Among various architectures of polymers,end-group-free rings have attracted growing interests due to their distinct physicochemical performances over the linear counterparts which are exemplified by reduced hydrodynam...Among various architectures of polymers,end-group-free rings have attracted growing interests due to their distinct physicochemical performances over the linear counterparts which are exemplified by reduced hydrodynamic size and slower degradation.It is key to develop facile methods to large-scale synthesis of polymer rings with tunable compositions and microstructures.Recent progresses in large-scale synthesis of polymer rings against single-chain dynamic nanoparticles,and the example applications in synchronous enhancing toughness and strength of polymer nanocomposites are summarized.Once there is the breakthrough in rational design and effective large-scale synthesis of polymer rings and their functional derivatives,a family of cyclic functional hybrids would be available,thus providing a new paradigm in developing polymer science and engineering.展开更多
Large-capacity hydropower transmission from southwestern China to load centers via ultra-high voltage direct current(UHVDC) or ultra-high voltage alternating current(UHVAC) transmission lines is an important measure o...Large-capacity hydropower transmission from southwestern China to load centers via ultra-high voltage direct current(UHVDC) or ultra-high voltage alternating current(UHVAC) transmission lines is an important measure of the accommodation of large-scale hydropower in China. The East China Grid(ECG) is the main hydropower receiver of the west–east power transmission channel in China. Moreover, it has been subject to a rapidly increasing rate of hydropower integration over the past decade. Currently, large-scale outer hydropower is one of the primary ECG power sources. However, the integration of rapidly increasing outer hydropower into the power grid is subject to a series of severe drawbacks. Therefore, this study considered the load demands and hydropower transmission characteristics for the analysis of several major problems and the determination of appropriate solutions. The power supply-demand balance problem, hydropower transmission schedule problem, and peakshaving problem were considered in this study. Correspondingly, three solutions are suggested in this paper, which include coordination between the outer hydropower and local power sources, an inter-provincial power complementary operation, and the introduction of a market mechanism. The findings of this study can serve as a basis to ensure that the ECG effectively receives an increased amount of outer hydropower in the future.展开更多
A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it’s inadvisable only using GPS network without distance measurements. Three schemes: terrestrial n...A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it’s inadvisable only using GPS network without distance measurements. Three schemes: terrestrial network, GPS network and combination network are discussed for horizontal control network design of Xiangjiaba Dam in view of precision, reliability, coordinate and outlay in detail.展开更多
The paper presents a two-stage approach to cope with the long-term optimal operation of cascaded hydropower systems. This approach combines progressive optimality algorithm (POA) with quadratic programming (QP) to imp...The paper presents a two-stage approach to cope with the long-term optimal operation of cascaded hydropower systems. This approach combines progressive optimality algorithm (POA) with quadratic programming (QP) to improve the optimization results. POA is used at the first stage to generate a local optimal result, which will be selected as the initial feasible solution of QP method employed at the second stage. Around the initial solution, a rational local search range for QP method is then determined, where the nonlinear water level function and tailrace level function can be linearized nearly with high accuracy. The simplified optimization problem is formulated as a QP model with a quadratic generation function and a linear set of constraints, and solved using the available mathematic optimization software package. Simulation is performed on the long term operation of Hongshui River hydropower system which is located in southwest China and consists of 9 built hydropower plants. Results obtained from the proposed approach show a significant increase in the total energy production compared to the results from POA.展开更多
1.Introduction Climate change mitigation pathways aimed at limiting global anthropogenic carbon dioxide(CO_(2))emissions while striving to constrain the global temperature increase to below 2℃—as outlined by the Int...1.Introduction Climate change mitigation pathways aimed at limiting global anthropogenic carbon dioxide(CO_(2))emissions while striving to constrain the global temperature increase to below 2℃—as outlined by the Intergovernmental Panel on Climate Change(IPCC)—consistently predict the widespread implementation of CO_(2)geological storage on a global scale.展开更多
The recent upsurge in metro construction emphasizes the necessity of understanding the mechanical performance of metro shield tunnel subjected to the influence of ground fissures.In this study,a largescale experiment,...The recent upsurge in metro construction emphasizes the necessity of understanding the mechanical performance of metro shield tunnel subjected to the influence of ground fissures.In this study,a largescale experiment,in combination with numerical simulation,was conducted to investigate the influence of ground fissures on a metro shield tunnel.The results indicate that the lining contact pressure at the vault increases in the hanging wall while decreases in the footwall,resulting in a two-dimensional stress state of vertical shear and axial tension-compression,and simultaneous vertical dislocation and axial tilt for the segments around the ground fissure.In addition,the damage to curved bolts includes tensile yield,flexural yield,and shear twist,leading to obvious concrete lining damage,particularly at the vault,arch bottom,and hance,indicating that the joints in these positions are weak areas.The shield tunnel orthogonal to the ground fissure ultimately experiences shear failure,suggesting that the maximum actual dislocation of ground fissure that the structure can withstand is approximately 20 cm,and five segment rings in the hanging wall and six segment rings in the footwall also need to be reinforced.This study could provide a reference for metro design in ground fissure sites.展开更多
