期刊文献+
共找到10篇文章
< 1 >
每页显示 20 50 100
Integration and horizontal testing of the CSNS-II double-spoke cavity cryomodule
1
作者 Wei-Min Pan Wen-Zhong Zhou +36 位作者 Fei-Si He Rui Ge Miao-Fu Xu Zheng-Hui Mi Jin Dai Ye Han Mei Li Zhe-Xin Xie Ming Liu Qun-Yao Wang Hai-Ying Lin Bai-Qi Liu Xiao-Long Wang Zhen-Qiang He Tong-Ming Huang Qiang Ma Xu Chen Min-Jing Sang Ke-Yu Zhu Tong-Xian Zhao Chang-Cheng Ma Rui Ye Zheng-Ze Chang Liang-Rui Sun Meng-Xu Fan Cong Zhang Hua-Chang Liu Zhen-Cheng Mu Tong Wang Bin Ye Yang Meng Lin-Yang Rong Hui Zhang Bo Wang Ma-Liang Wan Yun Wang Sheng Wang 《Nuclear Science and Techniques》 2025年第8期67-97,共31页
The China Spallation Neutron Source(CSNS)is the fourth pulsed accelerator-driven neutron source in the world,and it achieved its design target of 100 kW in 2020.The planned China Spallation Neutron Source Phase II(CSN... The China Spallation Neutron Source(CSNS)is the fourth pulsed accelerator-driven neutron source in the world,and it achieved its design target of 100 kW in 2020.The planned China Spallation Neutron Source Phase II(CSNS-II)commenced in 2024.The CSNS-II linac design primarily involves the addition of a radio-frequency ion source and a section of a superconducting linear accelerator composed of two types of superconducting cavities,namely double-spoke and six-cell elliptical cavities,after the drift tube linac(DTL).The development of the double-spoke superconducting cavity began in early 2021,and by January 2023,the welding,post-processing,and vertical tests of two 324 MHz double-spoke cavity prototypes were completed,with vertical test gradients of 11.6 and 15 MV/m,and Q_(0)≥3×10^(10)@E_(acc)≤10 MV/m.The R&D of the cryomodule began in January 2022.In October 2023,the clean assembly of the double-spoke cavity string and cold mass installation of the cryomodule commenced,with the installation of the cryomodule and valve box completing in two months.In January 2024,a horizontal test of the cryomodule was completed,making it the first double-spoke cavity cryomodule in China.The test results showed that the maximum gradients of the two superconducting cavities at a pulse width of 4 ms and repetition frequency of 25 Hz were 12.8 and 15.2 MV/m,respectively.This article provides a detailed introduction to the double-spoke superconducting cavity,tuner,coupler,and cryomodule,elaborates on the clean assembly of the cavity string and cold mass installation of the cryomodule,and provides a detailed analysis of the horizontal test results. 展开更多
关键词 Double-spoke cavity cryomodule Cavity string Vertical test Horizontal test
在线阅读 下载PDF
Ultra-high quality factor and ultra-high accelerating gradient achievements in a 1.3 GHz continuous wave cryomodule
2
作者 Jin-Fang Chen Yue Zong +35 位作者 Xiao-Yun Pu Sheng-Wang Xiang Shuai Xing Zheng Li Xu-Ming Liu Yan-Fei Zhai Xiao-Wei Wu Yong-Zhou He Ling-Ling Gong Ji-Dong Zhang Shan-Shan Cao Wen-Ding Fang Bin-Tuan Zhang Kai Xu Yi-Bo Yu Guang-Hua Chen Li-Jun Lu Ya-Wei Huang Shen-Jie Zhao Hong-Tao Hou Zhen-Yu Ma Ye-Liang Zhao Xiang Zheng Jiu-Ce Sun Sen Sun Zhi-Qiang Jiang Yu-Bin Zhao Meng Zhang Ying-Bing Yan Yi-Yong Liu Qiang Gu Bo Liu Li-Xin Yin Dong Wang Hai-Xiao Deng Zhen-Tang Zhao 《Nuclear Science and Techniques》 2025年第2期18-26,共9页
We report the world-leading performance of a 1.3 GHz cryomodule equipped with eight 9-cell superconducting radio-frequency cavities that underwent a medium-temperature furnace baking process.During continuous wave hor... We report the world-leading performance of a 1.3 GHz cryomodule equipped with eight 9-cell superconducting radio-frequency cavities that underwent a medium-temperature furnace baking process.During continuous wave horizontal testing,these cavities achieved unprecedented average intrinsic quality factors of 4.0×10^(10)at 20 MV/m and 3.2×10^(10)at 29 MV/m,with no instances of field emission.The cryomodule demonstrates near-complete preservation of ultra-high quality factors and ultra-high accelerating gradients from vertical to horizontal testing,marking a significant milestone in continuous-wave superconducting radio-frequency accelerator technology.This letter presents the cryomodule development experience,includ-ing cavity preparation,cryomodule assembly,degaussing,fast cooldown,and performance testing. 展开更多
