Practice and Exploration of Critical Path Management from the Perspective of Total Construction Period
1
作者 Songlin Chen 《Journal of Architectural Research and Development》 2025年第4期77-83,共7页
This article focuses on the overall construction duration,explaining the core role of the critical path method and its relationship with the total construction period.It analyzes the factors influencing the total cons... This article focuses on the overall construction duration,explaining the core role of the critical path method and its relationship with the total construction period.It analyzes the factors influencing the total construction duration,introduces the application of BIM and other technologies in identifying and managing critical paths,emphasizes the importance of optimizing resource allocation,and illustrates measures to address disruptions through practical examples.Additionally,it discusses the evaluation system and incentive mechanisms. 展开更多
关键词 Total construction period Critical line Resource allocation
在线阅读 下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
2
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model South-to-North Water Diversion Project
在线阅读 下载PDF
Experimental study on stability of sunken large diameter cylindrical structure on sandy seabed during construction period 被引量:1
3
作者 秦崇仁 庞红犁 +1 位作者 李世森 张伟 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2002年第4期581-595,共15页
A systematic experimental research work is done for the stability of sunken large diameter cylinder during construction period. It is the first research that gives the method for assessing the stability of the larger ... A systematic experimental research work is done for the stability of sunken large diameter cylinder during construction period. It is the first research that gives the method for assessing the stability of the larger diameter cylindrical structure, a set of values is derived also for the critical stability indices of the large diameter cylinder sunken to the sandy seabed. 展开更多
关键词 Sunken large diameter cylinder sandy seabed stability during construction period assessing method critical stability index
在线阅读 下载PDF
Target for Power Construction in 9th Five-year Plan Period Set-up
4
《Electricity》 1996年第4期19-19,共1页
According to the National Meeting on Power Construction and Cost Control held in Beijing on 26th August 1996, the target for power construction in the period of 9th Five- year Plan is set-up as follows:
关键词 In Target for Power Construction in 9th Five-year Plan period Set-up
在线阅读 下载PDF
Trial Demonstration of SupervisionDuring the Quality Guaranteed Period in Construction of Power Plant
5
作者 Peng Shumei Yu Baoxing(Northwest Electric Beijing-Sargent & LundyPower Design Institute Power Engineering Co.. Ltd.) 《Electricity》 1998年第3期34-37,共4页
The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the mon... The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the monitor of the operation and maintenance of power plant,organization of subcontractor to treat the problems and defects occurred in the field in time, technical consultancy and communication in time, delivery of spare parts, and assistance of clearing Contractor’s quality deposit. It is proved by the practice that it is necessary to early out the supervision during quality guaranteed period. 展开更多
关键词 Trial Demonstration of SupervisionDuring the Quality Guaranteed period in Construction of Power Plant
在线阅读 下载PDF
Optimization of key technologies of penstock shaft construction for a pumped storage power station 被引量:2
6
作者 ZHENG Jingxing CHEN Jianhua +4 位作者 HUANG Wenfeng YIN Jingke ZHANG Peng ZHANG Rui XIONG Fuyou 《水利水电技术(中英文)》 北大核心 2024年第S2期329-339,共11页
Completing the principal engineering components of a pumped storage power station spans between 50 and 60 months,from the inception of construction to the commencement of power generation by the first unit.The filling... Completing the principal engineering components of a pumped storage power station spans between 50 and 60 months,from the inception of construction to the commencement of power generation by the first unit.The filling of the penstock with water represents a critical phase preceding the production of electricity by the first unit.During this interval,the construction of the diversion shaft presents multiple challenges,including intricate construction procedures,considerable construction difficulty,elevated safety risks,and quality control issues.To address this issue,this study uses CFD software to analyze the flow field,pressure gradient,and head loss of shaft curved section with different curvature radius,and examines several key technologies by drawing on the practice of diversion shaft construction at the Meizhou pumped storage power station.These technologies include optimizing the curvature radius of the curved section of diversion shaft,reverse-well excavation for the shaft,and sliding-up for the lining concrete.It is found that as the curvature radius of shaft curved section reduces from 4 to 2 times the shaft diameter,the hydraulic characteristic index does not change much,and the increase of head loss accounts for about 0.18%of the total head loss of the water conveyance system.The result show that optimizing the curvature radius from 4 times to 2 times the shaft diameter is feasible and reasonable,and several improved technical measures have been proposed,such as stabilizing drill rods,mechanical scraper systems,and control technology of the relationship between concrete setting time and formwork sliding.Their implementation effectively mitigates difficulties and safety risks during shaft construction,expedites the project schedule,enhances engineering quality,and creates a 41-month timeline for the principal engineering schedule for the first power unit generation in China. 展开更多
关键词 hydroelectric engineering construction period record engineering technology optimization shaft construction curvature radius
在线阅读 下载PDF
THE ANNUAL CONFERENCE OF LEGAL PERIODICALS ASSOCIATION OF CHINA LAW SOCIETY WAS HELD IN CHONGQING IN 2025
7
