Effect of pipe characteristics in umbrella arch method on controlling tunneling-induced settlements in soft grounds 被引量:16
1
作者 Ali Morovatdar Massoud Palassi Reza S.Ashtiani 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2020年第5期984-1000,共17页
Recent developments in tunneling have stimulated design practitioners to more effectively utilize the underground spaces.However,tunneling at shallow depth in soft grounds gives rise to concerns associated with tunnel... Recent developments in tunneling have stimulated design practitioners to more effectively utilize the underground spaces.However,tunneling at shallow depth in soft grounds gives rise to concerns associated with tunnel instability.Umbrella arch method(UAM),as a pre-reinforcement approach of tunnels in complex geological conditions,is widely used to maintain the tunnel stability.Quantitative assessment of the impacts of the entire approach and forepoling pipe features on tunnel stability remains challenging due to the complex nature of the UAM application.This study aimed to assess the effect of pipe design parameters on reinforcing the tunnels excavated in soft grounds.This practical investigation considered the actual field conditions attributed to the tunneling procedure and UAM deployment.Then,the tunneling process was modeled and the tunnel excavation-induced settlements were calculated.The post-processed results confirmed that deploying the UAM substantially reduced the tunnel crown and ground surface settlements by 76%and 42%,respectively.Investigation of various design parameters of pipes underscored the significance of incorporating the optimum value for each individual parameter into design schemes to more effectively control the settlements.Additionally,contrasting the settlement reduction rates(SRRs)for pipe design variables showed that the tunnel stability is more sensitive to the changes in the values of diameter and length,compared to values of the installation angle and center-tocenter distance of the pipes. 展开更多
关键词 Tunnel reinforcement Umbrella arch method(UAM) Urban tunneling Forepoling pipes Finite element analysis Numerical simulation
在线阅读 下载PDF
The Types of Tunnels Maintenance in Umbrella Arch Method
2
作者 Arash Rostami Parham Kamali Dehkordi +2 位作者 Morteza Askari Ziarati Saman Jahani Kamran Lotfi 《Open Journal of Civil Engineering》 2016年第2期156-162,共7页
During tunneling in loose grounds, the ground deformation caused by drillings around the tunnel, leads to land subsidence and the adjacent tunnel which would affect tunnel structure and surrounding structures. In such... During tunneling in loose grounds, the ground deformation caused by drillings around the tunnel, leads to land subsidence and the adjacent tunnel which would affect tunnel structure and surrounding structures. In such situations it is necessary to improve the properties of the ground prior to drilling operations. In order to acquire tunnel face stability during excavation operations in areas with loose soil fault or areas with lack of adhesion, there are various methods such as split cross drilling, frame holder or auxiliary pre-holding methods such as umbrella arch method;pre-holding methods must provide safety when drilling and must be affordable, economically. In this study, we assessed the previous studies on methods and behaviors of umbrella arch strategy in reinforcing the concrete tunnels, reached the purpose with experimental and numerical methods and offered the latest design achievements, implementation progresses and analysis in relation with this method. 展开更多
