection angle;②The roof subsidence at the intersection of different roadway types has a rectangular type>arch type>circular type;③The roof subsidence of the intersection with weak surrounding rock is significantly larger than that of the intersection with hard surrounding rock.According to the application results of the two theories,the four advantages of the METP theory are compared and clarified in the basic assumptions,mechanical models,main viewpoints,and mechanism analysis.The large deformation inducement of the intersection roof is then explored.The J 2 peak area of the roof drives the large deformation of the area,the peak point of which is consistent with the center of gravity position of the METP.Furthermore,the change in the range of this peak is consistent with the change law of the METP’s area.Hence,this theory clarifies the large deformation area of the intersection roof,which provides a clear guiding basis for its initial support design,mid-term monitoring,and late local reinforcement.展开更多
This study is to determine the support mechanism of pre-stressed expandable props for the stope roof in room- and-pillar mining, which is crucial for maintaining stability and preventing roof collapse in mines. Utiliz...This study is to determine the support mechanism of pre-stressed expandable props for the stope roof in room- and-pillar mining, which is crucial for maintaining stability and preventing roof collapse in mines. Utilizing an engineering case from a gold mine in Dandong, China, a laboratory-based similar test is conducted to extract the actual roof characteristic curve. This test continues until the mining stope collapses due to a U-shaped failure. Concurrently, a semi-theoretical method for obtaining the roof characteristic curve is proposed and verified against the actual curve. The semi-theoretical method calculated that the support force and vertical displacement at the demarcation point between the elastic and plastic zones of the roof characteristic curve are 5.0 MPa and 8.20 mm, respectively, corroborating well with the laboratory-based similar test results of 0.22 MPa and 0.730 mm. The weakening factor for the plastic zone in the roof characteristic curve was semi-theoretically estimated to be 0.75. The intersection between the actual roof characteristic curve and the support characteristic curves of expandable props, natural pillars, and concrete props indicates that the expandable prop is the most effective “yielding support” for the stope roof in room-and-pillar mining. That is, the deformation and failure of the stope roof can be effectively controlled with proper release of roof stress. This study provides practical insights for optimizing support strategies in room-and-pillar mining, enhancing the safety and efficiency of mining operations.展开更多
基金Project(2024YFC2909500)supported by the National Key Research and Development Program of ChinaProjects(42377148,52204164)supported by the National Natural Science Foundation of ChinaProject(2022XJSB03)supported by the Fundamental Research Funds for the Central Universities,China。
文摘The weak and broken roof,explosive control and other problems seriously restrict the promotion of non coal pillar self-forming roadway technology.In order to solve such problems,a new method of non coal pillar self-forming roadway through non-blasting roof cutting and pressure relief was proposed in this study.A systematic research system of"theoretical analysis-physical experiment-engineering verification"was constructed with the 9103 working face of Longmenta Coal Mine as the research object.Firstly,the theoretical analysis was conducted to reveal the roof cutting mechanics mechanism of rock mass weakened by dense drilling,establish the design criteria for key drilling parameters,and obtain the key design parameters of dense drilling in the test working face.Secondly,the physical model test was conducted to make clear that the dense drilling method can directionally cut off the goaf roof along the set position,reducing the stress and deformation of the roadway surrounding rock.Finally,the field engineering tests were conducted,and monitoring results showed that the pressure relief effect of the dense drilling method was comparable to that of the directional blasting method,achieving non coal pillar self-forming roadway mining under non blasting conditions.
基金funded by the National Key R&D Program of China,China(No.2024YFF0507903)the National Key Research and Development Program of China(Grant No.2024YFF0507904)the National Natural Science Foundation of China,China(Grant No.52379114).These supports are gratefully acknowledged.
