Previous studies have demonstrated that the surge in jacking force during the Guanjingkou project is caused by the contact conditions of the debris bentonite slurry outside the pipe.Therefore,this paper further system...Previous studies have demonstrated that the surge in jacking force during the Guanjingkou project is caused by the contact conditions of the debris bentonite slurry outside the pipe.Therefore,this paper further systematically investigates the influence of different debris slurry mass ratios(SLRs)and different particle size distributions(PSDs)on the pipe-rock friction characteristics using friction tests.The test results reveal that under the same PSD,an adequate amount of slurry(with an SLR of 1:4)consistently yields the lowest friction coefficient.When the SLR is between 1:2 and 1:3,the viscosity of the slurry reaches its peak,resulting in the highest friction coefficient.Additionally,when the PSD is 1:1:5 and 1:1:15,the friction coefficient is primarily governed by the plowing effect at the contact surface.When the PSD is 5:1:1 and 15:1:1,the friction coefficient is mainly controlled by the void ratio(VR)of debris.In the case of PSDs 1:5:1 and 1:15:1,the friction coefficient is jointly controlled by the adhesion effect of high-viscosity slurry and the plowing effect at the contact surface,and it gradually shifts towards being dominated by the VR as the amount of debris increases.Regardless of the SLRs and PSDs,the continuous deposition of debris and the injection of slurry incessantly exacerbate both the plowing and adhesion effects,creating a vicious cycle.This is the reason why the high-pressure water flushing method can not only fail to resolve the issue but also accelerate the occurrence of the surge in jacking force.展开更多
Traditional construction techniques have a significant impact on the environment and are associated with long construction durations in the construction of municipal rainwater pipelines.Pipe jacking technology,a new t...Traditional construction techniques have a significant impact on the environment and are associated with long construction durations in the construction of municipal rainwater pipelines.Pipe jacking technology,a new type of pipeline construction method,enables non-excavation construction and can address the shortcomings of traditional pipeline construction.This article analyzes the concept and application advantages of pipe jacking technology.Combining engineering examples,it explores the application strategies of pipe jacking technology in the construction process of municipal rainwater pipelines for reference.展开更多
Determining earth pressure on jacked pipes is essential for ensuring lining safety and calculating jacking force,especially for deep-buried pipes.To better reflect the soil arching effect resulting from the excavation...Determining earth pressure on jacked pipes is essential for ensuring lining safety and calculating jacking force,especially for deep-buried pipes.To better reflect the soil arching effect resulting from the excavation of rectangular jacked pipes and the distribution of the earth pressure on jacked pipes,we present an analytical solution for predicting the vertical earth pressure on deep-buried rectangular pipe jacking tunnels,incorporating the tunnelling-induced ground loss distribution.Our proposed analytical model consists of the upper multi-layer parabolic soil arch and the lower friction arch.The key parameters(i.e.,width and height of friction arch B and height of parabolic soil arch H 1)are determined according to the existing research,and an analytical solution for K l is derived based on the distribution characteristics of the principal stress rotation angle.With consideration for the transition effect of the mechanical characteristics of the parabolic arch zone,an analytical solution for soil load transfer is derived.The prediction results of our analytical solution are compared with tests and simulation results to validate the effectiveness of the proposed analytical solution.Finally,the effects of different parameters on the soil pressure are discussed.展开更多
基金the funding support from the National Natural Science Foundations for Young Scientists of China(Grant No.52208391)Doctoral Foundation Project of Guizhou University(Grant No.2021e78).
文摘Previous studies have demonstrated that the surge in jacking force during the Guanjingkou project is caused by the contact conditions of the debris bentonite slurry outside the pipe.Therefore,this paper further systematically investigates the influence of different debris slurry mass ratios(SLRs)and different particle size distributions(PSDs)on the pipe-rock friction characteristics using friction tests.The test results reveal that under the same PSD,an adequate amount of slurry(with an SLR of 1:4)consistently yields the lowest friction coefficient.When the SLR is between 1:2 and 1:3,the viscosity of the slurry reaches its peak,resulting in the highest friction coefficient.Additionally,when the PSD is 1:1:5 and 1:1:15,the friction coefficient is primarily governed by the plowing effect at the contact surface.When the PSD is 5:1:1 and 15:1:1,the friction coefficient is mainly controlled by the void ratio(VR)of debris.In the case of PSDs 1:5:1 and 1:15:1,the friction coefficient is jointly controlled by the adhesion effect of high-viscosity slurry and the plowing effect at the contact surface,and it gradually shifts towards being dominated by the VR as the amount of debris increases.Regardless of the SLRs and PSDs,the continuous deposition of debris and the injection of slurry incessantly exacerbate both the plowing and adhesion effects,creating a vicious cycle.This is the reason why the high-pressure water flushing method can not only fail to resolve the issue but also accelerate the occurrence of the surge in jacking force.
文摘Traditional construction techniques have a significant impact on the environment and are associated with long construction durations in the construction of municipal rainwater pipelines.Pipe jacking technology,a new type of pipeline construction method,enables non-excavation construction and can address the shortcomings of traditional pipeline construction.This article analyzes the concept and application advantages of pipe jacking technology.Combining engineering examples,it explores the application strategies of pipe jacking technology in the construction process of municipal rainwater pipelines for reference.
基金Project(2022YJS073)supported by the Fundamental Research Funds for the Central Universities,ChinaProject(2024YFE0198500)supported by the National Key Research and Development Program of China:Intergovernmental International Science and Technology Innovation CooperationProject(U2469207)supported by the National Natural Science Foundation Railway Innovation and Development Joint Fund Project,China。
文摘Determining earth pressure on jacked pipes is essential for ensuring lining safety and calculating jacking force,especially for deep-buried pipes.To better reflect the soil arching effect resulting from the excavation of rectangular jacked pipes and the distribution of the earth pressure on jacked pipes,we present an analytical solution for predicting the vertical earth pressure on deep-buried rectangular pipe jacking tunnels,incorporating the tunnelling-induced ground loss distribution.Our proposed analytical model consists of the upper multi-layer parabolic soil arch and the lower friction arch.The key parameters(i.e.,width and height of friction arch B and height of parabolic soil arch H 1)are determined according to the existing research,and an analytical solution for K l is derived based on the distribution characteristics of the principal stress rotation angle.With consideration for the transition effect of the mechanical characteristics of the parabolic arch zone,an analytical solution for soil load transfer is derived.The prediction results of our analytical solution are compared with tests and simulation results to validate the effectiveness of the proposed analytical solution.Finally,the effects of different parameters on the soil pressure are discussed.