Study on the effect of mining height on overburden strata movement in longwall mining
1
作者 Ying Ma Qunying Wu +4 位作者 Jinhong Yang Fuqiang Gao Jinfu Lou Bingwei He Jianzhong Li 《International Journal of Coal Science & Technology》 2025年第4期160-173,共14页
The mining height of a coal seam is a critical factor influencing the detachment,collapse,and formation of the collapse angle of the strata during strata movement.To clarify the mechanism by which mining height affect... The mining height of a coal seam is a critical factor influencing the detachment,collapse,and formation of the collapse angle of the strata during strata movement.To clarify the mechanism by which mining height affects strata movement characteristics,a physical model experiment was conducted based on the geological conditions of the Panel 122104 in Caojiatan Coal Mine in Shaanxi.The experiment examined strata movement at mining heights of 1 m and 10 m,identifying differences in detachment,collapse behavior,and collapse angles under these two conditions.The results indicate the following:Delamination range directly governs collapse patterns,with higher stress concentration accelerating delamination initiation and expanding affected zones.1 m mining height exhibits a“superposed fixed beam”structure with lower strength compared to the“fixed beam+cantilever beam”configuration under 10 m height.A model estimating collapse step shows 9.13%average error.Strata structure dictates collapse angle mechanisms:Pseudo-plastic deformation under 1 m height determines collapse angle through vertical tensile stress boundaries,whereas 10 m height exhibits brittle fracture behavior with collapse angles approximating fracture angles.Periodic collapse volume above working face directly correlates with mine pressure intensity and is positively correlated with the caving step distance,collapse angle,and caving range.These parameters show higher values under 10 m mining height,resulting in more pronounced mine pressure manifestations compared to 1 m conditions. 展开更多
关键词 Mining height overburden movement DELAMINATION Collapse angle Structural instability
在线阅读 下载PDF
Prediction of overburden layer thickness based on spatial heterogeneity analysis and machine learning models in hillslope regions
2
作者 Zhilu Chang Shui-Hua Jiang +4 位作者 Faming Huang Lei Shi Jinsong Huang Jianhong Wan Filippo Catani 《Geoscience Frontiers》 2025年第5期109-122,共14页
The spatial distribution of overburden layer thickness(OLT)is crucial for landslide susceptibility prediction and slope stability analysis.Due to OLT spatial heterogeneity in hillslope regions,combined with the diffic... The spatial distribution of overburden layer thickness(OLT)is crucial for landslide susceptibility prediction and slope stability analysis.Due to OLT spatial heterogeneity in hillslope regions,combined with the difficulty and time consumption of OLT sample collection,accurately predicting OLT distribution remains a challenging.To address this,a novel framework has been developed.First,OLT samples are collected through field surveys,remote sensing,and geological drilling.Next,the heterogeneity of OLT’s spatial distribution is analyzed using the probability distribution of OLT samples and their horizontal and vertical distributions.The OLT samples are categorized and the small sample categories are expanded using the synthetic minority over-sampling technique(SMOTE).The slope position is selected as a key conditioning factor.Subsequently,16 conditioning factors are applied to construct OLT prediction model using the random forest regression algorithm.Weights are assigned to each OLT sample category to balance the uneven distribution of sample sizes.Finally,the Pearson correlation coefficient,mean absolute error(MAE),root mean square error(RMSE),and Lin’s concordance correlation coefficient(Lin’s CCC)are employed to validate the OLT prediction results.The Huangtan town serves as the case study.Results show:(1)heterogeneity analysis,SMOTE-based OLT sample expansion strategy and slope position selection can significantly mitigate the effect of spatial heterogeneity on OLT prediction.(2)The Pearson correlation coefficient,RMSE,MAE and Lin’s CCC values are 0.84,1.173,1.378 and 0.804,respectively,indicating excellent prediction performance.This research provides an effective solution for predicting OLT distribution in hillslope regions. 展开更多
关键词 overburden layer thickness Heterogeneity analysis Random forest regression Slope position Hillslope regions
在线阅读 下载PDF