关键词 SRF cryomodule Mid-T baking High quality factor High accelerating gradient
在线阅读 下载PDF
Alignment of beam position monitors in cryomodule of CADS injector Ⅱ 被引量:3
3
作者 Jian-Dong Yuan Yuan He +7 位作者 Bin Zhang Jun-Hui Zhang Jun-Xia Wu Yong Zhang Feng-Feng Wang Jun-Jie Yao Guo-Zhen Sun Yu-Qin Wan 《Nuclear Science and Techniques》 SCIE CAS CSCD 2017年第6期95-100,共6页
Significant temperature difference(300-77 K or even 4 K) can cause large deformations and displacements of the beam position monitors(BPMs),which affect BPMs measurement resolution or even cause their malfunction in c... Significant temperature difference(300-77 K or even 4 K) can cause large deformations and displacements of the beam position monitors(BPMs),which affect BPMs measurement resolution or even cause their malfunction in cryogenic situations.In this paper,to check the offset from the mechanical to electrical center in low temperature(77 K),Fourier's law and finite element method are used to simulate cryo-deformation.Laser tracker and micro-alignment telescope are employed in combined BPM calibration,installation and monitoring.The calibration error is<0.02 mm,and the installation and monitoring precision are 0.06 mm and 0.01 mm,respectively.The monitored cryo-deformation agrees well with the simulation results.These indicate that the combined alignment can improve performance of the BPM system.All these guaranteed the success of running the 9.55 MeV@2.14 mA cw protons. 展开更多
关键词 BEAM POSITION MONITORS ALIGNMENT Fourier’s LAW cryomodule CADS ANSYS
在线阅读 下载PDF
Thermal simulation and analysis of the STF cryomodule 被引量:4
4
作者 徐庆金 Ohuchi Norihito +4 位作者 Kiyosumi Tsuchiya Tsai Ming-Hsun 宗占国 翟纪元 高杰 《Chinese Physics C》 SCIE CAS CSCD 2009年第3期236-239,共4页
STF is a superconducting RF test facility constructed at the high energy accelerator research Organization of Japan (KEK), as a main part of a R&D project for the proposed International Linear Collider (ILC) in A... STF is a superconducting RF test facility constructed at the high energy accelerator research Organization of Japan (KEK), as a main part of a R&D project for the proposed International Linear Collider (ILC) in Asia. Thermal study of the STF 1.3 GHz 9-cell cavity cryomodule was carried out within a collaboration between China and Japan. Static and dynamic thermal behaviors of the STF cryomodule were simulated and analyzed with the FEM method, and some simulation results were compared with the available experimental data. This paper presents the details. 展开更多
关键词 STF cryomodule thermal simulation ILC
原文传递
Development of a China test cryomodule for ILC
5
作者 徐庆金 翟纪元 +9 位作者 李春华 孙毅 侯治龙 高杰 赵同宪 熊联友 陆文海 宗占国 刘立强 张亮 《Chinese Physics C》 SCIE CAS CSCD 2009年第1期77-80,共4页
Research and development of a 1.3 GHz 9-cell cavity test cryomodule were carried out by a collaboration group between IHEP (Institute of High Energy Physics) and TIPC (Technical Institute of Physics and Chemistry)... Research and development of a 1.3 GHz 9-cell cavity test cryomodule were carried out by a collaboration group between IHEP (Institute of High Energy Physics) and TIPC (Technical Institute of Physics and Chemistry) in China. The cryomodule is a "test model" for the ILC cryomodule, and a key component of a superconducting accelerator test unit which will be built in the near future, also can be used as a horizontal test facility for 1.3 GHz 9-cell cavities. This paper presents the development status of the cryomodule, including structure design, cryogenic flow diagram, thermal and mechanical simulations, heat load estimation and etc. 展开更多
关键词 cryomodule 1.3 GHz cavity ILC test model
原文传递
ADS Injector-I 2 K superfluid helium cryogenic system 被引量:8
6
作者 Rui Ge Shao-Peng Li +14 位作者 Rui-Xiong Han Miao-Fu Xu Liang-Rui Sun Min-Jing Sang Rui Ye Zhuo Zhang Jie-Hao Zhang Xiang-Zhen Zhang Lin Bian Jian-Qin Zhang Mei Li Chang-Cheng Ma Zheng-Ze Chang Tong-Xian Zhao Yong-Cheng Jiang 《Nuclear Science and Techniques》 SCIE CAS CSCD 2020年第4期79-92,共14页
