Microgrids (MGs) and active distribution networks (ADNs) are important platforms for distributed energy resource (DER) consumption. The increasing penetration of DERs has motivated the development ADNs coupled with MG...Microgrids (MGs) and active distribution networks (ADNs) are important platforms for distributed energy resource (DER) consumption. The increasing penetration of DERs has motivated the development ADNs coupled with MGs. This paper proposes a distributedco-optimization method for peer-to-peer (P2P) energy trading and network operation for an ADN integrated with multiple microgrids(MMGs). A framework that optimizes P2P energy trading among MMGs and ADN operations was first established. Subsequently, anenergy management model that aims to minimize the operation and energy trading costs was constructed for each MG. Accordingly, theMMGs’ cooperative game model was established based on Nash bargaining theory to incentivize each stakeholder to participate in P2Penergy trading, and a distributed solution method based on the alternating direction method of multipliers was developed. Moreover, analgorithm that adjusts the amount of energy trading between the ADN and MG is proposed to ensure safe operation of the distributionnetwork. With the communication between the MG and ADN, the MMGs’ P2P trading and ADN operations are optimized in a coordinated manner. Finally, numerical simulations were conducted to verify the accuracy and effectiveness of the proposed method.展开更多
Grid-scale energy storage systems provide effective solutions to address challenges such as supply-load imbalances and voltage violations resulting from the non-coinciding nature of renewable energy generation and pea...Grid-scale energy storage systems provide effective solutions to address challenges such as supply-load imbalances and voltage violations resulting from the non-coinciding nature of renewable energy generation and peak demand incidents.While battery and hydrogen storage are commonly used for peak shaving,ice-based thermal energy storage systems(TESSs)offer a direct way to reduce cooling loads without electrical conversion.This paper presents a multi-objective planning framework that optimizes TESS dispatch,network topology,and photovoltaic(PV)inverter reactive power support to address operational issues in active distribution networks.The objectives of the proposed scheme include minimizing peak demand,voltage deviations,and PV inverter VAr dependency.The mixed-integer nonlinear programming problem is solved using a Pareto-based multi-objective particle swarm optimization(MOPSO)method.The MATLAB-OpenDSS simulations for a modified IEEE-123 bus system show a 7.1%reduction in peak demand,a 13%reduction in voltage deviation,and a 52%drop in PV inverter VAr usage.The obtained solutions confirm minimal operational stress on control devices such as switches and PV inverters.Thus,unlike earlier studies,this work combines all three strategies to offer an effective solution for the operational planning of the active distribution network.展开更多
The optimal operation of water distribution networks under local pipe failures, such as water main breaks, was proposed. Based on a hydraulic analysis and a simulation of water distribution networks, a macroscopic mod...The optimal operation of water distribution networks under local pipe failures, such as water main breaks, was proposed. Based on a hydraulic analysis and a simulation of water distribution networks, a macroscopic model for a network under a local pipe failure was established by the statistical regression. After the operation objectives under a local pipe failure were determined, the optimal operation model was developed and solved by the genetic algorithm. The program was developed and examined by a city distribution network. The optimal operation alternative shows that the electricity cost is saved approximately 11%, the income of the water corporation is increased approximately 5%, and the pressure in the water distribution network is distributed evenly to ensure the network safe operation. Therefore, the proposed method for optimal operation under local pipe failure is feasible and cost-effective.展开更多
A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to...A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.展开更多
In the framework of vigorous promotion of low-carbon power system growth as well as economic globalization,multi-resource penetration in active distribution networks has been advancing fiercely.In particular,distribut...In the framework of vigorous promotion of low-carbon power system growth as well as economic globalization,multi-resource penetration in active distribution networks has been advancing fiercely.In particular,distributed generation(DG)based on renewable energy is critical for active distribution network operation enhancement.To comprehensively analyze the accessing impact of DG in distribution networks from various parts,this paper establishes an optimal DG location and sizing planning model based on active power losses,voltage profile,pollution emissions,and the economics of DG costs as well as meteorological conditions.Subsequently,multiobjective particle swarm optimization(MOPSO)is applied to obtain the optimal Pareto front.Besides,for the sake of avoiding the influence of the subjective setting of the weight coefficient,the decisionmethod based on amodified ideal point is applied to execute a Pareto front decision.Finally,simulation tests based on IEEE33 and IEEE69 nodes are designed.The experimental results show thatMOPSO can achieve wider and more uniformPareto front distribution.In the IEEE33 node test system,power loss,and voltage deviation decreased by 52.23%,and 38.89%,respectively,while taking the economy into account.In the IEEE69 test system,the three indexes decreased by 19.67%,and 58.96%,respectively.