The radar radiation source signals hold extremely high reconnaissance value.Accurately positioning these signals constitutes one of the key technologies in safeguarding the security of the electromagnetic space.The po...The radar radiation source signals hold extremely high reconnaissance value.Accurately positioning these signals constitutes one of the key technologies in safeguarding the security of the electromagnetic space.The positioning error in multi-station scenarios is influenced not only by the accuracy of positioning parameter estimation but also by the geometric configuration of the positioning platform.This paper focuses on the direction of arrival(DOA),frequency difference of arrival(FDOA),and time difference of arrival(TDOA)methods,analyzing the optimal configuration,optimal detection area,and optimal position dilution of precision in both elevation-known and elevation-unknown scenarios.Specifically,the paper constructs a signal receiving model,establishes the corresponding positioning equations,and performs dimensional normalization on these equations to derive measurement values in meters.Through differential processing,the position dilution of precision is obtained,which is then used as the optimization function to determine the optimal configuration,optimal detection area,and optimal position dilution of precision.Simulation results validate the accuracy of the proposed formulas.展开更多
This study introduces a novel approach to addressing the challenges of high-dimensional variables and strong nonlinearity in reservoir production and layer configuration optimization.For the first time,relational mach...This study introduces a novel approach to addressing the challenges of high-dimensional variables and strong nonlinearity in reservoir production and layer configuration optimization.For the first time,relational machine learning models are applied in reservoir development optimization.Traditional regression-based models often struggle in complex scenarios,but the proposed relational and regression-based composite differential evolution(RRCODE)method combines a Gaussian naive Bayes relational model with a radial basis function network regression model.This integration effectively captures complex relationships in the optimization process,improving both accuracy and convergence speed.Experimental tests on a multi-layer multi-channel reservoir model,the Egg reservoir model,and a real-field reservoir model(the S reservoir)demonstrate that RRCODE significantly reduces water injection and production volumes while increasing economic returns and cumulative oil recovery.Moreover,the surrogate models employed in RRCODE exhibit lightweight characteristics with low computational overhead.These results highlight RRCODE's superior performance in the integrated optimization of reservoir production and layer configurations,offering more efficient and economically viable solutions for oilfield development.展开更多
HOMER(Hybrid OptimizationModel for Electric Renewables)is an effective simulation and optimization platform for hybrid renewable energy.By inputting specific users’energy resource data(such as wind speed,solar radiat...HOMER(Hybrid OptimizationModel for Electric Renewables)is an effective simulation and optimization platform for hybrid renewable energy.By inputting specific users’energy resource data(such as wind speed,solar radiation,etc.)and load data,and by determining the types and models of components selected by the user,HOMER calculates and simulates the operational status of each component at every time step.Ultimately,it computes the energy balance of the system within specified constraints to simulate the overall system operation.This approach enables the reasonable determination of system component capacities,the evaluation of system feasibility,and the calculation of costs over the entire lifecycle of the system.In response to the challenges of matching capacities and high construction costs in wind-solar-storage multi-energy complementary power generation systems,This paper addresses issues such as difficulty in matching component capacities,high construction costs,and low system reliability in multi-energy complementary power generation systems.Using the HOMER hybrid renewable energy simulation and optimization platform,we constructed various hybrid energy systems for a specific region and considered multiple power supply modes.Thesoftware was used to solve for the optimal capacities and costs of each system.Four scenarios were analyzed:grid-only,grid-connected(purchase-sale)wind-solar-storage system,grid-connected(sale)wind-solar-storage system,and off-grid wind-solar-storage system.The results were compared and analyzed.HOMER can assess systemfeasibility and calculate the cost over its entire lifecycle.By inputting 8760 h of wind and solar resource data and load data for a specific region,and considering multiple system structures and power supply modes,the configuration results were evaluated using indicators such as cost and renewable energy utilization ratio.The simulation results indicate that the Net Present Cost(NPC)values across four different scenarios range from 1,877,292 CNY to 3,222,724 CNY,demonstrating significant cost differences.Among these scenarios,the grid-connected(purchase-sell)wind-solarstorage system exhibited the lowest NPC and the highest renewable energy utilization rate.Compared to a system relying solely on the grid,the NPC was reduced by 305,695 CNY,and the renewable energy utilization rate reached 74.7%.展开更多