The Accelerator Driven Sub-critical(ADS)system is a strategic plan to solve the nuclear waste problem for nuclear power plants in China.High-energy particle accelerators and colliders contain long strings of supercond... The Accelerator Driven Sub-critical(ADS)system is a strategic plan to solve the nuclear waste problem for nuclear power plants in China.High-energy particle accelerators and colliders contain long strings of superconducting devices,superconducting radio frequency cavities,and magnets,which may require cooling by 2 K superfluid helium(HeliumⅡ).2 K superfluid helium cryogenic system has become a research hot spot in the field of superconducting accelerators.In this study,the ADS Injector-I 2 K cryogenic system is examined in detail.The cryogenic system scheme design,key equipment,and technology design,such as the 2 K Joule–Thomson(J–T)heat exchanger and cryomodules CM1+CM2 design,are examined,in addition to the commissioning and operation of the cryogenic system.The ADS Injector-I 2 K cryogenic system is the first 100 W superfluid helium system designed and built independently in China.The ADS proton beam reached 10 Me V at 10 m A in July 2016 and 10 Me V at 2 m A in continuous mode in January 2017 and has been operated reliably for over 15,000 h,proving that the design of ADS Injector-I 2 K cryogenic system,the key equipment,and technology research are reasonable,reliable,and meet the requirements.The research into key technologies provides valuable engineering experience that can be helpful for future projects such as CI-ADS(China Initiative Accelerator-Driven System),SHINE(Shanghai High Repetition Rate XFEL and Extreme Light Facility),PAPS(Platform of Advanced Photon Source Technology),and CEPC(Circular Electron-Positron Collider),thereby developing national expertise in the field of superfluid helium cryogenic systems. 展开更多
关键词 ADS SUPERFLUID HELIUM CRYOGENIC system cryomodule J–T heat EXCHANGER
在线阅读 下载PDF
High RF power tests of the first 1.3 GHz fundamental power coupler prototypes for the SHINE project 被引量:4
7
作者 Zhen-Yu Ma Shen-Jie Zhao +9 位作者 Xu-Ming Liu Yue-Chao Yu Hong-Ru Jiang Xiang Zheng Qiang Chang Zi-Gang Zhang Kai Xu Yan Wang Yu-Bin Zhao Hong-Tao Hou 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2022年第1期107-119,共13页
The Shanghai High Repetition Rate XFEL and Extreme Light Facility(SHINE)project will use 6001.3 GHz fundamental power couplers,which are modified based on TTF-Ⅲ power couplers,for continuous-wave operation with input... The Shanghai High Repetition Rate XFEL and Extreme Light Facility(SHINE)project will use 6001.3 GHz fundamental power couplers,which are modified based on TTF-Ⅲ power couplers,for continuous-wave operation with input power up to approximately 7 kW.The first batch of 20 sets of 1.3 GHz coupler prototypes was fabricated from three domestic manufacturers for the SHINE project.To better characterize the radio frequency conditioning phenomena for validating the performance of power couplers,a room temperature test stand was designed,constructed,and commissioned for the SHINE 1.3 GHz power couplers.In addition,a horizontal test cryostat was built to test the 1.3 GHz superconducting cavities,fundamental power couplers,tuners,and other components as a set.The results of these tests indicate that the 1.3 GHz couplers are capable of handling up to 14 kW continuous waves.Herein,the main aspects of the radio frequency design and construction of the test stand,along with the test results of the high-power conditioning of the 1.3 GHz couplers,are described. 展开更多
关键词 Superconducting accelerating cryomodule 1.3 GHz fundamental power coupler RF conditioning Test bench Horizontal test cryostat
在线阅读 下载PDF
Cryogenic system design for HIAF iLinac 被引量:2
8
作者 Xiao-Fei Niu Feng Bai +3 位作者 Xian-Jin Wang Jun-Hui Zhang Xiao-Hong Guo Da-Ming Sun 《Nuclear Science and Techniques》 SCIE CAS CSCD 2019年第12期48-57,共10页
