Aiming to effectively solve the problem of deep mining with safety and high efficiency, according to geological conditions, production and stress analysis in roadway surrounding rock, experimental studies on roadway s...Aiming to effectively solve the problem of deep mining with safety and high efficiency, according to geological conditions, production and stress analysis in roadway surrounding rock, experimental studies on roadway supporting of workface 103 under three types of roof conditions with different supporting technologies and parameters were carried out based on the theory of supporting technology of gob-side entry. The results show the supporting of gob-side entry retaining is successful, and the deep surrounding rock is effectively controlled by field monitoring and drilling-hole photos. After stress in surrounding rock of roadways restores stable, the final roadway deformation of surrounding rock of haulage roadway and air-roadway are both about 300 mm; width of gob-side entry is 3.8-4.0 m and average height is 2.0-2.2 m; roadway section is above 8.0 m^2, which solves the problems of gob-side entry retaining support strength and safe mining; necessary conditions of mining safety in workface 103 are met.展开更多
In order to solve effectively the problems of deep mining with safety and high efficiency, the multi- pie factors influencing the stability of deep rock roadway and technical problems are analyzed in the light of the ...In order to solve effectively the problems of deep mining with safety and high efficiency, the multi- pie factors influencing the stability of deep rock roadway and technical problems are analyzed in the light of the severe situation of effective mining for deep coal resource, and the stability control methods for deep rock road- way are provided, which are based on the idea of combined support with separated steps and integral control of surrounding rock of deep rock roadway. The suggested methods were applied to a deep rock roadway with -648 m depth in Gubei coal mine of Huainan area. The field test was carried out and the in-situ monitoring was imple- mented, and the support scheme was optimized and adjusted to improve the stability of the surrounding rock of the roadway based on the feedback analysis. The results showed that the stability can be improved greatly by the provided control methods tbr deep roadway. The present methods lbr stability control of deep rock roadway can be used to other deep rock roadways with the similar conditions.展开更多
文摘Aiming to effectively solve the problem of deep mining with safety and high efficiency, according to geological conditions, production and stress analysis in roadway surrounding rock, experimental studies on roadway supporting of workface 103 under three types of roof conditions with different supporting technologies and parameters were carried out based on the theory of supporting technology of gob-side entry. The results show the supporting of gob-side entry retaining is successful, and the deep surrounding rock is effectively controlled by field monitoring and drilling-hole photos. After stress in surrounding rock of roadways restores stable, the final roadway deformation of surrounding rock of haulage roadway and air-roadway are both about 300 mm; width of gob-side entry is 3.8-4.0 m and average height is 2.0-2.2 m; roadway section is above 8.0 m^2, which solves the problems of gob-side entry retaining support strength and safe mining; necessary conditions of mining safety in workface 103 are met.
文摘In order to solve effectively the problems of deep mining with safety and high efficiency, the multi- pie factors influencing the stability of deep rock roadway and technical problems are analyzed in the light of the severe situation of effective mining for deep coal resource, and the stability control methods for deep rock road- way are provided, which are based on the idea of combined support with separated steps and integral control of surrounding rock of deep rock roadway. The suggested methods were applied to a deep rock roadway with -648 m depth in Gubei coal mine of Huainan area. The field test was carried out and the in-situ monitoring was imple- mented, and the support scheme was optimized and adjusted to improve the stability of the surrounding rock of the roadway based on the feedback analysis. The results showed that the stability can be improved greatly by the provided control methods tbr deep roadway. The present methods lbr stability control of deep rock roadway can be used to other deep rock roadways with the similar conditions.