文摘In-situ enlargement of super-large-span tunnels can intensify excavation-induced unloading in the surrounding rock,increasing deformation demand and failure risk during construction.This study combines laboratory model tests with FLAC3D simulations to evaluate the stabilizing role of prestressed anchor cables and to establish an energy-balance framework for support optimization.Comparative model tests of existing and enlarged tunnel sections,with and without anchors,show that reinforcement increases load-carrying capacity,reduces displacement,and confines damage to more localized zones.The numerical simulations reproduce displacement fields,shear-strain localization,and plastic-zone evolution with good agreement against the experimental observations.The energy framework is implemented in the in-situ simulations by quantifying unloading-related energy release in the rock mass and reinforcement work contributed by the anchors,and by introducing an energy release–reinforcement ratio as a stability indicator.Parametric analyses indicate that anchor length,spacing,and prestress influence stability in a nonlinear manner,with diminishing returns once reinforcement extends beyond the mechanically dominant deformation zone.An efficient parameter window is identified that improves deformation and yielding control while avoiding unnecessary reinforcement.The results provide an energy-consistent and design-oriented basis for prestressed anchorage selection in large-span tunnel expansion.
基金Sponsored by the National Natural Science Foundation of China(Grant No.50708030 and 90815021)
文摘The wind pressure pulse events, among the most important characteristics of wind pressure fluctuations on large-span flat roofs, were investigated by wind tunnel tests in this paper. Incorporating the formation mechanism of wind pressure pulse events, the peak over threshold method was employed to study properties of this kind of events. The event duration time, the energy contribution, the number of the pulse events, and the distribution of average peak pressure were calculated. Probability density functions of some typical samples in separation region were also given. Results show that the non-Gaussian roof pressure is strong in the flow separation region owing to the wind pressure pulse events. Evaluations of the extreme peak pressures, which can be determined by the peak over threshold method effectively, are important to the design of building cladding.
基金Major Science and Technology R&D Program of Ministry of Railways(No.2005K001-D(G)-2)
文摘A series of researches on mechanical behaviors of big pipe roof for shallow large-span loess tunnel were carried out based on the Wenxiang tunnel in Zhengzhou—Xi'an Special Passenger Railway. The longitudinal deformations of the pipe roofs were monitored and the mechanical behaviors of the pipe roofs were analyzed at the test section. A new double-parameter elastic foundation beam model for pipe roof in shallow tunnels was put forward in Wenxiang tunnel. The measured values and the calculation results agreed well with each other,revealing the force-deformation law of big pipe roof in loess tunnel:At about 15 m in front of the excavating face,the pipe roof starts to bear the load;at about 15 m behind the excavating face,the force of the pipe roof tends to be stabilized;the longitudinal deformation of the whole pipe roofs is groove-shaped distribution,and the largest force of pipe roofs is at the excavating face. Simultaneously,the results also indicate that mechanical behaviors of pipe roof closely relate to the location of the excavation face,the footage of the tunnelling cycle and the mechanics parameters of pipe roof and rock. The conclusions can be reference for the design parameter optimization and the construction scheme selection of pipe roofs,and have been verified by the result of numerical analysis software FLAC3Dand deformation monitoring.
基金support from the Natural Science Foundation of Jiangsu Province(Grant No.BK20242059)the Collaborative Innovation Center for Prevention and Control of Mountain Geological Hazards of Zhejiang Province(PCMGH-2023-02)the opening fund of State Key Laboratory of Coal Mine Disaster Dynamics and Control(2011DA105827-FW202209)are gratefully acknowledged.
文摘The stability and fracture behavior of a goaf roof beneath an open-pit bench are critical concerns,especially under impact loading.However,the effect of the thickness-to-span ratio on dynamic failure modes remains largely unexplored,as existing research focuses mainly on static stability.Energy dissipation and instability evolution under impact loading require further study.To address this gap,this study conducts drop-weight impact experiments on specimens with circular perforations,complemented by numerical simulations.By integrating dimensional analysis,cusp catastrophe theory,and strength reduction techniques,the dynamic instability mechanism of goaf roofs with varying thickness-to-span ratios is revealed.Results show that the thickness-to-span ratio significantly influences energy accumulation and dissipation during roof failure.A higher ratio increases both the magnitude and rate of energy dissipation,particularly during crack initiation and stable propagation,while its impact diminishes in the final failure stage.Optimizing the thickness-to-span ratio within a critical range enhances structural stability,improving the safety factor by up to 83%.However,beyond a certain threshold,additional thickness yields diminishing benefits.This study provides new insights into the energy-based instability mechanism of goaf roofs under impact loads,establishing a theoretical foundation for early warning systems and optimized safety design.