Effect of Seismic Bedrock Interface Depth on Surface Ground Motion Parameters of Deep Overburden Sites
3
作者 Yiyao Shen Xiuli Du +1 位作者 Liyun Li Dong-Mei Zhang 《Journal of Earth Science》 2025年第4期1623-1631,共9页
Ground response analysis and determination of site-specific ground motion parameters are necessary for evaluating seismic loads to enable sustainable design of aboveground and underground structures,particularly in de... Ground response analysis and determination of site-specific ground motion parameters are necessary for evaluating seismic loads to enable sustainable design of aboveground and underground structures,particularly in deep overburden sites.This study investigates the influence of bedrock interface conditions and depth of soil deposits on obtained site-specific ground motion parameters.Employing the one-dimensional seismic response analysis program SOILQUAKE,the ground responses of five representative soil profiles and 1050 case studies are calculated considering three different site models of seismic input interfaces.The analysis employs the actual bedrock interface with a shear wave velocity of 760 m/s as the reference input bedrock interface.The results illustrate that the selection of the bedrock interface condition significantly affects the seismic response on the ground surface of deep overburden sites.Specifically,the ground surface acceleration response spectra at longer periods are notably smaller compared to those at the actual bedrock site.This may present a challenge for designing long-period high-rise buildings situated in deep overburden sites.It is recommended to select a seismic input bedrock interface closely approximating the actual bedrock depth when conducting seismic response analyses for deep overburden sites. 展开更多
关键词 seismic bedrock interface deep overburden sites soilquake frequency consistent method seismic response
原文传递
Effects of spatial heterogeneity on pseudo-static stability of coal mine overburden dump slope,using random limit equilibrium and random finite element methods:A comparative study
4
作者 Madhumita Mohanty Rajib Sarkar Sarat Kumar Das 《Earthquake Engineering and Engineering Vibration》 2025年第1期83-99,共17页
Sudden and unforeseen seismic failures of coal mine overburden(OB)dump slopes interrupt mining operations,cause loss of lives and delay the production of coal.Consideration of the spatial heterogeneity of OB dump mate... Sudden and unforeseen seismic failures of coal mine overburden(OB)dump slopes interrupt mining operations,cause loss of lives and delay the production of coal.Consideration of the spatial heterogeneity of OB dump materials is imperative for an adequate evaluation of the seismic stability of OB dump slopes.In this study,pseudo-static seismic stability analyses are carried out for an OB dump slope by considering the material parameters obtained from an insitu field investigation.Spatial heterogeneity is simulated through use of the random finite element method(RFEM)and the random limit equilibrium method(RLEM)and a comparative study is presented.Combinations of horizontal and vertical spatial correlation lengths were considered for simulating isotropic and anisotropic random fields within the OB dump slope.Seismic performances of the slope have been reported through the probability of failure and reliability index.It was observed that the RLEM approach overestimates failure probability(P_(f))by considering seismic stability with spatial heterogeneity.The P_(f)was observed to increase with an increase in the coefficient of variation of friction angle of the dump materials.Further,it was inferred that the RLEM approach may not be adequately applicable for assessing the seismic stability of an OB dump slope for a horizontal seismic coefficient that is more than or equal to 0.1. 展开更多
关键词 coal mine overburden dump slope random limit equilibrium method random finite element method seismic slope stability spatial heterogeneity
在线阅读 下载PDF
罕遇地震作用下深厚覆盖层上土石混合体高填方人工半岛动力反应及抗震性能分析
5
作者 裴志勇 王夏 +2 位作者 董明名 邓小芹 方火浪 《地震研究》 北大核心 2026年第2期312-322,共11页
以白鹤滩水电站库区象鼻岭移民安置点人工半岛建设工程为研究对象,建立了包括深厚覆盖层、土石混合体高填方和上部结构在内的三维有限元模型。通过现场和室内试验,确定了场地内各种岩土材料和填筑料的物理力学性质和本构模型参数。根据... 以白鹤滩水电站库区象鼻岭移民安置点人工半岛建设工程为研究对象,建立了包括深厚覆盖层、土石混合体高填方和上部结构在内的三维有限元模型。通过现场和室内试验,确定了场地内各种岩土材料和填筑料的物理力学性质和本构模型参数。根据区域地震活动性和地震危险性评价结果,采用三角级数法合成了工程场地50年超越概率为2%的人工地震波。通过弹塑性动力时程分析,研究了人工半岛的地震反应规律和永久变形特征。结果表明,人工半岛中轴线处的加速度峰值随高程的增加呈先减小后增大的趋势,这与深厚覆盖层上土石坝的加速度反应特征高度一致。同时,顶部平台的最大水平永久变形和最大震陷率均远低于相关规范的限值,证明人工半岛在极端地震条件下仍具有良好的抗震稳定性,可以确保移民安置点的安全。 展开更多
关键词 深厚覆盖层 土石混合体 高填方人工半岛 地震反应 永久变形 白鹤滩水电站 象鼻岭安置点
在线阅读 下载PDF
