Improving the accuracy of the evaluation of the performance of wind farms in large wind power bases located in complex terrain under the actual atmosphere is crucial to the sustainable development of wind power.To thi...Improving the accuracy of the evaluation of the performance of wind farms in large wind power bases located in complex terrain under the actual atmosphere is crucial to the sustainable development of wind power.To this end,this study combined the Weather Research and Forecasting(WRF)model with the Wind Farm Parameterization(WFP)method to investigate the wake characteristics and operational performance of large onshore wind farms in the complex terrain of Jiuquan City,Gansu Province,China.The research results showed that after verification,the systematic error of the WRF simulations was less than 3%.The WRF model and the WFP scheme simulated a significant warming phenomenon within the wind power base area,while a cooling effect was observed outside.The analysis of the wake effects indicated that the impact of PhaseⅠconstruction on PhaseⅡconstruction of the wind power base was minimal.During the operation of the entire wind power base,the wind speed within the wind farm decreased by approximately 10%,and the influence range of the predominant wind direction extended over a hundred kilometers downwind.The research conclusions provide a powerful scientific basis for optimizing design and operation,improving efficiency,minimizing the negative impacts on adjacent wind turbines,and ensuring the sustainable development of wind energy through dynamic planning and scientific assessment.展开更多
In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is rel...In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is relatively simple. Thus, connecting large-capacity wind power units complicates the peak load regulation and stable operation of the power grids in these regions. Most wind turbines use power electronic converter technology, which affects the safety and stability of the power grid differently compared with conventional synchronous generators. Furthermore, fluctuations in wind power cause fluctuations in the output of wind farms, making it difficult to create and implement suitable power generation plans for wind farms. The generation technology and grid connection scheme for wind power and conventional thermal power generation differ considerably. Moreover, the active and reactive power control abilities of wind turbines are weaker than those of thermal power units, necessitating additional equipment to control wind turbines. Hence, to address the aforementioned issues with large-scale wind power generation, this study analyzes the differences between the grid connection and collection strategies for wind power bases and thermal power plants. Based on this analysis, the differences in the power control modes of wind power and thermal power are further investigated. Finally, the stability of different control modes is analyzed through simulation. The findings can be beneficial for the planning and development of large-scale wind power generation farms.展开更多
Several large-scale wind turbine tripping accidents occurred in Jiuquan wind power base in 2011.According to the on-site survey and analysis of these accidents related to relay protection,causes were found to be the c...Several large-scale wind turbine tripping accidents occurred in Jiuquan wind power base in 2011.According to the on-site survey and analysis of these accidents related to relay protection,causes were found to be the collection system defects and low correct operation rate of small current grounded line selectors of the unearthed neutral point collection system.By referring to both the characteristics of Jiuquan wind power base and arrangement of relay protection,the short-circuit features of wind power and its impacts on relay protection are analyzed.The collection system and the retrofit of the small current grounded line selector are improved by specific countermeasures.Finally,further research subjects are put forward.展开更多
More and more large capacity wind power will be integrated into power system in the future,and certain technical challenges will emerge due to the fluctuation characteristics of wind power and the complex control of p...More and more large capacity wind power will be integrated into power system in the future,and certain technical challenges will emerge due to the fluctuation characteristics of wind power and the complex control of power electronic devices inside the wind turbines(e.g.,low voltage ride through(LVRT)).By comparing a wind power integration grid with a hydropower integration grid,the special transient phenomena caused by the wind power integration is studied and simulation results are presented.Furthermore,the potential impacts on the traditional protection are discussed.Results show that the special transient phenomena can decrease the sensitivity,reliability and operation speed of conventional protections.展开更多
With the rapid development of China's economy, the power consumption is increasing. Traditional coal-fired power generation not only consumes a lot of energy, but also has a direct impact on the environment. It is...With the rapid development of China's economy, the power consumption is increasing. Traditional coal-fired power generation not only consumes a lot of energy, but also has a direct impact on the environment. It is against this background that wind energy is gradually developed with its clean and pollution-free characteristics. The implementation of large-scale wind power grid connection has brought many problems to power grid dispatching. Because of the low stability and continuity of wind turbines, installing too many wind turbines in the wind turbines will inevitably have a certain impact on the security and stability of the power grid. In this paper, the security and stability of power grid dispatching and operation under the condition of large-scale wind power grid connection are analyzed and optimized, which provides a basis for the implementation of power grid dispatching.展开更多