基金Project(52204164) supported by the National Natural Science Foundation of ChinaProject(2023ZKPYSB01) supported by the Fundamental Research Funds for the Central Universities,China。
文摘To enhance the recuperation rate of the mine and comply with the stipulations of green mining technology, it is vital to expeditiously recuperate the coal pillar resources in the final stage, thus preventing the considerable squandering of resources. The coal pillar resource of the main roadway and its branch roadway constitutes a significant recovery subject. Its coal pillar shape is regular and possesses a considerable strike distance, facilitating the arrangement of the coal pillar recovery working face (CPRWF) for mining operations. However, for the remaining coal pillars with a thick and hard roof (THF) and multiple tectonic zones, CPRWF encounters challenges in selecting an appropriate layout, managing excessive roof pressure, and predicting mining stress. Aiming at the roadway coal pillar group with THF and multi-structural areas in specific projects, a method of constructing multi-stage CPRWF by one side gob-side entry driving (GSED) and one side roadway reusing is proposed. Through theoretical calculation of roof fracture and numerical simulation verification, combined with field engineering experience and economic analysis, the width of the narrow coal pillar (NCP) in the GSED is determined to be 10 m and the length of the CPRWF is 65 m. Concurrently, the potential safety hazard that the roof will fall asymmetrically and THF is difficult to break during CPRWF mining after GSED is analyzed and verified. Then, a control method involving the pre-cutting of the roof in the reused roadway before mining is proposed. This method has been shown to facilitate the complete collapse of THF, reduce the degree of mine pressure, and facilitate the symmetrical breaking of the roof. Accordingly, a roof-cutting scheme based on a directional drilling rig, bidirectional shaped polyvinyl chloride (PVC) pipe, and emulsion explosive was devised, and the pre-splitting of 8.2 m THF was accomplished. Field observations indicate that directional cracks are evident in the roof, the coal wall is flat during CPRWF mining, and the overall level of mining pressure is within the control range. Therefore, the combined application of GSED and roof-cutting technology for coal pillar recovery has been successfully implemented, thereby providing new insights and engineering references for the construction and pressure relief mining of CPRWF.
文摘This study analyzes the energy impact of applying green roofs on flat roofs of existing buildings,assessing their potential to reduce the demand for non-renewable primary energy for heating and cooling.Through dynamic numerical simulations conducted on two real buildings located near Florence,Italy,and modeled in 130 different European locations,with a particular focus on the Mediterranean climate,it was possible to quantify the energy benefits derived from the application of green roofs on existing structures.The results show that,while the effect on heating is limited,with an average reduction in energy demand of only a few percentage points,the impact on cooling is significantly more pronounced,with average savings of 20%in non-renewable primary energy,particularly in Mediterranean climates with high CDD(cooling degree days)values.The study confirms that green roofs can be an effective solution to improve the energy efficiency of existing buildings with flat roofs in the Mediterranean climate,in line with European goals for reducing CO_(2) emissions and promoting renewable energy.
文摘Phillip Katuve,a landlord who owns a six-storey apartment complex in Kileleshwa,an upmarket Nairobi suburb,embraced green roofing two years ago.His building now boasts a vibrant rooftop garden with integrated solar panels,supplying energy to all 24 units.“Initially,the idea sounded expensive,but the long-term benefits have been remarkable,”said Katuve.
基金funded by the Science and Technology Research Program of the Chongqing Municipal Education Commission(grant number KJQN202403002).