Longwall surface subsidence control by technology of isolated overburden grout injection 被引量:13
6
作者 Xuan Dayang Xu Jialin 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第5期813-818,共6页
Surface subsidence is a typical ground movement due to longwall mining, which causes a series of environmental problems and hazards. In China, intensive coal extractions are commonly operated under dense-populated coa... Surface subsidence is a typical ground movement due to longwall mining, which causes a series of environmental problems and hazards. In China, intensive coal extractions are commonly operated under dense-populated coalfields, which exacerbates the negative subsequences resulted from surface settlement. Therefore, effective approaches to control the ground subsidence are in urgent need for the Chinese coal mining industry. This paper presents a newly developed subsidence control technology: isolated overburden grout injection, including the theory, technique and applications. Relevant procedures such as injection system design, grouting material selection, borehole layout, grout take estimation and injection process design are proposed. The applicability of this technology has been demonstrated through physical modelling, field measurements, and case studies. Since 2009, the technology has been successfully applied to 14 longwall areas in 9 Chinese coal mines. The ultimate surface subsidence factors vary from 0.10 to 0.15. This method has a great potential to be popularized and performed where longwall mining are implemented under villages and ground infrastructures. 展开更多
关键词 LONGWALL MINING Subsidence control ISOLATED overburden GROUT INJECTION Green MINING
在线阅读 下载PDF
Numerical stress-deformation analysis of cut-off wall in clay-core rockfill dam on thick overburden 被引量:12
7
作者 Si-hong Liu Liu-jiang Wang +1 位作者 Zi-jian Wang Erich Bauer 《Water Science and Engineering》 EI CAS CSCD 2016年第3期219-226,共8页
The cut-off wall in a clay-core rockfill dam built on a thick overburden layer is subjected to a large compressive pressure under the action of the loads such as the dead weight of both the dam and the overburden laye... The cut-off wall in a clay-core rockfill dam built on a thick overburden layer is subjected to a large compressive pressure under the action of the loads such as the dead weight of both the dam and the overburden layer, the frictional force induced by the differential settlement between the cut-off wall and surrounding soils, and the water pressure. Thus, reduction of the stress of the cut-off wall has become one of the main problems for consideration in engineering design. In this paper, numerical analysis of a core rockfill dam built on a thick overburden layer was conducted and some factors influencing the stress-strain behaviors of the cut-off wall were investigated. The factors include the improvement of the overburden layer, the modeling approach for interfacial contact between the cut-off wall and surrounding soils, the modulus of the cut-off wall concrete, and the connected pattern between the cut-off wall and the clay core. The result shows that improving the overburden layer,selecting plastic concrete with a low modulus and high strength, and optimizing the connection between the cut-off wall and the clay core of the dam are effective measures of reducing the deformations and compressive stresses of the cut-off wall. In addition, both the Goodman element and the mud-layer element are suitable for simulating the interfacial contact between the cut-off wall and surrounding soils. 展开更多
关键词 overburden layer Core ROCKFILL DAM CUT-OFF wall NUMERICAL ANALYSIS Stress and deformation ANALYSIS
在线阅读 下载PDF
Evaluation of seismic potential in a longwall mine with massive sandstone roof under deep overburden 被引量:5
8
作者 Mark A.Van Dyke Wen H.Su Joe Wickline 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2018年第1期115-119,共5页
A recent seismic event was recorded by a deep longwall mine in Virginia at 3.7 ML on the local magnitude scale and 3.4 MMS by the United States Geological Survey(USGS) in 2016.Further investigations by the National In... A recent seismic event was recorded by a deep longwall mine in Virginia at 3.7 ML on the local magnitude scale and 3.4 MMS by the United States Geological Survey(USGS) in 2016.Further investigations by the National Institute for Occupational Safety and Health(NIOSH) and Coronado Coal researchers have shown that this event was associated with geological features that have also been associated with other, similar seismic events in Virginia.Detailed mapping and geological