As a complicated optimization problem,parallel batch processing machines scheduling problem(PBPMSP)exists in many real-life manufacturing industries such as textiles and semiconductors.Machine eligibility means that a...As a complicated optimization problem,parallel batch processing machines scheduling problem(PBPMSP)exists in many real-life manufacturing industries such as textiles and semiconductors.Machine eligibility means that at least one machine is not eligible for at least one job.PBPMSP and scheduling problems with machine eligibility are frequently considered;however,PBPMSP with machine eligibility is seldom explored.This study investigates PBPMSP with machine eligibility in fabric dyeing and presents a novel shuffled frog-leaping algorithm with competition(CSFLA)to minimize makespan.In CSFLA,the initial population is produced in a heuristic and random way,and the competitive search of memeplexes comprises two phases.Competition between any two memeplexes is done in the first phase,then iteration times are adjusted based on competition,and search strategies are adjusted adaptively based on the evolution quality of memeplexes in the second phase.An adaptive population shuffling is given.Computational experiments are conducted on 100 instances.The computational results showed that the new strategies of CSFLA are effective and that CSFLA has promising advantages in solving the considered PBPMSP.展开更多
Fabric dyeing is a critical production process in the clothing industry and heavily relies on batch processing machines(BPM).In this study,the parallel BPM scheduling problem with machine eligibility in fabric dyeing ...Fabric dyeing is a critical production process in the clothing industry and heavily relies on batch processing machines(BPM).In this study,the parallel BPM scheduling problem with machine eligibility in fabric dyeing is considered,and an adaptive cooperated shuffled frog-leaping algorithm(ACSFLA)is proposed to minimize makespan and total tardiness simultaneously.ACSFLA determines the search times for each memeplex based on its quality,with more searches in high-quality memeplexes.An adaptive cooperated and diversified search mechanism is applied,dynamically adjusting search strategies for each memeplex based on their dominance relationships and quality.During the cooperated search,ACSFLA uses a segmented and dynamic targeted search approach,while in non-cooperated scenarios,the search focuses on local search around superior solutions to improve efficiency.Furthermore,ACSFLA employs adaptive population division and partial population shuffling strategies.Through these strategies,memeplexes with low evolutionary potential are selected for reconstruction in the next generation,while thosewithhighevolutionarypotential are retained to continue their evolution.Toevaluate the performance of ACSFLA,comparative experiments were conducted using ACSFLA,SFLA,ASFLA,MOABC,and NSGA-CC in 90 instances.The computational results reveal that ACSFLA outperforms the other algorithms in 78 of the 90 test cases,highlighting its advantages in solving the parallel BPM scheduling problem with machine eligibility.展开更多
Mobile Edge Computing(MEC)is promising to alleviate the computation and storage burdens for terminals in wireless networks.The huge energy consumption of MEC servers challenges the establishment of smart cities and th...Mobile Edge Computing(MEC)is promising to alleviate the computation and storage burdens for terminals in wireless networks.The huge energy consumption of MEC servers challenges the establishment of smart cities and their service time powered by rechargeable batteries.In addition,Orthogonal Multiple Access(OMA)technique cannot utilize limited spectrum resources fully and efficiently.Therefore,Non-Orthogonal Multiple Access(NOMA)-based energy-efficient task scheduling among MEC servers for delay-constraint mobile applications is important,especially in highly-dynamic vehicular edge computing networks.The various movement patterns of vehicles lead to unbalanced offloading requirements and different load pressure for MEC servers.Self-Imitation Learning(SIL)-based Deep Reinforcement Learning(DRL)has emerged as a promising machine learning technique to break through obstacles in various research fields,especially in time-varying networks.In this paper,we first introduce related MEC technologies in vehicular networks.Then,we propose an energy-efficient approach for task scheduling in vehicular edge computing networks based on DRL,with the purpose of both guaranteeing the task latency requirement for multiple users and minimizing total energy consumption of MEC servers.Numerical results demonstrate that the proposed algorithm outperforms other methods.展开更多
Cloud computing infrastructure has been evolving as a cost-effective platform for providing computational resources in the form of high-performance computing as a service(HPCaaS)to users for executing HPC applications...Cloud computing infrastructure has been evolving as a cost-effective platform for providing computational resources in the form of high-performance computing as a service(HPCaaS)to users for executing HPC applications.However,the broader use of the Cloud services,the rapid increase in the size,and the capacity of Cloud data centers bring a remarkable rise in energy consumption leading to a significant rise in the system provider expenses and carbon emissions in the environment.Besides this,users have become more demanding in terms of Quality-of-service(QoS)expectations in terms of execution time,budget cost,utilization,and makespan.This situation calls for the design of task scheduling policy,which ensures efficient task sequencing and allocation of computing resources to tasks to meet the trade-off between QoS promises and service provider requirements.Moreover,the task scheduling in the Cloud is a prevalent NP-Hard problem.Motivated by these concerns,this paper introduces and implements a QoS-aware Energy-Efficient Scheduling policy called as CSPSO,for scheduling tasks in Cloud systems to reduce the energy consumption of cloud resources and minimize the makespan of workload.The proposed multi-objective CSPSO policy hybridizes the search qualities of two robust metaheuristics viz.cuckoo search(CS)and particle swarm optimization(PSO)to overcome the slow convergence and lack of diversity of standard CS algorithm.A fitness-aware resource allocation(FARA)heuristic was developed and used by the proposed policy to allocate resources to tasks efficiently.A velocity update mechanism for cuckoo individuals is designed and incorporated in the proposed CSPSO policy.Further,the proposed scheduling policy has been implemented in the CloudSim simulator and tested with real supercomputing workload traces.The comparative analysis validated that the proposed scheduling policy can produce efficient schedules with better performance over other well-known heuristics and meta-heuristics scheduling policies.展开更多
