A time-varying optimization strategy for battery cluster power allocation is proposed to minimize energy loss in battery energy storage systems(BESS).First,the time-dependent loss characteristics of both storage and n...A time-varying optimization strategy for battery cluster power allocation is proposed to minimize energy loss in battery energy storage systems(BESS).First,the time-dependent loss characteristics of both storage and non-storage components in BESS are ana-lyzed.Based on this analysis,steady-state and transient methods for evaluating battery loss are proposed.Second,considering the distinct time-varying characteristics of various BESS components,the load-rate vs.equivalent-efficiency curve and the current-loss power component gradient field are introduced as analytical tools.These tools facilitate the derivation of optimization path for both time-varying and time-invariant energy compo-nents of BESS.Building on this foundation,a time-varying optimization strategy for battery cluster power allocation is developed,aiming to minimize energy loss while fully accounting for the dynamic characteristics of BESS.Compared to real-time optimization,this strategy prioritizes global optimality in the time domain,mitigates the risk of dimensionality curse,and enhances BESS efficiency.Finally,a Simulink/Simscape model is established based on real-world data to simulate internal component losses within BESS.The effectiveness of the proposed strategy is validated under a peak shaving scenario.Results indicate that,after optimization,the annual operational loss of BESS is reduced by 2.40%,while the energy round-trip efficiency is improved by 0.59%.展开更多
On December 24,a new industrial partner entered the friend circle of new energy vehicle industrial cluster in Daye;a new material project with a total investment of 3 billion yuan held ground-breaking ceremony,signali...On December 24,a new industrial partner entered the friend circle of new energy vehicle industrial cluster in Daye;a new material project with a total investment of 3 billion yuan held ground-breaking ceremony,signaling its formal landing in Daye.This Project is invested and constructed by Hubei Zhongxing New Advanced Material Co.,Ltd,the Project involves total investment of展开更多
基金supported by Key Program of the Na-tional Natural Science Foundation of China(No.52337004).
文摘A time-varying optimization strategy for battery cluster power allocation is proposed to minimize energy loss in battery energy storage systems(BESS).First,the time-dependent loss characteristics of both storage and non-storage components in BESS are ana-lyzed.Based on this analysis,steady-state and transient methods for evaluating battery loss are proposed.Second,considering the distinct time-varying characteristics of various BESS components,the load-rate vs.equivalent-efficiency curve and the current-loss power component gradient field are introduced as analytical tools.These tools facilitate the derivation of optimization path for both time-varying and time-invariant energy compo-nents of BESS.Building on this foundation,a time-varying optimization strategy for battery cluster power allocation is developed,aiming to minimize energy loss while fully accounting for the dynamic characteristics of BESS.Compared to real-time optimization,this strategy prioritizes global optimality in the time domain,mitigates the risk of dimensionality curse,and enhances BESS efficiency.Finally,a Simulink/Simscape model is established based on real-world data to simulate internal component losses within BESS.The effectiveness of the proposed strategy is validated under a peak shaving scenario.Results indicate that,after optimization,the annual operational loss of BESS is reduced by 2.40%,while the energy round-trip efficiency is improved by 0.59%.
文摘On December 24,a new industrial partner entered the friend circle of new energy vehicle industrial cluster in Daye;a new material project with a total investment of 3 billion yuan held ground-breaking ceremony,signaling its formal landing in Daye.This Project is invested and constructed by Hubei Zhongxing New Advanced Material Co.,Ltd,the Project involves total investment of