期刊文献+
共找到73篇文章
< 1 2 4 >
每页显示 20 50 100
Discussion on the Construction of Micro Hydropower Stations in China
1
作者 Qiqiang ZHANG Wei XU 《Asian Agricultural Research》 2025年第6期47-50,共4页
Through the demand analysis of emergency power supply construction, waterfall noise reduction treatment, and utilization of residual pressure resources, combined with water resources and industrial infrastructure cond... Through the demand analysis of emergency power supply construction, waterfall noise reduction treatment, and utilization of residual pressure resources, combined with water resources and industrial infrastructure conditions, this paper proposes the significance of micro hydropower station construction. However, micro hydropower stations face issues such as insufficient construction standardization, prominent safety hazards, lack of specialized standards, and the need for improved planning and design. Therefore, this paper analyzes and discusses the constraints and improvement summaries in the entire construction process of micro hydropower stations from aspects including guidance of standard formulation, rationality of planning and design, and innovation of new product applications. 展开更多
关键词 Micro hydropower station CONSTRUCTION Standard formulation Planning and design New product application
在线阅读 下载PDF
Debris flow susceptibility analysis based on the combined impacts of antecedent earthquakes and droughts: a case study for cascade hydropower stations in the upper Yangtze River, China 被引量:4
2
作者 HU Gui-sheng CHEN Ning-sheng +3 位作者 TANOLI Javed Iqbal LIU Mei LIU Rong-Kun CHEN Kun-Ting 《Journal of Mountain Science》 SCIE CSCD 2017年第9期1712-1727,共16页
The upper Yangtze River region is one of the most frequent debris flow areas in China. The study area contains a cascade of six large hydropower stations located along the river with total capacity of more than 70 mil... The upper Yangtze River region is one of the most frequent debris flow areas in China. The study area contains a cascade of six large hydropower stations located along the river with total capacity of more than 70 million kilowatts. The purpose of the study was to determine potential and dynamic differences in debris flow susceptibility and intensity with regard to seasonal monsoon events. We analyzed this region's debris flow history by examining the effective peak acceleration of antecedent earthquakes,the impacts of antecedent droughts, the combined effects of earthquakes and droughts, with regard to topography, precipitation, and loose solid material conditions. Based on these factors, we developed a debris flow susceptibility map. Results indicate that the entire debris flow susceptibility area is 167,500 km^2, of which 26,800 km^2 falls within the high susceptibility area, with 60,900 km^2 in medium and 79,800 km^2 are in low susceptibility areas. Three of the six large hydropower stations are located within the areas with high risk of debris flows. The synthetic zonation map of debris flow susceptibility for the study area corresponds with both the investigation data and actual distribution of debris flows. The results of debris flow susceptibility provide base-line data for mitigating, assessing, controlling and monitoring of debris flows hazards. 展开更多
关键词 hydropower stations Debris flow susceptibility Earthquake Drought Geological Information System(GIS) Upper Yangtze River
原文传递
TianshengqiaoⅠcascade and Ⅱ cascade hydropower stations completely built up
3
《Electricity》 2001年第1期50-50,共1页
关键词 cascade hydropower stations completely built up Tianshengqiao cascade and
在线阅读 下载PDF
Practice of Centralized Control over Cascade Hydropower Stations
4
作者 Jin Zehua General Manager, Guizhou Wujiang Hydropower Development Ltd. 《Electricity》 2010年第1期44-47,共4页
Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem,... Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem, centralized control over cascade hydropower stations is practiced with a considerable economic benef it gained. 展开更多
关键词 RATE Practice of Centralized Control over Cascade hydropower stations OVER
在线阅读 下载PDF
Effects of Mountain Rivers Cascade Hydropower Stations on Water Ecosystems
5
作者 Mengtian Sun Kai Huang +2 位作者 Jinhua Shao Weixiong Wu Xinyue Liang 《Research in Ecology》 2022年第1期17-26,共10页
China is rich in hydropower resources,and mountain rivers have abundant water resources and huge development potential,which have a profound impact on the pattern of water resources allocation in China.As the main way... China is rich in hydropower resources,and mountain rivers have abundant water resources and huge development potential,which have a profound impact on the pattern of water resources allocation in China.As the main way of water resources and hydropower development,the construction of cascade hydropower stations,while meeting the requirements of water resources utilization for social development,has also brought adverse effects on river ecosystems.Therefore,the impact of the construction of cascade hydropower stations on mountainous river ecosystems,where the minimum ecological flow of rivers must be ensured and reviewed.In addition,this paper proposed the deficiencies and outlooks for cascade hydropower stations based on previous research results. 展开更多
