Full operation of the Three Gorges Dam(TGD) reduces flood risk of the middle and lower parts of the Yangtze River Basin. However,Dongting Lake, which is located in the Yangtze River Basin, is still at high risk for po...Full operation of the Three Gorges Dam(TGD) reduces flood risk of the middle and lower parts of the Yangtze River Basin. However,Dongting Lake, which is located in the Yangtze River Basin, is still at high risk for potentially severe flooding in the future. The effects of the TGD on flood processes were investigated using a hydrodynamic model. The 1998 and 2010 flood events before and after the operation of the TGD, respectively, were analyzed. The numerical results show that the operation of the TGD changes flood processes, including the timing and magnitude of flood peaks in Dongting Lake. The TGD can effectively reduce the flood level in Dongting Lake, which is mainly caused by the flood water from the upper reach of the Yangtze River. This is not the case, however, for floods mainly induced by flood water from four main rivers in the catchment. In view of this, a comprehensive strategy for flood management in Dongting Lake is required. Non-engineering measures, such as warning systems and combined operation of the TGD and other reservoirs in the catchment, as well as traditional engineering measures, should be further improved. Meanwhile, a sustainable philosophy for flood control, including natural flood management and lake restoration, is recommended to reduce the flood risk.展开更多
To provide basis for sand excavation of hydraulic fill and land forming in Daohukou region in a watercourse (Wuhan reach) on Yangtze River, a 2-D water-sand mathematic model of this river reach is established. The var...To provide basis for sand excavation of hydraulic fill and land forming in Daohukou region in a watercourse (Wuhan reach) on Yangtze River, a 2-D water-sand mathematic model of this river reach is established. The variation of water levels of this reach and the back silting of watercourse after sand excavation are calculated. The rationality of the results calculated by this model and the measured data are validated and analyzed. The results show that, this model is reasonable and reliable.展开更多
The area of the Huaihe river flood control model is 4000m2. A computer system is employed to control models and collect experimental data.It can control 7 inflows which simulating 9 typical years flood process, a tail...The area of the Huaihe river flood control model is 4000m2. A computer system is employed to control models and collect experimental data.It can control 7 inflows which simulating 9 typical years flood process, a tail water level, 6 sluices, 11 outlets of breaking dike, and collect the water level of 37 points and velocity of 32 points.After running long time,the system has ben proved that it possesses steady character and exact accuracy.It is essential precondition for the experimental study of the Huaibe river find control model.展开更多
Based on the systematic summary of current research on oil bank, the definition of oil bank in the process of fire flooding and its quantitative indices were proposed; and a new one-dimensional positive dry-fire flood...Based on the systematic summary of current research on oil bank, the definition of oil bank in the process of fire flooding and its quantitative indices were proposed; and a new one-dimensional positive dry-fire flooding model considering temperature gradient was established based on the steady flow theory of gas and liquid phases. Single factor analysis and orthogonal experiments were adopted to verify the reliability and reveal the formation mechanisms and the controlling factors of the oil bank. Then the optimal conditions for the oil bank to form were discussed. The study results show the formation of the oil bank is controlled by 3 factors:(1) Oil bank would come into being within a certain temperature interval and above a critical value of temperature gradient(absolute value), with temperature too high or too low and temperature gradient absolute value lower than the critical value, the oil bank couldn't form.(2) For fire flooding process in heavy oil reservoirs, the viscosity of oil influences the width of oil bank and the speed at which oil bank forms; the lower the oil viscosity is, the wider the oil bank is and the faster the oil bank forms.(3) Oil saturation could affect the developing temperature and speed of oil bank. The favorable temperature at which oil bank develops gets lower and the accumulating speed of oil gets faster when the oil saturation is higher. By orthogonal experiments with the model, the optimal combinations of reservoir conditions for forming oil bank during fire flooding in heavy oil reservoirs can be worked out.展开更多
基金supported by the National Basic Research Program of China(973 Program,Grant No.2012CB417000)
文摘Full operation of the Three Gorges Dam(TGD) reduces flood risk of the middle and lower parts of the Yangtze River Basin. However,Dongting Lake, which is located in the Yangtze River Basin, is still at high risk for potentially severe flooding in the future. The effects of the TGD on flood processes were investigated using a hydrodynamic model. The 1998 and 2010 flood events before and after the operation of the TGD, respectively, were analyzed. The numerical results show that the operation of the TGD changes flood processes, including the timing and magnitude of flood peaks in Dongting Lake. The TGD can effectively reduce the flood level in Dongting Lake, which is mainly caused by the flood water from the upper reach of the Yangtze River. This is not the case, however, for floods mainly induced by flood water from four main rivers in the catchment. In view of this, a comprehensive strategy for flood management in Dongting Lake is required. Non-engineering measures, such as warning systems and combined operation of the TGD and other reservoirs in the catchment, as well as traditional engineering measures, should be further improved. Meanwhile, a sustainable philosophy for flood control, including natural flood management and lake restoration, is recommended to reduce the flood risk.
文摘To provide basis for sand excavation of hydraulic fill and land forming in Daohukou region in a watercourse (Wuhan reach) on Yangtze River, a 2-D water-sand mathematic model of this river reach is established. The variation of water levels of this reach and the back silting of watercourse after sand excavation are calculated. The rationality of the results calculated by this model and the measured data are validated and analyzed. The results show that, this model is reasonable and reliable.
文摘The area of the Huaihe river flood control model is 4000m2. A computer system is employed to control models and collect experimental data.It can control 7 inflows which simulating 9 typical years flood process, a tail water level, 6 sluices, 11 outlets of breaking dike, and collect the water level of 37 points and velocity of 32 points.After running long time,the system has ben proved that it possesses steady character and exact accuracy.It is essential precondition for the experimental study of the Huaibe river find control model.
基金Supported by the China National Science and Technology Major Project(2016ZX05012-004)the PetroChina Science and Technology Project(2016B-1402)
文摘Based on the systematic summary of current research on oil bank, the definition of oil bank in the process of fire flooding and its quantitative indices were proposed; and a new one-dimensional positive dry-fire flooding model considering temperature gradient was established based on the steady flow theory of gas and liquid phases. Single factor analysis and orthogonal experiments were adopted to verify the reliability and reveal the formation mechanisms and the controlling factors of the oil bank. Then the optimal conditions for the oil bank to form were discussed. The study results show the formation of the oil bank is controlled by 3 factors:(1) Oil bank would come into being within a certain temperature interval and above a critical value of temperature gradient(absolute value), with temperature too high or too low and temperature gradient absolute value lower than the critical value, the oil bank couldn't form.(2) For fire flooding process in heavy oil reservoirs, the viscosity of oil influences the width of oil bank and the speed at which oil bank forms; the lower the oil viscosity is, the wider the oil bank is and the faster the oil bank forms.(3) Oil saturation could affect the developing temperature and speed of oil bank. The favorable temperature at which oil bank develops gets lower and the accumulating speed of oil gets faster when the oil saturation is higher. By orthogonal experiments with the model, the optimal combinations of reservoir conditions for forming oil bank during fire flooding in heavy oil reservoirs can be worked out.