EPC general contract project includes design, procurement, construction and other links. The quota design in the design link is the first procedure of EPC general contract project. It is a major measure of cost contro...EPC general contract project includes design, procurement, construction and other links. The quota design in the design link is the first procedure of EPC general contract project. It is a major measure of cost control in the design stage, and also the key to control investment and determine the success or failure of the whole project, playing a crucial role in the whole project. By analyzing the role of quota design in EPC general contract project and related control means and determining the target value from the quota design, the design is constantly improved and optimized in each stage to avoid investment risks and misunderstandings, and the effectiveness of quota design in the whole EPC general contract project is effectively improved to increase its internal application value and comprehensively improve the level of project investment control and management, thereby consolidating the core competitiveness of EPC general contract project in the whole market competition.展开更多
The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purch...The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purchasing and construction.Fuqing nuclear power project is located in展开更多
Based on the design and construction general contracting bidding and contract management of the second phase project (pumping station and rubber dam project) of Jiaodong Peninsula strategic water source improvement an...Based on the design and construction general contracting bidding and contract management of the second phase project (pumping station and rubber dam project) of Jiaodong Peninsula strategic water source improvement and capacity increase project, this paper analyzes the characteristics of contract metering and pricing management under the general contracting project mode of water conservancy project led by the construction unit, expounds the advantages and existing problems in metering and pricing management of water conservancy project and puts forward relevant suggestions for the general contracting management of water conservancy project led by the construction unit.展开更多
Taking the whole-process consulting service of an EPC general contracting project in an international financial center in Haikou as an example, this paper summarizes and discusses the investment control planning and p...Taking the whole-process consulting service of an EPC general contracting project in an international financial center in Haikou as an example, this paper summarizes and discusses the investment control planning and practice of EPC projects from the aspects of formulating the general idea of investment control, the preparation of the maximum bid price limit, and the formulation of the main investment control clauses in the contract, so as to be beneficial to the investment control of the construction of similar EPC general contracting projects.展开更多
The construction industry, which forms the backbone of China's economy, can drive the development of construction materials, chemicals, metals, machinery, transportation and other industries, which is very importa...The construction industry, which forms the backbone of China's economy, can drive the development of construction materials, chemicals, metals, machinery, transportation and other industries, which is very important to China's economy. However, the construction industry has high consumption level, high emissions, low efficiency and difficult production and construction activities. Buildings consume a lot of energy and resources, from development to waste to degradation, while waste is released into the environment. With the improvement of urbanization in China, the construction industry is facing serious ecological, resource-intensive and energy problems. Therefore, the construction industry has embarked on the path of sustainable development, which not only meets the economic and social needs of the construction industry, but also saves resources and protects the environment. Green building project management is an important part of sustainable development of construction industry. EPC general contracting mode refers to that the general contractor undertakes comprehensive services such as project planning, construction, procurement and commissioning according to the contract commitment. The EPC general contracting model includes a powerful consulting unit for the overall management of the BIM technical consulting process and improved cost control and environmental management of the EPC global contract model. It is beneficial to strengthen the cost control and green management of EPC general contracting mode, play a leading role in the construction process, constantly optimize the overall layout, effectively overcome the conflict between design, delivery and construction, and promote the full and in-depth cooperation between environmentally friendly design.展开更多
In terms of general contracting management, it is necessary to carry out real-time division of labor for each professional system of the construction project, formulate corresponding management systems, and ensure tha...In terms of general contracting management, it is necessary to carry out real-time division of labor for each professional system of the construction project, formulate corresponding management systems, and ensure that each professional system has a clear code of conduct, so as to reduce the difficulty of the project and ensure the smooth development of the project.When controlling the implementation of the project plan, provide effective services and control to ensure the good operation of the project general contracting management system. Based on this, this paper mainly analyzes the formulation and key and difficult points of construction project general contracting management for reference.展开更多
Short, flat and fast construction requirements of MSW incineration power generation projects make EPC general contracting mode become gradually popularized in this kind of projects, which also brings a series of manag...Short, flat and fast construction requirements of MSW incineration power generation projects make EPC general contracting mode become gradually popularized in this kind of projects, which also brings a series of management problems. The problem is analyzed from the perspective of space deployment and time coordination, and the solution of general contractor coordination is introduced, which provides a certain reference and basis for the follow-up similar projects.展开更多