Fluctuating voltage levels in power grids necessitate automatic voltage regulators(AVRs)to ensure stability.This study examined the modeling and control of AVR in hydroelectric power plants using model predictive cont...Fluctuating voltage levels in power grids necessitate automatic voltage regulators(AVRs)to ensure stability.This study examined the modeling and control of AVR in hydroelectric power plants using model predictive control(MPC),which utilizes an extensive mathe-matical model of the voltage regulation system to optimize the control actions over a defined prediction horizon.This predictive feature enables MPC to minimize voltage deviations while accounting for operational constraints,thereby improving stability and performance under dynamic conditions.Thefindings were compared with those derived from an optimal proportional integral derivative(PID)con-troller designed using the artificial bee colony(ABC)algorithm.Although the ABC-PID method adjusts the PID parameters based on historical data,it may be difficult to adapt to real-time changes in system dynamics under constraints.Comprehensive simulations assessed both frameworks,emphasizing performance metrics such as disturbance rejection,response to load changes,and resilience to uncertainties.The results show that both MPC and ABC-PID methods effectively achieved accurate voltage regulation;however,MPC excelled in controlling overshoot and settling time—recording 0.0%and 0.25 s,respectively.This demonstrates greater robustness compared to conventional control methods that optimize PID parameters based on performance criteria derived from actual system behavior,which exhibited settling times and overshoots exceeding 0.41 s and 5.0%,respectively.The controllers were implemented using MATLAB/Simulink software,indicating a significant advancement for power plant engineers pursuing state-of-the-art automatic voltage regulations.展开更多
The titanium alloy strut serves as a key load-bearing component of aircraft landing gear,typically manufactured via forging.The friction condition has important influence on material flow and cavity filling during the...The titanium alloy strut serves as a key load-bearing component of aircraft landing gear,typically manufactured via forging.The friction condition has important influence on material flow and cavity filling during the forging process.Using the previously optimized shape and initial position of preform,the influence of the friction condition(friction factor m=0.1–0.3)on material flow and cavity filling was studied by numerical method with a shear friction model.A novel filling index was defined to reflect material flow into left and right flashes and zoom in on friction-induced results.The results indicate that the workpiece moves rigidly to the right direction,with the displacement decreasing as m increases.When m<0.18,the underfilling defect will occur in the left side of strut forging,while overflow occurs in the right forging die cavity.By combining the filling index and analyses of material flow and filling status,a reasonable friction factor interval of m=0.21–0.24 can be determined.Within this interval,the cavity filling behavior demonstrates robustness,with friction fluctuations exerting minimal influence.展开更多
Based on questionnaire surveys and field interviews conducted with various types of agricultural production organizations across five districts and four counties in Daqing City,this study combines relevant theoretical...Based on questionnaire surveys and field interviews conducted with various types of agricultural production organizations across five districts and four counties in Daqing City,this study combines relevant theoretical frameworks to systematically examine the evolution,performance,and influencing factors of governance mechanisms within these organizations.Using both quantitative and inductive analytical methods,the paper proposes innovative designs and supporting measures for improving governance mechanisms.The findings reveal that,amid large-scale farmland circulation,the governance mechanisms of agricultural production organizations in Daqing City are evolving from traditional to modern structures.However,challenges remain in areas such as decision-making efficiency,benefit distribution,and supervision mechanisms.In response,this study proposes innovative governance designs focusing on decision-making processes,profit-sharing mechanisms,and risk prevention.Corresponding policy recommendations are also provided to support the sustainable development of agricultural modernization in China.展开更多
In the context of energy structure transformation,digital and intelligent technologies have been introduced into the field of hydropower,which has accelerated the technological and equipment innovation of hydropower p...In the context of energy structure transformation,digital and intelligent technologies have been introduced into the field of hydropower,which has accelerated the technological and equipment innovation of hydropower plants.However,it has also brought severe challenges to the operation and maintenance of hydropower plants.Traditional hydropower plant operation and maintenance suffer from problems such as low efficiency,equipment aging,and high labor costs,which seriously hinder the innovation and upgrading of hydropower plant operation and maintenance.Therefore,this article focuses on the operation and maintenance of hydropower plants,summarizes a series of innovative strategies,and applies them in practice to effectively improve the operation and maintenance level of hydropower plants.展开更多