关键词 Mountain rivers Cascade hydropower stations Development and operations Ecological flow Water ecosystems Effects and countermeasures
在线阅读 下载PDF
Hongjiadu and Yinzidu hydropower stations on Wujiang River were successfully cut off
6
《Electricity》 2001年第4期7-7,共1页
关键词 Hongjiadu and Yinzidu hydropower stations on Wujiang River were successfully cut off
在线阅读 下载PDF
Optimization of Operation Mode of Large-sized and Medium-sized Hydropower Stations
7
作者 PENG Liantong 《外文科技期刊数据库(文摘版)工程技术》 2021年第1期307-311,共5页
Large and medium-sized hydropower stations generally include multiple units, so the operation control is more complex. If the operation mode is not reasonable, it will not only fail to play the functions of large and ... Large and medium-sized hydropower stations generally include multiple units, so the operation control is more complex. If the operation mode is not reasonable, it will not only fail to play the functions of large and medium-sized hydropower stations, but also affect various regional regulation and control work. Therefore, it is necessary to find the most scientific operation mode to ensure the operation effect of hydropower stations. This paper summarizes the optimization methods commonly used in the operation of hydropower stations, then analyzes the common problems in the operation of hydropower stations, and finally discusses the specific methods to optimize the operation of hydropower stations. Through the research to help improve the operation of hydropower stations, to enhance the scientific operation of large and medium-sized hydropower stations. 展开更多
关键词 large-sized and medium-sized hydropower stations operation mode OPTIMIZATION
原文传递
Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm 被引量:2
8
作者 Wei XIE Chang-ming JI +1 位作者 Zi-jun YANG Xiao-xing ZHANG 《Water Science and Engineering》 EI CAS 2012年第1期46-58,共13页
Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity... Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching. 展开更多
关键词 scheduling rule short-time power generation dispatching hybrid algorithm cascade hydropower station
在线阅读 下载PDF
Decision-making model for risk management of cascade hydropower stations
9
作者 Pan, Bangchuan Chi, Hong +1 位作者 Xu, Jianguo Qi, Mingliang 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期22-26,共5页
In a medium-term electricity market,in order to reduce the risks of price and inflow uncertainties, the cascade hydropower stations may use the options contract with electricity supply companies. A profit-based model ... In a medium-term electricity market,in order to reduce the risks of price and inflow uncertainties, the cascade hydropower stations may use the options contract with electricity supply companies. A profit-based model for risk management of cascade hydropower stations in the medium-term electricity market is presented. The objective function is profit maximization of cascade hydropower stations. In order to avoid the risks of price and inflow uncertainties, two different risk-aversion constraints: a minimum profit constraint and a minimum conditional value-at-risk, are introduced in the model. In addition, the model takes into account technology constraints of the generating units, which includes reservoir flow balance, reservoir capacity limits, water discharge constraints, etc. The model is formulated as a mixed integer nonlinear programming problem. Because the search space of the solution is very large, a genetic algorithm is used to deal with the problem. 展开更多
关键词 cascade hydropower station mixed integer nonlinear programming risk management medium-term electricity market
在线阅读 下载PDF
Study on Transmission Planning of Cascade Hydropower Stations along Lancang River Basin
10
作者 Cui Wenjia Du Zhongming Dai Jianfeng 《Electricity》 2012年第1期26-31,共6页
Most of the hydropower projects in Southwest China and the adjacent foreign regions will be put into operation between 2015 and 2020, which will bring some difficulties for reasonable accommodation and delivery of ele... Most of the hydropower projects in Southwest China and the adjacent foreign regions will be put into operation between 2015 and 2020, which will bring some difficulties for reasonable accommodation and delivery of electric energy. In this paper the author studies the development scale, development schedule, accommodation and transmission schemes of the cascade hydropower stations along the Lancang River basin, one of the five large basins in China, based on the load characteristics of grids at both the sending end and the receiving end, the strategy of complementary utilization of thermal power and hydropower, the advanced transmission technologies, and the optimal economic performance. The study results show that, the cascade hydropower stations on the upper reaches of the Lancang River in Yunnan should mainly serve Guangdong Province, with proper planning of partly serving Yunnan Province during dry seasons. The transmission schemes should adopt UHVDC, UHVAC, and single-tower double-circuited HVDC transmission scheme according to the transmission capacity and distance. 展开更多