exploration in the mining area has made it possible to forecast possible locations for future seismic activity.In order to use the geology as a forecaster of mining-induced seismic events and their energy potential, two primary components are needed.The first component is a long history of recorded seismic events with accurately plotted locations.The second component is a high density of geologic data within the mining area.In this case, 181 events of 1.0 MLor greater were recorded by the mine's seismic network between January, 2009, and October, 2016.Within the mining area, 897 geophysical logs, 224 core holes, and 1031 fiberscope holes were examined by mine geologists.From this information, it was found that overburden thickness, sandstone thickness, and sandstone quality contributed greatly to seismic locations.After the data was analyzed, a pattern became apparent indicating that the majority of seismic events occurred under specific conditions.Three forecast maps were created based on geology of previous seismic locations.The forecast maps have shown an accuracy of within 74%–89% when compared to the recorded 181 events that were1.0 MLor greater when considering three major geological criteria of overburden thickness of 579.12 m or greater, 6.096–12.192 m of sandstone within 15.24 m of the Pocahontas number 3 seam, and a longwall caving height of 4.572 m or less. 展开更多
关键词 Seismic Mapping Deep overburden MASSIVE SANDSTONE
在线阅读 下载PDF
Overburden management in open pits: options and limits in large limestone quarries 被引量:6
9
作者 Claudio Oggeri Taddeo Maria Fenoglio +1 位作者 Alberto Godio Raffaele Vinai 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2019年第2期217-228,共12页
The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important f... The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important factors affecting the disposal phase. Economic and environmental requirements must be followed in order to achieve the best reclamation results, keeping into account site constraints such as slope stability, hauling and dumping issues, and interactions with groundwater. This paper deals with the above mentioned issues, illustrating a rational approach applied on the case of a large limestone quarry where the thickness of the overburden is relevant and the spoil material has to be dumped in a flooded pit. The proposed multidisciplinary approach led to the selection of most suitable methods for excavation, transportation and disposal. The selection was based on a detailed laboratory and site characterisation that defined favorable and adverse factors to be considered during the preliminary study of a large quarrying project. 展开更多
关键词 Open pit overburden Soil TESTING LIMESTONE QUARRY Muck ON-SITE TESTING
在线阅读 下载PDF
Structure and deformation measurements of shallow overburden during top coal caving longwall mining 被引量:6
10
作者 Li Sheng Fan Chaojun +3 位作者 Luo Mingkun Yang Zhenhua Lan Tianwei Zhang Haifeng 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第6期1081-1085,共5页
Mining induced pressures are strong and overburden failure areas are large in top coal caving longwall mining, which constrains high production and safety mining. By employing the combination of the full view borehole... Mining induced pressures are strong and overburden failure areas are large in top coal caving longwall mining, which constrains high production and safety mining. By employing the combination of the full view borehole photography technique and the seismic CT scanner technique, the deformation and failure of overlying strata of fully mechanized caving face in shallow coal seam were studied and the failure development of overburden was determined. Results show that the full view borehole photography can reveal the characteristics of strata, and the seismic CT scanner can reflect the characteristics of strata between the boreholes. The combined measurement technique can effectively determine the height of fractured and caved zones. The top end of the caved zone in Yangwangou coal mine employing the top coal caving longwall mining was at the depth of 171 m and fractured zone was at the depth of 106-110 m. The results provide a theoretic foundation for controlling the overburden strata in the shallow buried top coal caving panel. 展开更多
关键词 Top coal CAVING SHALLOW depth overburden failure and deformation Full view BOREHOLE PHOTOGRAPHY Seismic CT SCANNER
在线阅读 下载PDF
Numerical analysis of rainfall effects in external overburden dump 被引量:8
11
作者 Radhakanta Koner Debashish Chakravarty 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第5期825-831,共7页