Formalizing complex processes and phenomena of a real-world problem may require a large number of variables and constraints,resulting in what is termed a large-scale optimization problem.Nowadays,such large-scale opti...Formalizing complex processes and phenomena of a real-world problem may require a large number of variables and constraints,resulting in what is termed a large-scale optimization problem.Nowadays,such large-scale optimization problems are solved using computing machines,leading to an enormous computational time being required,which may delay deriving timely solutions.Decomposition methods,which partition a large-scale optimization problem into lower-dimensional subproblems,represent a key approach to addressing time-efficiency issues.There has been significant progress in both applied mathematics and emerging artificial intelligence approaches on this front.This work aims at providing an overview of the decomposition methods from both the mathematics and computer science points of view.We also remark on the state-of-the-art developments and recent applications of the decomposition methods,and discuss the future research and development perspectives.展开更多
The 1320 MW Glen Canyon Dam in northern Arizona in the United States generates power for residents of seven states[1].But in February 2023 the dam’s ability to deliver that electricity was in danger.
This article focuses on the management of large-scale machinery and equipment in highway construction,with the research objective of identifying issues at the management level and exploring more effective management m...This article focuses on the management of large-scale machinery and equipment in highway construction,with the research objective of identifying issues at the management level and exploring more effective management measures.Through practical observation and logical analysis,this article elaborates on the management connotations of large-scale machinery and equipment in highway construction,affirming its management value from different perspectives.On this basis,it carefully analyzes the problems existing in the management of large-scale machinery and equipment,providing a detailed interpretation of issues such as the weak foundation of the equipment management system and the disconnection between equipment selection and configuration from reality.Combining the manifestations of related problems,this article proposes strategies such as strengthening the institutional foundation of equipment management,selecting and configuring equipment based on actual conditions,aiming to provide references for large-scale machinery and equipment management to relevant enterprises.展开更多
It has been argued that the human brain,as an information-processing machine,operates near a phase transition point in a non-equilibrium state,where it violates detailed balance leading to entropy production.Thus,the ...It has been argued that the human brain,as an information-processing machine,operates near a phase transition point in a non-equilibrium state,where it violates detailed balance leading to entropy production.Thus,the assessment of irreversibility in brain networks can provide valuable insights into their non-equilibrium properties.In this study,we utilized an open-source whole-brain functional magnetic resonance imaging(fMRI)dataset from both resting and task states to evaluate the irreversibility of large-scale human brain networks.Our analysis revealed that the brain networks exhibited significant irreversibility,violating detailed balance,and generating entropy.Notably,both physical and cognitive tasks increased the extent of this violation compared to the resting state.Regardless of the state(rest or task),interactions between pairs of brain regions were the primary contributors to this irreversibility.Moreover,we observed that as global synchrony increased within brain networks,so did irreversibility.The first derivative of irreversibility with respect to synchronization peaked near the phase transition point,characterized by the moderate mean synchronization and maximized synchronization entropy of blood oxygenation level-dependent(BOLD)signals.These findings deepen our understanding of the non-equilibrium dynamics of large-scale brain networks,particularly in relation to their phase transition behaviors,and may have potential clinical applications for brain disorders.展开更多
Offshore wind power plays a crucial role in energy strategies.The results of traditional small-scale physical models may be unreliable when extrapolated to large field scales.This study addressed this limitation by co...Offshore wind power plays a crucial role in energy strategies.The results of traditional small-scale physical models may be unreliable when extrapolated to large field scales.This study addressed this limitation by conducting large-scale(1:13)experiments to investigate the scour hole pattern and equilibrium scour depth around both slender and large monopiles under irregular waves.The experiments adopted KeuleganeCarpenter number(NKC)values from 1.01 to 8.89 and diffraction parameter(D/L,where D is the diameter of the monopile,and L is the wave length)values from 0.016 to 0.056.The results showed that changes in the maximum scour location and scour hole shape around a slender monopile were associated with NKC,with differences observed between irregular and regular waves.Improving the calculation of NKC enhanced the accuracy of existing scour formulae under irregular waves.The maximum scour locations around a large monopile were consistently found on both sides,regardless of NKC and D/L,but the scour hole topography was influenced by both parameters.Notably,the scour range around a large monopile was at least as large as the monopile diameter.展开更多