关键词 hydropower station transmission scheme electric energy accommodation
在线阅读 下载PDF
Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping Ⅱ hydropower station 被引量:6
11
作者 Shiyong Wu Ge Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第4期314-328,共15页
According to site-specific environments such as high water pressures, high in-situ stresses and strong rockbursts, the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimize... According to site-specific environments such as high water pressures, high in-situ stresses and strong rockbursts, the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimized to ensure construction safety. New drainage tunnels were considered. Furthermore, lining structures and grouting pressures were modified during the excavation of tunnels. The construction scheme was updated dynamically based on the complex geological conditions. For instances, the diversion tunnels were first excavated by drilling and blasting method at the first stage of construction, and then by the combination method of tunnel boring machine (TBM) and drilling and blasting, and finally by drilling and blasting method. Through optimized scheme and updated construction scheme, the excavation of diversion tunnel #1 was successfully completed in June, 2011. This paper summarizes the key issues in rock mechanics associated with the construction of the long and deep diversion tunnels at Jinping II hydropower station. The experiences of design and construction obtained from this project could provide reference to similar projects. 展开更多
关键词 Jinping II hydropower station diversion tunnels optimized design construction method GROUTING
在线阅读 下载PDF
Unloading performances and stabilizing practices for columnar jointed basalt:A case study of Baihetan hydropower station 被引量:5
12
作者 Qixiang Fan Xiating Feng +2 位作者 Wenlin Weng Yilin Fan Quan Jiang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2017年第6期1041-1053,共13页
The columnar jointed rock mass(CJR), composed of polygonal cross-sectional columns cut by several groups of joints in various directions, was exposed during the excavations of the Baihetan hydropower station, China. I... The columnar jointed rock mass(CJR), composed of polygonal cross-sectional columns cut by several groups of joints in various directions, was exposed during the excavations of the Baihetan hydropower station, China. In order to investigate the unloading performances and the stability conditions during excavation of the columns, an experimental field study was performed. Firstly, on-site investigations indicated that the geotechnical problems, including rock relaxation, cracking and collapse, were the most prominent for the CJR Class I that contains intensive joint network and the smallest column sizes.Comprehensive field tests, including deformation measurement by multi-point extensometers, ultrasonic wave testing, borehole television observation and stress monitoring of rock anchors, revealed that the time-dependent relaxation of the CJRs was marked. The practical excavation experiences for the Baihetan columnar jointed rock masses, such as blasting scheme, supporting time of shotcrete and rock bolts, were presented in the excavations of the diversion tunnels. These detailed investigations and practical construction experiences can provide helpful information for similar geotechnical works in jointed rock mass. 展开更多
关键词 Columnar jointed basalt Diversion tunnels Rock unloading In situ test hydropower station
在线阅读 下载PDF
Establishment and evaluation of operation function model for cascade hydropower station 被引量:2
13
作者 Chang-ming JI Ting ZHOU Hai-tao HUANO 《Water Science and Engineering》 EI CAS 2010年第4期443-453,共11页
Toward solving the actual operation problems of cascade hydropower stations under hydrologic uncertainty, this paper presents the process of extraction of statistical characteristics from long-term optimal cascade ope... Toward solving the actual operation problems of cascade hydropower stations under hydrologic uncertainty, this paper presents the process of extraction of statistical characteristics from long-term optimal cascade operation, and proposes a monthly operation function algorithm for the actual operation of cascade hydropower stations through the identification, processing, and screening of available information during long-term optimal operation. Applying the operation function to the cascade hydropower stations on the Jinshajiang-Yangtze River system, the modeled long-term electric generation is shown to have high precision and provide benefits. Through comparison with optimal operation, the simulation results show that the operation function proposed retains the characteristics of optimal operation. Also, the inadequacies and attribution of the algorithm are discussed based on case study, providing decision support and reference information for research on large-scale cascade operation work. 展开更多