With the development and progress in the field of construction engineering, the scale of construction engineering is gradually increasing, and the construction environment is also diversified. In recent years, EPC mod...With the development and progress in the field of construction engineering, the scale of construction engineering is gradually increasing, and the construction environment is also diversified. In recent years, EPC mode has been widely used in civil construction projects, and plays an important role in the process of project construction general contracting mode in engineering construction. The general contracting enterprise is responsible for completing the design, procurement, construction and other aspects of the construction project, and ultimately complete the "turn key work" of the whole project, that is, responsible for the integrity of the construction project, coordinate and deal with the relationship between all aspects, and finally ensure the quality of the project. In the application process of EPC general contracting mode, we should do a good job in the early stage of the project, construction period, trial operation period and other aspects, fully study the actual situation, and ensure that the project construction meets the requirements of the contract. In the design and construction of the project, the general contractor should consider the specific situation of the project, so that the project cost, quality, safety and other aspects meet the requirements of the contract and the enterprise itself. The general contractor can subcontract all aspects of the project according to the needs of the actual work, but it should control the overall quality, and the final quality is in the charge of the general contractor.展开更多
With the continuous reform and change of the construction market, EPC project general contracting and project management have gradually become the dominant mode in the construction market, and are widely used in real ...With the continuous reform and change of the construction market, EPC project general contracting and project management have gradually become the dominant mode in the construction market, and are widely used in real estate development and large-scale municipal infrastructure construction. Among them, the design-oriented EPC project general contracting has been vigorously promoted by the national policy due to its technical advantages and resource advantages. This paper analyzes the characteristics of the general contracting mode and design-led EPC municipal projects, the existing problems in cost management, and the cost control and management measures at each stage.展开更多
Complex integrity is one of the main characteristics of infrastructure mega-projects(IMPs). Cost,technology, risk, duration, environmental impact, and other uncertain complexities are interrelated and constitute a cha...Complex integrity is one of the main characteristics of infrastructure mega-projects(IMPs). Cost,technology, risk, duration, environmental impact, and other uncertain complexities are interrelated and constitute a challenging and complex management problem. At present, there is no unified understanding of or solutions to these complex integrity problems. This study analyzes the complex integrity of the island-tunnel subproject of the Hong Kong-Zhuhai-Macao Bridge(HZMB) project and proposes an improved design-build(DB) mode in which the owner provides a preliminary design and has the right to form and manage consortium. This improved DB mode creatively degrades the special complexities that arise from multiple dimensions. On this basis, it is an efficacious way to grasp the main contradictions, integrate the effective resources, and degrade the complex integrity in multiple dimensions and at multiple levels so as to effectively deal with the complexity management of IMPs.展开更多
文摘EPC general contract project includes design, procurement, construction and other links. The quota design in the design link is the first procedure of EPC general contract project. It is a major measure of cost control in the design stage, and also the key to control investment and determine the success or failure of the whole project, playing a crucial role in the whole project. By analyzing the role of quota design in EPC general contract project and related control means and determining the target value from the quota design, the design is constantly improved and optimized in each stage to avoid investment risks and misunderstandings, and the effectiveness of quota design in the whole EPC general contract project is effectively improved to increase its internal application value and comprehensively improve the level of project investment control and management, thereby consolidating the core competitiveness of EPC general contract project in the whole market competition.
文摘The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purchasing and construction.Fuqing nuclear power project is located in
文摘Based on the design and construction general contracting bidding and contract management of the second phase project (pumping station and rubber dam project) of Jiaodong Peninsula strategic water source improvement and capacity increase project, this paper analyzes the characteristics of contract metering and pricing management under the general contracting project mode of water conservancy project led by the construction unit, expounds the advantages and existing problems in metering and pricing management of water conservancy project and puts forward relevant suggestions for the general contracting management of water conservancy project led by the construction unit.
文摘Taking the whole-process consulting service of an EPC general contracting project in an international financial center in Haikou as an example, this paper summarizes and discusses the investment control planning and practice of EPC projects from the aspects of formulating the general idea of investment control, the preparation of the maximum bid price limit, and the formulation of the main investment control clauses in the contract, so as to be beneficial to the investment control of the construction of similar EPC general contracting projects.