In 2022, South China(SC) experienced record-breaking rainfall during its first rainy season, causing severe socioeconomic losses. This study examines the large-scale circulation anomalies responsible for this extreme ...In 2022, South China(SC) experienced record-breaking rainfall during its first rainy season, causing severe socioeconomic losses. This study examines the large-scale circulation anomalies responsible for this extreme event.Analysis reveals that the lower-tropospheric cyclonic anomaly over SC plays a crucial role. This cyclonic anomaly consists of extratropical northeasterly anomalies to the north of SC and tropical southwesterly anomalies to the south. Both components were particularly intense during the 2022 first rainy season, contributing to the heavy rainfall in SC. Moreover,the lower-tropospheric cyclonic anomaly is enhanced by its counterpart in the upper troposphere, which is associated with a wave train propagating from the North Atlantic to East Asia across the mid-high latitudes of the Eurasian continent.Further analysis indicates that the extratropical wave train correlates with sea surface temperature anomalies(SSTAs) in the North Atlantic. Additionally, the SSTAs over the North Indian Ocean also play a role in enhancing the tropical southwesterlies in the lower troposphere. This study highlights the combined influence of tropical and extratropical circulation anomalies, offering a comprehensive understanding of the record-breaking rainfall.展开更多
This study employs deformation monitoring data acquired during the construction of the Haoji railway large-scale bridge to investigate the displacement behavior of the subgrades,catenary columns,and tracks.Emphasis is...This study employs deformation monitoring data acquired during the construction of the Haoji railway large-scale bridge to investigate the displacement behavior of the subgrades,catenary columns,and tracks.Emphasis is placed on data acquisition and processing methods using total stations and automated monitoring systems.Through a comprehensive analysis of lateral,longitudinal,and vertical displacement data from 26 subgrade monitoring points,catenary columns,and track sections,this research evaluates how construction activities influence railway structures.The results show that displacement variations in the subgrades,catenary columns,and tracks remained within the established alert thresholds,exhibiting stable deformation trends and indicating that any adverse environmental impact was effectively contained.Furthermore,this paper proposes an early warning mechanism based on an automated monitoring system,which can promptly detect abnormal deformations and initiate emergency response procedures,thereby ensuring the safe operation of the railway.The integration of big data analysis and deformation prediction models offers a practical foundation for future safety management in railway construction.展开更多
Through the demand analysis of emergency power supply construction, waterfall noise reduction treatment, and utilization of residual pressure resources, combined with water resources and industrial infrastructure cond...Through the demand analysis of emergency power supply construction, waterfall noise reduction treatment, and utilization of residual pressure resources, combined with water resources and industrial infrastructure conditions, this paper proposes the significance of micro hydropower station construction. However, micro hydropower stations face issues such as insufficient construction standardization, prominent safety hazards, lack of specialized standards, and the need for improved planning and design. Therefore, this paper analyzes and discusses the constraints and improvement summaries in the entire construction process of micro hydropower stations from aspects including guidance of standard formulation, rationality of planning and design, and innovation of new product applications.展开更多
The research on optimization methods for constellation launch deployment strategies focused on the consideration of mission interval time constraints at the launch site.Firstly,a dynamic modeling of the constellation ...The research on optimization methods for constellation launch deployment strategies focused on the consideration of mission interval time constraints at the launch site.Firstly,a dynamic modeling of the constellation deployment process was established,and the relationship between the deployment window and the phase difference of the orbit insertion point,as well as the cost of phase adjustment after orbit insertion,was derived.Then,the combination of the constellation deployment position sequence was treated as a parameter,together with the sequence of satellite deployment intervals,as optimization variables,simplifying a highdimensional search problem within a wide range of dates to a finite-dimensional integer programming problem.An improved genetic algorithm with local search on deployment dates was introduced to optimize the launch deployment strategy.With the new description of the optimization variables,the total number of elements in the solution space was reduced by N orders of magnitude.Numerical simulation confirms that the proposed optimization method accelerates the convergence speed from hours to minutes.展开更多
基金Supported by the National Natural Science Foundation of China(Nos.52293472,22473096 and 22471164)。
文摘Among various architectures of polymers,end-group-free rings have attracted growing interests due to their distinct physicochemical performances over the linear counterparts which are exemplified by reduced hydrodynamic size and slower degradation.It is key to develop facile methods to large-scale synthesis of polymer rings with tunable compositions and microstructures.Recent progresses in large-scale synthesis of polymer rings against single-chain dynamic nanoparticles,and the example applications in synchronous enhancing toughness and strength of polymer nanocomposites are summarized.Once there is the breakthrough in rational design and effective large-scale synthesis of polymer rings and their functional derivatives,a family of cyclic functional hybrids would be available,thus providing a new paradigm in developing polymer science and engineering.