关键词 TUNNEL DRILLING Umbrella arch method Forepole ARMING
在线阅读 下载PDF
Three-dimensional lattice Boltzmann method for simulating blood flow in aortic arch 被引量:2
3
作者 康秀英 吉驭嫔 +1 位作者 刘大禾 金永娟 《Chinese Physics B》 SCIE EI CAS CSCD 2008年第3期1041-1049,共9页
The three-dimensional (3D) lattice Boltzmann models, 3DQ15, 3DQ19 and 3DQ27, under different wall boundary conditions and lattice resolutions have been investigated by simulating Poiseuille flow in a circular cylind... The three-dimensional (3D) lattice Boltzmann models, 3DQ15, 3DQ19 and 3DQ27, under different wall boundary conditions and lattice resolutions have been investigated by simulating Poiseuille flow in a circular cylinder for a wide range of Reynolds numbers. The 3DQ19 model with improved Fillippova and Hanel (FH) curved boundary condition represents a good compromise between computational efficiency and reliability. Blood flow in an aortic arch is then simulated as a typical haemodynamic application. Axial and secondary fluid velocity and effective wall shear stress profiles in a 180° bend are obtained, and the results also demonstrate that the lattice Boltzmann method is suitable for simulating the flow in 3D large-curved vessels. 展开更多
关键词 lattice Boltzmann method aortic arch secondary flow wall shear stress
原文传递
Visualization of the formation and features of soil arching within a piled embankment by discrete element method simulation 被引量:5
4
作者 Han-jiang LAI Jun-jie ZHENG +1 位作者 Rong-jun ZHANG Ming-juan CUI 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2016年第10期803-817,共15页
Piled embankments are widely used in highway and railway engineering due to their economy and efficiency inovercoming several issues encountered in constructing embankments over weak soils. Soil arching, caused by the... Piled embankments are widely used in highway and railway engineering due to their economy and efficiency inovercoming several issues encountered in constructing embankments over weak soils. Soil arching, caused by the pile-subsoilrelative displacement (△s), plays an important role in reducing the embankment load falling on weak soil, however, the funda-mental characteristics (e.g., formation and features) of soil arching remain poorly understood. In this study, a series of discreteelement method (DEM) modellings are performed to study the formation and features of soil arching with the variation of As inpiled embankments with or without geosynthetic reinforcement. Firstly, calibration for the modelling parameters is carried out bycomparing the DEM results with the experimental data obtained from the existing literature. Secondly, the analysis of the macro-and micro-behaviours is performed in detail. Finally, a parametric study is conducted in an effort to identify the influences