作者 Zhai Yujia(Translated) 《China Legal Science》 2025年第4期159-160,共2页
On May 23,24,2025,the Annual Conference of Legal Periodicals Association of China Law Society,hosted by the Legal Periodicals Association of China Law Society and organized by Southwest University of Political Science... On May 23,24,2025,the Annual Conference of Legal Periodicals Association of China Law Society,hosted by the Legal Periodicals Association of China Law Society and organized by Southwest University of Political Science and Law and the China Legal Science Journals Press,was held in Chongqing.The theme of the conference is Development of the Rule of Law in China and Construction of Legal Periodicals During the 15th Five-Year Plan Period.Wang Zhenjiang. 展开更多
关键词 development rule law th five year plan period development rule law china legal periodicals association china law society legal periodicals construction legal periodicals
原文传递
Research on the Control of Construction Period Risks by BIM Modeling Optimization in the Pre- construction Stage of Industrial Factory Buildings
8
作者 Zhixiong Huang 《Journal of Architectural Research and Development》 2025年第6期43-50,共8页
This research focuses on using BIM modeling optimization to control construction-period risks in the pre-construction stage of industrial factory buildings.It analyzes common risk factors and limitations of traditiona... This research focuses on using BIM modeling optimization to control construction-period risks in the pre-construction stage of industrial factory buildings.It analyzes common risk factors and limitations of traditional approaches.BIM-based methods like collision detection,4D simulation,multi-dimensional data integration,etc.,can effectively mitigate risks.Stakeholder collaboration,digital twin testing,and lean BIM integration is also crucial.Case studies show BIM can reduce risks by 32-41%,with a three phase roadmap provided. 展开更多
关键词 BIM modeling optimization Construction period risk Industrial factory building
在线阅读 下载PDF
Seepage field distribution and water inflow laws of tunnels in water-rich regions 被引量:10
9
作者 LI Zheng CHEN Zi-quan +2 位作者 HE Chuan MA Chun-chi DUAN Chao-ran 《Journal of Mountain Science》 SCIE CSCD 2022年第2期591-605,共15页
Currently,the water inrush hazards during tunnel construction,the water leakage during tunnel operation,and the accompanying disturbances to the ecological environment have become the main problems that affect the str... Currently,the water inrush hazards during tunnel construction,the water leakage during tunnel operation,and the accompanying disturbances to the ecological environment have become the main problems that affect the structural safety of tunnels in water-rich regions.In this paper,a tunnel seepage model testing system was used to conduct experiments of the grouting circle and primary support with different permeability coefficients.The influences of the supporting structures on the water inflow laws and the distribution of the water pressure in the tunnel were analyzed.With the decrease in the permeability coefficient of the grouting circle or the primary support,the inflow rate of water into the tunnel showed a non-linear decreasing trend.In comparison,the water inflow reduction effect of grouting circle was much better than that of primary support.With the increase of the permeability coefficient of the grouting ring,the water pressure behind the primary lining increases gradually,while the water pressure behind the grouting ring decreases.Thus,the grouting of surrounding rock during the construction of water-rich tunnel can effectively weaken the hydraulic connection,reduce the influence range of seepage,and significantly reduce the decline of groundwater.Meanwhile,the seepage tests at different hydrostatic heads and hydrodynamic heads during tunnel operation period were also conducted.As the hydrostatic head decreased,the water pressure at each characteristic point decreased approximately linearly,and the water inflow rate also had a gradual downward trend.Under the action of hydrodynamic head,the water pressure had an obvious lagging effect,which was not conducive to the stability of the supporting structures,and it could be mitigated by actively regulating the drainage rate.Compared with the hydrostatic head,the hydrodynamic head could change the real-time rate of water inflow to the tunnel and broke the dynamic balance between the water pressure and water inflow rate,thereby affecting the stress state on the supporting structures. 展开更多
关键词 Water-rich tunnel Seepage field distribution Water inflow law Construction period Operation period
原文传递
Dynamic Deformation Monitoring for Long-Span Bridges under Construction and EMD De-noising Method
10
作者 Shengxiang Huang Chao Kang Wen Zhang 《Journal of Civil Engineering and Architecture》 2016年第7期853-859,共7页
Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traff... Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traffic. To exactly evaluate the periodic alignments, internal forces and safety, geometrical and physical monitoring are needed during construction. This study aims at the requirement of dynamic geometric monitoring during Sutong Bridge construction, and introduces the realization and observing schemes of the self-developed GPS real-time dynamic geometrical deformation monitoring system. Affected by wind load and construction circumstance, GPS (global positioning system) monitoring signal contains a variety of noise. And the useful signal can be extracted from the signal after de-noising the noises. A de-noising method based on EMD (empirical mode decomposition) model is introduced here to process the bridge dynamic monitoring data, and with the wavelet threshold de-noising method are compared. The result shows that the EMD method has good adaptability, is free from the choice of wavelet bases and the number of decomposition layer. The method is an effective de-noising method for dynamic deformation monitoring to large-span bridges. 展开更多
关键词 Long-span bridge construction period dynamic deformation monitoring empirical mode decomposition de-noising.
