A type of penalty-hybrid variational principle is suggested for the analysis of Stokesian flow. On such a basis, a finite element model is formulated featuring, among others, a priori satisfaction of the deviatoric st...A type of penalty-hybrid variational principle is suggested for the analysis of Stokesian flow. On such a basis, a finite element model is formulated featuring, among others, a priori satisfaction of the deviatoric stress and hydrostatic pressure on linear momentum balance equations. Also in the present scheme the hydrostatic pressure is successfully eliminated at the element level, leaving only nodal velocities as solution unknowns. A series of 4-node and 8-node quadrilateral elements are derived and examined. Numerical examples demonstrating their characteristic behaviors are also included.展开更多
In this paper, a new finite element method for the flow analysis of the viscous incompressible power-law fluid is proposed by the use of penalty-hybrid/mixed finite element formulation and by the introduction of an al...In this paper, a new finite element method for the flow analysis of the viscous incompressible power-law fluid is proposed by the use of penalty-hybrid/mixed finite element formulation and by the introduction of an alternative perturbation, which is weighted by viscosity, of the continuity equation. A numerical example is presented to exhibit the efficiency of the method.展开更多
The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the qu...The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the quake-hit areas,and the channel-fill deposit problem caused by the debris flow was the most destructive.Moreover,it is of high possibility that an even severe deposit problem would reappear and result in worse consequences.In order to maximize risk reduction of this problem,relevant departments of the government established a series of emergency river restoration schemes,for which the numerical analysis is an important procedure to evaluate and determine the optimized one.This study presents a numerical analysis by applying a twodimensional debris flow model combined with a relevant water-sediment model to simulate the deposit during the progress of the debris flow,and to calculate and analyze the river flow field under both the present condition and different restoration conditions.The results show that the debris flow model,which takes the confluence of the Wenjia Gully to the main river into account,could simulate the deposit process quite well.In the reproduced debris flow from the simulation of the '8.13' Debris Flow,the original river flow path has switched to a relatively lower place just along the right bank with a high speed of near 7m.s-1 after being blocked by the deposit,which is highly hazardous.To prevent this hazard,a recommended scheme is derived through inter-comparison of different restoration conditions.It shows that the recommended scheme is able to reduce the water level and as well to regulate the flow path.Based on the given conditions of the mainstream and the tributary confluence for the simulated '8.13' Debris Flow,when encountering a debris flow with deposit volume less than 0.5 million m3,the river channel can endure a 20-year return flood;however,when the deposit volume increases to 2 million m3,the flood capacity of the river will be greatly impacted and the scheme becomes invalid.The recommended scheme supported by the present study has been applied to the emergency river restoration after this mega-debris flow.展开更多
An experimental setup for cold extrusion process with electric-hydraulic chattering was developed and its working principle was introduced. The finite element (FE) model for a kind of cup part (material: 20Cr) wa...An experimental setup for cold extrusion process with electric-hydraulic chattering was developed and its working principle was introduced. The finite element (FE) model for a kind of cup part (material: 20Cr) was built by using the software Deform-3D. FE simulation experiments with and without electric-hydraulic chattering were carried out to analyze the velocity fields and the metal grid flow lines. The extrusion ex- periments of the cup part were also performed under different conditions. The difference of metal flow lines with and without electric-hydraulic chattering was discussed via a scanning electron microscope (SEM) and the Keyence super-depth three-dimensional microscopic system. The results showed that with the electric-hydraulic chattering, the velocity of material flow increases, whereas deformation resistance decreases. Electric hydraulic chattering results in easy metal flow, small bending degree of metal flow lines, slender and dense metal grains, and thereby an improved quality of the deformed parts.展开更多
文摘A type of penalty-hybrid variational principle is suggested for the analysis of Stokesian flow. On such a basis, a finite element model is formulated featuring, among others, a priori satisfaction of the deviatoric stress and hydrostatic pressure on linear momentum balance equations. Also in the present scheme the hydrostatic pressure is successfully eliminated at the element level, leaving only nodal velocities as solution unknowns. A series of 4-node and 8-node quadrilateral elements are derived and examined. Numerical examples demonstrating their characteristic behaviors are also included.
文摘In this paper, a new finite element method for the flow analysis of the viscous incompressible power-law fluid is proposed by the use of penalty-hybrid/mixed finite element formulation and by the introduction of an alternative perturbation, which is weighted by viscosity, of the continuity equation. A numerical example is presented to exhibit the efficiency of the method.
基金supported by the National Basic Research Program of China ("973" Project) (Grant No. 2011CB409903)the National Natural Science Foundation of China (Grant No. 50739002)
文摘The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the quake-hit areas,and the channel-fill deposit problem caused by the debris flow was the most destructive.Moreover,it is of high possibility that an even severe deposit problem would reappear and result in worse consequences.In order to maximize risk reduction of this problem,relevant departments of the government established a series of emergency river restoration schemes,for which the numerical analysis is an important procedure to evaluate and determine the optimized one.This study presents a numerical analysis by applying a twodimensional debris flow model combined with a relevant water-sediment model to simulate the deposit during the progress of the debris flow,and to calculate and analyze the river flow field under both the present condition and different restoration conditions.The results show that the debris flow model,which takes the confluence of the Wenjia Gully to the main river into account,could simulate the deposit process quite well.In the reproduced debris flow from the simulation of the '8.13' Debris Flow,the original river flow path has switched to a relatively lower place just along the right bank with a high speed of near 7m.s-1 after being blocked by the deposit,which is highly hazardous.To prevent this hazard,a recommended scheme is derived through inter-comparison of different restoration conditions.It shows that the recommended scheme is able to reduce the water level and as well to regulate the flow path.Based on the given conditions of the mainstream and the tributary confluence for the simulated '8.13' Debris Flow,when encountering a debris flow with deposit volume less than 0.5 million m3,the river channel can endure a 20-year return flood;however,when the deposit volume increases to 2 million m3,the flood capacity of the river will be greatly impacted and the scheme becomes invalid.The recommended scheme supported by the present study has been applied to the emergency river restoration after this mega-debris flow.
文摘An experimental setup for cold extrusion process with electric-hydraulic chattering was developed and its working principle was introduced. The finite element (FE) model for a kind of cup part (material: 20Cr) was built by using the software Deform-3D. FE simulation experiments with and without electric-hydraulic chattering were carried out to analyze the velocity fields and the metal grid flow lines. The extrusion ex- periments of the cup part were also performed under different conditions. The difference of metal flow lines with and without electric-hydraulic chattering was discussed via a scanning electron microscope (SEM) and the Keyence super-depth three-dimensional microscopic system. The results showed that with the electric-hydraulic chattering, the velocity of material flow increases, whereas deformation resistance decreases. Electric hydraulic chattering results in easy metal flow, small bending degree of metal flow lines, slender and dense metal grains, and thereby an improved quality of the deformed parts.