The high-energy consumption and high construction density of 5G base stations have greatly increased the demand for backup energy storage batteries.To maximize overall benefits for the investors and operators of base ...The high-energy consumption and high construction density of 5G base stations have greatly increased the demand for backup energy storage batteries.To maximize overall benefits for the investors and operators of base station energy storage,we proposed a bi-level optimization model for the operation of the energy storage,and the planning of 5G base stations considering the sleep mechanism.A multi-base station cooperative system composed of 5G acer stations was considered as the research object,and the outer goal was to maximize the net profit over the complete life cycle of the energy storage.Furthermore,the power and capacity of the energy storage configuration were optimized.The inner goal included the sleep mechanism of the base station,and the optimization of the energy storage charging and discharging strategy,for minimizing the daily electricity expenditure of the 5G base station system.Additionally,genetic algorithm and mixed integer programming were used to solve the bi-level optimization model,analyze the numerical example test comparison of the three types of batteries and the net income of the configuration,and finally verify the validity of the model.Furthermore,the sleep mechanism,the charging and discharging strategy for energy consumption,and the economic benefits for the operators were investigated to provide reference for the 5G base station energy storage configuration.展开更多
This article investigates the optimal observation configuration of unmanned aerial vehicles(UAVs) based on angle and range measurements, and generalizes predecessors' researches in two dimensions into three dimens...This article investigates the optimal observation configuration of unmanned aerial vehicles(UAVs) based on angle and range measurements, and generalizes predecessors' researches in two dimensions into three dimensions. The relative geometry of the UAVs-target will significantly affect the state estimation performance of the target, the cost function based on the Fisher information matrix(FIM) is used to derive the FIM determinant of UAVs' observation in three-dimensional space, and the optimal observation geometric configuration that maximizes the determinant of the FIM is obtained. It is shown that the optimal observation configuration of the UAVs-target is usually not unique, and the optimal observation configuration is proved for two UAVs and three UAVs in three-dimension. The long-range over-the-horizon target tracking is simulated and analyzed based on the analysis of optimal observation configuration for two UAVs. The simulation results show that the theoretical analysis and control algorithm can effectively improve the positioning accuracy of the target. It can provide a helpful reference for the design of over-the-horizon target localization based on UAVs.展开更多
ARINC653 systems,which have been widely used in avionics industry,are an important class of safety-critical applications.Partitions are the core concept in the Arinc653 system architecture.Due to the existence of part...ARINC653 systems,which have been widely used in avionics industry,are an important class of safety-critical applications.Partitions are the core concept in the Arinc653 system architecture.Due to the existence of partitions,the system designer must allocate adequate time slots statically to each partition in the design phase.Although some time slot allocation policies could be borrowed from task scheduling policies,no existing literatures give an optimal allocation policy.In this paper,we present a partition configuration policy and prove that this policy is optimal in the sense that if this policy fails to configure adequate time slots to each partition,nor do other policies.Then,by simulation,we show the effects of different partition configuration policies on time slot allocation of partitions and task response time,respectively.展开更多
For achieving the desired configuration of spacecraft at the desired fixed time,a suboptimal fixed-finite-horizon configuration control method on the Lie group SE(3)is developed based on the Model Predictive Static Pr...For achieving the desired configuration of spacecraft at the desired fixed time,a suboptimal fixed-finite-horizon configuration control method on the Lie group SE(3)is developed based on the Model Predictive Static Programming(MPSP).The MPSP technique has been widely used to solve finite-horizon optimal control problems and is known for its high computational efficiency thanks to the closed-form solution,but it cannot be directly applied to systems on SE(3).The methodological innovation in this paper enables that the MPSP technique is extended to the geometric control on SE(3),using the variational principle,the left-invariant properties of Lie groups,and the topology structure of Lie algebra space.Moreover,the energy consumption,which is crucial for spacecraft operations,is considered as the objective function to be optimized in the optimal control formulation.The effectiveness of the designed sub-optimal control method is demonstrated through an online simulation under disturbances and state measurement errors.展开更多
Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we p...Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.展开更多
As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wi...As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wind power(WP).Due to the randomness of WP output,higher requirements are put forward for the voltage stability of each node of the regional power grid,and various reactive power compensation devices(RPCDs)need to be rationally configured to meet the stable operation requirements of the system.This paper proposes an optimal configuration method for multi-type RPCDs in regional power grids with a high proportion of WP.The RPCDs are located according to the proposed static voltage stability index(VSI)and dynamicVSI based on dynamic voltage drop area,and the optimal configuration model of RPCDs is constructed with the lowest construction cost as the objective function to determine the installed capacity of various RPCDs.Finally,the corresponding regional power grid model for intensive access to WFs is constructed on the simulation platform to verify the effectiveness of the proposed method.展开更多