展开更多
With the national electrification level getting higher and higher, peoples dependence on electric energy in production and life is also getting higher and higher. Therefore, people will pay more and more attention to ...With the national electrification level getting higher and higher, peoples dependence on electric energy in production and life is also getting higher and higher. Therefore, people will pay more and more attention to the stable operation of the power system. Electricity is also indispensable to the mechanical work in industry, to all kinds of mechanical work in rural areas, and to all kinds of household appliances in daily life. Therefore, to ensure the stable operation of the urban distribution network can not only meet the needs of peoples lives, but also the inevitable needs of economic and social production development. This paper focuses on the in-depth analysis of the operation and management of the urban distribution network, and also gives some suggestions on the operation and management of the county distribution network.展开更多
During the operation of the distribution network, some faults are easy to occur, which is unfavorable to the normal operation of the distribution network to a large extent. This requires the application of operation a...During the operation of the distribution network, some faults are easy to occur, which is unfavorable to the normal operation of the distribution network to a large extent. This requires the application of operation and maintenance to improve the operation quality of the distribution network. In addition, during the period of improvement, the distribution network operation and maintenance learning system is able to fully grasp the equipment operation status, and effectively strengthen the basic distribution network management and emergency repair management during this period, thus realizing the full-cycle management, which avoids the occurrence of potential safety hazards during the operation to a greater extent, and greatly improves the safety and reliability of the distribution network operation.展开更多
In order to cope with the global environmental crisis caused by energy generation and achieve carbon neutrality,it is imperative to promote a new power system dominated by renewable energy sources(RESs).This paper foc...In order to cope with the global environmental crisis caused by energy generation and achieve carbon neutrality,it is imperative to promote a new power system dominated by renewable energy sources(RESs).This paper focuses on the uncertainty of RESs and the distribution characteristics of carbon emission flows(CEFs),and studies the low-carbon operation and power system planning problem.Firstly,this paper extends the uncertainty of RES to the meteorological field and establishes meteorological robust constraints of photovoltaic(PV)generation.Based on the CEF theory,the carbon transmission trajectory is accurately delineated to improve the operation of power system.Considering further constraints from the power flow,CEF,and component operation characteristics of the active distribution network(ADN),this paper formulates a low-carbon joint planning model of ADN with PV,battery energy storage system(BESS),and distributed gas generator(DGG),taking into account economy and carbon reduction.In the case study,the low-carbon planning and operation scheme are analyzed in detail across multiple dimensions including time and space.The solution results show that the planning model can effectively leverage the low-carbon performance of PV and BESS,and improve the distribution of CEF.Through case comparison,the model can also efficiently reduce the total cost of the system and enhance carbon emission reduction benefits by 35.10 to 41.04%.展开更多
针对分布式光伏出力的不确定性对新型配电网合环运行产生的影响,文中提出了一种考虑合环电流约束的新型配电网负荷均衡分布鲁棒优化模型。考虑新型配电网合环电流的稳态约束和暂态约束,建立了新型配电网负荷均衡优化模型。在此基础上,采...针对分布式光伏出力的不确定性对新型配电网合环运行产生的影响,文中提出了一种考虑合环电流约束的新型配电网负荷均衡分布鲁棒优化模型。考虑新型配电网合环电流的稳态约束和暂态约束,建立了新型配电网负荷均衡优化模型。在此基础上,采用K-means聚类对分布式光伏出力历史数据进行聚类,得到具有代表性的典型场景,同时考虑1-范数和∞-范数对置信区间的约束,建立考虑合环电流约束的新型配电网负荷均衡分布鲁棒优化模型。最后采用列与约束生成(column and constraint generation,C&CG)算法对模型进行求解,在改进的IEEE-99节点上进行算例分析,验证了文中所提模型的有效性。展开更多
基金supported by the State Key Laboratory of Technology and Equipment for Defense against Power System Operational Risks Program(grant number SGNR0000KJJS2302139).