文摘The steel tube arch rib in a large-span concrete-filled steel tube arch bridge has a large span and diameter,which also leads to a larger weld seam scale.Large-scale welding seams will inevitably cause more obvious welding residual stress(WRS).For the purpose of studying the influence of WRS from large-scale welding seam on the mechanical properties of steel tube arch rib during arch rib splicing,test research and numerical simulation analysis on the WRS in arch rib splicing based on the Guangxi Pingnan Third Bridge,which is the world’s largest span concrete-filled steel tube arch bridge,were conducted in this paper,and the distribution pattern of WRS at the arch rib splicing joint was obtained.Subsequently,the WRS was introduced into the mechanical performance analysis of joints and structures to analyze its effects.The findings reveal that the distribution of WRS in the arch rib is greatly influenced by the rib plate,and the axial WRS in the heat-affected zone are primarily tensile,while the circumferential WRS are distributed in an alternating pattern of tensile and compressive stresses along the circumferential direction of the main tube.Under the influence of WRS,the ultimate bearing capacity of the joint is reduced by 29.4%,the initial axial stiffness is reduced by 4.32%,and the vertical deformation of the arch rib structure is increased by 4.7%.
文摘As complex and diverse ecosystems,cities encounter numerous challenges posed by both nature and humanity.Architecture,serving as the framework and texture of the city,has undoubtedly emerged as a crucial guide in addressing urban resilience issues.Roof greening and vertical greening of buildings,as ecofriendly urban green infrastructures,hold significant potential for mitigating these challenges.This paper explores the methods and strategies for implementing roof greening and vertical greening as solutions to enhance urban resilience.The objective is to offer valuable insights for sustainable urban development,encourage the widespread adoption of these greening techniques in urban construction,and ultimately strengthen urban resilience.
基金support from China National Natural Science Foundation (11672333)。
文摘The effectiveness of horizontal well multi-stage and multi-cluster fracturing in the fractured soft coal seam roof for coalbed methane(CBM) extraction has been demonstrated.This study focuses on the geological characteristics of the No.5 and No.11 coal seams in the Hancheng Block,Ordos Basin,China.A multi-functional,variable-size rock sample mold capable of securing the wellbore was developed to simulate layered formations comprising strata of varying lithology and thicknesses.A novel segmented fracturing simulation method based on an expandable pipe plugging technique is proposed.Large-scale true triaxial experiments were conducted to investigate the effects of horizontal wellbore location,perforation strategy,roof lithology,and vertical stress difference on fracture propagation,hydraulic energy variation,and the stimulated reservoir volume in horizontal wells targeting the soft coal seam roof.The results indicate that bilateral downward perforation with a phase angle of 120° optimizes hydraulic energy conservation,reduces operational costs,enhances fracture formation,and prevents fracturing failure caused by coal powder generation and migration.This perforation mode is thus considered optimal for coal seam roof fracturing.When the roof consists of sandstone,each perforation cluster tends to initiate a single dominant fracture with a regular geometry.In contrast,hydraulic fractures formed in mudstone roofs display diverse morphology.Due to its high strength,the sandstone roof requires significantly higher pressure for crack initiation and propagation,whereas the mudstone roof,with its strong water sensitivity,exhibits lower fracturing pressures.To mitigate inter-cluster interference,cluster spacing in mudstone roofs should be greater than that in sandstone roofs.Horizontal wellbore placement critically influences fracturing effectiveness.For indirect fracturing in sandstone roofs,an optimal position is 25 mm away from the lithological interface.In contrast,the optimal location for indirect fracturing in mudstone roofs is directly at the lithological interface with the coal seam.Higher vertical stress coefficients lead to increased fractu ring pressures and promote vertical,layer-penetrating fractures.A coefficient of 0.5 is identified as optimal for achieving effective indirect fracturing.This study provides valuable insights for the design and optimization of staged fracturing in horizontal wells targeting crushed soft coal seam roofs.