关键词 actual operation independent variable multiple stepwise regression attribution analysis cascade hydropower station
在线阅读 下载PDF
Measures for controlling large deformations of underground caverns under high in-situ stress condition--A case study of JinpingⅠhydropower station 被引量:12
14
作者 Shengwu Song Xuemin Feng +3 位作者 Chenggang Liao Dewen Cai Zhongxu Liu Yunhao Yang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2016年第5期605-618,共14页
The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the ... The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics. 展开更多
关键词 Large-scale underground caverns High in-situ stress Large deformationDeformation controlling technologies Jinping I hydropower station
在线阅读 下载PDF
Mechanical characteristics of columnar jointed rock at dam base of Baihetan hydropower station 被引量:1
15
作者 闫东旭 徐卫亚 +3 位作者 郑文棠 王伟 石安池 吴关叶 《Journal of Central South University》 SCIE EI CAS 2011年第6期2157-2162,共6页
Irregular columnar jointed structure is a primary irregular columnar morphological tensile fracture. In order to study the geometric features of irregular columnar joints and the new problems in geotechnical engineeri... Irregular columnar jointed structure is a primary irregular columnar morphological tensile fracture. In order to study the geometric features of irregular columnar joints and the new problems in geotechnical engineering, hydraulic and hydropower engineering caused by columnar jointed basaltic mass, Voronoi graph from geometry was introduced to simulate the irregular columnar jointed basaltic mass at Baihetan hydraulic station. Discrete element software UDEC was used to simulate the whole process of rigid bearing plate test. Anisotropic constitutive of columnar joints was adopted to analyze the stress diffusion of rock mass at dam base of Baihetan. The results show that, the compaction property and hysteresis effect are well simulated based on discrete element simulation of Voronoi joint structure by UDEC. Four stages of cyclic loading and unloading process are imaged clearly. The results from in situ rigid bearing plate tests are explicated and the stress diffusion rule of anisotropic body is affected by structure surface. The elements in the stress state of 4-5 MPa are the most, about more than 35% of the total. Appropriate constitutive must be proposed to columnar jointed rock mass with different styles. It has important significance to realize the nonlinear mechanical behavior of irregular columnar jointed basaltic mass. 展开更多
关键词 columnar joints Voronoi graph discrete element method hysteresis effect Baihetan hydropower station stressdiffusion
在线阅读 下载PDF
Treatment design of geological defects in dam foundation of Jinping I hydropower station 被引量:1
16
作者 Shengwu Song Xuemin Feng +1 位作者 Hongling Rao Hanhuai Zheng 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第5期342-349,共8页
Jinping I hydropower station is one of the most challenging projects in China due to its highest arch dam and complex geological conditions for construction.After geological investigation into the dam foundation,a few... Jinping I hydropower station is one of the most challenging projects in China due to its highest arch dam and complex geological conditions for construction.After geological investigation into the dam foundation,a few large-scale weak discontinuities are observed.The rock masses in the left dam foundation are intensively unloaded,approximately to the depth of 150–300 m.These serious geological defects lead to a geological asymmetry on the left and right banks,and thus some major diffculties of dam construction are encountered.In this paper,the influences of geological defects on the project are analyzed,followed by the concepts and methods of treatment design.Based on the analysis,the treatment methods of the weak rock masses and discontinuities are carefully determined,including the concrete cushion,concrete replacement grids,and consolidation grouting.They work together to enhance the strength and integrity of the dam foundation.Evaluations and calibrations through geo-mechanical model tests in combination with feld monitoring results in early impoundment period show that the arch dam and its foundation are roughly stable,suggesting that the treatment designs are reasonable and effective.The proposed treatment methods and concepts in the context can be helpful for similar complex rock projects. 展开更多
关键词 Geological defects Treatment design Concrete cushion Concrete replacement grids Consolidation grouting Performance evaluation Jinping I hydropower station
在线阅读 下载PDF
High Slope Stability of Diversion Power System Intake of Jinchuan Hydropower Station 被引量:1
17
作者 TANG Liang-qin TANG Kui +2 位作者 NIE De-xin WANG Jun-jie LIU Dong-yan 《Journal of Mountain Science》 SCIE CSCD 2013年第6期1109-1117,共9页