Motivated by optimal combination of paired wings configuration and troke-plane inclination in biological flapping flights that can achieve high aerodynamic performance,we propose a biomimetic rotor-configuration desig...Motivated by optimal combination of paired wings configuration and troke-plane inclination in biological flapping flights that can achieve high aerodynamic performance,we propose a biomimetic rotor-configuration design to explore optimal aerodynamic performance in multirotor drones.While aerodynamic interactions among propellers in multirotor Unmanned Aerial Vehicles(UAVs)play a crucial role in lift force production and Figure of Merit(FM)efficiency,the rotor-configuration effect remains poorly understood.Here we address a Computational Fluid Dynamics(CFD)-based study on optimal aerodynamic performance of the rotor-configuration in hovering quadrotor drones with a specific focus on the aerodynamic effects of tip distance,height difference and tilt angle of propellers.Our results indicate that the tip distance-induced interactions can most alter lift force production and hence lead to remarked improvement in FM,and the height difference also plays a key role in improving aerodynamic performance,while the tilt angle effect is less important.Furthermore,we carried out an extensive analysis to explore the optimal aerodynamic performance of the rotor-configuration over a broad parameter space,by combining the CFD-based simulations and a novel surrogate model.We find that a rotor-configuration with a large tip distance and some height difference with zero tilt angle is capable of optimizing both lift force production and FM,which could offer a novel optimal design as well as maneuver strategy for multirotor UAVs.展开更多
To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model...To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.展开更多
Aim To obtain an optimizing range of the main configuration parameters of double swirls combustion system (DSCS) Methods To analyze the influence of DS combustion cham-ber configuration parameters on fuel spray and mi...Aim To obtain an optimizing range of the main configuration parameters of double swirls combustion system (DSCS) Methods To analyze the influence of DS combustion cham-ber configuration parameters on fuel spray and mixing by means of the fuel jet developmentperiphery charts obtained by the high speed photography with a modeling test device deve-loped by authors,and to examine it by the tests on a single cylinder diesel engine.Resultsand Conclusion The mixing process can be divided into four phases.The optimizing range of the ration of the inner chamber diameter to the cylinder bore,d2/D,is 0.4-0.7; and the outerchamber diameter,d1 the height of the circular ridge to the piston top face,h1,the radius of outer/inner chamber circle,R1,R2 ,the max depth of outer/inner chamber bowl,H1,H2,etc. are also important展开更多
Satellite constellation configuration design is a complicated and time-consuming simulation optimization problem. In this paper, a new method called the rapid method for satellite constellation performance calculation...Satellite constellation configuration design is a complicated and time-consuming simulation optimization problem. In this paper, a new method called the rapid method for satellite constellation performance calculation is developed by the Hermite interpolation technique to reduce the computing complication and time. The constellation configuration optimization model is established on the basis of the rapid performance calculation. To reduce the search space and enhance the optimization efficiency, this paper presents a new constellation optimization strategy based on the ordinal optimization (00) theory and expands the algorithm realization for constellation optimization including precise and crude models, ordered performance curves, selection rules and selected subsets. Two experiments about navigation constellation and space based surveillance system (SBSS) are carried out and the analysis of simulation results indicates that the ordinal optimization for satellite constellation configuration design is effective.展开更多
Using both numerical and experimental methods, we studied the effect of coil configuration of pulsed magneto-oscillation(PMO) on distribution of electromagnetic field, flow field and solidification structure with th...Using both numerical and experimental methods, we studied the effect of coil configuration of pulsed magneto-oscillation(PMO) on distribution of electromagnetic field, flow field and solidification structure with the same pulse currentparameters in A1 ingots. We designed and constructed three types of coils: surface pulsed magneto-oscillation, hot-toppulsed magneto-oscillation (HPMO) and combined pulsed magneto-oscillation (CPMO). PMO treatment refined thesolidification structure in all the ingots. The configuration of the PMO, however, introduced differences in magnetic fieldintensity, electromagnetic force, Joule heat, flow field, equiaxed grain zone, grain size and growth direction of columnargrains. The largest equiaxed grain zone was found in CPMO treated ingot, and the smallest grain size was found in bothHPM0 and CPMO treated ingots. Numerical simulation indicated that difference in electromagnetic field and flow fieldresulted in differences in solidification structure. HPMO is more advantageous over others for large ingot production.展开更多
Before the dispatch of the carrier-based aircraft,a series of pre-flight preparation operations need to be completed on the flight deck.Flight deck fixed aviation support resource station configuration has an importan...Before the dispatch of the carrier-based aircraft,a series of pre-flight preparation operations need to be completed on the flight deck.Flight deck fixed aviation support resource station configuration has an important impact on operation efficiency and sortie rate.However,the resource station configuration is determined during the aircraft carrier design phase and is rarely modified as required,which may not be suitable for some pre-flight preparation missions.In order to solve the above defects,the joint optimization of flight deck resource station configuration and aircraft carrier pre-flight preparation scheduling is studied in this paper,which is formulated as a two-tier optimization decision-making framework.An improved variable neighborhood search algorithm with four original neighborhood structures is presented.Dispatch mission experiment and algorithm performance comparison experiment are carried out in the computational experiment section.The correlation between the pre-flight preparation time(makespan)and flight deck cabin occupancy percentage is given,and advantages of the proposed algorithm in solving the mathematical model are verified.展开更多