文摘The construction industry, which forms the backbone of China's economy, can drive the development of construction materials, chemicals, metals, machinery, transportation and other industries, which is very important to China's economy. However, the construction industry has high consumption level, high emissions, low efficiency and difficult production and construction activities. Buildings consume a lot of energy and resources, from development to waste to degradation, while waste is released into the environment. With the improvement of urbanization in China, the construction industry is facing serious ecological, resource-intensive and energy problems. Therefore, the construction industry has embarked on the path of sustainable development, which not only meets the economic and social needs of the construction industry, but also saves resources and protects the environment. Green building project management is an important part of sustainable development of construction industry. EPC general contracting mode refers to that the general contractor undertakes comprehensive services such as project planning, construction, procurement and commissioning according to the contract commitment. The EPC general contracting model includes a powerful consulting unit for the overall management of the BIM technical consulting process and improved cost control and environmental management of the EPC global contract model. It is beneficial to strengthen the cost control and green management of EPC general contracting mode, play a leading role in the construction process, constantly optimize the overall layout, effectively overcome the conflict between design, delivery and construction, and promote the full and in-depth cooperation between environmentally friendly design.
文摘In terms of general contracting management, it is necessary to carry out real-time division of labor for each professional system of the construction project, formulate corresponding management systems, and ensure that each professional system has a clear code of conduct, so as to reduce the difficulty of the project and ensure the smooth development of the project.When controlling the implementation of the project plan, provide effective services and control to ensure the good operation of the project general contracting management system. Based on this, this paper mainly analyzes the formulation and key and difficult points of construction project general contracting management for reference.
文摘Short, flat and fast construction requirements of MSW incineration power generation projects make EPC general contracting mode become gradually popularized in this kind of projects, which also brings a series of management problems. The problem is analyzed from the perspective of space deployment and time coordination, and the solution of general contractor coordination is introduced, which provides a certain reference and basis for the follow-up similar projects.
文摘With the development and progress in the field of construction engineering, the scale of construction engineering is gradually increasing, and the construction environment is also diversified. In recent years, EPC mode has been widely used in civil construction projects, and plays an important role in the process of project construction general contracting mode in engineering construction. The general contracting enterprise is responsible for completing the design, procurement, construction and other aspects of the construction project, and ultimately complete the "turn key work" of the whole project, that is, responsible for the integrity of the construction project, coordinate and deal with the relationship between all aspects, and finally ensure the quality of the project. In the application process of EPC general contracting mode, we should do a good job in the early stage of the project, construction period, trial operation period and other aspects, fully study the actual situation, and ensure that the project construction meets the requirements of the contract. In the design and construction of the project, the general contractor should consider the specific situation of the project, so that the project cost, quality, safety and other aspects meet the requirements of the contract and the enterprise itself. The general contractor can subcontract all aspects of the project according to the needs of the actual work, but it should control the overall quality, and the final quality is in the charge of the general contractor.
文摘With the continuous reform and change of the construction market, EPC project general contracting and project management have gradually become the dominant mode in the construction market, and are widely used in real estate development and large-scale municipal infrastructure construction. Among them, the design-oriented EPC project general contracting has been vigorously promoted by the national policy due to its technical advantages and resource advantages. This paper analyzes the characteristics of the general contracting mode and design-led EPC municipal projects, the existing problems in cost management, and the cost control and management measures at each stage.
基金funded by the National Natural Science Foundation of China(Grant Nos.71390520,71390521,71271107,91646123,71671088)Key Laboratory for Public Projects Audit of Jiangsu Province,P.R.China(GGSS2016-12)
文摘Complex integrity is one of the main characteristics of infrastructure mega-projects(IMPs). Cost,technology, risk, duration, environmental impact, and other uncertain complexities are interrelated and constitute a challenging and complex management problem. At present, there is no unified understanding of or solutions to these complex integrity problems. This study analyzes the complex integrity of the island-tunnel subproject of the Hong Kong-Zhuhai-Macao Bridge(HZMB) project and proposes an improved design-build(DB) mode in which the owner provides a preliminary design and has the right to form and manage consortium. This improved DB mode creatively degrades the special complexities that arise from multiple dimensions. On this basis, it is an efficacious way to grasp the main contradictions, integrate the effective resources, and degrade the complex integrity in multiple dimensions and at multiple levels so as to effectively deal with the complexity management of IMPs.