Optimized positioning and cross-layer control for roadways beneath residual coal pillars in extremely close-distance coal seams
1
作者 WANG Yuxuan XIE Shengrong +2 位作者 WU Yiyi LIU Chenyang WANG Zhigen 《Journal of Mountain Science》 2025年第10期3850-3868,共19页
In extremely close-distance coal seam(ECDCS)mining,section coal pillars remain after upper coal seam(UCS)extraction.Thus,for layout and support design of lower coal seam(LCS)mining roadways,it is critical to account f... In extremely close-distance coal seam(ECDCS)mining,section coal pillars remain after upper coal seam(UCS)extraction.Thus,for layout and support design of lower coal seam(LCS)mining roadways,it is critical to account for UCS goaf deterioration and residual coal pillar(RCP)-induced stress disturbance.Taking the 6.4 m layer spacing of ECDCS mining in Nanyangpo Coal Mine as a case study,this research aimed to determine the optimal layout and surrounding rock control method for the 24202-ventilation roadway in the RCP area.First,the challenges of roadway layout and support under RCP were clarified:three layout methods face distinct RCPinduced stress disturbances and goaf-related roof damage.A finite element model was established;the second invariant of deviatoric stress(J_(2))and horizontal stress index were introduced to analyze plastic zone and stress evolution after UCS mining.Results show that J_(2)distributes symmetrically,with its peak diffusing downward and attenuating in a“/”-shaped pattern.Six schemes were simulated to compare plastic zone distributions at different positions,revealing that the optimal layout consists of a roadway alignment with the RCP center.Based on roadway layout and roof conditions,a cooperative control scheme was proposed:deep,strong anchorage with long cables across the RCP,and shallow stable support with short bolts in the ECDCS.This scheme secures roof cables anchored to the UCS RCP roof to achieve cross-seam anchorage.On-site borehole peeping and loose circle tests confirm smooth surrounding rock hole walls and limited failure range.Specifically,surrounding rock deformation and roof separation were controlled within 200 mm and 80 mm,respectively,with stable bolt/cable support resistance.These results offer an innovative solution for roadway layout design and support strategies under RCP in ECDCS,with significant engineering application value. 展开更多
关键词 Extremely close-distance coal seams Residual coal pillar Roadway layout Numerical simulation Surrounding rock control Field observation
原文传递
A novel control method of automatically formed roadway by roof cutting and confined concrete column in extremely close-distance coal seam
2
作者 XUE Hao-jie WANG Qi +4 位作者 ZHANG Chong HE Man-chao ZHANG Bo-wen ZHANG Shu WANG Ye-tai 《Journal of Central South University》 2025年第10期3911-3926,共16页
Under the influence of the upper coal pillars and dynamic pressure of coal mining,the roadway of the lower coal seam is prone to large deformation failure.In this paper,a novel control method and key technologies of a... Under the influence of the upper coal pillars and dynamic pressure of coal mining,the roadway of the lower coal seam is prone to large deformation failure.In this paper,a novel control method and key technologies of automatically formed roadway(AFR)by roof cutting and confined concrete column in extremely close-distance coal seam are proposed.Furthermore,a numerical model is established to analyze the structure characteristics of overlying roof strata.Based on numerical results,the roof structure model of“voussoir beam of upper layer+short cantilever beam of lower layer”of this method is proposed.What’s more,the calculation equation of the roof bending moment and evaluation indexes is established,and the influence of different factors on roof stability control of AFR is studied.Finally,a field test is conducted to verify the effectiveness of this novel method.Field results were as follows:1)The maximum and average support stress of working face obviously decreased;2)The confined concrete column can provide high-strength support in dynamic influence zone;3)The maximum deformation of AFR safety requirement can be met.This study can provide effective guidance for the application of this method in extremely close-distance coal seam. 展开更多
关键词 extremely close-distance coal seam automatically formed roadway(AFR) confined concrete column numerical simulation roof structure model field test
在线阅读 下载PDF
Characteristics of stress distribution in floor strata and control of roadway stability under coal pillars 被引量:10
3
作者 Tongqiang Xiao Bai Jianbiao +1 位作者 Xu Lei Zhang Xuebin 《Mining Science and Technology》 EI CAS 2011年第2期243-247,共5页
Given the difficulties encountered in roadway support under coal pillars,we studied the characteristics of stress distribution and their effect on roadway stability,using theoretical analysis and numerical simulation.... Given the difficulties encountered in roadway support under coal pillars,we studied the characteristics of stress distribution and their effect on roadway stability,using theoretical analysis and numerical simulation.The results show that,under a coal pillar,vertical stress in a floor stratum increases while horizontal stress decreases.We conclude that the increased difference between vertical and horizontal stress is an important reason for deformation of the surrounding rock and failures of roadways under coal pillars.Based on this,we propose control technologies of the surrounding rock of a roadway under a coal pillar,such as high strength and high pre-stressed bolt support,cable reinforcement support single hydraulic prop with beam support and reinforcement by grouting of the surrounding rock,which have been successfully applied in a stability control project of a roadway under a coal pillar. 展开更多