在线阅读 下载PDF
Risk Assessment and Prediction of Construction Project Based on 1D-CNN-Attention-BP
11
作者 Yawen Zhong 《World Journal of Engineering and Technology》 2021年第4期861-876,共16页
In order to solve the problem of low accuracy of construction project duration prediction, this paper proposes a CNN attention BP combination model </span><span style="font-family:"white-space:... In order to solve the problem of low accuracy of construction project duration prediction, this paper proposes a CNN attention BP combination model </span><span style="font-family:"white-space:normal;">project risk prediction model based on attention mechanism, one-dimensional </span><span style="font-family:"white-space:normal;">convolutional neural network (1d-cnn) and BP neural network. Firstly, the literature analysis method is used to select the risk evaluation index value of construction project, and the attention mechanism is used to determine the weight of risk factors on construction period prediction;then, BP neural network is used to predict the project duration, and accuracy, cross entropy loss function and F1 score are selected to comprehensively evaluate the performance of 1d-cnn-attention-bp combined model. The experimental results show that the duration risk prediction accuracy of the risk prediction model proposed in this paper is more than 90%, which can meet the risk prediction of construction projects with high accuracy. 展开更多
关键词 Construction Project Risk 1D-CNN-Attention-BP One Dimensional Convolutional Neural Network Construction period Forecast Risk Identification
在线阅读 下载PDF
Characteristics of strong-coupling bipolaron qubit in two-dimensional quantum dot in electric field
12
作者 张颖 韩超 额尔敦朝鲁 《Optoelectronics Letters》 EI 2015年第5期386-389,共4页
Based on Lee-Low-Pines(LLP) unitary transformation, this article adopts the variational method of the Pekar type and gets the energy and wave functions of the ground state and the first excited state of strong-couplin... Based on Lee-Low-Pines(LLP) unitary transformation, this article adopts the variational method of the Pekar type and gets the energy and wave functions of the ground state and the first excited state of strong-coupling bipolaron in two-dimensional quantum dot in electric field, thus constructs a bipolaron qubit. The numerical results represent that the time oscillation period T0 of probability density of the two electrons in qubit decreases with the increasing electric field intensity F and dielectric constant ratio of the medium η; the probability density Q of the two electrons in qubit oscillates periodically with the increasing time t; the probability of electron appearing near the center of the quantum dot is larger, while that appearing away from the center of the quantum dot is much smaller. 展开更多
关键词 appearing unitary dielectric periodically excited phonon constructs coordinates variational coherent
原文传递
Study on the Relationship between Construction Technology and Project Quality, Cost and Time Limit and Current Situation Analysis
13
作者 XING DongMei 《外文科技期刊数据库(文摘版)工程技术》 2020年第3期082-084,共5页
With the efficient development of Chinese economic level, the scale of the construction industry has been expanded accordingly. Construction technology has an important impact on construction quality, cost and period ... With the efficient development of Chinese economic level, the scale of the construction industry has been expanded accordingly. Construction technology has an important impact on construction quality, cost and period of construction project, and is restricted by project quality, construction cost and period. Therefore, it is necessary to continuously improve the construction technology, so as to effectively improve the quality of project, reduce the cost of project and control the construction period. This paper will analyze and discuss the relationship between construction technology and project quality, cost, time limit and current situation in detail, and then put forward the effective coordination of four suggestions, in order to provide reference. 展开更多
关键词 construction technology project quality project cost construction period
原文传递