A helium cryogenic system is designed by the Institute of Modern Physics,Chinese Academy of Sciences,to supply different cooling powers to the cryomodules of ion-Linac(iLinac)accelerator,which serves as the injector o... A helium cryogenic system is designed by the Institute of Modern Physics,Chinese Academy of Sciences,to supply different cooling powers to the cryomodules of ion-Linac(iLinac)accelerator,which serves as the injector of the High Intensity Heavy-Ion Accelerator Facility project.The iLinac is a superconducting heavy-ion accelerator approximately 100 m long and contains 13 cryomodules cooled by superfluid helium.This article describes the cryogenic system design of the iLinac accelerator.The requirements of the cryogenic system,such as cooling mode,refrigeration temperature,operating pressure and pressure stability,are introduced and described in detail.In addition,heat loads from different sources are analyzed and calculated quantitatively.An equivalent cooling capacity of 10 kW at 4.5 K was determined for the cryogenic system according to the total heat load.Furthermore,a system process design was conducted and analyzed in detail.Further,the system layout and the main equipment are presented. 展开更多
关键词 Ion-Linac(iLinac)accelerator SUPERFLUID liquid HELIUM CRYOGENIC system cryomodule
在线阅读 下载PDF
Design optimization of 3.9GHz fundamental power coupler for the SHINE project 被引量:3
9
作者 Zhen-Yu Ma Jin-Fang Chen 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2021年第11期174-190,共17页
The third harmonic superconducting cryomodule is being designed for the Shanghai High repetition rate XFEL and Extreme light facility(SHINE)project,which is under construction.In contrast to the European X-ray Free El... The third harmonic superconducting cryomodule is being designed for the Shanghai High repetition rate XFEL and Extreme light facility(SHINE)project,which is under construction.In contrast to the European X-ray Free Electron Laser(E-XFEL)project,the 3.9 GHz cryomodules in the SHINE project will operate in the continuous wave regime with higher radio frequency average power for both cavities and couplers.We propose a 3.9 GHz fundamental power coupler with an adjustable antenna length,for satisfying the SHINE project requirements.Here,we describe the 3.9 GHz fundamental power coupler's design considerations and power requirements for various operating modes of the SHINE Linac.We also present the results of the radio frequency simulation and optimization,including the studies on multipacting and thermal analysis of the proposed 3.9 GHz coupler. 展开更多
关键词 3.9 GHz fundamental power coupler Third harmonic cavity Superconducting cryomodule XFEL and extreme light facility(SHINE)Linac
在线阅读 下载PDF
Status of the IHEP 1.3 GHz superconducting RF program 被引量:1
10
作者 GAO Jie ZHAI JiYuan +16 位作者 PAN WeiMing LI ShaoPeng SUN Yi DAI JianPing CHI YunLong LI ZhongQuan ZHAO TongXian HUANG TongMing MA Qiang GE Rui LI ChunHua GUO HaiSheng WANG GuangWei QIU Feng LIN HaiYing HOU Mi WANG QunYao 《Science China(Physics,Mechanics & Astronomy)》 SCIE EI CAS 2011年第S2期154-159,共6页
The 1.3 GHz superconducting radio-frequency (SRF) technology is one of the key technologies for the ILC and future XFEL and ERL projects in China. With the aim to develop 1.3 GHz SRF technology, IHEP has started a pro... The 1.3 GHz superconducting radio-frequency (SRF) technology is one of the key technologies for the ILC and future XFEL and ERL projects in China. With the aim to develop 1.3 GHz SRF technology, IHEP has started a program to build an SRF Accelerating Unit. This unit contains a 9-cell 1.3 GHz superconducting cavity, a short cryomodule, a high power input coupler, a tuner and a low level RF system. This program also includes the SRF laboratory upgrade, which will permit the unit to be built and tested at IHEP. The unit will be used for the 1.3 GHz SRF system integration study, high power horizontal test and possible beam test in the future. In this paper, we report the recent R&D status of this program. The first large grain low-loss shape 9-cell superconducting RF cavity made by IHEP reached 20 MV/m in the first vertical test in July, 2010. The prototype tuner and low level RF (LLRF) system are under test. The high power input coupler and cryomodule are under fabrication. Several key SRF facilities for 9-cell cavity surface treatment and pre-tuning were successfully commissioned and are in operation. 展开更多
关键词 1.3 GHZ SUPERCONDUCTING RF 9-cell CAVITY high power input COUPLER TUNER LLRF cryomodule
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部