期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Application of Bored Pile Construction Technology in Road and Bridge Construction
1
作者 HE Jiahao 《外文科技期刊数据库(文摘版)工程技术》 2021年第4期328-330,共3页
Time to enter the 21st century, our country gradually moving towards modernization power, along with our country's economic strength, science and technology development, such as the country's many industry get... Time to enter the 21st century, our country gradually moving towards modernization power, along with our country's economic strength, science and technology development, such as the country's many industry get the progress by leaps and bounds, road engineering in China traditional architectural engineering, road engineering has always been about the development of China's people's daily life level and the development of the economy, but in the road engineering construction, Often face a variety of construction challenges, in actual engineering construction, due to loose soil, settlement or some other reasons, if the relevant staff careless operation, it is easy to lead to a lot of potential problems in the use of road engineering, and even bring a certain threat to people's daily use experience. In the face of these problems, it is necessary for relevant personnel to analyze the problems existing in the construction process and operate in strict accordance with the operation plan of drilling perfusion technology in road construction. 展开更多
关键词 road and bridge engineering construction technology of bored cast-in-place pile APPLICATION
原文传递
Study on influence of ground settlement in bored metro tunnel
2
作者 方江华 张志红 《Journal of Coal Science & Engineering(China)》 2006年第2期27-29,共3页
At present the bored construction method is one of the main construction methods of metro and tunnel construction in China. The empirical estimated formulas of tunnel ground surface settlement using the bored construc... At present the bored construction method is one of the main construction methods of metro and tunnel construction in China. The empirical estimated formulas of tunnel ground surface settlement using the bored construction method were obtained, combining the mechanical stimulant calculated result of tunnel model of different embedded depth, different cross section and different construction method and the actual measurement data of Beijing metro construction. According to the regressed analysis of calculated data, the calculated equations of ground surface settlement value and settlement range of tunnel section under the condition of different embedded depth, different cross section and different construction method were gained. Among them there are some empirical formulas can apply to the construction design of metro tunnel directly. 展开更多
关键词 bored construction method ground settlement settlement groove width modulus settlement range
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部