Genetic Algorithm for Scheduling Problem of Chemical Batch Process with Due Date Constraints
1
作者 SONG Jie-wei, RONG Gang (National Key Laboratory of Industrial Control Technology, Zhejiang U niversity, Hangzhou 310027, China) 《厦门大学学报(自然科学版)》 CAS CSCD 北大核心 2002年第S1期147-,共1页
The intense competition in the current marketplace ha s forced firms to reexamine their methods of doing business, using superior manu facturing practices in the form of just-in-time (JIT), production with JIT pra cti... The intense competition in the current marketplace ha s forced firms to reexamine their methods of doing business, using superior manu facturing practices in the form of just-in-time (JIT), production with JIT pra ctices pursue completion on time and zero inventory, which is often instruct ed according to the custom’s demand or the sale contract. Earliness and tardine ss are undesirable because both of them will bring the extra cost, cost will als o be increased by some factors such as operation condition, intermediate storage , clean method, etc, to minimize the total cost is often the main scheduling objective, but sometime it is most important for factories to eliminate the tar diness cost in order to maintain the commercial credit and to avoid penalty, the refore, minimum of tardiness cost becomes the first objective. It is more import ant to select a reasonable objective by the actual condition during scheduli ng. In this paper scheduling problem of chemical batch process with due date is studied, two different intermediate storage policies and two different productio n modes are also discussed, production scheduling with different intermediate st orage policy and different production mode is proposed and the result is compare d. In order to complete all products within the due date, not only earliness and tardiness but also holding problem is considered, the objective is to selec t a proper intermediate storage policy and production mode and to minimize the c ost resulted by the earliness and tardiness, even the cost result by the interme diate storage. Scheduling with multiple stage and multiple machine is known as a NP-hard problem, mathematical program (MP) method, such as branch-and-bound (BAB), mixed integer linear program (MILP), etc, is often used to solve the sche duling problem. But as is well known, MP method is not good for combination opti mization, especially for large scale and complex optimal problem, whereas geneti c algorithm (GA) can overcome the MP method’s shortcoming and is fit for solvin g such scheduling problem. In this paper a modified genetic algorithm with speci al crossover operator and mutation operator is presented to solve this schedulin g problem. The results show such problem can be solved effectively with the pres ented method. 展开更多
关键词 batch process earliness and tardiness genetic a lgorithms hold cost intermediate storage JIT scheduling
在线阅读 下载PDF
基于遗传算法的批调度问题
2
作者 王莉 张世泽 李大卫 《鞍山钢铁学院学报》 CAS 1997年第6期4-7,共4页
对把独立的、可同时达到的工件组批,并同时在单机上确定批内序和批间序的批调度问题进行了研究。给出了问题的数学模型,并构造了一个有效的遗传算法。实验结果表明是有效的。
关键词 批调度 提前 拖期 设置成本 遗传算法
在线阅读 下载PDF
装配作业车间的JIT调度研究 被引量:15
3
作者 吕海利 朱家涛 +1 位作者 王正国 吴姝 《机械工程学报》 EI CAS CSCD 北大核心 2021年第5期157-165,共9页
虽然作业车间调度问题在过去几十年里已经得到了广泛而深入的研究,但大部分研究都是以正规指标(Regular measures)最小化为目标。正规指标的调度只需要将工序尽量提前即可。相对于正规指标,最小化提前和延迟成本之和等则属于非正规指标(... 虽然作业车间调度问题在过去几十年里已经得到了广泛而深入的研究,但大部分研究都是以正规指标(Regular measures)最小化为目标。正规指标的调度只需要将工序尽量提前即可。相对于正规指标,最小化提前和延迟成本之和等则属于非正规指标(Non-regular measures)。对于非正规指标调度,将所有工序尽量提前并不能优化目标,其调度方案的生成过程必然更加复杂。针对提前和延迟成本最小化这类非正规指标问题,将研究对象从作业车间调度(Job shop scheduling,JSP)扩展到了装配作业车间调度(Assembly job shop scheduling,AJSP),以更广泛地探讨求解此类问题的一般规律。设计了一种三阶段调整的启发式算法以生成调度方案,并结合遗传算法的求解框架进行了分析。通过与最优解结果对比,证明该启发式算法的效率和有效性。另外,试验结果也揭示了不同求解因子对求解效果的影响,为后续研究提供参考。 展开更多
关键词 装配作业车间调度 提前和延迟成本 遗传算法 启发式算法
原文传递