Countries worldwide are advocating for energy transition initiatives to promote the construction of low-carbon energy systems.The low voltage ride through(LVRT)characteristics of renewable energy units and commutation...Countries worldwide are advocating for energy transition initiatives to promote the construction of low-carbon energy systems.The low voltage ride through(LVRT)characteristics of renewable energy units and commutation failures in line commutated converter high voltage direct current(LCC-HVDC)systems at the receiving end leads to short-term power shortage(STPS),which differs from traditional frequency stability issues.STPS occurs during the generator’s power angle swing phase,before the governor responds,and is on a timescale that is not related to primary frequency regulation.This paper addresses these challenges by examining the impact of LVRT on voltage stability,developing a frequency response model to analyze the mechanism of frequency instability caused by STPS,deriving the impact of STPS on the maximum frequency deviation,and introducing an energy deficiency factor to assess its impact on regional frequency stability.The East China Power Grid is used as a case study,where the energy deficiency factor is calculated to validate the proposed mechanism.STPS is mainly compensated by the rotor kinetic energy of the generators in this region,with minimal impact on other regions.It is concluded that the energy deficiency factor provides an effective explanation for the spatial distribution of the impact of STPS on system frequency.展开更多
The integration of large-scale new energy and high-capacity DC transmission leads to a reduction in system inertia.Grid-forming renewable energy sources(GF-RES)has a significant improvement effect on system inertia.Co...The integration of large-scale new energy and high-capacity DC transmission leads to a reduction in system inertia.Grid-forming renewable energy sources(GF-RES)has a significant improvement effect on system inertia.Commutation failure faults may cause a short-term reactive power surplus at the sending end and trigger transient overvoltage,threatening the safe and stable operation of the power grid.However,there is a lack of research on the calculation method of transient overvoltage caused by commutation failure in high-voltage DC transmission systems with grid-forming renewable energy sources integration.Based on the existing equivalent model of highvoltage DC transmission systems at the sending end,this paper proposes to construct a model of the high-voltage DC transmission system at the sending end with grid-forming renewable energy sources.The paper first clarifies the mechanism of overvoltage generation,then considers the reactive power droop control characteristics of GF-RES,and derives the transient voltage calculation model of theDC transmission system with GF-RES integration.It also proposes a calculation method for transient overvoltage at the sending-end converter bus with GF-RES integration.Based on the PSCAD/EMTDC simulation platform,this paper builds an experimental simulation model.By constructing three different experimental scenarios,the accuracy and effectiveness of the proposed transient overvoltage calculation method are verified,with a calculation error within 5%.At the same time,this paper quantitatively analyzes the impact of grid strength,new energy proportion,and rated transmission power on transient overvoltage from three different perspectives.展开更多
The information of the field current is essential for the brushless synchronous starter/generator system,which determines the performance and health status of this system.However,since the field winding of the main ma...The information of the field current is essential for the brushless synchronous starter/generator system,which determines the performance and health status of this system.However,since the field winding of the main machine is installed in the rotor part,the measurement of the field current in this brushless system seem impossible.Considering that,the field current might be affected by the rectifier mode,the field current estimation method in different rectifier mode is studied in this paper.The main exciter(ME)rotor currents were restructured based on the ME flux equations.With these restructured rotor currents,the field current in different rectifier commutation mode is analyzed,then the field current estimation method considering the rectifier mode can be obtained.The experiments in different rectifier modes are carried out to verify the proposed method.展开更多
基金funded by the Technology Project of State Grid Corporation of China(Research on Safety and Stability Evaluation and Optimization Enhancement Technology of Flexible Ultra High Voltage Multiterminal DC System Adapting to the Background of“Sand and Gobi Deserts”),grant number J2024003。
文摘Countries worldwide are advocating for energy transition initiatives to promote the construction of low-carbon energy systems.The low voltage ride through(LVRT)characteristics of renewable energy units and commutation failures in line commutated converter high voltage direct current(LCC-HVDC)systems at the receiving end leads to short-term power shortage(STPS),which differs from traditional frequency stability issues.STPS occurs during the generator’s power angle swing phase,before the governor responds,and is on a timescale that is not related to primary frequency regulation.This paper addresses these challenges by examining the impact of LVRT on voltage stability,developing a frequency response model to analyze the mechanism of frequency instability caused by STPS,deriving the impact of STPS on the maximum frequency deviation,and introducing an energy deficiency factor to assess its impact on regional frequency stability.The East China Power Grid is used as a case study,where the energy deficiency factor is calculated to validate the proposed mechanism.STPS is mainly compensated by the rotor kinetic energy of the generators in this region,with minimal impact on other regions.It is concluded that the energy deficiency factor provides an effective explanation for the spatial distribution of the impact of STPS on system frequency.
基金supported by Key Natural Science Research Projects of Colleges and Universities in Anhui Province(2022AH051831).
文摘The integration of large-scale new energy and high-capacity DC transmission leads to a reduction in system inertia.Grid-forming renewable energy sources(GF-RES)has a significant improvement effect on system inertia.Commutation failure faults may cause a short-term reactive power surplus at the sending end and trigger transient overvoltage,threatening the safe and stable operation of the power grid.However,there is a lack of research on the calculation method of transient overvoltage caused by commutation failure in high-voltage DC transmission systems with grid-forming renewable energy sources integration.Based on the existing equivalent model of highvoltage DC transmission systems at the sending end,this paper proposes to construct a model of the high-voltage DC transmission system at the sending end with grid-forming renewable energy sources.The paper first clarifies the mechanism of overvoltage generation,then considers the reactive power droop control characteristics of GF-RES,and derives the transient voltage calculation model of theDC transmission system with GF-RES integration.It also proposes a calculation method for transient overvoltage at the sending-end converter bus with GF-RES integration.Based on the PSCAD/EMTDC simulation platform,this paper builds an experimental simulation model.By constructing three different experimental scenarios,the accuracy and effectiveness of the proposed transient overvoltage calculation method are verified,with a calculation error within 5%.At the same time,this paper quantitatively analyzes the impact of grid strength,new energy proportion,and rated transmission power on transient overvoltage from three different perspectives.
基金supported in part by the Natural Science Foundation of Shaanxi Province under Grant 2023JCQN0534in part by the Natural Science Foundation of Shaanxi Provincial Department of Education under Grant 23JK0660in part by the Xi’an Municipal Bureau of Science and Technology under Grant 24GXF0085。
文摘The information of the field current is essential for the brushless synchronous starter/generator system,which determines the performance and health status of this system.However,since the field winding of the main machine is installed in the rotor part,the measurement of the field current in this brushless system seem impossible.Considering that,the field current might be affected by the rectifier mode,the field current estimation method in different rectifier mode is studied in this paper.The main exciter(ME)rotor currents were restructured based on the ME flux equations.With these restructured rotor currents,the field current in different rectifier commutation mode is analyzed,then the field current estimation method considering the rectifier mode can be obtained.The experiments in different rectifier modes are carried out to verify the proposed method.