期刊文献+
共找到5,111篇文章
< 1 2 250 >
每页显示 20 50 100
Refreezing of cast-in-place piles under various engineering conditions 被引量:9
1
作者 Lei Guo QiHao Yu +2 位作者 XiaoNing Li XinBin Wang YongYu Yue 《Research in Cold and Arid Regions》 CSCD 2015年第4期376-383,共8页
In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafro... In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafrost regions greatly affects the stability of the towers as well as the operation of the QTPTL. The casting of piles will markedly affect the thermal regime of the surrounding permafrost because of the casting temperature and the hydration heat of cement. Based on the typical geological and engineering conditions along the QTPTL, thermal disturbance ofa CIPP to surrounding permafrost under different casting seasons, pile depths, and casting temperatures were simulated. The results show that the casting season (summer versus winter) can influence the refreezing process of CIPPs, within the first 6 m of pile depth. Sixty days after being cast, CIPPs greater than 6 m in depth can be frozen regardless of which season they were cast, and the foundation could be reffozen after a cold season. Comparing the refreezing characteristics of CIPPs cast in different seasons also showed that, without considering the ground surface conditions, warm seasons are more suitable for casting piles. With the increase of pile depth, the thermal effect of a CIPP on the surrounding soil mainly expands vertically, while the lateral heat disturbance changes little. Deeper, longer CIPPs have better stability. The casting temperature clearly affects the thermal disturbance, and the radius of the melting circle increases with rising casting temperature. The optimal casting temperature is between 2 ℃ and 9 ℃. 展开更多
关键词 cast-in-place pile hydration heat REFREEZING engineering factor PERMAFROST
在线阅读 下载PDF
Regressive approach for predicting bearing capacity of bored piles from cone penetration test data 被引量:4
2
作者 Iyad S. Alkroosh Mohammad Bahadori +1 位作者 Hamid Nikraz Alireza Bahadori 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第5期584-592,共9页
In this study, th e least sq u are su p p o rt v ecto r m achine (LSSVM) alg o rith m w as applied to predicting th ebearing capacity o f b ored piles e m b ed d ed in sand an d m ixed soils. Pile g eo m etry an d c... In this study, th e least sq u are su p p o rt v ecto r m achine (LSSVM) alg o rith m w as applied to predicting th ebearing capacity o f b ored piles e m b ed d ed in sand an d m ixed soils. Pile g eo m etry an d cone p e n e tra tio nte s t (CPT) resu lts w ere used as in p u t variables for pred ictio n o f pile bearin g capacity. The d ata u se d w erecollected from th e existing litera tu re an d consisted o f 50 case records. The application o f LSSVM w ascarried o u t by dividing th e d ata into th re e se ts: a train in g se t for learning th e pro b lem an d obtain in g arelationship b e tw e e n in p u t variables an d pile bearin g capacity, and testin g an d validation sets forevaluation o f th e predictive an d g en eralization ability o f th e o b tain ed relationship. The predictions o f pilebearing capacity by LSSVM w ere evaluated by com paring w ith ex p erim en tal d ata an d w ith th o se bytrad itio n al CPT-based m eth o d s and th e gene ex pression pro g ram m in g (GEP) m odel. It w as found th a t th eLSSVM perform s w ell w ith coefficient o f d eterm in atio n , m ean, an d sta n d ard dev iatio n equivalent to 0.99,1.03, an d 0.08, respectively, for th e testin g set, an d 1, 1.04, an d 0.11, respectively, for th e v alidation set. Thelow values o f th e calculated m ean squared e rro r an d m ean ab so lu te e rro r indicated th a t th e LSSVM w asaccurate in p redicting th e pile bearing capacity. The results o f com parison also show ed th a t th e p roposedalg o rith m p red icted th e pile bearin g capacity m ore accurately th a n th e trad itio n al m eth o d s including th eGEP m odel. 展开更多
关键词 bored piles Cone penetration test(CPT) Bearing capacity Least square support vector machine(LSSVM) TRAINING VALIDATION
在线阅读 下载PDF
A case study on behaviors of composite soil nailed wall with bored piles in a deep excavation 被引量:7
3
作者 ZHU Feng-bin MIAO Lin-chang +1 位作者 GU Huan-da CHENG Yue-hong 《Journal of Central South University》 SCIE EI CAS 2013年第7期2017-2024,共8页