For steel-making and continuous/ingot casting are the key processes of modern iron and steel enterprises, this paper proposes a batch splitting schedule policy to solve continuous and ingot casting schedule of mixed w...For steel-making and continuous/ingot casting are the key processes of modern iron and steel enterprises, this paper proposes a batch splitting schedule policy to solve continuous and ingot casting schedule of mixed whole/ half charging plan for steel making. First establish the model of continuous and ingot casting schedule of mixed whole/half charging plan according to the complex constraints. Then solve this model by heuristic algorithm. Finally use actual data to prove the proposed algorithmrs validity and analyze the application result in steel plant.展开更多
Chemical batch processes have become significant in chemical manufacturing. In these processes, large numbers of chemical products are produced to satisfy human demands in daily life. Recently, economy globalization h...Chemical batch processes have become significant in chemical manufacturing. In these processes, large numbers of chemical products are produced to satisfy human demands in daily life. Recently, economy globalization has resulted, in growing worldwide competitions in tradi.tional chemical .process industry. In order to keep competitive in the global marketplace, each company must optimize its production management and set up a reactive system for market fluctuation. Scheduling is the core of production management in chemical processes. The goal of this paper is to review the recent developments in this challenging area. Classifications of batch scheduling problems and optimization methods are introduced. A comparison of six typical models is shown in a general benchmark example from the literature. Finally, challenges and applications in future research are discussed.展开更多
The optimal scheduling of multi-product batch process is studied and a new mathematics model targeting the maximum profit is proposed, which can be solved by the modified genetic algorithm (MGA) with mixed coding (seq...The optimal scheduling of multi-product batch process is studied and a new mathematics model targeting the maximum profit is proposed, which can be solved by the modified genetic algorithm (MGA) with mixed coding (sequence coding and decimal coding) developed by us. In which, the partially matched cross over (PMX) and reverse mutation are used for the sequence coding, whereas the arithmetic crossover and heteropic mutation are used for the decimal coding. In addition, the relationship between production scale and production cost is analyzed and the maximum profit is always a trade-off of the production scale and production cost. Two examples are solved to demonstrate the effectiveness of the method.展开更多
This work develops an optimization-based methodology for the design and scheduling of batch water recycle networks. This task requires the identification of network configuration, fresh-water usage, recycle assignment...This work develops an optimization-based methodology for the design and scheduling of batch water recycle networks. This task requires the identification of network configuration, fresh-water usage, recycle assignments from sources to sinks, wastewater discharge, and a scheduling scheme. A new source-tank-sink representation is developed to allow for storage and dispatch tanks. The problem is solved in stages by first eliminating scheduling constraints and determining minimum usage of fresh water and wastewater discharge. An iterative procedure is formulated to minimize the total annual cost of the system by trading off capital versus operating costs. The work overcomes limitations in previous literature work including restricted recycle within the same cycle, lumped balances that may not lead to feasible solutions, and unrealistic objective functions. A case study is solved to illustrate the usefulness of the devised procedure.展开更多
In order to solve the flexible job shop scheduling problem with variable batches,we propose an improved multiobjective optimization algorithm,which combines the idea of inverse scheduling.First,a flexible job shop pro...In order to solve the flexible job shop scheduling problem with variable batches,we propose an improved multiobjective optimization algorithm,which combines the idea of inverse scheduling.First,a flexible job shop problem with the variable batches scheduling model is formulated.Second,we propose a batch optimization algorithm with inverse scheduling in which the batch size is adjusted by the dynamic feedback batch adjusting method.Moreover,in order to increase the diversity of the population,two methods are developed.One is the threshold to control the neighborhood updating,and the other is the dynamic clustering algorithm to update the population.Finally,a group of experiments are carried out.The results show that the improved multi-objective optimization algorithm can ensure the diversity of Pareto solutions effectively,and has effective performance in solving the flexible job shop scheduling problem with variable batches.展开更多
The single machine parallel batch problem with job compatibility is considered to minimize makespan, where the job compatibility constraints are represented by a graph G. This problem is proved to be NP-hard. And when...The single machine parallel batch problem with job compatibility is considered to minimize makespan, where the job compatibility constraints are represented by a graph G. This problem is proved to be NP-hard. And when the graph G is limited to be a general bipartite, a complete bipartite and a complete m-partite graph, these problems are solved in polynomial time respectively.展开更多