The construction of island power grids is a systematic engineering task.To ensure the safe operation of power grid systems,optimizing the line layout of island power grids is crucial.Especially in the current context ...The construction of island power grids is a systematic engineering task.To ensure the safe operation of power grid systems,optimizing the line layout of island power grids is crucial.Especially in the current context of large-scale distributed renewable energy integration into the power grid,conventional island power grid line layouts can no longer meet actual demands.It is necessary to combine the operational characteristics of island power systems and historical load data to perform load forecasting,thereby generating power grid line layout paths.This article focuses on large-scale distributed renewable energy integration,summarizing optimization strategies for island power grid line layouts,and providing a solid guarantee for the safe and stable operation of island power systems.展开更多
The increasing penetration of wind power brings great uncertainties into power systems,which poses challenges to system planning and operation.This paper proposes a novel probabilistic load flow(PLF)method based on cl...The increasing penetration of wind power brings great uncertainties into power systems,which poses challenges to system planning and operation.This paper proposes a novel probabilistic load flow(PLF)method based on clustering technique to handle large fluctuations from large-scale wind power integration.The traditional cumulant method(CM)for PLF is based on the linearization of load flow equations around the operation point,therefore resulting in significant errors when input random variables have large fluctuations.In the proposed method,the samples of wind power and loads are first generated by the inverse Nataf transformation and then clustered using an improved K-means algorithm to obtain input variable samples with small variances in each cluster.With such pre-processing,the cumulant method can be applied within each cluster to calculate cumulants of output random variables with improved accuracy.The results obtained in each cluster are combined according to the law of total probability to calculate the final cumulants of output random variables for the whole samples.The proposed method is validated on modified IEEE 9-bus and 118-bus test achieve a better performance with the consideration of both traditional CM,2 m+1 point estimate method(PEM),Monte Carlo simulation(MCS)and Latin hypercube sampling(LHS)based MCS,the proposed method can achieve a better performance with the consideration of bothcomputational efficiency and accuracy.展开更多
Concerning the integration of large-scale wind power,an integrated model of generation and transmission expansion planning is proposed based on the assessment of the value of steady state and dynamic security.In the a...Concerning the integration of large-scale wind power,an integrated model of generation and transmission expansion planning is proposed based on the assessment of the value of steady state and dynamic security.In the assessment of security value,the unit commitment simulation based on the predicted hourly load and wind power output data in the planning horizon is used to evaluate the costs of preventive control,emergency control and social losses due to the uncertainty of load and wind power.The cost of preventive control consists of the fuel cost of power generation,the environmental cost and the load shedding cost.This not only provides a systematic method of security assessment of power system expansion planning schemes,but also broadens the perspective of power system planning from the technology and economic assessment to the measure of the whole social value.In the assessment process,the preventive control and emergency control of cascading failures are also presented,which provides a convincing tool for cascading failure analysis of planning schemes and makes the security assessment more comprehensive and reasonable.The proposed model and method have been demonstrated by the assessment of two power system planning schemes on the New England 10-genarator 39-bus System.The importance of considering the value of security and simulating hourly system operation for the planning horizon,in expansion planning of power system with integration of large-scale wind power,has been confirmed.展开更多
The grid-connection of large-scale and high-penetration wind power poses challenges to the friendly dispatching control of the power system.To coordinate the complicated optimal dispatching and rapid real-time control...The grid-connection of large-scale and high-penetration wind power poses challenges to the friendly dispatching control of the power system.To coordinate the complicated optimal dispatching and rapid real-time control,this paper proposes a hierarchical cluster coordination control(HCCC)strategy based on model predictive control(MPC)technique.Considering the time-varying characteristics of wind power generation,the proposed HCCC strategy constructs an improved multitime-scale active power dispatching model,which consists of five parts:formulation of cluster dispatching plan,rolling modification of intra-cluster plan,optimization allocation of wind farm(WF),grouping coordinated control of wind turbine group(WTG),and real-time adjustment of single-machine power.The time resolutions are sequentially given as 1 hour,30 min,15 min,5 min,and 1 min.In addition,a combined predictive model based on complete ensemble empirical mode decomposition with adaptive noise(CEEMDAN),wavelet thresholding(WT),and least squares support vector machine(LSSVM)is established.The fast predictive feature of this model cooperates with the HCCC strategy that effectively improves the predictive control precision.Simulation results show that the proposed HCCC strategy enables rapid response to active power control(APC),and significantly improves dispatching control accuracy and wind power accommodation capabilities.展开更多