A complete case of a deep excavation was explored. According to the practical working conditions, a 3D non-linear finite element procedure is used to simulate a deep excavation supported by the composite soil nailed w... A complete case of a deep excavation was explored. According to the practical working conditions, a 3D non-linear finite element procedure is used to simulate a deep excavation supported by the composite soil nailed wall with bored piles in soft soil. The modified cam clay model is employed as the constitutive relationship of the soil in the numerical simulation. Results from the numerical analysis are fitted well with the field data, which indicate that the research approach used is reliable. Based on the field data and numerical results of the deep excavation supported by four different patterns of the composite soil nailed wall, the significant corner effect is founded in the 3D deep excavation. If bored piles or soil anchors are considered in the composite soil nailed wall, they are beneficial to decreasing deformations and internal forces of bored piles, cement mixing piles, soil anchors, soil nailings and soil around the deep excavation. Besides, the effects due to bored piles are more significant than those deduced from soil anchors. All mentioned above prove that the composite soil nailed wall with bored piles is feasible in the deep excavation. 展开更多
关键词 deep excavation 3D non-linear finite element bored pile composite soil nailed wall corner effect DEFORMATION internal force
在线阅读 下载PDF
Thermal performance of cast-in-place piles with artificial ground freezing in permafrost regions 被引量:1
4
作者 WANG Xinbin CHEN Kun +3 位作者 YU Qihao GUO Lei YOU Yanhui JIN Mingyang 《Journal of Mountain Science》 SCIE CSCD 2024年第4期1307-1328,共22页
During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing cap... During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing capacity of the pile is quite small before the full freeze-back,the quick refreezing of the native soils surrounding the cast-in-place pile has become the focus of the infrastructure construction in permafrost.To solve this problem,this paper innovatively puts forward the application of the artificial ground freezing(AGF)method at the end of the curing period of cast-in-place piles in permafrost.A field test on the AGF was conducted at the Beiluhe Observation and Research Station of Frozen Soil Engineering and Environment(34°51.2'N,92°56.4'E)in the Qinghai Tibet Plateau(QTP),and then a 3-D numerical model was established to investigate the thermal performance of piles using AGF under different engineering conditions.Additionally,the long-term thermal performance of piles after the completion of AGF under different conditions was estimated.Field experiment results demonstrate that AGF is an effective method to reduce the refreezing time of the soil surrounding the piles constructed in permafrost terrain,with the ability to reduce the pile-soil interface temperatures to below the natural ground temperature within 3 days.Numerical results further prove that AGF still has a good cooling effect even under unfavorable engineering conditions such as high pouring temperature,large pile diameter,and large pile length.Consequently,the application of this method is meaningful to save the subsequent latency time and solve the problem of thermal disturbance in pile construction in permafrost.The research results are highly relevant for the spread of AGF technology and the rapid building of pile foundations in permafrost. 展开更多
关键词 Permafrost engineering cast-in-place pile Artificial ground freezing Thermal performance.
原文传递
Dynamic estimation and reliability control of quality assurance for bored piles
5
作者 赵文艺 徐志军 +1 位作者 郑俊杰 边晓亚 《Journal of Central South University》 SCIE EI CAS 2014年第3期1148-1157,共10页
A systematic method was proposed to estimate the occurrence probability of defective piles(OPDP) from a site according to quality assurance inspection. The OPDP was firstly suggested as the criterion to weight the per... A systematic method was proposed to estimate the occurrence probability of defective piles(OPDP) from a site according to quality assurance inspection. The OPDP was firstly suggested as the criterion to weight the performance of a pile foundation. Its prior distribution and updating distribution were deduced to follow Beta distributions. To calibrate the OPDP, a dynamic estimation model was established according to the relationships between prior mean and variance and updating mean and variance. Finally, a reliability-control method dealing with uncertainties arising from quality assurance inspection was formalized to judge whether all the bored piles from a site can be accepted. It is exemplified that the OPDP can be substantially improved when more definite prior information and sampling formation become available. For the example studied herein, the Bayesian estimator of updating variance for OPDP is reduced from 0.0037 to 0.0014 for the first inspection, from 0.0014 to 0.0009 for the second inspection, and with less uncertainty by incorporating experience information. 展开更多
关键词 bored piles quality assurance inspection reliability control occurrence probability Bayesian method
在线阅读 下载PDF
Comparative Examinations of Single Bored Piles Using International Codes
6
作者 Mohamed Mosad El-Gendy Ibrahim A. El Araby Mohamed A. Kamal 《Engineering(科研)》 2013年第10期796-806,共11页