This paper considers a hybrid two-stage flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage. The processing time of job Jj on any of m identical parall...This paper considers a hybrid two-stage flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage. The processing time of job Jj on any of m identical parallel machines is aj≡a (j∈N), and the processing time of job Jj is bj(j∈N) on a batch processorM. We take makespan (Cmax) as our minimization objective. In this paper, for the problem of FSMP-BI (m identical parallel machines on the first stage and a batch processor on the second stage), based on the algorithm given by Sung and Choung for the problem of 1 |ri, BI|Cmax under the constraint of the given processing sequence, we develop an optimal dynamic programming Algorithm H1 for it in max {O(nlogn), O(nB)} time. A max {O(nlogn) , O(nB)}time symmetric Algorithm H2 is given then for the problem of BI-FSMP (a batch processor on the first stage and m identical parallel machines on the second stage).展开更多
In this contribution we present an online scheduling algorithm for a real world multiproduct batch plant. The overall mixed integer nonlinear programming (MINLP) problem is hierarchically structured into a mixed integ...In this contribution we present an online scheduling algorithm for a real world multiproduct batch plant. The overall mixed integer nonlinear programming (MINLP) problem is hierarchically structured into a mixed integer linear programming (MILP) problem first and then a reduced dimensional MINLP problem, which are optimized by mathematical programming (MP) and genetic algorithm (GA) respectively. The basis idea relies on combining MP with GA to exploit their complementary capacity. The key features of the hierarchical model are explained and illustrated with some real world cases from the multiproduct batch plants.展开更多
This paper considers a scheduling problem in industrial make-and-pack batch production process. This process equips with sequence-dependent changeover time, multipurpose storage units with limited capacity, storage ti...This paper considers a scheduling problem in industrial make-and-pack batch production process. This process equips with sequence-dependent changeover time, multipurpose storage units with limited capacity, storage time, batch splitting, partial equipment connectivity and transfer time. The objective is to make a production plan to satisfy all constraints while meeting demand requirement of packed products from various product families. This problem is NP-hard and the problem size is exponentially large for a realistic-sized problem. Therefore,we propose a genetic algorithm to handle this problem. Solutions to the problems are represented by chromosomes of product family sequences. These sequences are decoded to assign the resource for producing packed products according to forward assignment strategy and resource selection rules. These techniques greatly reduce unnecessary search space and improve search speed. In addition, design of experiment is carefully utilized to determine appropriate parameter settings. Ant colony optimization and Tabu search are also implemented for comparison. At the end of each heuristics, local search is applied for the packed product sequence to improve makespan. In an experimental analysis, all heuristics show the capability to solve large instances within reasonable computational time. In all problem instances, genetic algorithm averagely outperforms ant colony optimization and Tabu search with slightly longer computational time.展开更多
It is known that the problem of minimizing total weighted completion time on a series-batching machine is NP-hard. We consider a series-batching bicriteria scheduling problem of minimizing makespan and total weighted ...It is known that the problem of minimizing total weighted completion time on a series-batching machine is NP-hard. We consider a series-batching bicriteria scheduling problem of minimizing makespan and total weighted completion time with equal length job simultaneously. A batching machine can handle up to b jobs in a batch, where b is called the batch capacity of the machine. We study the unbounded model with b ≥ n, where n denotes the number of jobs. A dynamic programming algorithm is proposed to solve the unbounded model, which can find all Pareto optimal schedules in O(n3) time.展开更多
The intense competition in the current marketplace ha s forced firms to reexamine their methods of doing business, using superior manu facturing practices in the form of just-in-time (JIT), production with JIT pra cti...The intense competition in the current marketplace ha s forced firms to reexamine their methods of doing business, using superior manu facturing practices in the form of just-in-time (JIT), production with JIT pra ctices pursue completion on time and zero inventory, which is often instruct ed according to the custom’s demand or the sale contract. Earliness and tardine ss are undesirable because both of them will bring the extra cost, cost will als o be increased by some factors such as operation condition, intermediate storage , clean method, etc, to minimize the total cost is often the main scheduling objective, but sometime it is most important for factories to eliminate the tar diness cost in order to maintain the commercial credit and to avoid penalty, the refore, minimum of tardiness cost becomes the first objective. It is more import ant to select a reasonable objective by the actual condition during scheduli ng. In this paper scheduling problem of chemical batch process with due date is studied, two different intermediate storage policies and two different productio n modes are also discussed, production scheduling with different intermediate st orage policy and different production mode is proposed and the result is compare d. In order to complete all products within the due date, not only earliness and tardiness but also holding problem is considered, the objective is to selec t a proper intermediate storage policy and production mode and to minimize the c ost resulted by the earliness and tardiness, even the cost result by the interme diate storage. Scheduling with multiple stage and multiple machine is known as a NP-hard problem, mathematical program (MP) method, such as branch-and-bound (BAB), mixed integer linear program (MILP), etc, is often used to solve the sche duling problem. But as is well known, MP method is not good for combination opti mization, especially for large scale and complex optimal problem, whereas geneti c algorithm (GA) can overcome the MP method’s shortcoming and is fit for solvin g such scheduling problem. In this paper a modified genetic algorithm with speci al crossover operator and mutation operator is presented to solve this schedulin g problem. The results show such problem can be solved effectively with the pres ented method.展开更多