Large-scale wind power penetration can affect the supply continuity in the power system.This is a matter of high priority to investigate,as more regulating reserves and specified control strategies for generation cont...Large-scale wind power penetration can affect the supply continuity in the power system.This is a matter of high priority to investigate,as more regulating reserves and specified control strategies for generation control are required in the future power system with even more high wind power penetration.This paper evaluates the impact of large-scale wind power integration on future power systems.An active power balance control methodology is used for compensating the power imbalances between the demand and the generation in real time,caused by wind power forecast errors.The methodology for the balance power control of future power systems with large-scale wind power integration is described and exemplified considering the generation and power exchange capacities in2020 for Danish power system.展开更多
Continuous increase of wind power penetration brings high randomness to power system,and also leads to serious shortage of primary frequency regulation(PFR)reserve for power system whose reserve capacity is typically ...Continuous increase of wind power penetration brings high randomness to power system,and also leads to serious shortage of primary frequency regulation(PFR)reserve for power system whose reserve capacity is typically provided by conventional units.Considering large-scale wind power participating in PFR,this paper proposes a unit commitment optimization model with respect to coordination of steady state and transient state.In addition to traditional operation costs,losses of wind farm de-loaded operation,environmental benefits and transient frequency safety costs in high-risk stochastic scenarios are also considered in the model.Besides,the model makes full use of interruptible loads on demand side as one of the PFR reserve sources.A selection method for high-risk scenarios is also proposed to improve the calculation efficiency.Finally,this paper proposes an inner-outer iterative optimization method for the model solution.The method is validated by the New England 10-machine system,and the results show that the optimization model can guarantee both the safety of transient frequency and the economy of system operation.展开更多
Bilateral electric power contract is settled based on contract output curve. This paper considered the bilateral transactions execution, new energy accommodation, power grid security and generation economy, considerin...Bilateral electric power contract is settled based on contract output curve. This paper considered the bilateral transactions execution, new energy accommodation, power grid security and generation economy, considering the executive priority of different power components to establish a multi-objective coordination unit commitment model. Through an example to verify the effectiveness of the model in promoting wind power consumption, guaranteeing trade execution, and improving power generation efficiency, and analyzed the interactions to each other among the factors of wind power, trading and blocking. According to the results, when wind power causes reverse power flow in the congestion line, it will promote the implementation of contracts, the influence of wind power accommodation to trade execution should be analyzed combined with the grid block, the results can provide reference for wind power planning.展开更多
This paper presents a robust interval economic dispatch(RIED)model for power systems with large-scale wind power integration.Differing from existing interval optimization(IO)approaches that merely rely on the upper an...This paper presents a robust interval economic dispatch(RIED)model for power systems with large-scale wind power integration.Differing from existing interval optimization(IO)approaches that merely rely on the upper and lower boundaries of random variables,the distribution information retained in the historical data is introduced to the IO method in this paper.Based on the available probability distribution function(PDF),wind power curtailment and load shedding are quantified as the operational risk and incorporated into the decision-making process.In this model,we need not rely on the forecasted value of wind power,which is randomly fluctuating and quite unpredictable.Furthermore,when the PDFs of wind power are taken into account,the resulting dispatch solution makes a good tradeoff between the generation cost and the operational risk.Finally,the RIED model yields an optimal dispatch solution for thermal units and the allowable intervals of wind power for the wind farms,which efficiently mitigates the uncertainty in wind power generation and provides more practical suggestions for system operators.Simulation studies are conducted on a modified IEEE-118 bus system and the results verify the effectiveness of the proposed RIED model.展开更多
The initiative participation of wind power generators in power system frequency regulation is an inevitable demand to ensure power system safe operation with large-scale wind power integration.However,it is principall...The initiative participation of wind power generators in power system frequency regulation is an inevitable demand to ensure power system safe operation with large-scale wind power integration.However,it is principally difficult for conventional wind turbines to participate in power system frequency regulation.For this reason,solution to this problem is becoming a hot topic in the current studies.This paper systematically reviews the relevant research progresses in the control strategies and the capability assessment of using wind power generators in the power system frequency regulation,including the comparing among the emulating inertia control,the droop control,the rotor speed control,the pitch angle control and the coordinated control.Also,future research in this area is pointed out in the paper.展开更多
Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge ...Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge but an industrial problem as well.The objective of this study is to introduce a concept of large-scale,non-grid-connected wind power(LSNGCWP) industrial zones and establish an evaluation model to assess their industrial arrangement.The data of wind energy,industry,nature resources and socio-economy were collected in this study.Using spatial overlay analysis of geographic information system,this study proposes a spatial arrangement of the LSNGCWP indus-trial zones in the coastal areas of China,which could be summarized as the 'one line and three circles' structure,which will contribute to the optimization of the industrial structure,advance the wind power technology,coordinate the multi-industrial cooperation,and upgrade the industrial transformation of China's coastal areas.展开更多