文摘Microgrids (MGs) and active distribution networks (ADNs) are important platforms for distributed energy resource (DER) consumption. The increasing penetration of DERs has motivated the development ADNs coupled with MGs. This paper proposes a distributedco-optimization method for peer-to-peer (P2P) energy trading and network operation for an ADN integrated with multiple microgrids(MMGs). A framework that optimizes P2P energy trading among MMGs and ADN operations was first established. Subsequently, anenergy management model that aims to minimize the operation and energy trading costs was constructed for each MG. Accordingly, theMMGs’ cooperative game model was established based on Nash bargaining theory to incentivize each stakeholder to participate in P2Penergy trading, and a distributed solution method based on the alternating direction method of multipliers was developed. Moreover, analgorithm that adjusts the amount of energy trading between the ADN and MG is proposed to ensure safe operation of the distributionnetwork. With the communication between the MG and ADN, the MMGs’ P2P trading and ADN operations are optimized in a coordinated manner. Finally, numerical simulations were conducted to verify the accuracy and effectiveness of the proposed method.
基金supported by the US Appalachian Regional Commission(ARC)under Grant MU-21579-23。
文摘Grid-scale energy storage systems provide effective solutions to address challenges such as supply-load imbalances and voltage violations resulting from the non-coinciding nature of renewable energy generation and peak demand incidents.While battery and hydrogen storage are commonly used for peak shaving,ice-based thermal energy storage systems(TESSs)offer a direct way to reduce cooling loads without electrical conversion.This paper presents a multi-objective planning framework that optimizes TESS dispatch,network topology,and photovoltaic(PV)inverter reactive power support to address operational issues in active distribution networks.The objectives of the proposed scheme include minimizing peak demand,voltage deviations,and PV inverter VAr dependency.The mixed-integer nonlinear programming problem is solved using a Pareto-based multi-objective particle swarm optimization(MOPSO)method.The MATLAB-OpenDSS simulations for a modified IEEE-123 bus system show a 7.1%reduction in peak demand,a 13%reduction in voltage deviation,and a 52%drop in PV inverter VAr usage.The obtained solutions confirm minimal operational stress on control devices such as switches and PV inverters.Thus,unlike earlier studies,this work combines all three strategies to offer an effective solution for the operational planning of the active distribution network.
基金Project(50278062) supported by the National Natural Science Foundation of ChinaProject(003611611)supported by the Natural Science Foundation of Tianjin, China
文摘The optimal operation of water distribution networks under local pipe failures, such as water main breaks, was proposed. Based on a hydraulic analysis and a simulation of water distribution networks, a macroscopic model for a network under a local pipe failure was established by the statistical regression. After the operation objectives under a local pipe failure were determined, the optimal operation model was developed and solved by the genetic algorithm. The program was developed and examined by a city distribution network. The optimal operation alternative shows that the electricity cost is saved approximately 11%, the income of the water corporation is increased approximately 5%, and the pressure in the water distribution network is distributed evenly to ensure the network safe operation. Therefore, the proposed method for optimal operation under local pipe failure is feasible and cost-effective.
文摘A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.
基金The authors gratefully acknowledge the support of the Enhancement Strategy of Multi-Type Energy Integration of Active Distribution Network(YNKJXM20220113).