文摘Crack control of basement roof slab is a key technical challenge to ensure building safety and durability.Based on the requirements of“General Specification for Concrete Structures”(GB55008-2021),this paper systematically analyses the causes of cracks,and puts forward a whole-process prevention and control system covering design optimization,low-shrinkage material proportioning,fine control of construction technology,and dynamic monitoring and repair.Through structural finite element simulation,wireless sensor network real-time monitoring,and carbon fibre fabric reinforcement test,the effectiveness of the multi-technology synergistic control framework is verified,and the engineering cases show that the crack width after repair is stable within 0.1mm,and the bearing capacity is increased by more than 30%.The study provides theoretical support for crack prevention and control in super-long underground projects,and looks forward to the direction of integration application of BIM technology and intelligent materials.
文摘A steel-concrete composite cable-stayed bridge features integrated steel girders and concrete decks linked by shear connectors to support loads,but stress concentration in wet joints can lead to cracking.In-situ tests were conducted on key sections of steel-concrete composite cable-stayed bridges to analyze the stress-strain evolution of wet joints under environmental factors,constraints,and complex construction processes.The coordinated working performance of the bridge decks was also analyzed.The results indicate that temperature is the key factor affecting the stresses and strains in wet joint concrete.Approximately 7 days after casting the wet joint concrete,the strains at each measurement point of the wet joint are approximately negatively correlated with the temperature change at the measurement point.Different locations within the wet joints have respective impacts,presenting potential weak points.Construction conditions have a certain impact on the stress and strain of the wet joint.The top deck of the steel box girder is not fully bonded to the bottom surface of the wet joints,resulting in a certain strain difference after loading.To further analyze the cooperative working performance of steel box girders and concrete wet joint bridge deck systems,finite element analysis was conducted on composite girder structures.A stiffness calculation method for shear connectors based on numerical simulation was proposed.The results indicate that strain differences can cause interface slip in composite girders.This slip leads to increased deflection of the composite girders and increased tensile stress in the bottom plate of the steel box girders.This study clarifies the stress conditions and factors affecting wet joints during construction,preventing early cracking,and offers precise data for a full bridge finite element model.
基金Project(2023YFC3805700) supported by the National Key Research and Development Program of ChinaProjects(42477166,42277174) supported by the National Natural Science Foundation of China+2 种基金Project(2024JCCXSB01) supported by the Fundamental Research Funds for the Central Universities,ChinaProject(KFJJ24-01M) supported by the State Key Laboratory of Explosion Science and Safety Protection,Beijing Institute of Technology,ChinaProject(HLCX-2024-04) supported by the Open Foundation of Collaborative Innovation Center of Green Development and Ecological Restoration of Mineral Resources,China。
文摘The surrounding rock is prone to large-scale loosening and failure after the excavation of shallow large-span caverns because of the thin overlying strata and large cross-section span.The rational design of bolt support is very important to the safety control of surrounding rock as a common support means.The control mechanism and design method of bolt support for shallow-buried large-span caverns is carried out.The calculation method of bolt prestress and length based on arched failure and collapsed failure mode is established.The influence mechanism of different influencing factors on the bolt prestress and length is clarified.At the same time,the constant resistance energy-absorbing bolt with high strength and high toughness is developed,and the comparative test of mechanical properties is carried out.On this basis,the design method of high prestressed bolt support for shallow-buried large-span caverns is put forward,and the field test is carried out in Qingdao metro station in China.The monitoring results show that the maximum roof settlement is 6.8 mm after the new design method is adopted,and the effective control of the shallow-buried large-span caverns is realized.The research results can provide theoretical and technical support for the safety control of shallow-buried large-span caverns.
文摘The present paper investigates the methods for estimating the maximum(positive)and the minimum(negative)peak wind force coefficients on domed free roofs based on the quasi-steady theory and the peak factor method,in which the experimental results obtained from our previous studies(2019,2025)are used.Focus is on the distributions of the peak wind force coefficients along the centerline parallel to the wind direction considering that domed free roof is an axisymmetric body.Empirical formulas are provided to the distributions of mean wind force coefficient,RMS(root mean square)fluctuating wind force coefficient and peak factors as a function of the rise/span ratio of the roof and the turbulence intensity of the approach flow in the along-wind direction at the mean roof height.The proposed methods are validated by the experimental results for the peak wind force coefficients.The methods would provide useful information to structural engineers when estimating the design wind loads on cladding/components of domed free roofs.