While having constantly developed for five years,China's wind power meets its bottleneck of further development in fast-growing areas due to the insufficient market accommodation.In contrast,the Central China and ...While having constantly developed for five years,China's wind power meets its bottleneck of further development in fast-growing areas due to the insufficient market accommodation.In contrast,the Central China and the East China have experienced the shortage of coal,oil and natural gas for power generation in recent winters.Hence,how to handle the discrepancy between insufficient accommodation and short energy supply has become the focus of attention both domestically and abroad.Taking Jiuquan Wind Power Base as an example,the reverse distribution between the energy resources and the consumer market,the wind power accommodation and the energy transmission are analyzed;the necessity and feasibility of long-distance power transmission are also discussed,which presents a technical roadmap for the long-distance transmission of thermal and wind power in combination.展开更多
The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, ...The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, frequency control and peak load regulation as well as system stability. In addition, the high capital cost and operation cost of the supporting transmission project invested and constructed by the Gansu Provincial Power Company will definitely have significant impacts on the management and economic profit of the Company. Through analysis of the construction and operation cost changes resulting from the wind power collection and delivery project, the author carried out research into the effects of developing large-scale wind power base on the management and economic benefits of power grid enterprises and proposed corresponding suggestions to make the related policies perfect.展开更多
In order to study the towing dynamic properties of the large-scale composite bucket foundation the hydrodynamic software MOSES is used to simulate the dynamic motion of the foundation towed to the construction site.Th...In order to study the towing dynamic properties of the large-scale composite bucket foundation the hydrodynamic software MOSES is used to simulate the dynamic motion of the foundation towed to the construction site.The MOSES model with the prototype size is established as the water draft of 5 and 6 m under the environmental conditions on site.The related factors such as towing force displacement towing accelerations in six degrees of freedom of the bucket foundation and air pressures inside the bucket are analyzed in detail.In addition the towing point and wave conditions are set as the critical factors to simulate the limit conditions of the stable dynamic characteristics.The results show that the large-scale composite bucket foundation with reasonable subdivisions inside the bucket has the satisfying floating stability.During the towing process the air pressures inside the bucket obviously change little and it is found that the towing point at the waterline is the most optimal choice.The characteristics of the foundation with the self-floating towing technique are competitive for saving lots of cost with few of the expensive types of equipment required during the towing transportation.展开更多
The key in the force transmission between the tower and the foundation for offshore wind turbines is to transfer the large moment and horizontal loads. The finite element model of a large-scale prestressing bucket fou...The key in the force transmission between the tower and the foundation for offshore wind turbines is to transfer the large moment and horizontal loads. The finite element model of a large-scale prestressing bucket founda- tion for offshore wind turbines is set up and the structural characteristics of the arc transition structure of the founda- tion are analyzed for 40-60 channels(20-30 rows) arranged with prestressing steel strand under the same ultimate load and boundary conditions. The mechanical characteristics of the key parts of the foundation structures are illus- trated by the peak of the principal tensile stress, the peak of the principal compressive stress and the distribution areas where the principal tensile stress is larger than 2.00 MPa. It can be concluded that the maximum principal tensile stress of the arc transition decreases with the increasing number of channels, and the amplitude does not change signifi- cantly; the maximum principal compressive stress increases with the increasing number of channels and the amplitude changes significantly; however, for the distribution areas where the principal tensile stress is larger than 2.00 MPa, with different channel numbers, the phenomenon is not obvious. Furthermore, the principal tensile stress at the top of the foundation beams fluctuantly increases with the increasing number of channels and for the top cover of the bucket, the principal tensile stress decreases with the increasing number of channels.展开更多
Power quality is a crucial area of research in contemporary power systems,particularly given the rapid proliferation of intermittent renewable energy sources such as wind power.This study investigated the relationship...Power quality is a crucial area of research in contemporary power systems,particularly given the rapid proliferation of intermittent renewable energy sources such as wind power.This study investigated the relationships between power quality indices of system output and PSD by utilizing theories related to spectra,PSD,and random signal power spectra.The relationship was derived,validated through experiments and simulations,and subsequently applied to multi-objective optimization.Various optimization algorithms were compared to achieve optimal system power quality.The findings revealed that the relationships between power quality indices and PSD were influenced by variations in the order of the power spectral estimation model.An increase in the order of the AR model resulted in a 36%improvement in the number of optimal solutions.Regarding optimal solution distribution,NSGA-II demonstrated superior diversity,while MOEA/D exhibited better convergence.However,practical applications showed that while MOEA/D had higher convergence,NSGA-II produced superior optimal solutions,achieving the best power quality indices(THDi at 4.62%,d%at 3.51%,and cosφat 96%).These results suggest that the proposed method holds significant potential for optimizing power quality in practical applications.展开更多