This paper presents some aspects of the load-settlement behavior for large diameter bored piles using four different international codes, namely: ECP 202 [1], DIN 4014 [2], AASHTO [3] and French Code [4]. Ultimate cap... This paper presents some aspects of the load-settlement behavior for large diameter bored piles using four different international codes, namely: ECP 202 [1], DIN 4014 [2], AASHTO [3] and French Code [4]. Ultimate capacities for 38 pile load tests founded in realistic multi-layered soils in Delta and Port Saidareas atEgyptare evaluated using modified Chin (1970) method and compared to ultimate load predictions obtained by the aforementioned codes. Many statistical analyses were conducted on the total pile loads and individual contributions of tip and skin resistances. Based on code predictions of ultimate pile loads, an empirical modified load-settlement model is proposed. This model will simplify to a great extent the analysis of piled-raft systems as it can effortlessly predict pile settlement due to the load on pile itself. Comparisons showed that the pile load test is an irreplaceable process for determining the ultimate capacity of piles. 展开更多
关键词 bored piles ULTIMATE pile Load International CODES Empirical Function
暂未订购
Experimental study and numerical analysis on bearing behaviors of super-long rock-socketed bored pile groups 被引量:3
7
作者 高睿 胡念 朱斌 《Journal of Southeast University(English Edition)》 EI CAS 2010年第4期597-602,共6页
A centrifuge modeling test and a three-dimensional finite element analysis(FEA)of super-long rock-socketed bored pile groups of the Tianxingzhou Bridge are proposed.Based on the similarity theory,different prototypi... A centrifuge modeling test and a three-dimensional finite element analysis(FEA)of super-long rock-socketed bored pile groups of the Tianxingzhou Bridge are proposed.Based on the similarity theory,different prototypical materials are simulated using different indicators in the centrifuge model.The silver sand,the shaft and the pile cap are simulated according to the natural density,the compressive stiffness and the bending stiffness,respectively.The finite element method(FEM)is implemented and analyzed in ANSYS,in which the stress field during the undisturbed soil stage,the boring stage,the concrete-casting stage and the curing stage are discussed in detail.Comparisons in terms of load-settlement,shaft axial force distribution and lateral friction between the numerical results and the test data are carried out to investigate the bearing behaviors of super-long rock-socketed bored pile groups under loading and unloading conditions.Results show that there is a good agreement between the centrifuge modeling tests and the FEM.In addition,the load distribution at the pile top is complicated,which is related to the stiffness of the cap,the corresponding assumptions and the analysis method.The shaft axial force first increases slightly with depth then decreases sharply,and the rate of decrease in rock is greater than that in sand and soil. 展开更多
关键词 super-long rock-socketed pile bored pile groups centrifuge modeling test finite element analysis
在线阅读 下载PDF
Exothermic process of cast-in-place pile foundation and its thermal agitation of the frozen ground under a long dry bridge on the Qinghai-Tibet Railway 被引量:5
8
作者 Ya-ping WU Jian GUO +2 位作者 Chun-xiang GUO Wei MA Xiao-jun WANG 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2010年第2期88-96,共9页
A number of dry bridges have been built to substitute for the roadbed on the Qinghai-Tibet Railway,China.The aim of this study was to investigate the exothermic process of cast-in-place (CIP) pile foundation of a dry ... A number of dry bridges have been built to substitute for the roadbed on the Qinghai-Tibet Railway,China.The aim of this study was to investigate the exothermic process of cast-in-place (CIP) pile foundation of a dry bridge and its harm to the stability of nearby frozen ground.We present 3D heat conduction functions of a concrete pile and of frozen ground with related boundaries.Our analysis is based on the theory of heat conduction and the exponent law describing the adiabatic temperature rise caused by hydration heat.Results under continuous and initial conditions were combined to establish a finite element model of a CIP pile-frozen ground system for a dry bridge under actual field conditions in cold regions.Numerical results indicated that the process could effectively simulate the exothermic process of CIP pile foundation.Thermal disturbance to frozen ground under a long dry bridge caused by the casting temperature and hydration heat of CIP piles was substantial and long-lasting.The simulated thermal analysis results agreed with field measurements and some significant rules relating to the problem were deduced and conclusions reached. 展开更多
关键词 Exothermic process of hydration heat cast-in-place (CIP) pile foundation Dry bridge Thermal agitation Frozen ground Qinghai-Tibet Railway
原文传递
Physical modeling of behaviors of cast-in-place concrete piled raft compared to free-standing pile group in sand 被引量:1
9