基金supported by the National Natural Science Foundation of China [No.51579029]Fundamental Research Funds for the Central Universities (No. DUT19JC43)
文摘Large-capacity hydropower transmission from southwestern China to load centers via ultra-high voltage direct current(UHVDC) or ultra-high voltage alternating current(UHVAC) transmission lines is an important measure of the accommodation of large-scale hydropower in China. The East China Grid(ECG) is the main hydropower receiver of the west–east power transmission channel in China. Moreover, it has been subject to a rapidly increasing rate of hydropower integration over the past decade. Currently, large-scale outer hydropower is one of the primary ECG power sources. However, the integration of rapidly increasing outer hydropower into the power grid is subject to a series of severe drawbacks. Therefore, this study considered the load demands and hydropower transmission characteristics for the analysis of several major problems and the determination of appropriate solutions. The power supply-demand balance problem, hydropower transmission schedule problem, and peakshaving problem were considered in this study. Correspondingly, three solutions are suggested in this paper, which include coordination between the outer hydropower and local power sources, an inter-provincial power complementary operation, and the introduction of a market mechanism. The findings of this study can serve as a basis to ensure that the ECG effectively receives an increased amount of outer hydropower in the future.
基金Supported bythe National 973 Programof China(No.2003CB716705) International Cooperative Fund of European Union(No.EVGI-CT-2002-00061) .
文摘A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it’s inadvisable only using GPS network without distance measurements. Three schemes: terrestrial network, GPS network and combination network are discussed for horizontal control network design of Xiangjiaba Dam in view of precision, reliability, coordinate and outlay in detail.
文摘The paper presents a two-stage approach to cope with the long-term optimal operation of cascaded hydropower systems. This approach combines progressive optimality algorithm (POA) with quadratic programming (QP) to improve the optimization results. POA is used at the first stage to generate a local optimal result, which will be selected as the initial feasible solution of QP method employed at the second stage. Around the initial solution, a rational local search range for QP method is then determined, where the nonlinear water level function and tailrace level function can be linearized nearly with high accuracy. The simplified optimization problem is formulated as a QP model with a quadratic generation function and a linear set of constraints, and solved using the available mathematic optimization software package. Simulation is performed on the long term operation of Hongshui River hydropower system which is located in southwest China and consists of 9 built hydropower plants. Results obtained from the proposed approach show a significant increase in the total energy production compared to the results from POA.
基金supported by the National Key Research and Development Program of China(2022YFE0206700)。
文摘1.Introduction Climate change mitigation pathways aimed at limiting global anthropogenic carbon dioxide(CO_(2))emissions while striving to constrain the global temperature increase to below 2℃—as outlined by the Intergovernmental Panel on Climate Change(IPCC)—consistently predict the widespread implementation of CO_(2)geological storage on a global scale.
基金supported by the National Key Research&Development Program of China(Grant No.2023YFC3008404)the Key Laboratory of Earth Fissures Geological Disaster,Ministry of Natural Resources,China(Grant Nos.EFGD20240609 and EFGD20240610).
