期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Talking about the Construction Technology of Shield Launching Crossing Important Pipeline Groups
1
作者 WANGLantao 《外文科技期刊数据库(文摘版)工程技术》 2022年第3期224-230,共7页
The initial construction of earth pressure balance shield is one of the key links in the construction and has high safety risk. When there are important pipelines in the shield starting section, the deformation of the... The initial construction of earth pressure balance shield is one of the key links in the construction and has high safety risk. When there are important pipelines in the shield starting section, the deformation of the stratum is required to be high and the shield starting process is required to be strict. Therefore, the important pipelines should be protected before the shield construction, and the control of tunnel line type, shield driving parameters and posture should be strengthened during the construction. Through an engineering example, the paper introduces a construction technology for shield starting section to pass through important pipeline groups. Through pipeline protection and shield construction control, the smooth passage of shield is ensured, which can provide reference for similar engineering construction. 展开更多
关键词 project overview construction technology end reinforcement control measures
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部