of threekey factors on soil arching: the friction coefficient of the embankment fill (f), the embankment height (h), and the pile clear spacing(s-a). Numerical results indicate that △s is a key factor governing the formation and features of soil arching in embankments. Tobe specific, soil arching gradually evolves from two inclined shear planes at a small △s to a hemispherical arch at a relatively largeAs. Then, with a continuous increase in △s, the soil arching height gradually increases and finally approaches a constant value of0.8(s-a) (i.e., the maximum soil arching height). For a given case, the higher the soil arching height, the greater the degree of soilarching effect. The parametric study shows that the friction coefficient of the embankment fill has a negligible influence on theformation and features of soil arching. However, embankment height is a key factor governing the formation and features of soilarching. In addition, pile clear spacing has a significant effect on the formation of soil arching, but not on its features. 展开更多
关键词 Piled embankment Numerical simulation DISCRETE element method (DEM) Soil arching Formation Features
原文传递
General displacement arch-cantilever element method for stress analysis of arch dam
5
作者 Hao REN Tong-chun LI Zhi-wei NIU Lan-hao ZHAO 《Water Science and Engineering》 EI CAS 2009年第1期32-42,共11页
Based on the general displacement method and the basic hypothesis of the trial load method, a new advanced trial load method, the general displacement arch-cantilever element method, was proposed to derive the transfo... Based on the general displacement method and the basic hypothesis of the trial load method, a new advanced trial load method, the general displacement arch-cantilever element method, was proposed to derive the transformation relation of displacements and loads between the surface nodes and middle plane nodes. This method considers the nodes on upstream and downstream surfaces of the arch dam to be exit nodes (master nodes), and the middle plane nodes to be slave nodes. According to the derived displacement and load transformation matrices, the equilibrium equation treating the displacement of middle plane nodes as a basic unknown variable is transformed into one that treats the displacement of upstream and downstream nodes as a basic unknown variable. Because the surface nodes have only three degrees of freedom (DOF), this method can be directly coupled with the finite element method (FEM), which is used for foundation simulation to analyze the stress of the arch dam with consideration of dam-foundation interaction. Moreover, using the FEM, the nodal load of the arch dam can be easily obtained. Case studies of a typical cylindrical arch dam and the Wudongde arch dam demonstrate the robustness and feasibility of the proposed method. 展开更多
关键词 arch dam arch-cantilever element method general displacement method finite element method (FEM) couoled analysis stress analysis Wudongde arch dam
在线阅读 下载PDF
Seismic damage analysis of the outlet piers of arch dams using the finite element sub-model method 被引量:2
6
作者 Song Liangfeng Wu Mingxin +1 位作者 Wang Jinting Xu Yanjie 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2016年第3期617-626,共10页