文摘The recent upsurge in metro construction emphasizes the necessity of understanding the mechanical performance of metro shield tunnel subjected to the influence of ground fissures.In this study,a largescale experiment,in combination with numerical simulation,was conducted to investigate the influence of ground fissures on a metro shield tunnel.The results indicate that the lining contact pressure at the vault increases in the hanging wall while decreases in the footwall,resulting in a two-dimensional stress state of vertical shear and axial tension-compression,and simultaneous vertical dislocation and axial tilt for the segments around the ground fissure.In addition,the damage to curved bolts includes tensile yield,flexural yield,and shear twist,leading to obvious concrete lining damage,particularly at the vault,arch bottom,and hance,indicating that the joints in these positions are weak areas.The shield tunnel orthogonal to the ground fissure ultimately experiences shear failure,suggesting that the maximum actual dislocation of ground fissure that the structure can withstand is approximately 20 cm,and five segment rings in the hanging wall and six segment rings in the footwall also need to be reinforced.This study could provide a reference for metro design in ground fissure sites.
文摘Fluctuating voltage levels in power grids necessitate automatic voltage regulators(AVRs)to ensure stability.This study examined the modeling and control of AVR in hydroelectric power plants using model predictive control(MPC),which utilizes an extensive mathe-matical model of the voltage regulation system to optimize the control actions over a defined prediction horizon.This predictive feature enables MPC to minimize voltage deviations while accounting for operational constraints,thereby improving stability and performance under dynamic conditions.Thefindings were compared with those derived from an optimal proportional integral derivative(PID)con-troller designed using the artificial bee colony(ABC)algorithm.Although the ABC-PID method adjusts the PID parameters based on historical data,it may be difficult to adapt to real-time changes in system dynamics under constraints.Comprehensive simulations assessed both frameworks,emphasizing performance metrics such as disturbance rejection,response to load changes,and resilience to uncertainties.The results show that both MPC and ABC-PID methods effectively achieved accurate voltage regulation;however,MPC excelled in controlling overshoot and settling time—recording 0.0%and 0.25 s,respectively.This demonstrates greater robustness compared to conventional control methods that optimize PID parameters based on performance criteria derived from actual system behavior,which exhibited settling times and overshoots exceeding 0.41 s and 5.0%,respectively.The controllers were implemented using MATLAB/Simulink software,indicating a significant advancement for power plant engineers pursuing state-of-the-art automatic voltage regulations.
基金National Natural Science Foundation of China(52375378)National Key Laboratory of Metal Forming Technology and Heavy Equipment(S2308100.W12)Huxiang High-Level Talent Gathering Project of Hunan Province(2021RC5001)。
文摘The titanium alloy strut serves as a key load-bearing component of aircraft landing gear,typically manufactured via forging.The friction condition has important influence on material flow and cavity filling during the forging process.Using the previously optimized shape and initial position of preform,the influence of the friction condition(friction factor m=0.1–0.3)on material flow and cavity filling was studied by numerical method with a shear friction model.A novel filling index was defined to reflect material flow into left and right flashes and zoom in on friction-induced results.The results indicate that the workpiece moves rigidly to the right direction,with the displacement decreasing as m increases.When m<0.18,the underfilling defect will occur in the left side of strut forging,while overflow occurs in the right forging die cavity.By combining the filling index and analyses of material flow and filling status,a reasonable friction factor interval of m=0.21–0.24 can be determined.Within this interval,the cavity filling behavior demonstrates robustness,with friction fluctuations exerting minimal influence.
基金Supported by Daqing City Philosophy and Social Sciences Planning Research Project(DSGB 2025011)the Heilongjiang Province Education Science Planning Key Project(GJB1320229).
文摘Based on questionnaire surveys and field interviews conducted with various types of agricultural production organizations across five districts and four counties in Daqing City,this study combines relevant theoretical frameworks to systematically examine the evolution,performance,and influencing factors of governance mechanisms within these organizations.Using both quantitative and inductive analytical methods,the paper proposes innovative designs and supporting measures for improving governance mechanisms.The findings reveal that,amid large-scale farmland circulation,the governance mechanisms of agricultural production organizations in Daqing City are evolving from traditional to modern structures.However,challenges remain in areas such as decision-making efficiency,benefit distribution,and supervision mechanisms.In response,this study proposes innovative governance designs focusing on decision-making processes,profit-sharing mechanisms,and risk prevention.Corresponding policy recommendations are also provided to support the sustainable development of agricultural modernization in China.