The effect of slope angle for external overburden dump in response to average and heavy rainfall has been analyzed using a two dimensional finite difference method of transient water flow through unsaturated–saturate... The effect of slope angle for external overburden dump in response to average and heavy rainfall has been analyzed using a two dimensional finite difference method of transient water flow through unsaturated–saturated soil. The external dump stability is evaluated for five geomaterial types on the basis of globally accepted safety factor analysis technique, based on shear strength reduction approach using finite difference method. The results obtained from the finite difference method of analysis indicate that the external dump with more than 30° slope angle is greatly influenced by the rainfall under the studied conditions for geomaterial 3, 4 and 5, whereas dumps with geomaterial 1 and 2 remain safe. The analysis shows that major slope failure is out of preview for the studied rainfall conditions. 展开更多
关键词 External overburden dumps Shear strength reduction Finite difference approach RAINFALL STABILITY
在线阅读 下载PDF
Measurement of overburden failure zones in close-multiple coal seams mining 被引量:14
12
作者 Yang Li Yuqi Ren +3 位作者 Syd S.Peng Haozhou Cheng Nan Wang Junbo Luo 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2021年第1期43-50,共8页
In the Kaiping Coal field,mining of five coal seams,located within 80 m in the Kailuan Group,#5,#7,#8,#9 and#12 coal seam,is difficult due to small interburden thickness,concentrated stress distributions,high coal sea... In the Kaiping Coal field,mining of five coal seams,located within 80 m in the Kailuan Group,#5,#7,#8,#9 and#12 coal seam,is difficult due to small interburden thickness,concentrated stress distributions,high coal seam metamorphism,and complex geological conditions.By using the ZTR12 geological penetration radar(GPR)survey combined with borehole observations,the overburden caving due to mining of the five coals seams was measured.The development characteristics of full-cover rock fractures after mining were obtained from the GPR scan,which provides a measurement basis for the control of rock strata in close multiple coal seam mining.For the first time,it was found that the overburden caving pattern shows a periodic triangular caved characteristic.Furthermore,it is proposed that an upright triangular collapsed pile masonry and an inverted triangular with larger fragments piled up alternately appear in the lower gob.The research results show that the roof structure formed in the gob area can support the key overlying strata,which is beneficial to ensure the integrity and stability of the upper coal seams in multiple-seam mining of close coal seams. 展开更多
关键词 overburden measurement GPR survey Close multiple coal seam Secondary roof break Periodic triangular cave overburden caving
在线阅读 下载PDF
An assessment of coal pillar system stability criteria based on a mechanistic evaluation of the interaction between coal pillars and the overburden 被引量:24
13
作者 Reed Guy Mctyer Kent Frith Russell 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第1期9-15,共7页
Coal pillar design has historically assigned a factor of safety(Fo S) or stability factor(SF) according to their estimated strength and the assumed overburden load acting on them. Acceptable Fo S values have been assi... Coal pillar design has historically assigned a factor of safety(Fo S) or stability factor(SF) according to their estimated strength and the assumed overburden load acting on them. Acceptable Fo S values have been assigned based on past mining experience or a statistical link between Fo S and probability of failure(Po F). Pillar width-to-height(w/h) ratio has long been established as having a material influence on both pillar strength and its potential failure mode. However, there has been significant disagreement on using both factor of safety(Fo S) and w/h as part of pillar system stability criterion, as compared to using Fo S in isolation. This paper will argue that there are valid technical reasons to bring w/h ratio into system stability criteria(other than its influence on pillar strength), as it is related to the post-failure stiffness of the pillar, as measured in situ, and its interaction with overburden stiffness. When overburden stiffness is also brought into pillar system stability considerations, two issues emerge. The first is the width-todepth(W/D) ratio of the panel and whether it is sub-critical or super-critical