This study aims to analyze seismic damage of reinforced outlet piers of arch dams by the nonlinear finite element (FE) sub-model method. First, the dam-foundation system is modeled and analyzed, in which the effects... This study aims to analyze seismic damage of reinforced outlet piers of arch dams by the nonlinear finite element (FE) sub-model method. First, the dam-foundation system is modeled and analyzed, in which the effects of infinite foundation, contraction joints, and nonlinear concrete are taken into account. The detailed structures of the outlet pier are then simulated with a refined FE model in the sub-model analysis. In this way the damage mechanism of the plain (unreinforced) outlet pier is analyzed, and the effects of two reinforcement measures (i.e., post-tensioned anchor cables and reinforcing bar) on the dynamic damage to the outlet pier are investigated comprehensively. Results show that the plain pier is damaged severely by strong earthquakes while implementation of post-tensioned anchor cables strengthens the pier effectively. In addition, radiation damping strongly alleviates seismic damage to the piers. 展开更多
关键词 arch dam outlet pier seismic damage reinforcement measure FE sub-model method
在线阅读 下载PDF
Nonlinear simulation of arch dam cracking with mixed finite element method
7
作者 Ren Hao Li Tongchun Chen Huifang Zhao Lanhao 《Water Science and Engineering》 EI CAS 2008年第2期88-101,共14页
This paper proposes a new, simple and efficient method for nonlinear simulation of arch dam cracking from the construction period to the operation period, which takes into account the arch dam construction process and... This paper proposes a new, simple and efficient method for nonlinear simulation of arch dam cracking from the construction period to the operation period, which takes into account the arch dam construction process and temperature loads. In the calculation mesh, the contact surface of pair nodes is located at places on the arch dam where cracking is possible. A new effective iterative method, the mixed finite element method for friction-contact problems, is improved and used for nonlinear simulation of the cracking process. The forces acting on the structure are divided into two parts: external forces and contact forces. The displacement of the structure is chosen as the basic variable and the nodal contact force in the possible contact region of the local coordinate system is chosen as the iterative variable, so that the nonlinear iterative process is only limited within the possible contact surface and is much more economical. This method was used to simulate the cracking process of the Shuanghe Arch Dam in Southwest China. In order to prove the validity and accuracy of this method and to study the effect of thermal stress on arch dam cracking, three schemes were designed for calculation. Numerical results agree with actual measured data, proving that it is feasible to use this method to simulate the entire process of nonlinear arch dam cracking. 展开更多
关键词 mixed finite element method contact pair nodes crack of arch dam SIMULATION thermal stress