基金funded by“The Factors Affecting the Accuracy of Wind Resource Assessment and Comprehensive Post-Evaluation Techniques for Operating Wind Power Projects,”grant number YJ24.002“The Research and Application of Future Medium to Long Term Wind Resource Assessment for Wind Farms Based on Artificial Intelligence Project,”grant number 2023021。
文摘Improving the accuracy of the evaluation of the performance of wind farms in large wind power bases located in complex terrain under the actual atmosphere is crucial to the sustainable development of wind power.To this end,this study combined the Weather Research and Forecasting(WRF)model with the Wind Farm Parameterization(WFP)method to investigate the wake characteristics and operational performance of large onshore wind farms in the complex terrain of Jiuquan City,Gansu Province,China.The research results showed that after verification,the systematic error of the WRF simulations was less than 3%.The WRF model and the WFP scheme simulated a significant warming phenomenon within the wind power base area,while a cooling effect was observed outside.The analysis of the wake effects indicated that the impact of PhaseⅠconstruction on PhaseⅡconstruction of the wind power base was minimal.During the operation of the entire wind power base,the wind speed within the wind farm decreased by approximately 10%,and the influence range of the predominant wind direction extended over a hundred kilometers downwind.The research conclusions provide a powerful scientific basis for optimizing design and operation,improving efficiency,minimizing the negative impacts on adjacent wind turbines,and ensuring the sustainable development of wind energy through dynamic planning and scientific assessment.
基金This work was supported by National Key Research and Development Program of China(2018YFB0904000).
文摘In China, regions with abundant wind energy resources are generally located at the end of power grids. The power grid architecture in these regions is typically not sufficiently strong, and the energy structure is relatively simple. Thus, connecting large-capacity wind power units complicates the peak load regulation and stable operation of the power grids in these regions. Most wind turbines use power electronic converter technology, which affects the safety and stability of the power grid differently compared with conventional synchronous generators. Furthermore, fluctuations in wind power cause fluctuations in the output of wind farms, making it difficult to create and implement suitable power generation plans for wind farms. The generation technology and grid connection scheme for wind power and conventional thermal power generation differ considerably. Moreover, the active and reactive power control abilities of wind turbines are weaker than those of thermal power units, necessitating additional equipment to control wind turbines. Hence, to address the aforementioned issues with large-scale wind power generation, this study analyzes the differences between the grid connection and collection strategies for wind power bases and thermal power plants. Based on this analysis, the differences in the power control modes of wind power and thermal power are further investigated. Finally, the stability of different control modes is analyzed through simulation. The findings can be beneficial for the planning and development of large-scale wind power generation farms.
基金supported by National High Technology Research and Development Program of China(863Program)(No.2011AA05A104)
文摘Several large-scale wind turbine tripping accidents occurred in Jiuquan wind power base in 2011.According to the on-site survey and analysis of these accidents related to relay protection,causes were found to be the collection system defects and low correct operation rate of small current grounded line selectors of the unearthed neutral point collection system.By referring to both the characteristics of Jiuquan wind power base and arrangement of relay protection,the short-circuit features of wind power and its impacts on relay protection are analyzed.The collection system and the retrofit of the small current grounded line selector are improved by specific countermeasures.Finally,further research subjects are put forward.
文摘More and more large capacity wind power will be integrated into power system in the future,and certain technical challenges will emerge due to the fluctuation characteristics of wind power and the complex control of power electronic devices inside the wind turbines(e.g.,low voltage ride through(LVRT)).By comparing a wind power integration grid with a hydropower integration grid,the special transient phenomena caused by the wind power integration is studied and simulation results are presented.Furthermore,the potential impacts on the traditional protection are discussed.Results show that the special transient phenomena can decrease the sensitivity,reliability and operation speed of conventional protections.
文摘With the rapid development of China's economy, the power consumption is increasing. Traditional coal-fired power generation not only consumes a lot of energy, but also has a direct impact on the environment. It is against this background that wind energy is gradually developed with its clean and pollution-free characteristics. The implementation of large-scale wind power grid connection has brought many problems to power grid dispatching. Because of the low stability and continuity of wind turbines, installing too many wind turbines in the wind turbines will inevitably have a certain impact on the security and stability of the power grid. In this paper, the security and stability of power grid dispatching and operation under the condition of large-scale wind power grid connection are analyzed and optimized, which provides a basis for the implementation of power grid dispatching.