Upper stage solid rocket motors (SRMS) for launch vehicles require a highly efficient propulsion system. Grain design proves to be vital in terms of minimizing inert mass by adopting a high volumetric efficiency wit...Upper stage solid rocket motors (SRMS) for launch vehicles require a highly efficient propulsion system. Grain design proves to be vital in terms of minimizing inert mass by adopting a high volumetric efficiency with minimum possible sliver. In this arti- cle, a methodology has been presented for designing three-dimensional (3D) grain configuration of radial slot for upper stage solid rocket motors. The design process involves parametric modeling of the geometry in computer aided design (CAD) software through dynamic variables that define the complex configuration. Grain bum back is achieved by making new surfaces at each web increment and calculating geometrical properties at each step. Geometrical calculations are based on volume and change-in-volume calculations. Equilibrium pressure method is used to calculate the internal ballistics. Genetic algorithm (GA) has been used as the optimizer because of its robustness and efficient capacity to explore the design space for global optimum solution and eliminate the requirement of an initial guess. Average thrust maximization under design constraints is the objective function.展开更多
To reduce the comprehensive costs of the construction and operation of microgrids and to minimize the power fluctuations caused by randomness and intermittency in distributed generation,a double-layer optimizing confi...To reduce the comprehensive costs of the construction and operation of microgrids and to minimize the power fluctuations caused by randomness and intermittency in distributed generation,a double-layer optimizing configuration method of hybrid energy storage microgrid based on improved grey wolf optimization(IGWO)is proposed.Firstly,building a microgrid system containing a wind-solar power station and electric-hydrogen coupling hybrid energy storage system.Secondly,the minimum comprehensive cost of the construction and operation of the microgrid is taken as the outer objective function,and the minimum peak-to-valley of the microgrid’s daily output is taken as the inner objective function.By iterating through the outer and inner layers,the system improves operational stability while achieving economic configuration.Then,using the energy-self-smoothness of the microgrid as the evaluation index,a double-layer optimizing configuration method of the microgrid is constructed.Finally,to improve the disadvantages of grey wolf optimization(GWO),such as slow convergence in the later period and easy falling into local optima,by introducing the convergence factor nonlinear adjustment strategy and Cauchy mutation operator,an IGWO with excellent global performance is proposed.After testing with the typical test functions,the superiority of IGWO is verified.Next,using IGWO to solve the double-layer model.The case analysis shows that compared to GWO and particle swarm optimization(PSO),the IGWO reduced the comprehensive cost by 15.6%and 18.8%,respectively.Therefore,the proposed double-layer optimizationmethod of capacity configuration ofmicrogrid with wind-solar-hybrid energy storage based on IGWO could effectively improve the independence and stability of the microgrid and significantly reduce the comprehensive cost.展开更多
An extended crowding genetic algorithm (ECGA) is introduced for solvingoptimal pump configuration problem, which was presented by T. Westerlund in 1994. This problem hasbeen found to be non-convex, and the objective f...An extended crowding genetic algorithm (ECGA) is introduced for solvingoptimal pump configuration problem, which was presented by T. Westerlund in 1994. This problem hasbeen found to be non-convex, and the objective function contained several local optima and globaloptimality could not be ensured by all the traditional MINLP optimization method. The concepts ofspecies conserving and composite encoding are introduced to crowding genetic algorithm (CGA) formaintain the diversity of population more effectively and coping with the continuous and/or discretevariables in MINLP problem. The solution of three-levels pump configuration got from DICOPT++software (OA algorithm) is also given. By comparing with the solutions obtained from DICOPT++, ECPmethod, and MIN-MIN method, the ECGA algorithm proved to be very effective in finding the globaloptimal solution of multi-levels pump configuration via using the problem-specific information.展开更多
In order to improve the in-flight characteristics of the atomizing droplets during high velocity wire arc spraying (HVAS), some changes have been operated on the original design of the HVAS gun configuration. A compar...In order to improve the in-flight characteristics of the atomizing droplets during high velocity wire arc spraying (HVAS), some changes have been operated on the original design of the HVAS gun configuration. A comparative study was carried out to investigate the microstructure and properties of the coatings produced by the original design spraying gun and the modified one, using 3Cr13 wires of 3 mm in diameter. The characteristics of their jets were examined during spraying. The results indicate that, the included angle between the two wires and the distance from the nozzle to the meeting point of the two vires may have a strong influence on the characteristics of the in-flight droplets and then the coatings. The jet divergence is found to be lower than that of the original one (about 12° against 25°). By modified gun, the adhesion strength, the microhardness and porosity of the coating deposited by modified gun are increased by 39% and 9% respectively. And the porosity of the coatings is decreased by 57%.展开更多
基金supported by the National Natural Science Foundation of China(Nos.62027801,62301035).