In parallel-batching machine scheduling, all jobs in a batch start and complete at the same time, and the processing time of the batch is the maximum processing time of any job in it. For the unbounded parallel-batchi...In parallel-batching machine scheduling, all jobs in a batch start and complete at the same time, and the processing time of the batch is the maximum processing time of any job in it. For the unbounded parallel-batching machine scheduling problem of minimizing the maximum lateness, denoted 1|p-batch|L_(max), a dynamic programming algorithm with time complexity O(n^2) is well known in the literature.Later, this algorithm is improved to be an O(n log n) algorithm. In this note, we present another O(n log n) algorithm with simplifications on data structure and implementation details.展开更多
A batch is a subset of jobs which must be processed jointly in either serial or parallel form. For the single machine, batching, total completion time scheduling problems, the algorithmic aspects have been extensively...A batch is a subset of jobs which must be processed jointly in either serial or parallel form. For the single machine, batching, total completion time scheduling problems, the algorithmic aspects have been extensively studied in the literature. This paper presents the optimal hatching structures of the problems on the batching ways: all jobs in exactly N(arbitrary fix batch number and 1 〈 N 〈 n) batches.展开更多
This study focuses on the scheduling problem of unrelated parallel batch processing machines(BPM)with release times,a scenario derived from the moulding process in a foundry.In this process,a batch is initially formed...This study focuses on the scheduling problem of unrelated parallel batch processing machines(BPM)with release times,a scenario derived from the moulding process in a foundry.In this process,a batch is initially formed,placed in a sandbox,and then the sandbox is positioned on a BPM formoulding.The complexity of the scheduling problem increases due to the consideration of BPM capacity and sandbox volume.To minimize the makespan,a new cooperated imperialist competitive algorithm(CICA)is introduced.In CICA,the number of empires is not a parameter,and four empires aremaintained throughout the search process.Two types of assimilations are achieved:The strongest and weakest empires cooperate in their assimilation,while the remaining two empires,having a close normalization total cost,combine in their assimilation.A new form of imperialist competition is proposed to prevent insufficient competition,and the unique features of the problem are effectively utilized.Computational experiments are conducted across several instances,and a significant amount of experimental results show that the newstrategies of CICAare effective,indicating promising advantages for the considered BPMscheduling problems.展开更多
With the rapid development of intelligent manufacturing and the changes in market demand,the current manufacturing industry presents the characteristics of multi-varieties,small batches,customization,and a short produ...With the rapid development of intelligent manufacturing and the changes in market demand,the current manufacturing industry presents the characteristics of multi-varieties,small batches,customization,and a short production cycle,with the whole production process having certain flexibility.In this paper,a mathematical model is established with the minimum production cycle as the optimization objective for the dual-resource batch scheduling of the flexible job shop,and an improved nested optimization algorithm is designed to solve the problem.The outer layer batch optimization problem is solved by the improved simulated annealing algorithm.The inner double resource scheduling problem is solved by the improved adaptive genetic algorithm,the double coding scheme,and the decoding scheme of Automated Guided Vehicle(AGV)scheduling based on the scheduling rules.The time consumption of collision-free paths is solved with the path planning algorithm which uses the Dijkstra algorithm based on a time window.Finally,the effectiveness of the algorithm is verified by actual cases,and the influence of AGV with different configurations on workshop production efficiency is analyzed.展开更多
We address a scheduling problem with job processing time compatibility and rejection on a parallel-batching machine.The processing time of each job is defined by an interval and any number of jobs can be assigned into...We address a scheduling problem with job processing time compatibility and rejection on a parallel-batching machine.The processing time of each job is defined by an interval and any number of jobs can be assigned into a batch provided that the processing time intervals of the jobs in the common batch are not disjoint.Three problems are considered:(1)minimize the sum of the makespan of accepted jobs and the total rejection penalty of rejected jobs;(2)minimize the makespan of accepted jobs subject to an upper bound on the total rejection penalty of rejected jobs;(3)minimize the total rejection penalty of rejected jobs subject to an upper bound on the makespan of accepted jobs.We provide an O(n2)time algorithm for the first problem.Moreover,for the other two problems,we first show that they are NP-hard,and then present pseudo-polynomial time dynamic programming algorithms and fully polynomial time approximation schemes for them,respectively.展开更多
基金supported by the National Natural Science Foundation of China(Grant Number 61573264).