作者 Mehdi Sharafkhah Issa Shooshpasha 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2018年第4期703-716,共14页
Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies i... Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies indicated that this method is too conservative. Only when the pile cap is elevated from the ground level,the raft bearing contribution can be neglected. In a piled raft foundation, pileesoileraft interaction is complicated. Although several numerical studies have been carried out to analyze the behaviors of piled raft foundations, very few experimental studies are reported in the literature. The available laboratory studies mainly focused on steel piles. The present study aims to compare the behaviors of piled raft foundations with free-standing pile groups in sand, using laboratory physical models. Cast-in-place concrete piles and concrete raft are used for the tests. The tests are conducted on single pile, single pile in pile group, unpiled raft, free-standing pile group and piled raft foundation. We examine the effects of the number of piles, the pile installation method and the interaction between different components of foundation. The results indicate that the ultimate bearing capacity of the piled raft foundation is considerably higher than that of the free-standing pile group with the same number of piles. With installation of the single pile in the group, the pile bearing capacity and stiffness increase. Installation of the piles beneath the raft decreases the bearing capacity of the raft. When the raft bearing capacity is not included in the design process, the allowable bearing capacity of the piled raft is underestimated by more than 200%. This deviation intensifies with increasing spacing of the piles. 展开更多
关键词 Free-standing pile group piled raft pileesoileraft interaction Physical modeling cast-in-place concrete piles
在线阅读 下载PDF
Field observation of the thermal disturbance and freezeback processes of cast-in-place pile foundations in warm permafrost regions 被引量:1
10
作者 Xin Hou Ji Chen +4 位作者 YouQian Liu PengFei Rui JingYi Zhao ShouHong Zhang HaiMing Dang 《Research in Cold and Arid Regions》 CSCD 2023年第1期18-26,共9页
The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the therm... The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the thermal stability of permafrost.In this paper,temperature data from inside multiple CIP piles,borehole observations of ground thermal status adjacent to the foundations and local weather stations were monitored in warm permafrost regions to study the thermal influence process of CIP pile foundations.The following conclusions are drawn from the field observation data.(1)The early temperature change process of different CIP piles is different,and the differences gradually diminish over time.(2)The initial concrete temperature is linearly related with the air temperature,net radiation and wind speed within 1 h before the completion of concrete pouring;the contributions of the air temperature,net radiation,and wind speed to the initial concrete temperature are 51.9%,20.3%and 27.9%,respectively.(3)The outer boundary of the thermal disturbance annulus is approximately 2 m away from the pile center.It took more than 224 days for the soil around the CIP piles to return to the natural permafrost temperature at the study site. 展开更多
关键词 PERMAFROST cast-in-place pile foundations Thermal disturbance Freezeback process Initial concrete temperature
在线阅读 下载PDF
Field study of plastic tube cast-in-place concrete pile
11
作者 陈永辉 曹德洪 +2 位作者 王新泉 杜海伟 张霆 《Journal of Central South University》 SCIE EI CAS 2008年第S2期195-202,共8页
The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on sin... The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on single piles with different forms of pile shoes and on their composite foundations were analyzed. The distribution patterns of axial force, shaft friction and toe resistance were studied based on the measurements taken from buried strain gauges. From the point of engineering application, the pile has merits in convenient quality control, high bearing capacity and reliable quality, showing higher reasonability, advancement and suitability than other ground improvement methods. The pile can be adopted properly to take place of ordinary ground improvement method, achieving greater economical and social benefits. 展开更多
关键词 PLASTIC tube cast-in-place concrete pile SOFT ground improvement pile-supported type reinforced EMBANKMENT CONSTRUCTION equipment CONSTRUCTION workmanship
在线阅读 下载PDF
Influence of the penetration of adjacent X-section cast-in-place concrete(XCC)pile on the existing XCC pile in sand
12
作者 Peng ZHOU Jianhui XU +3 位作者 Changjie XU Guangwei CAO Jie CUP Xuanming DING 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2024年第7期557-572,共16页