文摘The construction of island power grids is a systematic engineering task.To ensure the safe operation of power grid systems,optimizing the line layout of island power grids is crucial.Especially in the current context of large-scale distributed renewable energy integration into the power grid,conventional island power grid line layouts can no longer meet actual demands.It is necessary to combine the operational characteristics of island power systems and historical load data to perform load forecasting,thereby generating power grid line layout paths.This article focuses on large-scale distributed renewable energy integration,summarizing optimization strategies for island power grid line layouts,and providing a solid guarantee for the safe and stable operation of island power systems.
基金supported by the National Key Research and Development Program of China(No.2017YFB0903400).
文摘The increasing penetration of wind power brings great uncertainties into power systems,which poses challenges to system planning and operation.This paper proposes a novel probabilistic load flow(PLF)method based on clustering technique to handle large fluctuations from large-scale wind power integration.The traditional cumulant method(CM)for PLF is based on the linearization of load flow equations around the operation point,therefore resulting in significant errors when input random variables have large fluctuations.In the proposed method,the samples of wind power and loads are first generated by the inverse Nataf transformation and then clustered using an improved K-means algorithm to obtain input variable samples with small variances in each cluster.With such pre-processing,the cumulant method can be applied within each cluster to calculate cumulants of output random variables with improved accuracy.The results obtained in each cluster are combined according to the law of total probability to calculate the final cumulants of output random variables for the whole samples.The proposed method is validated on modified IEEE 9-bus and 118-bus test achieve a better performance with the consideration of both traditional CM,2 m+1 point estimate method(PEM),Monte Carlo simulation(MCS)and Latin hypercube sampling(LHS)based MCS,the proposed method can achieve a better performance with the consideration of bothcomputational efficiency and accuracy.
文摘Concerning the integration of large-scale wind power,an integrated model of generation and transmission expansion planning is proposed based on the assessment of the value of steady state and dynamic security.In the assessment of security value,the unit commitment simulation based on the predicted hourly load and wind power output data in the planning horizon is used to evaluate the costs of preventive control,emergency control and social losses due to the uncertainty of load and wind power.The cost of preventive control consists of the fuel cost of power generation,the environmental cost and the load shedding cost.This not only provides a systematic method of security assessment of power system expansion planning schemes,but also broadens the perspective of power system planning from the technology and economic assessment to the measure of the whole social value.In the assessment process,the preventive control and emergency control of cascading failures are also presented,which provides a convincing tool for cascading failure analysis of planning schemes and makes the security assessment more comprehensive and reasonable.The proposed model and method have been demonstrated by the assessment of two power system planning schemes on the New England 10-genarator 39-bus System.The importance of considering the value of security and simulating hourly system operation for the planning horizon,in expansion planning of power system with integration of large-scale wind power,has been confirmed.
基金supported in part by the Joint Funds of the National Natural Science Foundation of China(No.U1966205)Fundamental Research Funds for the Central Universities(No.B210202067).
文摘The grid-connection of large-scale and high-penetration wind power poses challenges to the friendly dispatching control of the power system.To coordinate the complicated optimal dispatching and rapid real-time control,this paper proposes a hierarchical cluster coordination control(HCCC)strategy based on model predictive control(MPC)technique.Considering the time-varying characteristics of wind power generation,the proposed HCCC strategy constructs an improved multitime-scale active power dispatching model,which consists of five parts:formulation of cluster dispatching plan,rolling modification of intra-cluster plan,optimization allocation of wind farm(WF),grouping coordinated control of wind turbine group(WTG),and real-time adjustment of single-machine power.The time resolutions are sequentially given as 1 hour,30 min,15 min,5 min,and 1 min.In addition,a combined predictive model based on complete ensemble empirical mode decomposition with adaptive noise(CEEMDAN),wavelet thresholding(WT),and least squares support vector machine(LSSVM)is established.The fast predictive feature of this model cooperates with the HCCC strategy that effectively improves the predictive control precision.Simulation results show that the proposed HCCC strategy enables rapid response to active power control(APC),and significantly improves dispatching control accuracy and wind power accommodation capabilities.
基金funded by Sino-Danish Centre for Education and Research (SDC)
文摘Large-scale wind power penetration can affect the supply continuity in the power system.This is a matter of high priority to investigate,as more regulating reserves and specified control strategies for generation control are required in the future power system with even more high wind power penetration.This paper evaluates the impact of large-scale wind power integration on future power systems.An active power balance control methodology is used for compensating the power imbalances between the demand and the generation in real time,caused by wind power forecast errors.The methodology for the balance power control of future power systems with large-scale wind power integration is described and exemplified considering the generation and power exchange capacities in2020 for Danish power system.