文摘As a complicated optimization problem,parallel batch processing machines scheduling problem(PBPMSP)exists in many real-life manufacturing industries such as textiles and semiconductors.Machine eligibility means that at least one machine is not eligible for at least one job.PBPMSP and scheduling problems with machine eligibility are frequently considered;however,PBPMSP with machine eligibility is seldom explored.This study investigates PBPMSP with machine eligibility in fabric dyeing and presents a novel shuffled frog-leaping algorithm with competition(CSFLA)to minimize makespan.In CSFLA,the initial population is produced in a heuristic and random way,and the competitive search of memeplexes comprises two phases.Competition between any two memeplexes is done in the first phase,then iteration times are adjusted based on competition,and search strategies are adjusted adaptively based on the evolution quality of memeplexes in the second phase.An adaptive population shuffling is given.Computational experiments are conducted on 100 instances.The computational results showed that the new strategies of CSFLA are effective and that CSFLA has promising advantages in solving the considered PBPMSP.
文摘Fabric dyeing is a critical production process in the clothing industry and heavily relies on batch processing machines(BPM).In this study,the parallel BPM scheduling problem with machine eligibility in fabric dyeing is considered,and an adaptive cooperated shuffled frog-leaping algorithm(ACSFLA)is proposed to minimize makespan and total tardiness simultaneously.ACSFLA determines the search times for each memeplex based on its quality,with more searches in high-quality memeplexes.An adaptive cooperated and diversified search mechanism is applied,dynamically adjusting search strategies for each memeplex based on their dominance relationships and quality.During the cooperated search,ACSFLA uses a segmented and dynamic targeted search approach,while in non-cooperated scenarios,the search focuses on local search around superior solutions to improve efficiency.Furthermore,ACSFLA employs adaptive population division and partial population shuffling strategies.Through these strategies,memeplexes with low evolutionary potential are selected for reconstruction in the next generation,while thosewithhighevolutionarypotential are retained to continue their evolution.Toevaluate the performance of ACSFLA,comparative experiments were conducted using ACSFLA,SFLA,ASFLA,MOABC,and NSGA-CC in 90 instances.The computational results reveal that ACSFLA outperforms the other algorithms in 78 of the 90 test cases,highlighting its advantages in solving the parallel BPM scheduling problem with machine eligibility.
基金supported in part by the National Natural Science Foundation of China under Grant 61971084 and Grant 62001073in part by the National Natural Science Foundation of Chongqing under Grant cstc2019jcyj-msxmX0208in part by the open research fund of National Mobile Communications Research Laboratory,Southeast University,under Grant 2020D05.
文摘Mobile Edge Computing(MEC)is promising to alleviate the computation and storage burdens for terminals in wireless networks.The huge energy consumption of MEC servers challenges the establishment of smart cities and their service time powered by rechargeable batteries.In addition,Orthogonal Multiple Access(OMA)technique cannot utilize limited spectrum resources fully and efficiently.Therefore,Non-Orthogonal Multiple Access(NOMA)-based energy-efficient task scheduling among MEC servers for delay-constraint mobile applications is important,especially in highly-dynamic vehicular edge computing networks.The various movement patterns of vehicles lead to unbalanced offloading requirements and different load pressure for MEC servers.Self-Imitation Learning(SIL)-based Deep Reinforcement Learning(DRL)has emerged as a promising machine learning technique to break through obstacles in various research fields,especially in time-varying networks.In this paper,we first introduce related MEC technologies in vehicular networks.Then,we propose an energy-efficient approach for task scheduling in vehicular edge computing networks based on DRL,with the purpose of both guaranteeing the task latency requirement for multiple users and minimizing total energy consumption of MEC servers.Numerical results demonstrate that the proposed algorithm outperforms other methods.
