In the present article we study the generalized laws of importation and crossmigrativity based on(D,N)-implications.On the one hand,we consider the generalized law of importation I(T(x,α),y)=I(x,J(α,y)),when T is co...In the present article we study the generalized laws of importation and crossmigrativity based on(D,N)-implications.On the one hand,we consider the generalized law of importation I(T(x,α),y)=I(x,J(α,y)),when T is concretized as a fuzzy conjunction C,I and J are concretized as(D,N)-implications generated by a fuzzy disjunction D and a fuzzy negation N.On the other hand,we discuss the cross-migrativity of fuzzy disjunctions over fuzzy implications,that is,I(x,D(y,z))=D(y,I(x,z)),where I is a fuzzy implication,D is a fuzzy disjunction.In addition,we study the relationship between the(α-)cross-migrative of(I,D)and the(α-)cross-law of importation(I,ID,N,C).展开更多
On November 8, 1996. the import contract signing ceremony on the two 660 MW coal-fired generating units of Hanfeng Thermal Power Plant 1st phase was held in the Great Hall of People, Beijing.
基金Supported by the National Natural Science Foundation of China(Grant Nos.12471438,12001413)the Natural Science Basic Research Plan Project of Shaanxi Province(Grant No.2022JM-048)the Shaanxi Fundamental Science Research Project for Mathematics and Physics(Grant No.23JSQ043)。
文摘In the present article we study the generalized laws of importation and crossmigrativity based on(D,N)-implications.On the one hand,we consider the generalized law of importation I(T(x,α),y)=I(x,J(α,y)),when T is concretized as a fuzzy conjunction C,I and J are concretized as(D,N)-implications generated by a fuzzy disjunction D and a fuzzy negation N.On the other hand,we discuss the cross-migrativity of fuzzy disjunctions over fuzzy implications,that is,I(x,D(y,z))=D(y,I(x,z)),where I is a fuzzy implication,D is a fuzzy disjunction.In addition,we study the relationship between the(α-)cross-migrative of(I,D)and the(α-)cross-law of importation(I,ID,N,C).
文摘On November 8, 1996. the import contract signing ceremony on the two 660 MW coal-fired generating units of Hanfeng Thermal Power Plant 1st phase was held in the Great Hall of People, Beijing.