Contract Net Protocol (CNP) has been widely used in solving the problems of multi-Agent cooperates and reservoir flood control optimization dispatch. This paper designs an Agent functional module based on the multi-Ag...Contract Net Protocol (CNP) has been widely used in solving the problems of multi-Agent cooperates and reservoir flood control optimization dispatch. This paper designs an Agent functional module based on the multi-Agent coordinated the construction of reservoir flood control optimization dispatch and the corresponding Agent to solve the problem of classical CNP in the Agent communication aspect, to enhance the efficiency of reservoir optimization dispatch and to improve the insufficiency of the classical CNP in the application of reservoir flood control dispatcher. Then, the capacity factor and the cooperation level are introduced in the module. Experiments are conducted on the Agentbuilder simulation platform to simulate reservoir flood control optimization dispatching with the improved CNP. The simulation results show the communication interactive efficiency and the performance of new protocol is superior to those of the classical CNP.展开更多
According to the demand of modern surface mine production, production, a multi-objective optimum dispatchingmodel is set up in this paper, it includes overall comprehensive optimal model, the goal programming model to...According to the demand of modern surface mine production, production, a multi-objective optimum dispatchingmodel is set up in this paper, it includes overall comprehensive optimal model, the goal programming model to optimize truck fleet in mine haulage system, and the selection of real time dispatching criteria. A surface coal mineis studied as a case in a built system simulation mantel, and the simulation result shows that the model is correct.展开更多
A kind of dispatch method for power system eigenvalue control is proposed-in this paper. With the help of this method, not only the low-frequency oscillation of a power system can be prevented and controlled, but also...A kind of dispatch method for power system eigenvalue control is proposed-in this paper. With the help of this method, not only the low-frequency oscillation of a power system can be prevented and controlled, but also the probabilistic power oscillatoin on the interconnection lines of an interconnected power system can be reduced. The proposed method has the advantages of high calculation speed and good convergency. Therefore, the method has much prospect of on-line application.展开更多
Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid...Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid planning and construction, and will make a heavy impact on the safe and reliable operation of power systems. To deal with the diff iculties of large scale wind power dispatch, this paper presents a new automatic generation control (AGC) scheme that involves the participation of wind farms. The scheme is based on ultra-short-term wind power forecast. The author establishes a generation output distribution optimization mode for the power system with wind farms and verif ies the feasibility of the scheme by an example.展开更多
Besides common characteristics of wind power,there are some special characteristics in China power system,including large-scale,long distance transmission and lack of flexible regulating power sources.These special ch...Besides common characteristics of wind power,there are some special characteristics in China power system,including large-scale,long distance transmission and lack of flexible regulating power sources.These special characteristics make power dispatch more challenging in China.Many studies have been carried out and some improvements are presented including wind power monitoring and control as well as evaluation of wind power integration capabilities.As a demonstration project,the technologies are integrated into the energy management system and are implemented in the Northwest China power system.They provide effective measures for wind power dispatch in the grid.展开更多
The power grid is a fusion of technologies in energy systems, and how to adjust and control the output power of each generator to balance the load of the grid is a crucial issue. As a platform, the smart grid is for t...The power grid is a fusion of technologies in energy systems, and how to adjust and control the output power of each generator to balance the load of the grid is a crucial issue. As a platform, the smart grid is for the convenience of the implementation of adaptive control generators using advanced technologies. In this paper, we are introducing a new approach, the Central Lower Configuration Table, which optimizes dispatch of the generating capacity in a smart grid power system. The dispatch strategy of each generator in the grid is presented in the configuration table, and the scenario consists of two-level agents. A central agent optimizes dispatch calculation to get the configuration table, and a lower agent controls generators according to the tasks of the central level and the work states during generation. The central level is major optimization and adjustment. We used machine learning to predict the power load and address the best optimize cost function to deal with a different control strategy. We designed the items of the cost function, such as operations, maintenances and the effects on the environment. Then, according to the total cost, we got a new second-rank-sort table. As a result, we can resolve generator’s task based on the table, which can also be updated on-line based on the environmental situation. The signs of the driving generator’s controller include active power and system’s f. The lower control level agent carries out the generator control to track f along with the best optimized cost function. Our approach makes optimized dispatch algorithm more convenient to realize, and the numerical simulation indicates the strategy of machine learning forecast of optimized power dispatch is effective.展开更多
文摘Contract Net Protocol (CNP) has been widely used in solving the problems of multi-Agent cooperates and reservoir flood control optimization dispatch. This paper designs an Agent functional module based on the multi-Agent coordinated the construction of reservoir flood control optimization dispatch and the corresponding Agent to solve the problem of classical CNP in the Agent communication aspect, to enhance the efficiency of reservoir optimization dispatch and to improve the insufficiency of the classical CNP in the application of reservoir flood control dispatcher. Then, the capacity factor and the cooperation level are introduced in the module. Experiments are conducted on the Agentbuilder simulation platform to simulate reservoir flood control optimization dispatching with the improved CNP. The simulation results show the communication interactive efficiency and the performance of new protocol is superior to those of the classical CNP.