The excavated height of the left bank slope of the diversion power system intake in Jinchuan hydropower station is about 16o m. The stability and safety of the slope during construction and its operation/utilization b... The excavated height of the left bank slope of the diversion power system intake in Jinchuan hydropower station is about 16o m. The stability and safety of the slope during construction and its operation/utilization become one of the most important geological engineering problems. At the same time, it is also crucial to select a safe and economic excavation gradient for the construction. We studied the problem of how to select a safe and economic slope ratio by analyzing the geological condition of the high slope, including the lithology, slope structure, structural surface and their combinations, rock weathering and unloading, hydrology, and the natural gradient. The study results showed that the use of an excavation gradient larger than the gradient observed during site investigation and the gradient recommended in standards and field practice manuals is feasible. Then, we used the finite element method and rigid limit equilibrium method to evaluate the stability of the excavation slope under natural, rainstorm and earthquake conditions. The calculated results showed that the excavated slope only has limited failure, but its stability is greatly satisfactory. The research findings can be useful in excavation and slope stabilization projects. 展开更多
关键词 Jinchuan hydropower Station Highslope Excavation slope ratio STABILITY
原文传递
Precision blasting excavation of rock face beam in underground hydropower station under complex geological conditions 被引量:1
18
作者 Li Changneng Xu Chengguang 《Engineering Sciences》 EI 2014年第6期46-51,共6页
To deal with the construction difficulties of Xiangjiaba underground hydropower station,such as complex geological conditions,narrow rock bench,high loading,high quality requirements and urgent time limit,the project ... To deal with the construction difficulties of Xiangjiaba underground hydropower station,such as complex geological conditions,narrow rock bench,high loading,high quality requirements and urgent time limit,the project adopted the concept of precision blasting.The explosive energy and rock mass fragmentation were well controlled by taking reasonable excavation sequence,designing steel pipe drilling frame,the additional techniques of double layer smooth blasting,evenly micro charge,staggered arrangement of boreholes and pre-stressed anchors.These technologies ensured the excavation quality of the rock face beam,achieving successful blasting results:Semi hole ratio was 100%in Ⅱ surrounding rock,99.2%in Ⅲ surrounding rock and 90%~ 97.3%in Ⅳ surrounding rock;underbreak was avoided and the average backbreak was only2.9 cm;the unevenness was 0 ~ 4 cm;the influence depth of blasting and unloading was 0.2 ~ 0.7 cm. 展开更多
关键词 Xiangjiaba hydropower station underground workshop rock face beam precision blasting exca- vation
在线阅读 下载PDF
A Study on Additional Electric Energy Accommodation of Three Gorges Hydropower Station 被引量:1
19
作者 Chen Zheng Lin Tingwei +2 位作者 Li Ke Xia Kai Wang Xue 《Electricity》 2011年第1期29-33,共5页
Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is .focused on... Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is .focused on the additional electricity accommodation, based on the research at the earl), stage. The electric energ), accommodation solutions ate recommended as that. based on the cost-benefit analysis of the power distribution area, the additional electric energy of the Three Gorges should be given ptqority to meet the needs at the supply end of Hubei and Chongqing. The results of this research has a reference value on the implementation of the Three Gorges electric power accommodation, after the further optimization of the transmission curves in both wet and dry seasons. 展开更多
关键词 Three Gorges hydropower Station electric energy accommodation cost-benefit analysis
在线阅读 下载PDF
Research on reform schemes of control methods of inlet gate in Jiaxin Hydropower Station
20
作者 FU Wei ZHAO Yulin 《Journal of Northeast Agricultural University(English Edition)》 CAS 2007年第3期264-268,共5页
The simple gate control system which is made of traditional manual or proximity switch cannot meet the requirements of connecting with the computer monitoring system of hydropower station, it must be reformed. On the ... The simple gate control system which is made of traditional manual or proximity switch cannot meet the requirements of connecting with the computer monitoring system of hydropower station, it must be reformed. On the basis of the integrated analysis for small hydropower station, the paper discussed the singlechip as the core to realize the methods of gate automatic control system in small hydropower station. The designs for hardware and software of gate control system were introduced. And the control system was reformed from customary manual control to computer automatic control. The simulation experiment shows that this scheme is feasible. 展开更多
关键词 small hydropower station gate control system singlechip
在线阅读 下载PDF
上一页 1 2 4 下一页 到第
使用帮助 返回顶部