A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the v... A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the variations in surrounding soil stress.The results showed that the bending patterns of existing XCC piles varied with penetration depth.The lateral response of the existing pile was sensitive to the change in relative density and pile geometry.For example,the bending moment of the existing pile increased along with these parameters.The development of the radial stressσ′r/σ′v0 of the soil around an existing pile showed different trends at various depths during the penetration of the adjacent pile.Moreover,the change in radial stress during the penetration of the XCC pile did not exhibit the“h/R effect”that was observed in the free-field soil,due to the shielding effect of the existing piles.The peak value of radial stressσ′r_max/σ′v0 decreased exponentially as the radial distance r/R increased.The attenuation ofσ′r_max/σ′v0 with r/R in the loose sand was faster than in the medium-dense or dense sands.Theσ′r_max/σ′v0 at the same soil location increased with the cross-section geometry parameter. 展开更多
关键词 X-section cast-in-place concrete(XCC)pile Test PENETRATION SAND Lateral response Radial stress
原文传递
Application of Bored Pile Construction Technology in Road and Bridge Construction
13
作者 HE Jiahao 《外文科技期刊数据库(文摘版)工程技术》 2021年第4期328-330,共3页
Time to enter the 21st century, our country gradually moving towards modernization power, along with our country's economic strength, science and technology development, such as the country's many industry get... Time to enter the 21st century, our country gradually moving towards modernization power, along with our country's economic strength, science and technology development, such as the country's many industry get the progress by leaps and bounds, road engineering in China traditional architectural engineering, road engineering has always been about the development of China's people's daily life level and the development of the economy, but in the road engineering construction, Often face a variety of construction challenges, in actual engineering construction, due to loose soil, settlement or some other reasons, if the relevant staff careless operation, it is easy to lead to a lot of potential problems in the use of road engineering, and even bring a certain threat to people's daily use experience. In the face of these problems, it is necessary for relevant personnel to analyze the problems existing in the construction process and operate in strict accordance with the operation plan of drilling perfusion technology in road construction. 展开更多
关键词 road and bridge engineering construction technology of bored cast-in-place pile APPLICATION
原文传递
On the Application of Bored Pile Construction Technology in Road and Bridge Construction Engineering
14
作者 YANG Xiaohong 《外文科技期刊数据库(文摘版)工程技术》 2021年第6期428-431,共6页
Bridge plays an important role in highway engineering. Among them, the pile foundation is the foundation structure of the bridge, which is not conducive to the smooth progress of the construction in case of special ge... Bridge plays an important role in highway engineering. Among them, the pile foundation is the foundation structure of the bridge, which is not conducive to the smooth progress of the construction in case of special geological conditions such as karst caves. If there is no effective treatment measures, it is easy to have problems such as drilling loss, hammer sticking and hole collapse, which seriously threaten the stability of the pile foundation and even the whole bridge. In order to ensure that the bored piles meet the requirements of the quality standards, the construction procedures of pile position measurement, casing embedding, mud preparation, drilling, hole cleaning and concrete pouring should be done well, so that the bridge foundation can be completed according to the quality, quantity and time. 展开更多
关键词 road and bridge CONSTRUCTION bored pile construction technology APPLICATION
原文传递
Construction Technology Analysis of Highway Bridge Bored Pile
15
作者 WANG Dandan 《外文科技期刊数据库(文摘版)工程技术》 2021年第4期203-207,共5页
Subgrade is the main infrastructure of pavement, and the overall quality of the path determines the performance and service life of the pavement. Highway bridge bored pile combined with the change of bearing layer to ... Subgrade is the main infrastructure of pavement, and the overall quality of the path determines the performance and service life of the pavement. Highway bridge bored pile combined with the change of bearing layer to configure the reinforcement combination, which uses less reinforcement, construction is simple and practical. At the same time, the cost of the technology itself is not very high, the applicability is strong, and the operation is more convenient. Based on the actual project, aiming at the application of bored pile in highway bridge, this paper studies the problems that may be encountered in the process of highway bridge drilling construction, so as to study the construction technology of bored pile. 展开更多
关键词 Highway Bridge bored pile construction technology
原文传递