文摘According to the demand of modern surface mine production, production, a multi-objective optimum dispatchingmodel is set up in this paper, it includes overall comprehensive optimal model, the goal programming model to optimize truck fleet in mine haulage system, and the selection of real time dispatching criteria. A surface coal mineis studied as a case in a built system simulation mantel, and the simulation result shows that the model is correct.
文摘A kind of dispatch method for power system eigenvalue control is proposed-in this paper. With the help of this method, not only the low-frequency oscillation of a power system can be prevented and controlled, but also the probabilistic power oscillatoin on the interconnection lines of an interconnected power system can be reduced. The proposed method has the advantages of high calculation speed and good convergency. Therefore, the method has much prospect of on-line application.
文摘Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid planning and construction, and will make a heavy impact on the safe and reliable operation of power systems. To deal with the diff iculties of large scale wind power dispatch, this paper presents a new automatic generation control (AGC) scheme that involves the participation of wind farms. The scheme is based on ultra-short-term wind power forecast. The author establishes a generation output distribution optimization mode for the power system with wind farms and verif ies the feasibility of the scheme by an example.
基金supported by National Natural Science Foundation of China(No.51177019,61074100,60974036)Doctoral Fund of Ministry of Education of China(No.20090092110020)and the State Grid Corporation of China
文摘Besides common characteristics of wind power,there are some special characteristics in China power system,including large-scale,long distance transmission and lack of flexible regulating power sources.These special characteristics make power dispatch more challenging in China.Many studies have been carried out and some improvements are presented including wind power monitoring and control as well as evaluation of wind power integration capabilities.As a demonstration project,the technologies are integrated into the energy management system and are implemented in the Northwest China power system.They provide effective measures for wind power dispatch in the grid.
文摘The power grid is a fusion of technologies in energy systems, and how to adjust and control the output power of each generator to balance the load of the grid is a crucial issue. As a platform, the smart grid is for the convenience of the implementation of adaptive control generators using advanced technologies. In this paper, we are introducing a new approach, the Central Lower Configuration Table, which optimizes dispatch of the generating capacity in a smart grid power system. The dispatch strategy of each generator in the grid is presented in the configuration table, and the scenario consists of two-level agents. A central agent optimizes dispatch calculation to get the configuration table, and a lower agent controls generators according to the tasks of the central level and the work states during generation. The central level is major optimization and adjustment. We used machine learning to predict the power load and address the best optimize cost function to deal with a different control strategy. We designed the items of the cost function, such as operations, maintenances and the effects on the environment. Then, according to the total cost, we got a new second-rank-sort table. As a result, we can resolve generator’s task based on the table, which can also be updated on-line based on the environmental situation. The signs of the driving generator’s controller include active power and system’s f. The lower control level agent carries out the generator control to track f along with the best optimized cost function. Our approach makes optimized dispatch algorithm more convenient to realize, and the numerical simulation indicates the strategy of machine learning forecast of optimized power dispatch is effective.