关键词 close-distance seams Coal pillar Stress distribution Roadway layout Surrounding rock control
在线阅读 下载PDF
Reasonable location of stopping line in close‑distance underlying coal seam and partition support of large cross‑section roadway 被引量:5
4
作者 Dongdong Chen Yiyi Wu +3 位作者 Shengrong Xie Fangfang Guo Fulian He Ruipeng Liu 《International Journal of Coal Science & Technology》 EI CAS CSCD 2022年第4期181-202,共22页
Close-distance coal seams are widely distributed over China,and the coal pillars left by the overlying coal seams afect the retracement channel of the underlying coal seam in the stopping stage.Based on the engineerin... Close-distance coal seams are widely distributed over China,and the coal pillars left by the overlying coal seams afect the retracement channel of the underlying coal seam in the stopping stage.Based on the engineering background of close-distance seam mining in a coal mine,the reasonable position of the underlying coal seam's stopping line and the support method of the large section roadway during stopping are investigated using feld measurements,similar simulation experiments,and numerical simulations.There are three types of location relationships between the stopping line of the underlying coal seam and the stopping line of the overlying coal seam:"externally staggered with the upper stopping line"(ESUL,stops mining under the overlying goaf),"overlapped with upper stopping line"(OUL),and"internally staggered with the upper stopping line"(ISUL,ISUL-SD for shorter internal staggered distances,ISUL-LD for longer ones).There are diferent stress arch structures in the overlying strata of the above three positions,and the stress arch evolution process exists in the process of ESUL→OUL→ISUL-SD→ISUL-LD:a front and rear double stress arch structure→the front arch gradually decreases→the front arch dies out,and the double arch synthesizes the single arch→the single-arch range expands→the nested double arch.The relationship between the stress arch structure and the position of the stopping line is evaluated as follows:(1)ESUL:the stress concentration in the roof plate of the retracement channel of the underlying coal seam is the highest,because the overburden block of the extensive collapse zone acts directly on the roof plate of the retracement channel,resulting in relative difculties in roof support.(2)OUL:although the retracement channel roof pressure is minimal,the overlying rock structure has the potential for rotation or slippage instability.(3)ISUL-SD:the pressure on the roof of the retracement channel is small and the overburden structure is stable,which is conducive to the safe retraction of the support and not limited by the width of the end-mining coal pillar.(4)ISUL-LD:it is basically the same as the condition of stopping under the non-goaf;however,it has a limitation on the width of the end-mining coal pillar.The location of the stopping line is selected as ISUL-SD,and the retraction process of the self-excavating retraction channel was adopted.A partition asymmetric support scheme which is proven by feld practice is proposed,through a comprehensive analysis of the pre-stress feld simulation of the support scheme,based on the diferent control requirements of the roof above the support and the roof of the retracement channel in the stopping area.This method realizes safe and smooth withdrawal of the support. 展开更多
关键词 close-distance coal seams Stopping line Stress arch structure Retracement channel Partition support
在线阅读 下载PDF
Review on Prevention and Control of Roadway Surrounding Rock in Closely Spaced Coal Seam Group Mining
5
作者 Bin Li Bo Zhou +2 位作者 Shou-kun Chen Zhi-song Chen Ji-tao Zhang 《Applied Geophysics》 2026年第1期109-124,428,429,共18页
Coal resources continuously advance to deep areas,facing increasingly complex geological conditions.Closely spaced coal seam group mining occupies an important position in China's coal resource extraction,easily c... Coal resources continuously advance to deep areas,facing increasingly complex geological conditions.Closely spaced coal seam group mining occupies an important position in China's coal resource extraction,easily causing large deformation of roadway surrounding rock due to mining impacts,bringing severe challenges to safe and efcient coal mine production.Therefore,research on prevention and control technologies for roadway surrounding rock under closely spaced coal seam group mining is imperative.This paper systematically summarizes current research globally on stress distribution patterns of surrounding rock,main deformation and failure mechanisms of roadway surrounding rock(repeated mining impacts,strength weakening of surrounding rock,and unreasonable support,etc.),eld monitoring and early warning,and currently adopted prevention technologies and measures(optimizing roadway layout to avoid stress concentration zones,adopting high-strength support systems,applying pressure relief and surrounding rock reinforcement technologies,etc.).Simultaneously,it supplements current deficiencies in this research domestically and internationally,such as intelligent monitoring and early warning systems,innovative application of support technologies,interdisciplinary research and comprehensive management,informationbased management and technical support,and introduction of green environmental technologies.Finally,based on the above research,prospects for prevention and control technologies of roadway surrounding rock under closely spaced coal seam group mining are proposed. 展开更多
关键词 close-distance coal seam group large deformation of surrounding rock stress distribution monitoring and early warning prevention and control pressure relief