文摘In the framework of vigorous promotion of low-carbon power system growth as well as economic globalization,multi-resource penetration in active distribution networks has been advancing fiercely.In particular,distributed generation(DG)based on renewable energy is critical for active distribution network operation enhancement.To comprehensively analyze the accessing impact of DG in distribution networks from various parts,this paper establishes an optimal DG location and sizing planning model based on active power losses,voltage profile,pollution emissions,and the economics of DG costs as well as meteorological conditions.Subsequently,multiobjective particle swarm optimization(MOPSO)is applied to obtain the optimal Pareto front.Besides,for the sake of avoiding the influence of the subjective setting of the weight coefficient,the decisionmethod based on amodified ideal point is applied to execute a Pareto front decision.Finally,simulation tests based on IEEE33 and IEEE69 nodes are designed.The experimental results show thatMOPSO can achieve wider and more uniformPareto front distribution.In the IEEE33 node test system,power loss,and voltage deviation decreased by 52.23%,and 38.89%,respectively,while taking the economy into account.In the IEEE69 test system,the three indexes decreased by 19.67%,and 58.96%,respectively.
文摘With the national electrification level getting higher and higher, peoples dependence on electric energy in production and life is also getting higher and higher. Therefore, people will pay more and more attention to the stable operation of the power system. Electricity is also indispensable to the mechanical work in industry, to all kinds of mechanical work in rural areas, and to all kinds of household appliances in daily life. Therefore, to ensure the stable operation of the urban distribution network can not only meet the needs of peoples lives, but also the inevitable needs of economic and social production development. This paper focuses on the in-depth analysis of the operation and management of the urban distribution network, and also gives some suggestions on the operation and management of the county distribution network.
文摘During the operation of the distribution network, some faults are easy to occur, which is unfavorable to the normal operation of the distribution network to a large extent. This requires the application of operation and maintenance to improve the operation quality of the distribution network. In addition, during the period of improvement, the distribution network operation and maintenance learning system is able to fully grasp the equipment operation status, and effectively strengthen the basic distribution network management and emergency repair management during this period, thus realizing the full-cycle management, which avoids the occurrence of potential safety hazards during the operation to a greater extent, and greatly improves the safety and reliability of the distribution network operation.
基金supported by the Key Program of National Natural Science Foundation of China under Grant 52130702.
文摘In order to cope with the global environmental crisis caused by energy generation and achieve carbon neutrality,it is imperative to promote a new power system dominated by renewable energy sources(RESs).This paper focuses on the uncertainty of RESs and the distribution characteristics of carbon emission flows(CEFs),and studies the low-carbon operation and power system planning problem.Firstly,this paper extends the uncertainty of RES to the meteorological field and establishes meteorological robust constraints of photovoltaic(PV)generation.Based on the CEF theory,the carbon transmission trajectory is accurately delineated to improve the operation of power system.Considering further constraints from the power flow,CEF,and component operation characteristics of the active distribution network(ADN),this paper formulates a low-carbon joint planning model of ADN with PV,battery energy storage system(BESS),and distributed gas generator(DGG),taking into account economy and carbon reduction.In the case study,the low-carbon planning and operation scheme are analyzed in detail across multiple dimensions including time and space.The solution results show that the planning model can effectively leverage the low-carbon performance of PV and BESS,and improve the distribution of CEF.Through case comparison,the model can also efficiently reduce the total cost of the system and enhance carbon emission reduction benefits by 35.10 to 41.04%.
文摘针对分布式光伏出力的不确定性对新型配电网合环运行产生的影响,文中提出了一种考虑合环电流约束的新型配电网负荷均衡分布鲁棒优化模型。考虑新型配电网合环电流的稳态约束和暂态约束,建立了新型配电网负荷均衡优化模型。在此基础上,采用K-means聚类对分布式光伏出力历史数据进行聚类,得到具有代表性的典型场景,同时考虑1-范数和∞-范数对置信区间的约束,建立考虑合环电流约束的新型配电网负荷均衡分布鲁棒优化模型。最后采用列与约束生成(column and constraint generation,C&CG)算法对模型进行求解,在改进的IEEE-99节点上进行算例分析,验证了文中所提模型的有效性。