基金Project(SDAST2024QT060)supported by the Young Talent of Lifting Engineering for Science and Technology in Shandong,ChinaProjects(52304136,52304149,52204093)supported by the National Natural Science Foundation of China+1 种基金Project(ZR2022ME165)supported by the Shandong Provincial Natural Science Foundation,ChinaProject(2023YD02)supported by the Key Project of Research and Development in Liaocheng,China。
文摘Affected by the geological characteristics of coal bearing strata in western mining areas of China,the double soft composite roof has low strength and poor integrity,which is prone to induce disasters such as large deformation and roof collapse.Four-point bending tests were conducted on anchored double-layer rock beams with different pre tightening force and upper/lower rock strength ratios(Ⅰ/Ⅱ)based on the digital speckle correlation method(DSCM).The research results indicate that the instability process of anchored roof can be divided into stages of elastic deformation,crack propagation,alternating fracture,and failure collapse.The proportion of crack propagation and alternating fracture processes increased with the increase of pre-tightening force and Ⅰ/Ⅱ.The pre-tightening force can suppress the sliding of the upper/lower rock interface,and delay the initiation and propagation of cracks.As Ⅰ/Ⅱ increases,the failure mode changes from tensile failure steel strip to shear failure anchor rod.Steel strip can improve the continued bearing effect of anchored roof during crack propagation and alternating fracture processes.
基金Project(2023YFC2907600)supported by the National Key Research and Development Program of ChinaProjects(42277174,42477166)supported by the National Natural Science Foundation of China+1 种基金Project(2024JCCXSB01)supported by the Fundamental Research Funds for the Central Universities,ChinaProject(KFJJ24-01M)supported by the State Key Laboratory of Explosion Science and Safety Protection,Beijing Institute of Technology,China。
文摘Considering the characteristics of deep thick top coal roadway,in which the high ground stress,coal seam with low strength,and a large range of surrounding rock fragmentation,the pressure relief anchor box beam support system with high strength is developed.The high-strength bearing characteristics and coupling yielding support mechanism of this support system are studied by the mechanical tests of composite members and the combined support system.The test results show that under the coupling effect of support members,the peak stress of the box-shaped support beam in the anchor box beam is reduced by 21.9%,and the average deformation is increased by 135.0%.The ultimate bending bearing capacity of the box-shaped support beam is 3.5 times that of traditional channel beam.The effective compressive stress zone applied by the high prestressed cable is expanded by 26.4%.On this basis,the field support comparison test by the anchor channel beam,the anchor I-shaped beam and the anchor box beam are carried out.Compared with those of the previous two,the surrounding rock convergence of the latter is decreased by 41.2%and 22.2%,respectively.The field test verifies the effectiveness of the anchor box beam support system.
基金supported by the Autonomous General Projects of the State Key Laboratory of Coal Mine Disaster Dynamics and Control,Chongqing University,China(Grant No.2011DA105287-MS202209)the National Natural Science Foundation of China,China(Grant Nos.52304149 and 52204127).
