期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Mechanism and practice of rock control in deep large span cut holes 被引量:2
1
作者 Li Chong Xu Jinhai +2 位作者 Fu Chunsheng Wu Rui Ma Qianqian 《Mining Science and Technology》 EI CAS 2011年第6期891-896,共6页
Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pr... Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability. 展开更多
关键词 Deep large span cut hole Double micro arch cross-section roadway Roof control by cross cut Equal strength coordinated support
在线阅读 下载PDF
Variable Universe Fuzzy Control for Battery Equalization 被引量:12
2
作者 ZHENG Jian CHEN Jian OUYANG Quan 《Journal of Systems Science & Complexity》 SCIE EI CSCD 2018年第1期325-342,共18页
In order to avoid the overcharge and overdischarge damages, and to improve the lifetime of the lithium-ion batteries, it is essential to keep the cell voltages in a battery pack at the same level,i.e., battery equaliz... In order to avoid the overcharge and overdischarge damages, and to improve the lifetime of the lithium-ion batteries, it is essential to keep the cell voltages in a battery pack at the same level,i.e., battery equalization. Based on the bi-directional modified Cuk converter, variable universe fuzzy controllers are proposed to adaptively maintain equalizing currents between cells of a serially connected battery pack in varying conditions. The inputs to the fuzzy controller are the voltage differences and the average voltages of adjacent cell pairs. A large voltage difference requires large equalizing current while adjacent cells both with low/high voltages can only stand small discharge/charge currents. Compared with the conventional fuzzy control method, the proposed method differs in that the universe can shrink or expand as the effects of the input changes. This is important as the input may change in a small range. Simulation results demonstrate that the proposed variable universe fuzzy control method has fast equalization speed and good adaptiveness for varying conditions. 展开更多
关键词 Cell equalization lithium-ion battery variable universe fuzzy control
原文传递
Design and evaluation of control strategies in urban drainage systems in Kunming city 被引量:5
3
作者 Xin Dong Senchen Huang Siyu Zeng 《Frontiers of Environmental Science & Engineering》 SCIE EI CAS CSCD 2017年第4期105-112,共8页
Real time control (RTC) of urban drainage systems (UDSs) is an important measure to reduce combined sewer overflow (CSO) and urban flooding, helping achieve the aims of "Sponge City'. Application of RTC requir... Real time control (RTC) of urban drainage systems (UDSs) is an important measure to reduce combined sewer overflow (CSO) and urban flooding, helping achieve the aims of "Sponge City'. Application of RTC requires three main steps: strategy design, simulation-based evaluation and field test. But many of published RTC studies are system-specific, lacking discussions on how to design a strategy step by step. In addition, the existing studies are prone to use hydrologic model to evaluated strategics, but a more precise and dynamic insight into strategy performance is needed. To fill these knowledge gaps, based on a case UDS in Kunming city, a studio on RTC strategy design and Management Model (SWMM) - uncier four typical rainfall events characterized by different return periods (1-year or 0.5 year) and different spatial distributions (uniform or uneven). The equal filling strategy outperformss other two strategies and it can achieve 10% more CSO reduction and 5% more flooding reduction relative to the no-tank case. 展开更多
关键词 Urban drainage system Real time control Static strategy Constant strategy Equal filling strategy
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部