期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Tracking of horizontal alignment of the long and large diameter uncharged hole in NATM tunnel
1
作者 Min-Seong Kim Sean Seungwon Lee 《Underground Space》 SCIE EI CSCD 2024年第3期18-28,共11页
The long and large diameter uncharged hole boring(LLB)method is a cut blasting method that minimizes blast-induced vibrations by creating long and large diameter uncharged holes at the excavation face of tunnels prior... The long and large diameter uncharged hole boring(LLB)method is a cut blasting method that minimizes blast-induced vibrations by creating long and large diameter uncharged holes at the excavation face of tunnels prior to tunnel excavation.Drilling in this method typically uses a 50 m long with a 382 mm diameter hammer bit in the horizontal direction at the tunnel face.However,the significant weight and uni-directional rotation of the rod head,as well as variables such as geological characteristics,machine conditions,and inexperienced operators result in significant deviation from the target borehole alignment that hinders the vibration-dampening effect of the uncharged holes.Furthermore,since there is no method to verify the alignment of the boreholes until main tunnel construction,borehole misalignment is often not discovered until weeks after construction,which requires tunnel construction to cease until the equipment can be remobilized and an additional borehole be created,causing significant delays and increased costs for the entire tunnel project.In this study,the borehole alignment tracking and ground exploration system(BGS)is developed to predict and monitor the quality and alignment of boreholes for cut blasting methods such as the LLB methods immediately after boring.The BGS was subsequently tested at a subway construction site to evaluate its performance in the field.The measurements yielded by the BGS were compared with manually measured boring positions at every 5 m along the borehole.Although the BGS showed a maximum deviation of approximately 12%at a local point where the hole surface was relatively rough,the accuracy for the final boring position was approximately 97%,demonstrating excellent precision of the alignment tracking system.The BGS demonstrates excellent performance in predicting ground conditions and the boring quality of a cut hole immediately after drilling,and shows promise in various other applications for monitoring borehole alignment. 展开更多
关键词 Tunnel blasting LLB method Drilling deviation Vertical sagging horizontal alignment tracking BGS
在线阅读 下载PDF
Determination of particle exchange rates at over-flow weirs in horizontal fluidised beds by particle tracking velocimetry 被引量:1
2
作者 Katja Meyer Andreas Buck Evangelos Tsotsas 《Particuology》 SCIE EI CAS CSCD 2017年第3期1-9,共9页
Residence time distributions (RTDs) in horizontal fluidised beds have a huge effect on solid product properties and are infuenced by the internal design of the apparatus, e.g. the separation into different compartme... Residence time distributions (RTDs) in horizontal fluidised beds have a huge effect on solid product properties and are infuenced by the internal design of the apparatus, e.g. the separation into different compartments by weirs. Weirs can be passed in or against the overall solid transport direction, with the back-flow resulting in axial dispersion, which is a measure of the spread of the RTD. Therefore, the ratio of exchange rates at weirs under different fluidisation conditions provides information on axial dispersion. In this work, a methodology based on particle tracking velocimetry is presented to obtain information on the exchange rates of particles at weirs in horizontal fluidised beds. The internal recirculation is studied for over-flow weirs with respect to different fluidisation conditions, providing a first step towards determining the effects of weirs and fluidisation conditions on axial dispersion and RTDs in horizontal fluidised beds. 展开更多
关键词 Particle tracking velocimetry horizontal fluidised bedAxial dispersion Granulation Drying
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部