文摘The radar radiation source signals hold extremely high reconnaissance value.Accurately positioning these signals constitutes one of the key technologies in safeguarding the security of the electromagnetic space.The positioning error in multi-station scenarios is influenced not only by the accuracy of positioning parameter estimation but also by the geometric configuration of the positioning platform.This paper focuses on the direction of arrival(DOA),frequency difference of arrival(FDOA),and time difference of arrival(TDOA)methods,analyzing the optimal configuration,optimal detection area,and optimal position dilution of precision in both elevation-known and elevation-unknown scenarios.Specifically,the paper constructs a signal receiving model,establishes the corresponding positioning equations,and performs dimensional normalization on these equations to derive measurement values in meters.Through differential processing,the position dilution of precision is obtained,which is then used as the optimization function to determine the optimal configuration,optimal detection area,and optimal position dilution of precision.Simulation results validate the accuracy of the proposed formulas.
基金supported by the National Natural Science Foundation of China under Grant 52325402,52274057,and 52074340the National Key R&D Program of China under Grant 2023YFB4104200+2 种基金the Major Scientific and Technological Projects of CNOOC under Grant CCL2022RCPS0397RSN111 Project under Grant B08028China Scholarship Council under Grant 202306450108.
文摘This study introduces a novel approach to addressing the challenges of high-dimensional variables and strong nonlinearity in reservoir production and layer configuration optimization.For the first time,relational machine learning models are applied in reservoir development optimization.Traditional regression-based models often struggle in complex scenarios,but the proposed relational and regression-based composite differential evolution(RRCODE)method combines a Gaussian naive Bayes relational model with a radial basis function network regression model.This integration effectively captures complex relationships in the optimization process,improving both accuracy and convergence speed.Experimental tests on a multi-layer multi-channel reservoir model,the Egg reservoir model,and a real-field reservoir model(the S reservoir)demonstrate that RRCODE significantly reduces water injection and production volumes while increasing economic returns and cumulative oil recovery.Moreover,the surrogate models employed in RRCODE exhibit lightweight characteristics with low computational overhead.These results highlight RRCODE's superior performance in the integrated optimization of reservoir production and layer configurations,offering more efficient and economically viable solutions for oilfield development.
基金supported in part by the Inner Mongolia Autonomous Region Science and Technology Project Fund(2021GG0336)Inner Mongolia Natural Science Fund(2023ZD20).
文摘HOMER(Hybrid OptimizationModel for Electric Renewables)is an effective simulation and optimization platform for hybrid renewable energy.By inputting specific users’energy resource data(such as wind speed,solar radiation,etc.)and load data,and by determining the types and models of components selected by the user,HOMER calculates and simulates the operational status of each component at every time step.Ultimately,it computes the energy balance of the system within specified constraints to simulate the overall system operation.This approach enables the reasonable determination of system component capacities,the evaluation of system feasibility,and the calculation of costs over the entire lifecycle of the system.In response to the challenges of matching capacities and high construction costs in wind-solar-storage multi-energy complementary power generation systems,This paper addresses issues such as difficulty in matching component capacities,high construction costs,and low system reliability in multi-energy complementary power generation systems.Using the HOMER hybrid renewable energy simulation and optimization platform,we constructed various hybrid energy systems for a specific region and considered multiple power supply modes.Thesoftware was used to solve for the optimal capacities and costs of each system.Four scenarios were analyzed:grid-only,grid-connected(purchase-sale)wind-solar-storage system,grid-connected(sale)wind-solar-storage system,and off-grid wind-solar-storage system.The results were compared and analyzed.HOMER can assess systemfeasibility and calculate the cost over its entire lifecycle.By inputting 8760 h of wind and solar resource data and load data for a specific region,and considering multiple system structures and power supply modes,the configuration results were evaluated using indicators such as cost and renewable energy utilization ratio.The simulation results indicate that the Net Present Cost(NPC)values across four different scenarios range from 1,877,292 CNY to 3,222,724 CNY,demonstrating significant cost differences.Among these scenarios,the grid-connected(purchase-sell)wind-solarstorage system exhibited the lowest NPC and the highest renewable energy utilization rate.Compared to a system relying solely on the grid,the NPC was reduced by 305,695 CNY,and the renewable energy utilization rate reached 74.7%.