from a surface subsidence perspective. The second relates to a re-evaluation of pillar Fo S based on whether the pillar is in an elastic or non-elastic(i.e., post-yield) state in its as-designed condition, as this is relevant to maintaining overburden stiffness at the highest possible level. The significance of the model is the potential to maximise both reserve recovery and mining efficiencies without any discernible increase in geotechnical risk, particularly in thick seams and higher depth of cover mining situations. At a time when mining economics are, at best, marginal, removing potentially unnecessary design conservatism is of interest to all mine operators and is an important topic for discussion amongst the geotechnical community. 展开更多
关键词 Coa] pillars Stability overburden Post-failure behaviour Stability criteria
在线阅读 下载PDF
Key technologies for construction of Jinping traffic tunnel with an extremely deep overburden and a high water pressure 被引量:6
14
作者 Shougen CHEN Heng ZHANG Xinrong TAN Liang CHEN 《Journal of Modern Transportation》 2011年第2期94-103,共10页
Jinping traffic tunnel is one of the deepest traffic tunnels in the world with a maximum overburden of 2 375 m and the overburden over 73% of its total length is larger than 1 500 m. The tunnel is 17.5 km long and des... Jinping traffic tunnel is one of the deepest traffic tunnels in the world with a maximum overburden of 2 375 m and the overburden over 73% of its total length is larger than 1 500 m. The tunnel is 17.5 km long and designed to provide a shortcut road between two hydropower stations: Jinping I and Jinping II of the Jinping Hydropower Project, located on Yalong River, Liangshan State, Sichuan Province, China. The tunnel is so deep that building any shafts is impossible. The construction starts from both ends (east and west ends), and the construction length from the west end is 10 km with a blind heading. This paper deals with an overview of this project and analysis of the engineering features, as well as key technologies developed and applied during the construction, including geological prediction, rock burst prevention under a super high in-situ stress, sealing of groundwater with a high pressure and big flow rate, ventilation for a blind heading of 10 km, wet spraying of shotcrete at zones of rock burst and rich water, etc. The application of the new technologies to the construction achieved a high quality tunnel within the contract period. 展开更多
关键词 key technologies Jinping traffic tunnel extremely deep overburden high water pressure
在线阅读 下载PDF
Investigation of overburden behaviour for grout injection to control mine subsidence 被引量:8
15
作者 Shen Baotang Poulsen Brett 《International Journal of Mining Science and Technology》 SCIE EI 2014年第3期317-323,共7页
This paper describes a field and numerical investigation of the overburden strata response to underground longwall mining, focusing on overburden strata movements and stress concentrations.Subsidence related high stre... This paper describes a field and numerical investigation of the overburden strata response to underground longwall mining, focusing on overburden strata movements and stress concentrations.Subsidence related high stress concentrations are believed to have caused damage to river beds in the Illawarra region, Australia. In the field study, extensometers, stressmeters and piezometers were installed in the overburden strata of a longwall panel at West Cliff Colliery. During longwall mining, a total of1000 mm tensile deformation was recorded in the overburden strata and as a result bed separation and gaps were formed. Bed separation was observed to start in the roof of the mining seam and gradually propagate toward the surface as the longwall face advanced. A substantial increase in the near-surface horizontal stresses was recorded before the longwall face reached the monitored locations. The stresses continued to increase as mining advanced and they reached a peak at about 200 m behind the longwall face. A numerical modelling study identified that the angle of breakage(i.e., the angle of the boundary of caved zone) behind the longwall face and over the goaf was 22–25° from vertical direction. This is consistent with the monitoring results showing the high gradient of stresses and strains on the surface150–320 m behind the mining face. 展开更多
关键词 Longwal mining overburden movement Stress SUBSIDENCE Grout injection
在线阅读 下载PDF
Time-lapse geophysical technology-based study on overburden strata changes induced by modern coal mining 被引量:19
16