文摘Cloud computing infrastructure has been evolving as a cost-effective platform for providing computational resources in the form of high-performance computing as a service(HPCaaS)to users for executing HPC applications.However,the broader use of the Cloud services,the rapid increase in the size,and the capacity of Cloud data centers bring a remarkable rise in energy consumption leading to a significant rise in the system provider expenses and carbon emissions in the environment.Besides this,users have become more demanding in terms of Quality-of-service(QoS)expectations in terms of execution time,budget cost,utilization,and makespan.This situation calls for the design of task scheduling policy,which ensures efficient task sequencing and allocation of computing resources to tasks to meet the trade-off between QoS promises and service provider requirements.Moreover,the task scheduling in the Cloud is a prevalent NP-Hard problem.Motivated by these concerns,this paper introduces and implements a QoS-aware Energy-Efficient Scheduling policy called as CSPSO,for scheduling tasks in Cloud systems to reduce the energy consumption of cloud resources and minimize the makespan of workload.The proposed multi-objective CSPSO policy hybridizes the search qualities of two robust metaheuristics viz.cuckoo search(CS)and particle swarm optimization(PSO)to overcome the slow convergence and lack of diversity of standard CS algorithm.A fitness-aware resource allocation(FARA)heuristic was developed and used by the proposed policy to allocate resources to tasks efficiently.A velocity update mechanism for cuckoo individuals is designed and incorporated in the proposed CSPSO policy.Further,the proposed scheduling policy has been implemented in the CloudSim simulator and tested with real supercomputing workload traces.The comparative analysis validated that the proposed scheduling policy can produce efficient schedules with better performance over other well-known heuristics and meta-heuristics scheduling policies.
基金Sponsored by National Basic Research Program of China (2009CB320601)National Natural Science Foundation of China (7102061,60974091,61020106003)Program for New Century Excellent Talents in University (NCET-08-0105)
文摘For steel-making and continuous/ingot casting are the key processes of modern iron and steel enterprises, this paper proposes a batch splitting schedule policy to solve continuous and ingot casting schedule of mixed whole/ half charging plan for steel making. First establish the model of continuous and ingot casting schedule of mixed whole/half charging plan according to the complex constraints. Then solve this model by heuristic algorithm. Finally use actual data to prove the proposed algorithmrs validity and analyze the application result in steel plant.
基金Supported by the National Natural Science Foundation of China (20536020, 20876056).
文摘Chemical batch processes have become significant in chemical manufacturing. In these processes, large numbers of chemical products are produced to satisfy human demands in daily life. Recently, economy globalization has resulted, in growing worldwide competitions in tradi.tional chemical .process industry. In order to keep competitive in the global marketplace, each company must optimize its production management and set up a reactive system for market fluctuation. Scheduling is the core of production management in chemical processes. The goal of this paper is to review the recent developments in this challenging area. Classifications of batch scheduling problems and optimization methods are introduced. A comparison of six typical models is shown in a general benchmark example from the literature. Finally, challenges and applications in future research are discussed.
文摘The optimal scheduling of multi-product batch process is studied and a new mathematics model targeting the maximum profit is proposed, which can be solved by the modified genetic algorithm (MGA) with mixed coding (sequence coding and decimal coding) developed by us. In which, the partially matched cross over (PMX) and reverse mutation are used for the sequence coding, whereas the arithmetic crossover and heteropic mutation are used for the decimal coding. In addition, the relationship between production scale and production cost is analyzed and the maximum profit is always a trade-off of the production scale and production cost. Two examples are solved to demonstrate the effectiveness of the method.
基金the Texas Water Resources Institute (TWRI)the Texas Hazardous Waste Research Center
文摘This work develops an optimization-based methodology for the design and scheduling of batch water recycle networks. This task requires the identification of network configuration, fresh-water usage, recycle assignments from sources to sinks, wastewater discharge, and a scheduling scheme. A new source-tank-sink representation is developed to allow for storage and dispatch tanks. The problem is solved in stages by first eliminating scheduling constraints and determining minimum usage of fresh water and wastewater discharge. An iterative procedure is formulated to minimize the total annual cost of the system by trading off capital versus operating costs. The work overcomes limitations in previous literature work including restricted recycle within the same cycle, lumped balances that may not lead to feasible solutions, and unrealistic objective functions. A case study is solved to illustrate the usefulness of the devised procedure.
基金supported by the National Key R&D Plan(2020YFB1712902)the National Natural Science Foundation of China(52075036).
文摘In order to solve the flexible job shop scheduling problem with variable batches,we propose an improved multiobjective optimization algorithm,which combines the idea of inverse scheduling.First,a flexible job shop problem with the variable batches scheduling model is formulated.Second,we propose a batch optimization algorithm with inverse scheduling in which the batch size is adjusted by the dynamic feedback batch adjusting method.Moreover,in order to increase the diversity of the population,two methods are developed.One is the threshold to control the neighborhood updating,and the other is the dynamic clustering algorithm to update the population.Finally,a group of experiments are carried out.The results show that the improved multi-objective optimization algorithm can ensure the diversity of Pareto solutions effectively,and has effective performance in solving the flexible job shop scheduling problem with variable batches.