基金supported by the State Grid Science and Technology Project(KJ21-1-56).
文摘The high-energy consumption and high construction density of 5G base stations have greatly increased the demand for backup energy storage batteries.To maximize overall benefits for the investors and operators of base station energy storage,we proposed a bi-level optimization model for the operation of the energy storage,and the planning of 5G base stations considering the sleep mechanism.A multi-base station cooperative system composed of 5G acer stations was considered as the research object,and the outer goal was to maximize the net profit over the complete life cycle of the energy storage.Furthermore,the power and capacity of the energy storage configuration were optimized.The inner goal included the sleep mechanism of the base station,and the optimization of the energy storage charging and discharging strategy,for minimizing the daily electricity expenditure of the 5G base station system.Additionally,genetic algorithm and mixed integer programming were used to solve the bi-level optimization model,analyze the numerical example test comparison of the three types of batteries and the net income of the configuration,and finally verify the validity of the model.Furthermore,the sleep mechanism,the charging and discharging strategy for energy consumption,and the economic benefits for the operators were investigated to provide reference for the 5G base station energy storage configuration.
基金supported by the National Natural Science Foundation of China(61703419)。
文摘This article investigates the optimal observation configuration of unmanned aerial vehicles(UAVs) based on angle and range measurements, and generalizes predecessors' researches in two dimensions into three dimensions. The relative geometry of the UAVs-target will significantly affect the state estimation performance of the target, the cost function based on the Fisher information matrix(FIM) is used to derive the FIM determinant of UAVs' observation in three-dimensional space, and the optimal observation geometric configuration that maximizes the determinant of the FIM is obtained. It is shown that the optimal observation configuration of the UAVs-target is usually not unique, and the optimal observation configuration is proved for two UAVs and three UAVs in three-dimension. The long-range over-the-horizon target tracking is simulated and analyzed based on the analysis of optimal observation configuration for two UAVs. The simulation results show that the theoretical analysis and control algorithm can effectively improve the positioning accuracy of the target. It can provide a helpful reference for the design of over-the-horizon target localization based on UAVs.
基金supported by the National Natural Science Foundation of China under Grant No.90718019the National High-Tech Research and Development Plan of China under Grant No.2007AA010304
文摘ARINC653 systems,which have been widely used in avionics industry,are an important class of safety-critical applications.Partitions are the core concept in the Arinc653 system architecture.Due to the existence of partitions,the system designer must allocate adequate time slots statically to each partition in the design phase.Although some time slot allocation policies could be borrowed from task scheduling policies,no existing literatures give an optimal allocation policy.In this paper,we present a partition configuration policy and prove that this policy is optimal in the sense that if this policy fails to configure adequate time slots to each partition,nor do other policies.Then,by simulation,we show the effects of different partition configuration policies on time slot allocation of partitions and task response time,respectively.
基金the support of the TUM University Foundation Fellowship。
文摘For achieving the desired configuration of spacecraft at the desired fixed time,a suboptimal fixed-finite-horizon configuration control method on the Lie group SE(3)is developed based on the Model Predictive Static Programming(MPSP).The MPSP technique has been widely used to solve finite-horizon optimal control problems and is known for its high computational efficiency thanks to the closed-form solution,but it cannot be directly applied to systems on SE(3).The methodological innovation in this paper enables that the MPSP technique is extended to the geometric control on SE(3),using the variational principle,the left-invariant properties of Lie groups,and the topology structure of Lie algebra space.Moreover,the energy consumption,which is crucial for spacecraft operations,is considered as the objective function to be optimized in the optimal control formulation.The effectiveness of the designed sub-optimal control method is demonstrated through an online simulation under disturbances and state measurement errors.
基金funded by Major Science and Technology Projects in Gansu Province(19ZD2GA003).
文摘Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.
基金supported by the Science and Technology Project of State Grid Corporation Headquarters(No.5100-202323008A-1-1-ZN).
文摘As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wind power(WP).Due to the randomness of WP output,higher requirements are put forward for the voltage stability of each node of the regional power grid,and various reactive power compensation devices(RPCDs)need to be rationally configured to meet the stable operation requirements of the system.This paper proposes an optimal configuration method for multi-type RPCDs in regional power grids with a high proportion of WP.The RPCDs are located according to the proposed static voltage stability index(VSI)and dynamicVSI based on dynamic voltage drop area,and the optimal configuration model of RPCDs is constructed with the lowest construction cost as the objective function to determine the installed capacity of various RPCDs.Finally,the corresponding regional power grid model for intensive access to WFs is constructed on the simulation platform to verify the effectiveness of the proposed method.