文摘The fracture and migration patterns of direct roofs play a critical role in excavation stability and mining pressure.However,current methods fail to capture the irregular three-dimensional(3D)behavior of these roofs.In this study,the problem was solved by introducing an innovative 2.5-dimensional(2.5D)Voronoi numerical simulation method,dividing rock layers into 2.5D Voronoi blocks and developing cohesive element-based failure models,supported by a strain-softening HoekeBrown model.The method was applied to the 8311 working face in the Taishan Mine in China,and its accuracy was confirmed through physical experiments.The following conclusions were drawn.The first roof break typically followed an"O-X"pattern.The direct roof did not break randomly over time;instead,it followed three distinct scenarios:(1)A complete break of the direct roof occurred,followed by a sequential collapse(ScenarioⅠ).(2)Regional irregular stacking in one area was followed by sequential collapse in other zones(ScenarioⅡ).(3)The staged breakdown of the direct roof led to separate and sequential collapses on the left and right flanks(ScenarioⅢ).Scenario I was quite common during the 400 m advance of the working face and occurred five times.The fracture characteristics in Scenario I led to widespread pressure on the hydraulic supports in the middle of the working face.Finally,the direct roof from the working face towards the goaf area underwent phases of overhanging,hinging,and collapsing plates.After the first and periodic breaks,the basic roof formed stable hinged plate structures reinforced by overhanging plates and irregular accumulations of the direct roof.
基金Project(52204164)supported by the National Natural Science Foundation of ChinaProject(2021QNRC001)supported by the Young Elite Scientists Sponsorship Program by CAST,China。
文摘The intersection is a widely used traffic line structure from the shallow tunnel to the deep roadway,and determining the subsidence hidden danger area of the roof is the key to its stability control.However,applying traditional maximum equivalent span beam(MESB)theory to determine deformation range,peak point,and angle influence poses a challenge.Considering the overall structure of the intersection roof,the maximum equivalent triangular plate(METP)theory is proposed,and its geometric parameter calculation formula and deflection calculation formula are obtained.The application of the two theories in 18 models with different intersection angles,roadway types,and surrounding rock lithology is verified by numerical analysis.The results show that:1)The METP structure of the intersection roof established by the simulation results of each model successfully determined the location of the roof’s high displacement zone;2)The area comparison method of the METP theory can be reasonably explained:①The roof subsidence of the intersection decreases with the increase of the intersection angle;②The roof subsidence at the intersection of different roadway types has a rectangular type>arch type>circular type;③The roof subsidence of the intersection with weak surrounding rock is significantly larger than that of the intersection with hard surrounding rock.According to the application results of the two theories,the four advantages of the METP theory are compared and clarified in the basic assumptions,mechanical models,main viewpoints,and mechanism analysis.The large deformation inducement of the intersection roof is then explored.The J 2 peak area of the roof drives the large deformation of the area,the peak point of which is consistent with the center of gravity position of the METP.Furthermore,the change in the range of this peak is consistent with the change law of the METP’s area.Hence,this theory clarifies the large deformation area of the intersection roof,which provides a clear guiding basis for its initial support design,mid-term monitoring,and late local reinforcement.
基金Project(2022YFC2903801) supported by the National Key Research and Development Program of ChinaProjects(52374117, 52274115) supported by the National Natural Science Foundation of China。
文摘This study is to determine the support mechanism of pre-stressed expandable props for the stope roof in room- and-pillar mining, which is crucial for maintaining stability and preventing roof collapse in mines. Utilizing an engineering case from a gold mine in Dandong, China, a laboratory-based similar test is conducted to extract the actual roof characteristic curve. This test continues until the mining stope collapses due to a U-shaped failure. Concurrently, a semi-theoretical method for obtaining the roof characteristic curve is proposed and verified against the actual curve. The semi-theoretical method calculated that the support force and vertical displacement at the demarcation point between the elastic and plastic zones of the roof characteristic curve are 5.0 MPa and 8.20 mm, respectively, corroborating well with the laboratory-based similar test results of 0.22 MPa and 0.730 mm. The weakening factor for the plastic zone in the roof characteristic curve was semi-theoretically estimated to be 0.75. The intersection between the actual roof characteristic curve and the support characteristic curves of expandable props, natural pillars, and concrete props indicates that the expandable prop is the most effective “yielding support” for the stope roof in room-and-pillar mining. That is, the deformation and failure of the stope roof can be effectively controlled with proper release of roof stress. This study provides practical insights for optimizing support strategies in room-and-pillar mining, enhancing the safety and efficiency of mining operations.