文摘In the context of energy structure transformation,digital and intelligent technologies have been introduced into the field of hydropower,which has accelerated the technological and equipment innovation of hydropower plants.However,it has also brought severe challenges to the operation and maintenance of hydropower plants.Traditional hydropower plant operation and maintenance suffer from problems such as low efficiency,equipment aging,and high labor costs,which seriously hinder the innovation and upgrading of hydropower plant operation and maintenance.Therefore,this article focuses on the operation and maintenance of hydropower plants,summarizes a series of innovative strategies,and applies them in practice to effectively improve the operation and maintenance level of hydropower plants.
基金The Australian Research Council(DP200101197,DP230101107).
文摘Formalizing complex processes and phenomena of a real-world problem may require a large number of variables and constraints,resulting in what is termed a large-scale optimization problem.Nowadays,such large-scale optimization problems are solved using computing machines,leading to an enormous computational time being required,which may delay deriving timely solutions.Decomposition methods,which partition a large-scale optimization problem into lower-dimensional subproblems,represent a key approach to addressing time-efficiency issues.There has been significant progress in both applied mathematics and emerging artificial intelligence approaches on this front.This work aims at providing an overview of the decomposition methods from both the mathematics and computer science points of view.We also remark on the state-of-the-art developments and recent applications of the decomposition methods,and discuss the future research and development perspectives.
文摘The 1320 MW Glen Canyon Dam in northern Arizona in the United States generates power for residents of seven states[1].But in February 2023 the dam’s ability to deliver that electricity was in danger.
文摘This article focuses on the management of large-scale machinery and equipment in highway construction,with the research objective of identifying issues at the management level and exploring more effective management measures.Through practical observation and logical analysis,this article elaborates on the management connotations of large-scale machinery and equipment in highway construction,affirming its management value from different perspectives.On this basis,it carefully analyzes the problems existing in the management of large-scale machinery and equipment,providing a detailed interpretation of issues such as the weak foundation of the equipment management system and the disconnection between equipment selection and configuration from reality.Combining the manifestations of related problems,this article proposes strategies such as strengthening the institutional foundation of equipment management,selecting and configuring equipment based on actual conditions,aiming to provide references for large-scale machinery and equipment management to relevant enterprises.
基金supported by the Fundamental Research Funds for the Central Universities(Grant Nos.lzujbky-2021-62 and lzujbky-2024-jdzx06)the National Natural Science Foundation of China(Grant No.12247101)+1 种基金the Natural Science Foundation of Gansu Province,China(Grant Nos.22JR5RA389 and 23JRRA1740)the‘111 Center’Fund(Grant No.B20063).
文摘It has been argued that the human brain,as an information-processing machine,operates near a phase transition point in a non-equilibrium state,where it violates detailed balance leading to entropy production.Thus,the assessment of irreversibility in brain networks can provide valuable insights into their non-equilibrium properties.In this study,we utilized an open-source whole-brain functional magnetic resonance imaging(fMRI)dataset from both resting and task states to evaluate the irreversibility of large-scale human brain networks.Our analysis revealed that the brain networks exhibited significant irreversibility,violating detailed balance,and generating entropy.Notably,both physical and cognitive tasks increased the extent of this violation compared to the resting state.Regardless of the state(rest or task),interactions between pairs of brain regions were the primary contributors to this irreversibility.Moreover,we observed that as global synchrony increased within brain networks,so did irreversibility.The first derivative of irreversibility with respect to synchronization peaked near the phase transition point,characterized by the moderate mean synchronization and maximized synchronization entropy of blood oxygenation level-dependent(BOLD)signals.These findings deepen our understanding of the non-equilibrium dynamics of large-scale brain networks,particularly in relation to their phase transition behaviors,and may have potential clinical applications for brain disorders.
基金supported by the National Nature Science Foundation of China National Outstanding Youth Science Fund Project(Grant No.52122109)the National Natural Science Foundation of China(Grants No.51861165102 and 52039005).
