The method for optimizing the hydraulic fracturing parameters of the cube development infill well pad was proposed,aiming at the well pattern characteristic of“multi-layer and multi-period”of the infill wells in Sic...The method for optimizing the hydraulic fracturing parameters of the cube development infill well pad was proposed,aiming at the well pattern characteristic of“multi-layer and multi-period”of the infill wells in Sichuan Basin.The fracture propagation and inter-well interference model were established based on the evolution of 4D in-situ stress,and the evolution characteristics of stress and the mechanism of interference between wells were analyzed.The research shows that the increase in horizontal stress difference and the existence of natural fractures/faults are the main reasons for inter-well interference.Inter-well interference is likely to occur near the fracture zones and between the infill wells and parent wells that have been in production for a long time.When communication channels are formed between the infill wells and parent wells,it can increase the productivity of parent wells in the short term.However,it will have a delayed negative impact on the long-term sustained production of both infill wells and parent wells.The change trend of in-situ stress caused by parent well production is basically consistent with the decline trend of pore pressure.The lateral disturbance range of in-situ stress is initially the same as the fracture length and reaches 1.5 to 1.6 times that length after 2.5 years.The key to avoiding inter-well interference is to optimize the fracturing parameters.By adopting the M-shaped well pattern,the optimal well spacing for the infill wells is 300 m,the cluster spacing is 10 m,and the liquid volume per stage is 1800 m^(3).展开更多
Key technologies that make productivity increase are revealed through analyzing the best practices and production data in major shale basins of North America.Trends of the key technologies and optimization designs for...Key technologies that make productivity increase are revealed through analyzing the best practices and production data in major shale basins of North America.Trends of the key technologies and optimization designs for shale oil and gas development are summarized and analyzed based on drilling and completion operations and well data.These technologies mainly include:(1)Optimizing well design and hydraulic fracturing design,including reducing cluster spacing,increasing proppant and fracturing fluid volumes,optimizing horizontal well lateral length and fracture stage length.The most effective method is to reduce cluster spacing to an optimized length.The second most effective method is to optimally increase proppant volumes.(2)Placing horizontal wells in the sweet spots and drilling the wells parallel or close to the minimum horizontal stress direction.(3)Using cube development with optimized well spacing to maximize resource recovery and reduce well interferences.Plus,in-situ stress impacts on hydraulic fracture propagation and hydrocarbon production are addressed.Determination of formation breakdown pressure is studied by considering the impacts of in-situ stresses,drilling and perforation directions.Whether or not the hydraulic fracturing can generate orthogonal fracture networks is also discussed.The key technologies and optimization design parameters proposed in this paper can be applied to guide new well placement,drilling and completion designs,and hydraulic fracture operations to increase productivity.展开更多
基金Supported by the General Program of the NATIONAL NATURAL SCIENCE FOUNDATION OF CHINA(52374004)National Key Research and Development Program(2023YFF06141022023YFE0110900)。
文摘The method for optimizing the hydraulic fracturing parameters of the cube development infill well pad was proposed,aiming at the well pattern characteristic of“multi-layer and multi-period”of the infill wells in Sichuan Basin.The fracture propagation and inter-well interference model were established based on the evolution of 4D in-situ stress,and the evolution characteristics of stress and the mechanism of interference between wells were analyzed.The research shows that the increase in horizontal stress difference and the existence of natural fractures/faults are the main reasons for inter-well interference.Inter-well interference is likely to occur near the fracture zones and between the infill wells and parent wells that have been in production for a long time.When communication channels are formed between the infill wells and parent wells,it can increase the productivity of parent wells in the short term.However,it will have a delayed negative impact on the long-term sustained production of both infill wells and parent wells.The change trend of in-situ stress caused by parent well production is basically consistent with the decline trend of pore pressure.The lateral disturbance range of in-situ stress is initially the same as the fracture length and reaches 1.5 to 1.6 times that length after 2.5 years.The key to avoiding inter-well interference is to optimize the fracturing parameters.By adopting the M-shaped well pattern,the optimal well spacing for the infill wells is 300 m,the cluster spacing is 10 m,and the liquid volume per stage is 1800 m^(3).
文摘Key technologies that make productivity increase are revealed through analyzing the best practices and production data in major shale basins of North America.Trends of the key technologies and optimization designs for shale oil and gas development are summarized and analyzed based on drilling and completion operations and well data.These technologies mainly include:(1)Optimizing well design and hydraulic fracturing design,including reducing cluster spacing,increasing proppant and fracturing fluid volumes,optimizing horizontal well lateral length and fracture stage length.The most effective method is to reduce cluster spacing to an optimized length.The second most effective method is to optimally increase proppant volumes.(2)Placing horizontal wells in the sweet spots and drilling the wells parallel or close to the minimum horizontal stress direction.(3)Using cube development with optimized well spacing to maximize resource recovery and reduce well interferences.Plus,in-situ stress impacts on hydraulic fracture propagation and hydrocarbon production are addressed.Determination of formation breakdown pressure is studied by considering the impacts of in-situ stresses,drilling and perforation directions.Whether or not the hydraulic fracturing can generate orthogonal fracture networks is also discussed.The key technologies and optimization design parameters proposed in this paper can be applied to guide new well placement,drilling and completion designs,and hydraulic fracture operations to increase productivity.