基金This work was partly supported by the Grant-in-Aid for Scientific Research of KAKENHI No.19H02060,19H00750,JSPSa Global Prominent Research Program,Chiba University.
文摘Motivated by optimal combination of paired wings configuration and troke-plane inclination in biological flapping flights that can achieve high aerodynamic performance,we propose a biomimetic rotor-configuration design to explore optimal aerodynamic performance in multirotor drones.While aerodynamic interactions among propellers in multirotor Unmanned Aerial Vehicles(UAVs)play a crucial role in lift force production and Figure of Merit(FM)efficiency,the rotor-configuration effect remains poorly understood.Here we address a Computational Fluid Dynamics(CFD)-based study on optimal aerodynamic performance of the rotor-configuration in hovering quadrotor drones with a specific focus on the aerodynamic effects of tip distance,height difference and tilt angle of propellers.Our results indicate that the tip distance-induced interactions can most alter lift force production and hence lead to remarked improvement in FM,and the height difference also plays a key role in improving aerodynamic performance,while the tilt angle effect is less important.Furthermore,we carried out an extensive analysis to explore the optimal aerodynamic performance of the rotor-configuration over a broad parameter space,by combining the CFD-based simulations and a novel surrogate model.We find that a rotor-configuration with a large tip distance and some height difference with zero tilt angle is capable of optimizing both lift force production and FM,which could offer a novel optimal design as well as maneuver strategy for multirotor UAVs.
基金The National Natural Science Foundation of China(No.51377021)the Science and Technology Project of State Grid Corporation of China(No.SGTJDK00DWJS1600014)
文摘To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.
文摘Aim To obtain an optimizing range of the main configuration parameters of double swirls combustion system (DSCS) Methods To analyze the influence of DS combustion cham-ber configuration parameters on fuel spray and mixing by means of the fuel jet developmentperiphery charts obtained by the high speed photography with a modeling test device deve-loped by authors,and to examine it by the tests on a single cylinder diesel engine.Resultsand Conclusion The mixing process can be divided into four phases.The optimizing range of the ration of the inner chamber diameter to the cylinder bore,d2/D,is 0.4-0.7; and the outerchamber diameter,d1 the height of the circular ridge to the piston top face,h1,the radius of outer/inner chamber circle,R1,R2 ,the max depth of outer/inner chamber bowl,H1,H2,etc. are also important
文摘Satellite constellation configuration design is a complicated and time-consuming simulation optimization problem. In this paper, a new method called the rapid method for satellite constellation performance calculation is developed by the Hermite interpolation technique to reduce the computing complication and time. The constellation configuration optimization model is established on the basis of the rapid performance calculation. To reduce the search space and enhance the optimization efficiency, this paper presents a new constellation optimization strategy based on the ordinal optimization (00) theory and expands the algorithm realization for constellation optimization including precise and crude models, ordered performance curves, selection rules and selected subsets. Two experiments about navigation constellation and space based surveillance system (SBSS) are carried out and the analysis of simulation results indicates that the ordinal optimization for satellite constellation configuration design is effective.
基金financially supported by the National Natural Science Foundation of China(No.51704210)the National Key Research and Development Program of China(No.2017YFB0701802)the Natural Science Foundation of Hebei Province(No.E2017105016)
文摘Using both numerical and experimental methods, we studied the effect of coil configuration of pulsed magneto-oscillation(PMO) on distribution of electromagnetic field, flow field and solidification structure with the same pulse currentparameters in A1 ingots. We designed and constructed three types of coils: surface pulsed magneto-oscillation, hot-toppulsed magneto-oscillation (HPMO) and combined pulsed magneto-oscillation (CPMO). PMO treatment refined thesolidification structure in all the ingots. The configuration of the PMO, however, introduced differences in magnetic fieldintensity, electromagnetic force, Joule heat, flow field, equiaxed grain zone, grain size and growth direction of columnargrains. The largest equiaxed grain zone was found in CPMO treated ingot, and the smallest grain size was found in bothHPM0 and CPMO treated ingots. Numerical simulation indicated that difference in electromagnetic field and flow fieldresulted in differences in solidification structure. HPMO is more advantageous over others for large ingot production.
文摘Before the dispatch of the carrier-based aircraft,a series of pre-flight preparation operations need to be completed on the flight deck.Flight deck fixed aviation support resource station configuration has an important impact on operation efficiency and sortie rate.However,the resource station configuration is determined during the aircraft carrier design phase and is rarely modified as required,which may not be suitable for some pre-flight preparation missions.In order to solve the above defects,the joint optimization of flight deck resource station configuration and aircraft carrier pre-flight preparation scheduling is studied in this paper,which is formulated as a two-tier optimization decision-making framework.An improved variable neighborhood search algorithm with four original neighborhood structures is presented.Dispatch mission experiment and algorithm performance comparison experiment are carried out in the computational experiment section.The correlation between the pre-flight preparation time(makespan)and flight deck cabin occupancy percentage is given,and advantages of the proposed algorithm in solving the mathematical model are verified.