文摘Offshore wind power plays a crucial role in energy strategies.The results of traditional small-scale physical models may be unreliable when extrapolated to large field scales.This study addressed this limitation by conducting large-scale(1:13)experiments to investigate the scour hole pattern and equilibrium scour depth around both slender and large monopiles under irregular waves.The experiments adopted KeuleganeCarpenter number(NKC)values from 1.01 to 8.89 and diffraction parameter(D/L,where D is the diameter of the monopile,and L is the wave length)values from 0.016 to 0.056.The results showed that changes in the maximum scour location and scour hole shape around a slender monopile were associated with NKC,with differences observed between irregular and regular waves.Improving the calculation of NKC enhanced the accuracy of existing scour formulae under irregular waves.The maximum scour locations around a large monopile were consistently found on both sides,regardless of NKC and D/L,but the scour hole topography was influenced by both parameters.Notably,the scour range around a large monopile was at least as large as the monopile diameter.
基金Guangdong Major Project of Basic and Applied Basic Research (2020B0301030004)National Natural Science Foundation of China (42275041)Hainan Province Science and Technology Special Fund (SOLZSKY2025006)。
文摘In 2022, South China(SC) experienced record-breaking rainfall during its first rainy season, causing severe socioeconomic losses. This study examines the large-scale circulation anomalies responsible for this extreme event.Analysis reveals that the lower-tropospheric cyclonic anomaly over SC plays a crucial role. This cyclonic anomaly consists of extratropical northeasterly anomalies to the north of SC and tropical southwesterly anomalies to the south. Both components were particularly intense during the 2022 first rainy season, contributing to the heavy rainfall in SC. Moreover,the lower-tropospheric cyclonic anomaly is enhanced by its counterpart in the upper troposphere, which is associated with a wave train propagating from the North Atlantic to East Asia across the mid-high latitudes of the Eurasian continent.Further analysis indicates that the extratropical wave train correlates with sea surface temperature anomalies(SSTAs) in the North Atlantic. Additionally, the SSTAs over the North Indian Ocean also play a role in enhancing the tropical southwesterlies in the lower troposphere. This study highlights the combined influence of tropical and extratropical circulation anomalies, offering a comprehensive understanding of the record-breaking rainfall.
文摘This study employs deformation monitoring data acquired during the construction of the Haoji railway large-scale bridge to investigate the displacement behavior of the subgrades,catenary columns,and tracks.Emphasis is placed on data acquisition and processing methods using total stations and automated monitoring systems.Through a comprehensive analysis of lateral,longitudinal,and vertical displacement data from 26 subgrade monitoring points,catenary columns,and track sections,this research evaluates how construction activities influence railway structures.The results show that displacement variations in the subgrades,catenary columns,and tracks remained within the established alert thresholds,exhibiting stable deformation trends and indicating that any adverse environmental impact was effectively contained.Furthermore,this paper proposes an early warning mechanism based on an automated monitoring system,which can promptly detect abnormal deformations and initiate emergency response procedures,thereby ensuring the safe operation of the railway.The integration of big data analysis and deformation prediction models offers a practical foundation for future safety management in railway construction.
文摘Through the demand analysis of emergency power supply construction, waterfall noise reduction treatment, and utilization of residual pressure resources, combined with water resources and industrial infrastructure conditions, this paper proposes the significance of micro hydropower station construction. However, micro hydropower stations face issues such as insufficient construction standardization, prominent safety hazards, lack of specialized standards, and the need for improved planning and design. Therefore, this paper analyzes and discusses the constraints and improvement summaries in the entire construction process of micro hydropower stations from aspects including guidance of standard formulation, rationality of planning and design, and innovation of new product applications.
文摘The research on optimization methods for constellation launch deployment strategies focused on the consideration of mission interval time constraints at the launch site.Firstly,a dynamic modeling of the constellation deployment process was established,and the relationship between the deployment window and the phase difference of the orbit insertion point,as well as the cost of phase adjustment after orbit insertion,was derived.Then,the combination of the constellation deployment position sequence was treated as a parameter,together with the sequence of satellite deployment intervals,as optimization variables,simplifying a highdimensional search problem within a wide range of dates to a finite-dimensional integer programming problem.An improved genetic algorithm with local search on deployment dates was introduced to optimize the launch deployment strategy.With the new description of the optimization variables,the total number of elements in the solution space was reduced by N orders of magnitude.Numerical simulation confirms that the proposed optimization method accelerates the convergence speed from hours to minutes.