Research on Construction Technology of Bored Pile for Highway Bridges
16
作者 WANG Baocai 《外文科技期刊数据库(文摘版)工程技术》 2021年第1期491-495,共5页
Road and bridge engineering requires subgrade to have high stability and firmness. Therefore, the subgrade needs to have strong load performance. At present, the construction technology of bored piles for highway brid... Road and bridge engineering requires subgrade to have high stability and firmness. Therefore, the subgrade needs to have strong load performance. At present, the construction technology of bored piles for highway bridges is well developed and widely used in various industries. The application of this technology in the construction of bored piles for highway bridge construction can greatly improve the physical properties of the subgrade, strengthen the stability of the subgrade and avoid the occurrence of uneven settlement. Therefore, relevant technical personnel need to be familiar with the construction technology of cast-in-place bored piles, and enterprises need to attach great importance to the construction management work, which is beneficial to maximize the use of cast-in-place bored piles construction technology. 展开更多
关键词 Highway bridge bored pile construction technology
原文传递
Application of Bored Pile Technology in Bridge Construction
17
作者 WANG Yufeng 《外文科技期刊数据库(文摘版)工程技术》 2021年第12期1553-1558,共9页
Bored cast-in-place pile technology is the most widely used foundation bearing method in major projects in China. However, due to its special working environment, the application of cast-in-place bored pile technology... Bored cast-in-place pile technology is the most widely used foundation bearing method in major projects in China. However, due to its special working environment, the application of cast-in-place bored pile technology in bridge engineering is easy to cause various malignant consequences, such as broken pile, broken hole, steel cage floating box, etc. In this paper, the most common quality problems of cast-in-place bored pile technology in bridge engineering and the corresponding effective solutions are analyzed and explained in detail. 展开更多
关键词 bridge engineering bored pile construction technology
原文传递
Analysis on Construction Technology of Bored Pile in Water Conservancy Construction
18
作者 YUTao 《外文科技期刊数据库(文摘版)工程技术》 2022年第5期001-004,共4页
In water conservancy projects, the technology of cast-in-place bored pile in water conservancy construction is also an important content. The quality of the project will directly affect the speed and benefit of the wh... In water conservancy projects, the technology of cast-in-place bored pile in water conservancy construction is also an important content. The quality of the project will directly affect the speed and benefit of the whole construction. However, in the actual construction of water conservancy projects, more stringent measures are still needed to manage them to ensure that they can work more smoothly. This article mainly analyzes the current construction technology of cast-in-place bored piles in water conservancy projects, and at the same time gives some suggestions, hoping to bring some reference significance to relevant engineers. 展开更多
关键词 water conservancy bored piles construction technique
原文传递
Quality Control Measures of Bored Pile in Bridge Construction
19
作者 Lin Nan Guangjun Li +3 位作者 Yan Liu Xu Meng Yingying Ye Zhongyang Sun 《Journal of World Architecture》 2023年第2期47-52,共6页
In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding... In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding quality control measures,in hopes of improving quality control of bored piles in bridge construction in our country. 展开更多
关键词 Bridge construction bored pile Quality control
在线阅读 下载PDF
Common Quality Problems in the Construction of Bored Pile for Urban Road Bridges and Countermeasures
20
作者 WUCaicai 《外文科技期刊数据库(文摘版)工程技术》 2022年第6期074-077,共4页
Due to the increasing number of large and heavy transportation vehicles, the road and bridge are facing great pressure. In order to better deal with and solve such pressure, the construction quality problem of bored p... Due to the increasing number of large and heavy transportation vehicles, the road and bridge are facing great pressure. In order to better deal with and solve such pressure, the construction quality problem of bored piles should be properly solved, which is beneficial to control the adverse factors in the construction and provide basic guarantee for the quality of roads and bridges. Common quality problems in the construction of bored piles for urban road bridges include: hole collapse, borehole deviation, cage floating, pile breaking, warp shrinkage, etc. Therefore, the quality problems of the cast-in-place pile and the solutions should be discussed in depth, the causes of the problems should be analyzed, and prevention suggestions should be provided. 展开更多
关键词 urban roads and bridges bored piles problems between construction COUNTERMEASURES
原文传递
上一页 1 2 250 下一页 到第
使用帮助 返回顶部