基金supported by the Six Talent Peaks Project in Jiangsu Province(No.XNY-020)the State Key Laboratory of Smart Grid Protection and Control
文摘Continuous increase of wind power penetration brings high randomness to power system,and also leads to serious shortage of primary frequency regulation(PFR)reserve for power system whose reserve capacity is typically provided by conventional units.Considering large-scale wind power participating in PFR,this paper proposes a unit commitment optimization model with respect to coordination of steady state and transient state.In addition to traditional operation costs,losses of wind farm de-loaded operation,environmental benefits and transient frequency safety costs in high-risk stochastic scenarios are also considered in the model.Besides,the model makes full use of interruptible loads on demand side as one of the PFR reserve sources.A selection method for high-risk scenarios is also proposed to improve the calculation efficiency.Finally,this paper proposes an inner-outer iterative optimization method for the model solution.The method is validated by the New England 10-machine system,and the results show that the optimization model can guarantee both the safety of transient frequency and the economy of system operation.
文摘Bilateral electric power contract is settled based on contract output curve. This paper considered the bilateral transactions execution, new energy accommodation, power grid security and generation economy, considering the executive priority of different power components to establish a multi-objective coordination unit commitment model. Through an example to verify the effectiveness of the model in promoting wind power consumption, guaranteeing trade execution, and improving power generation efficiency, and analyzed the interactions to each other among the factors of wind power, trading and blocking. According to the results, when wind power causes reverse power flow in the congestion line, it will promote the implementation of contracts, the influence of wind power accommodation to trade execution should be analyzed combined with the grid block, the results can provide reference for wind power planning.
基金supported by the National Natural Science Foundation of China(51937005)the Natural Science Foundation of Guangdong Province(2019A1515010689)the Oversea Study Program of Guangzhou Elite Project(GEP).
文摘This paper presents a robust interval economic dispatch(RIED)model for power systems with large-scale wind power integration.Differing from existing interval optimization(IO)approaches that merely rely on the upper and lower boundaries of random variables,the distribution information retained in the historical data is introduced to the IO method in this paper.Based on the available probability distribution function(PDF),wind power curtailment and load shedding are quantified as the operational risk and incorporated into the decision-making process.In this model,we need not rely on the forecasted value of wind power,which is randomly fluctuating and quite unpredictable.Furthermore,when the PDFs of wind power are taken into account,the resulting dispatch solution makes a good tradeoff between the generation cost and the operational risk.Finally,the RIED model yields an optimal dispatch solution for thermal units and the allowable intervals of wind power for the wind farms,which efficiently mitigates the uncertainty in wind power generation and provides more practical suggestions for system operators.Simulation studies are conducted on a modified IEEE-118 bus system and the results verify the effectiveness of the proposed RIED model.
基金supported by the National Basic Research Program of China(2012CB215106)the National Natural Science Foundation of China(51261130484)+1 种基金the National Key Technology Research & Development Program of China(2011AA05A112)the State Grid Corporation of China(304-2013)
文摘The initiative participation of wind power generators in power system frequency regulation is an inevitable demand to ensure power system safe operation with large-scale wind power integration.However,it is principally difficult for conventional wind turbines to participate in power system frequency regulation.For this reason,solution to this problem is becoming a hot topic in the current studies.This paper systematically reviews the relevant research progresses in the control strategies and the capability assessment of using wind power generators in the power system frequency regulation,including the comparing among the emulating inertia control,the droop control,the rotor speed control,the pitch angle control and the coordinated control.Also,future research in this area is pointed out in the paper.
基金Under the auspices of National Basic Research Program (No.2007CB210306)
文摘Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge but an industrial problem as well.The objective of this study is to introduce a concept of large-scale,non-grid-connected wind power(LSNGCWP) industrial zones and establish an evaluation model to assess their industrial arrangement.The data of wind energy,industry,nature resources and socio-economy were collected in this study.Using spatial overlay analysis of geographic information system,this study proposes a spatial arrangement of the LSNGCWP indus-trial zones in the coastal areas of China,which could be summarized as the 'one line and three circles' structure,which will contribute to the optimization of the industrial structure,advance the wind power technology,coordinate the multi-industrial cooperation,and upgrade the industrial transformation of China's coastal areas.