文摘The single machine parallel batch problem with job compatibility is considered to minimize makespan, where the job compatibility constraints are represented by a graph G. This problem is proved to be NP-hard. And when the graph G is limited to be a general bipartite, a complete bipartite and a complete m-partite graph, these problems are solved in polynomial time respectively.
基金Sponsored by the Innovation Foundation of Shanghai University(Grant No.A.10-0101-07 -406)NNSF of China(Grant No.60874039)
文摘This paper considers a hybrid two-stage flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage. The processing time of job Jj on any of m identical parallel machines is aj≡a (j∈N), and the processing time of job Jj is bj(j∈N) on a batch processorM. We take makespan (Cmax) as our minimization objective. In this paper, for the problem of FSMP-BI (m identical parallel machines on the first stage and a batch processor on the second stage), based on the algorithm given by Sung and Choung for the problem of 1 |ri, BI|Cmax under the constraint of the given processing sequence, we develop an optimal dynamic programming Algorithm H1 for it in max {O(nlogn), O(nB)} time. A max {O(nlogn) , O(nB)}time symmetric Algorithm H2 is given then for the problem of BI-FSMP (a batch processor on the first stage and m identical parallel machines on the second stage).
基金Supported by the National 973 Program of China (No. G2000263).
文摘In this contribution we present an online scheduling algorithm for a real world multiproduct batch plant. The overall mixed integer nonlinear programming (MINLP) problem is hierarchically structured into a mixed integer linear programming (MILP) problem first and then a reduced dimensional MINLP problem, which are optimized by mathematical programming (MP) and genetic algorithm (GA) respectively. The basis idea relies on combining MP with GA to exploit their complementary capacity. The key features of the hierarchical model are explained and illustrated with some real world cases from the multiproduct batch plants.
基金Thailand Research Fund (Grant #MRG5480176)National Research University Project of Thailand Office of Higher Education Commission
文摘This paper considers a scheduling problem in industrial make-and-pack batch production process. This process equips with sequence-dependent changeover time, multipurpose storage units with limited capacity, storage time, batch splitting, partial equipment connectivity and transfer time. The objective is to make a production plan to satisfy all constraints while meeting demand requirement of packed products from various product families. This problem is NP-hard and the problem size is exponentially large for a realistic-sized problem. Therefore,we propose a genetic algorithm to handle this problem. Solutions to the problems are represented by chromosomes of product family sequences. These sequences are decoded to assign the resource for producing packed products according to forward assignment strategy and resource selection rules. These techniques greatly reduce unnecessary search space and improve search speed. In addition, design of experiment is carefully utilized to determine appropriate parameter settings. Ant colony optimization and Tabu search are also implemented for comparison. At the end of each heuristics, local search is applied for the packed product sequence to improve makespan. In an experimental analysis, all heuristics show the capability to solve large instances within reasonable computational time. In all problem instances, genetic algorithm averagely outperforms ant colony optimization and Tabu search with slightly longer computational time.
基金Foundation item: Supported by the National Natural Science Foundation of China(11201121, 11101383) Supported by the China Scholarship Counci1(201309895008)+1 种基金 Supported bythe 2013GGJS-079 Supported by the 2011B110008
文摘It is known that the problem of minimizing total weighted completion time on a series-batching machine is NP-hard. We consider a series-batching bicriteria scheduling problem of minimizing makespan and total weighted completion time with equal length job simultaneously. A batching machine can handle up to b jobs in a batch, where b is called the batch capacity of the machine. We study the unbounded model with b ≥ n, where n denotes the number of jobs. A dynamic programming algorithm is proposed to solve the unbounded model, which can find all Pareto optimal schedules in O(n3) time.
文摘The intense competition in the current marketplace ha s forced firms to reexamine their methods of doing business, using superior manu facturing practices in the form of just-in-time (JIT), production with JIT pra ctices pursue completion on time and zero inventory, which is often instruct ed according to the custom’s demand or the sale contract. Earliness and tardine ss are undesirable because both of them will bring the extra cost, cost will als o be increased by some factors such as operation condition, intermediate storage , clean method, etc, to minimize the total cost is often the main scheduling objective, but sometime it is most important for factories to eliminate the tar diness cost in order to maintain the commercial credit and to avoid penalty, the refore, minimum of tardiness cost becomes the first objective. It is more import ant to select a reasonable objective by the actual condition during scheduli ng. In this paper scheduling problem of chemical batch process with due date is studied, two different intermediate storage policies and two different productio n modes are also discussed, production scheduling with different intermediate st orage policy and different production mode is proposed and the result is compare d. In order to complete all products within the due date, not only earliness and tardiness but also holding problem is considered, the objective is to selec t a proper intermediate storage policy and production mode and to minimize the c ost resulted by the earliness and tardiness, even the cost result by the interme diate storage. Scheduling with multiple stage and multiple machine is known as a NP-hard problem, mathematical program (MP) method, such as branch-and-bound (BAB), mixed integer linear program (MILP), etc, is often used to solve the sche duling problem. But as is well known, MP method is not good for combination opti mization, especially for large scale and complex optimal problem, whereas geneti c algorithm (GA) can overcome the MP method’s shortcoming and is fit for solvin g such scheduling problem. In this paper a modified genetic algorithm with speci al crossover operator and mutation operator is presented to solve this schedulin g problem. The results show such problem can be solved effectively with the pres ented method.