作者 Wenfeng Du Suping Peng +1 位作者 Guowei Zhu Feng Yang 《International Journal of Coal Science & Technology》 EI CAS 2014年第2期184-191,共8页
To study the impact of modern coal mining on overlying strata and its water bearing conditions,integrated time-lapse geophysical prospecting integrating 3D seismic,electrical and ground penetrating radar method were u... To study the impact of modern coal mining on overlying strata and its water bearing conditions,integrated time-lapse geophysical prospecting integrating 3D seismic,electrical and ground penetrating radar method were used.Through observing and analyzing the geophysical data variations of all stages of pre-mining,mining and post-mining as well as post-mining deposition stable period,impacts of coal mining on stratigraphic structure and its water bearing were studied and modern coal mining induced stratigraphic change pattern was summarized.The research result shows that the stratigraphic structure and the water bearing of surface layer during modern coal mining have self-healing pattern with mining time;the self-healing capability of near-surface strata is relatively strong while the roof weak;water bearing selfhealing of near-surface strata is relatively high while the roof strata adjacent to mined coal beds low.Due to integrated time-lapse geophysical prospecting technology has extra time dimension which makes up the deficiency of static analysis of conventional geophysical methods,it can better highlight the dynamic changes of modern coal mining induced overburden strata and its water bearing conditions. 展开更多
关键词 Time lapse Geophysical prospecting Coal mining overburden strata Strata changes Modern coalmining
在线阅读 下载PDF
Behaviors of overlying strata in extra-thick coal seams using top-coalcaving method 被引量:9
17
作者 Bin Yu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2016年第2期238-247,共10页
Accidents such as support failure and excessive deformation of roadways due to drastic changes in strata behaviors are frequently reported when mining the extra-thick coal seams Nos.3e5 in Datong coal mine with top-co... Accidents such as support failure and excessive deformation of roadways due to drastic changes in strata behaviors are frequently reported when mining the extra-thick coal seams Nos.3e5 in Datong coal mine with top-coal caving method,which significantly hampers the mine's normal production.To understand the mechanism of strata failure,this paper presented a structure evolution model with respect to strata behaviors.Then the behaviors of strata overlying the extra-thick coal seams were studied with the combined method of theoretical analysis,physical simulation,and field measurement.The results show that the key strata,which are usually thick-hard strata,play an important role in overlying movement and may influence the mining-induced strata behaviors in the working face using top-coal caving method.The structural model of far-field key strata presents a 'masonry beam' type structure when'horizontal O-X' breakage type happens.The rotational motion of the block imposed radial compressive stress on the surrounding rock mass of the roadway.This can induce excessive deformation of roadway near the goaf.Besides,this paper proposed a pre-control technology for the hard roof based on fracture holes and underground roof pre-splitting.It could effectively reduce stress concentration and release the accumulated energy of the strata,when mining underground coal resources with top-coal caving method. 展开更多
关键词 extra-thick coal seam Datong mining area Large-space structure Near-and far-field strata Strata behavior Key strata
在线阅读 下载PDF
Prediction of upper limit position of bedding separation overlying a coal roadway within an extra-thick coal seam 被引量:5
18
作者 YAN Hong ZHANG Ji-xiong +2 位作者 LI Lin-yue FENG Rui-min LI Tian-tong 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第2期448-460,共13页