文摘While having constantly developed for five years,China's wind power meets its bottleneck of further development in fast-growing areas due to the insufficient market accommodation.In contrast,the Central China and the East China have experienced the shortage of coal,oil and natural gas for power generation in recent winters.Hence,how to handle the discrepancy between insufficient accommodation and short energy supply has become the focus of attention both domestically and abroad.Taking Jiuquan Wind Power Base as an example,the reverse distribution between the energy resources and the consumer market,the wind power accommodation and the energy transmission are analyzed;the necessity and feasibility of long-distance power transmission are also discussed,which presents a technical roadmap for the long-distance transmission of thermal and wind power in combination.
文摘The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, frequency control and peak load regulation as well as system stability. In addition, the high capital cost and operation cost of the supporting transmission project invested and constructed by the Gansu Provincial Power Company will definitely have significant impacts on the management and economic profit of the Company. Through analysis of the construction and operation cost changes resulting from the wind power collection and delivery project, the author carried out research into the effects of developing large-scale wind power base on the management and economic benefits of power grid enterprises and proposed corresponding suggestions to make the related policies perfect.
基金The National Natural Science Foundation of China(No.51109160)the National High Technology Research and Development Program of China(863 Program)(No.2012AA051705)+1 种基金the International S&T Cooperation Program of China(No.2012DFA70490)the Natural Science Foundation of Tianjin(No.13JCQNJC06900,13JCYBJC19100)
文摘In order to study the towing dynamic properties of the large-scale composite bucket foundation the hydrodynamic software MOSES is used to simulate the dynamic motion of the foundation towed to the construction site.The MOSES model with the prototype size is established as the water draft of 5 and 6 m under the environmental conditions on site.The related factors such as towing force displacement towing accelerations in six degrees of freedom of the bucket foundation and air pressures inside the bucket are analyzed in detail.In addition the towing point and wave conditions are set as the critical factors to simulate the limit conditions of the stable dynamic characteristics.The results show that the large-scale composite bucket foundation with reasonable subdivisions inside the bucket has the satisfying floating stability.During the towing process the air pressures inside the bucket obviously change little and it is found that the towing point at the waterline is the most optimal choice.The characteristics of the foundation with the self-floating towing technique are competitive for saving lots of cost with few of the expensive types of equipment required during the towing transportation.
基金Supported by Creative Research Groups of National Natural Science Foundation of China (No. 51021004)Program for Changjiang Scholars and Innovative Research Team in University (No. IRT0851)
文摘The key in the force transmission between the tower and the foundation for offshore wind turbines is to transfer the large moment and horizontal loads. The finite element model of a large-scale prestressing bucket founda- tion for offshore wind turbines is set up and the structural characteristics of the arc transition structure of the founda- tion are analyzed for 40-60 channels(20-30 rows) arranged with prestressing steel strand under the same ultimate load and boundary conditions. The mechanical characteristics of the key parts of the foundation structures are illus- trated by the peak of the principal tensile stress, the peak of the principal compressive stress and the distribution areas where the principal tensile stress is larger than 2.00 MPa. It can be concluded that the maximum principal tensile stress of the arc transition decreases with the increasing number of channels, and the amplitude does not change signifi- cantly; the maximum principal compressive stress increases with the increasing number of channels and the amplitude changes significantly; however, for the distribution areas where the principal tensile stress is larger than 2.00 MPa, with different channel numbers, the phenomenon is not obvious. Furthermore, the principal tensile stress at the top of the foundation beams fluctuantly increases with the increasing number of channels and for the top cover of the bucket, the principal tensile stress decreases with the increasing number of channels.
基金funded by the Inner Mongolia Nature Foundation Project,Project number:2023JQ04.
文摘Power quality is a crucial area of research in contemporary power systems,particularly given the rapid proliferation of intermittent renewable energy sources such as wind power.This study investigated the relationships between power quality indices of system output and PSD by utilizing theories related to spectra,PSD,and random signal power spectra.The relationship was derived,validated through experiments and simulations,and subsequently applied to multi-objective optimization.Various optimization algorithms were compared to achieve optimal system power quality.The findings revealed that the relationships between power quality indices and PSD were influenced by variations in the order of the power spectral estimation model.An increase in the order of the AR model resulted in a 36%improvement in the number of optimal solutions.Regarding optimal solution distribution,NSGA-II demonstrated superior diversity,while MOEA/D exhibited better convergence.However,practical applications showed that while MOEA/D had higher convergence,NSGA-II produced superior optimal solutions,achieving the best power quality indices(THDi at 4.62%,d%at 3.51%,and cosφat 96%).These results suggest that the proposed method holds significant potential for optimizing power quality in practical applications.