基金Supported by NSFC(11571323 11201121)+1 种基金NSFSTDOHN(162300410221)NSFEDOHN(2013GGJS-079)
文摘In parallel-batching machine scheduling, all jobs in a batch start and complete at the same time, and the processing time of the batch is the maximum processing time of any job in it. For the unbounded parallel-batching machine scheduling problem of minimizing the maximum lateness, denoted 1|p-batch|L_(max), a dynamic programming algorithm with time complexity O(n^2) is well known in the literature.Later, this algorithm is improved to be an O(n log n) algorithm. In this note, we present another O(n log n) algorithm with simplifications on data structure and implementation details.
基金Supported by the NSF of Henan Province(082300410070)
文摘A batch is a subset of jobs which must be processed jointly in either serial or parallel form. For the single machine, batching, total completion time scheduling problems, the algorithmic aspects have been extensively studied in the literature. This paper presents the optimal hatching structures of the problems on the batching ways: all jobs in exactly N(arbitrary fix batch number and 1 〈 N 〈 n) batches.
基金the National Natural Science Foundation of China(Grant Number 61573264).
文摘This study focuses on the scheduling problem of unrelated parallel batch processing machines(BPM)with release times,a scenario derived from the moulding process in a foundry.In this process,a batch is initially formed,placed in a sandbox,and then the sandbox is positioned on a BPM formoulding.The complexity of the scheduling problem increases due to the consideration of BPM capacity and sandbox volume.To minimize the makespan,a new cooperated imperialist competitive algorithm(CICA)is introduced.In CICA,the number of empires is not a parameter,and four empires aremaintained throughout the search process.Two types of assimilations are achieved:The strongest and weakest empires cooperate in their assimilation,while the remaining two empires,having a close normalization total cost,combine in their assimilation.A new form of imperialist competition is proposed to prevent insufficient competition,and the unique features of the problem are effectively utilized.Computational experiments are conducted across several instances,and a significant amount of experimental results show that the newstrategies of CICAare effective,indicating promising advantages for the considered BPMscheduling problems.
文摘With the rapid development of intelligent manufacturing and the changes in market demand,the current manufacturing industry presents the characteristics of multi-varieties,small batches,customization,and a short production cycle,with the whole production process having certain flexibility.In this paper,a mathematical model is established with the minimum production cycle as the optimization objective for the dual-resource batch scheduling of the flexible job shop,and an improved nested optimization algorithm is designed to solve the problem.The outer layer batch optimization problem is solved by the improved simulated annealing algorithm.The inner double resource scheduling problem is solved by the improved adaptive genetic algorithm,the double coding scheme,and the decoding scheme of Automated Guided Vehicle(AGV)scheduling based on the scheduling rules.The time consumption of collision-free paths is solved with the path planning algorithm which uses the Dijkstra algorithm based on a time window.Finally,the effectiveness of the algorithm is verified by actual cases,and the influence of AGV with different configurations on workshop production efficiency is analyzed.
基金Supported by Key Research Projects of Henan Higher Education Institutions(20A110037)Young Backbone Teachers Training Program of Zhongyuan University of Technology(2018XQG15)+4 种基金Outstanding Youth Foundation of Science and Technology Innovation of Henan Province(184100510004)Natural Science Foundation of Henan Education Department(16A630061)Science and Technology Program of Henan Province(182102110129)Innovation Training Program for College Students of Henan Province(S201910485026)Basic Research Projects of Key Scientific Research Projects Plan in Henan Higher Education Institutions(20zx003)。
文摘We address a scheduling problem with job processing time compatibility and rejection on a parallel-batching machine.The processing time of each job is defined by an interval and any number of jobs can be assigned into a batch provided that the processing time intervals of the jobs in the common batch are not disjoint.Three problems are considered:(1)minimize the sum of the makespan of accepted jobs and the total rejection penalty of rejected jobs;(2)minimize the makespan of accepted jobs subject to an upper bound on the total rejection penalty of rejected jobs;(3)minimize the total rejection penalty of rejected jobs subject to an upper bound on the makespan of accepted jobs.We provide an O(n2)time algorithm for the first problem.Moreover,for the other two problems,we first show that they are NP-hard,and then present pseudo-polynomial time dynamic programming algorithms and fully polynomial time approximation schemes for them,respectively.