文摘Upper stage solid rocket motors (SRMS) for launch vehicles require a highly efficient propulsion system. Grain design proves to be vital in terms of minimizing inert mass by adopting a high volumetric efficiency with minimum possible sliver. In this arti- cle, a methodology has been presented for designing three-dimensional (3D) grain configuration of radial slot for upper stage solid rocket motors. The design process involves parametric modeling of the geometry in computer aided design (CAD) software through dynamic variables that define the complex configuration. Grain bum back is achieved by making new surfaces at each web increment and calculating geometrical properties at each step. Geometrical calculations are based on volume and change-in-volume calculations. Equilibrium pressure method is used to calculate the internal ballistics. Genetic algorithm (GA) has been used as the optimizer because of its robustness and efficient capacity to explore the design space for global optimum solution and eliminate the requirement of an initial guess. Average thrust maximization under design constraints is the objective function.
基金supported by the NationalNatural Science Foundation of China Under Grant 61961017Key R&D Plan Projects in Hubei Province 2022BAA060.
文摘To reduce the comprehensive costs of the construction and operation of microgrids and to minimize the power fluctuations caused by randomness and intermittency in distributed generation,a double-layer optimizing configuration method of hybrid energy storage microgrid based on improved grey wolf optimization(IGWO)is proposed.Firstly,building a microgrid system containing a wind-solar power station and electric-hydrogen coupling hybrid energy storage system.Secondly,the minimum comprehensive cost of the construction and operation of the microgrid is taken as the outer objective function,and the minimum peak-to-valley of the microgrid’s daily output is taken as the inner objective function.By iterating through the outer and inner layers,the system improves operational stability while achieving economic configuration.Then,using the energy-self-smoothness of the microgrid as the evaluation index,a double-layer optimizing configuration method of the microgrid is constructed.Finally,to improve the disadvantages of grey wolf optimization(GWO),such as slow convergence in the later period and easy falling into local optima,by introducing the convergence factor nonlinear adjustment strategy and Cauchy mutation operator,an IGWO with excellent global performance is proposed.After testing with the typical test functions,the superiority of IGWO is verified.Next,using IGWO to solve the double-layer model.The case analysis shows that compared to GWO and particle swarm optimization(PSO),the IGWO reduced the comprehensive cost by 15.6%and 18.8%,respectively.Therefore,the proposed double-layer optimizationmethod of capacity configuration ofmicrogrid with wind-solar-hybrid energy storage based on IGWO could effectively improve the independence and stability of the microgrid and significantly reduce the comprehensive cost.
基金This project is supported by Provincial Science Foundation of Hebei (No.01213553).
文摘An extended crowding genetic algorithm (ECGA) is introduced for solvingoptimal pump configuration problem, which was presented by T. Westerlund in 1994. This problem hasbeen found to be non-convex, and the objective function contained several local optima and globaloptimality could not be ensured by all the traditional MINLP optimization method. The concepts ofspecies conserving and composite encoding are introduced to crowding genetic algorithm (CGA) formaintain the diversity of population more effectively and coping with the continuous and/or discretevariables in MINLP problem. The solution of three-levels pump configuration got from DICOPT++software (OA algorithm) is also given. By comparing with the solutions obtained from DICOPT++, ECPmethod, and MIN-MIN method, the ECGA algorithm proved to be very effective in finding the globaloptimal solution of multi-levels pump configuration via using the problem-specific information.
基金Project (50235030) supported by the National Natural Science Foundation of China
文摘In order to improve the in-flight characteristics of the atomizing droplets during high velocity wire arc spraying (HVAS), some changes have been operated on the original design of the HVAS gun configuration. A comparative study was carried out to investigate the microstructure and properties of the coatings produced by the original design spraying gun and the modified one, using 3Cr13 wires of 3 mm in diameter. The characteristics of their jets were examined during spraying. The results indicate that, the included angle between the two wires and the distance from the nozzle to the meeting point of the two vires may have a strong influence on the characteristics of the in-flight droplets and then the coatings. The jet divergence is found to be lower than that of the original one (about 12° against 25°). By modified gun, the adhesion strength, the microhardness and porosity of the coating deposited by modified gun are increased by 39% and 9% respectively. And the porosity of the coatings is decreased by 57%.