Failure of the surrounding rock around a roadway induced by roof separation is one major type of underground roof-fall accidents.This failure can especially be commonly-seen in a bottom-driven roadway within an extra-... Failure of the surrounding rock around a roadway induced by roof separation is one major type of underground roof-fall accidents.This failure can especially be commonly-seen in a bottom-driven roadway within an extra-thick coal seam("bottom-driven roadway"is used throughout for ease of reference),containing weak partings in their roof coal seams.To determine the upper limit position of the roof interlayer separation is the primary premise for roof control.In this study,a mechanical model for predicting the interlayer separation overlying a bottom-driven roadway within an extra-thick coal seam was established and used to deduce the vertical stress,and length,of the elastic,and plastic zones in the rock strata above the wall of the roadway as well as the formulae for calculating the deflection in different regions of rock strata under bearing stress.Also,an approach was proposed,calculating the stratum load,deflection,and limiting span of the upper limit position of the interlayer separation in a thick coal seam.Based on the key strata control theory and its influence of bedding separation,a set of methods judging the upper limit position of the roof interlayer separation were constructed.In addition,the theoretical prediction and field monitoring for the upper limit position of interlayer separation were conducted in a typical roadway.The results obtained by these two methods are consistent,indicating that the methods proposed are conducive to improving roof control in a thick coal seam. 展开更多
关键词 extra-thick coal seam bedding separation coal roadway roof fall mechanical model
在线阅读 下载PDF
Prediction and safety analysis of additional vertical stress within a shaft wall in an extra-thick alluvium 被引量:8
19
作者 WANG Yansen ZHANG Chi +1 位作者 XUE Libing HUANG Xinggen 《Mining Science and Technology》 EI CAS 2010年第3期350-356,共7页
An alluvium with a sandy aquifer at the bottom,but lacking an effective impermeable layer between the sandy aquifer and bedrock is referred to as a special alluvial stratum.Impacted by the drainage of the aquifer due ... An alluvium with a sandy aquifer at the bottom,but lacking an effective impermeable layer between the sandy aquifer and bedrock is referred to as a special alluvial stratum.Impacted by the drainage of the aquifer due to mining activities,a shaft wall in this special alluvial stratum will be subject to a downward load by an additional vertical force which must be taken into consideration in the design of the shaft wall.The complexity of interaction between shaft wall and the surrounding walls makes it extremely difficult to determine this additional vertical force.For a particular shaft wall in an extra-thick alluvium and assuming that the friction coefficient between shaft wall and stratum does not change with depth,an analysis of a numerical simulation of the stress within the shaft wall has been carried out.Growth and size of the additional vertical stress have been obtained,based on specific values of the friction coefficient,the modulus of elasticity of the drainage layer and the thickness of the drainage layer.Subsequently, the safety of shaft walls with different structural types was studied and a more suitable structural design,providing an important basis for the design of shaft walls,is promoted. 展开更多
关键词 extra-thick alluvium shaft wall additional vertical stress additional vertical force numerical analysis
在线阅读 下载PDF
Selection of overburden surface mining method in West Virginia by analytical hierarchy process 被引量:5
20
作者 Timothy A.Nolan Vladislav Kecojevic 《International Journal of Coal Science & Technology》 EI CAS 2014年第3期306-314,共9页
The broad objective of this research was to improve current surface mining practices and reduce negative environmental impact of overburden removal in West Virginia(WV).The specific objectives were to(i)compare conven... The broad objective of this research was to improve current surface mining practices and reduce negative environmental impact of overburden removal in West Virginia(WV).The specific objectives were to(i)compare conventional surface mining method(drilling,blasting,digging,and loading)to a surface miner(SM)method,and(ii)apply the analytical hierarchy process(AHP)to help select the optimal mining method based on production,cost and environmental criteria.The design and the procedures used in this research involve five interrelated modules:(i)rock properties of overburden in WV,(ii)drilling and blasting,(iii)digging and loading,(iv)SM method,and(v)comparative analysis and selection of the optimal mining method by AHP.Results of this research indicate that application of SM method would yield higher cost of overburden removal than conventional mining methods in rocks with a high unconfined compressive strength and abrasivity.A significant advantage of SM method,where applicable,is the elimination of the negative environmental impacts associated with blasting. 展开更多
关键词 Surface mining West Virginia overburden Production rate COST Environmental impact AHP model