在线阅读 下载PDF
中国特高拱坝变形曲线解析研究——散点MNO法实例
8
作者 王民浩 陈观福 《水力发电》 2026年第1期1-7,共7页
通过调研收集大量特高拱坝监测资料,分析中国已建成投运的9座特高拱坝的工程特点,运用散点MNO法解析出特高拱坝的标准曲线。计算结果表明,9个特高拱坝的变形标准曲线的趋势是一致的,全部符合拱坝物理特性和变形规律。最后提出开放大坝... 通过调研收集大量特高拱坝监测资料,分析中国已建成投运的9座特高拱坝的工程特点,运用散点MNO法解析出特高拱坝的标准曲线。计算结果表明,9个特高拱坝的变形标准曲线的趋势是一致的,全部符合拱坝物理特性和变形规律。最后提出开放大坝监测数据的建议,在海量监测数据的基础上,根据散点MON法和拱坝宏评M法,建立拱坝最大变形标准曲线数据库,从而可进行智能设计,提高效率,降低生产成本,进一步提升拱坝设计水平。 展开更多
关键词 特高拱坝 大坝监测 散点 MNO法 变形曲线
在线阅读 下载PDF
吊索猝断下钢桁拱桥的时变体系抗连续倒塌性能
9
作者 王晓明 杨文杰 +3 位作者 邹杰 邓华 高泽亮 张浩楠 《工程力学》 北大核心 2026年第2期209-222,共14页
吊索猝断下在役钢桁拱桥体系的抗连续倒塌性能为结构应对非对称极端作用提供了必要的内部缓冲机制,材料劣化会改变体系抗连续倒塌过程中的再平衡格局。基于等效卸载的AP法模拟吊索猝断下应力波的传递与叠加效应,建立了吊索猝断下体系时... 吊索猝断下在役钢桁拱桥体系的抗连续倒塌性能为结构应对非对称极端作用提供了必要的内部缓冲机制,材料劣化会改变体系抗连续倒塌过程中的再平衡格局。基于等效卸载的AP法模拟吊索猝断下应力波的传递与叠加效应,建立了吊索猝断下体系时变连续倒塌易损性评估方法。基于MATLAB/OpenSEES编制了单元纤维的时变演化参数组管理程序,建立了基于纤维宏单元的时变体系连续倒塌数值模拟方法,并通过动力试验数据验证了数值模拟的准确性;采用增量动力分析(IDA)法,开展了吊索猝断下钢桁拱桥的连续倒塌易损性分析,研究了材料劣化对吊索猝断下体系抗连续倒塌性能的影响规律。结果表明:吊索猝断会引起钢桁拱桥主要承载构件响应增大,其中猝断吊索相邻范围内受影响最大;材料劣化会降低钢桁拱桥体系的抗连续倒塌能力;基于IDA法的时变连续倒塌模型,可有效评估钢桁拱桥服役年限内的抗连续倒塌性能。 展开更多
关键词 钢桁拱桥 连续倒塌 纤维宏单元 易损性 IDA法
在线阅读 下载PDF
基于GARCH-TARCH模型的国内天然橡胶期货市场有效性研究 被引量:4
10
作者 韩民 郭薇 《甘肃科学学报》 2015年第6期127-131,共5页
天然橡胶是促进我国国民经济增长的重要经济作物。中国作为天然橡胶市场的最大需求国和进口国,国内期货市场有效性能否充分发挥,对用胶企业以及宏观经济的发展起着至关重要的作用。以2011—2014年上海期货交易所天然橡胶日交易数据为实... 天然橡胶是促进我国国民经济增长的重要经济作物。中国作为天然橡胶市场的最大需求国和进口国,国内期货市场有效性能否充分发挥,对用胶企业以及宏观经济的发展起着至关重要的作用。以2011—2014年上海期货交易所天然橡胶日交易数据为实证数据,建立自回归条件异方差模型,运用方差比检验方法对我国天然橡胶期货市场有效性进行分析。结果表明,天胶期货市场日收益率序列存在显著的自回归异方差特性,该市场存在严重的信息不对称性且尚未达到弱式有效,易受投机等其他异常因素的影响,总体风险系数较高。针对上述问题,提出增强我国天然橡胶期货市场有效性的对策建议。 展开更多
关键词 天然橡胶 期货市场有效性 arch模型 方差比检验法
在线阅读 下载PDF
上软下硬地层大跨地铁车站初支拱盖法开挖力学特性研究
11
作者 刘正 《国防交通工程与技术》 2026年第1期77-81,共5页
为研究上软下硬地层初支拱盖法力学特性,以锦江路站为例,选取车站中部典型断面作为分析对象,对不同施工阶段进行了初期支护、临时支护及大拱盖结构的应力分析和拱顶及地表沉降监测。研究结果表明:在各分析工况下,初期支护与临时支护的... 为研究上软下硬地层初支拱盖法力学特性,以锦江路站为例,选取车站中部典型断面作为分析对象,对不同施工阶段进行了初期支护、临时支护及大拱盖结构的应力分析和拱顶及地表沉降监测。研究结果表明:在各分析工况下,初期支护与临时支护的最大主拉应力和最大主压应力均远小于C25喷射混凝土的抗拉强度设计值和抗压强度设计值,支护结构整体处于安全状态。沉降监测显示:最大拱顶沉降、最大地表沉降,均满足规范控制要求;沉降主要发生在上部导坑开挖阶段,大拱盖施作后沉降趋于稳定,并有效减小了下部开挖引起的附加变形。采用初支拱盖法对保证施工安全、控制变形和加快施工进度起到了关键作用。 展开更多
关键词 上软下硬地层 初支拱盖法 地表沉降 结构受力 临时支护
在线阅读 下载PDF
钢筋混凝土桁架拱桥加固后承载力评定及拱脚裂缝分析
12
作者 冯冲 崔文林 +1 位作者 王文雅 刘子玉 《工程建设》 2026年第1期63-71,共9页
为研究加固后钢筋混凝土桁架拱桥承载力及拱脚裂缝,文章以某上承式钢筋混凝土桁架拱桥为研究背景,通过外观质量检测,识别病害类型及产生位置,分析病害成因;建立全桥有限元模型,提出采用黏贴钢板的方案加固横向联系构件,采用外包钢板结... 为研究加固后钢筋混凝土桁架拱桥承载力及拱脚裂缝,文章以某上承式钢筋混凝土桁架拱桥为研究背景,通过外观质量检测,识别病害类型及产生位置,分析病害成因;建立全桥有限元模型,提出采用黏贴钢板的方案加固横向联系构件,采用外包钢板结合低收缩自密实微膨胀混凝土的增大截面法加固主拱结构;针对多杆交汇、应力状态复杂且裂缝开展严重的拱脚区域,建立精细化局部有限元模型,系统分析了加固前后拱脚位置的应力状态、裂缝开展特征等参数。研究表明:加固后,桥梁结构承载能力显著提升并满足规范要求,拱脚裂缝宽度得到有效控制且分布范围明显减小。该加固方案取得了显著的工程效果和经济性,可为类似工程加固设计提供理论支持和指导。 展开更多
关键词 桁架拱桥 裂缝 加固方式 加固效果
原文传递
钻爆法隧道装配式仰拱结构选型及受力特征研究
13
作者 邓启华 付钧福 高文学 《北京理工大学学报》 北大核心 2026年第2期131-140,共10页
针对钻爆法隧道现浇施工模式存在的效率低、工序复杂、机械化程度低等问题,以时速200 km铁路单线隧道为工程背景,采用数值模拟与模型试验相结合的方法,对装配式仰拱的结构形式及不同的环向连接方式下装配式仰拱结构的受力性能与破坏特... 针对钻爆法隧道现浇施工模式存在的效率低、工序复杂、机械化程度低等问题,以时速200 km铁路单线隧道为工程背景,采用数值模拟与模型试验相结合的方法,对装配式仰拱的结构形式及不同的环向连接方式下装配式仰拱结构的受力性能与破坏特性进行分析研究.结果表明:单块三孔方案相较于双块方案具有整体性好、施工简便等显著优势,并优化出安全可靠的衬砌结构配筋方案;环向接头形式对预制仰拱破坏形态影响显著,Z形与凸形连接结构因力学传递性能良好,主要呈现压碎与剪切破坏,平接头及锥形接合部位则因结合强度不够,表现为连接处位移破坏;不同环向接头的衬砌结构顶部所承受围岩压力基本相同,而Z形和凸形接头在仰拱处出现明显应力集中,承受约200%的实际加载压力,而平接头和锥形接头仰拱仅承受约20%. 展开更多
关键词 装配式仰拱 结构选型 钻爆法隧道 环向连接 受力特征 模型试验
在线阅读 下载PDF
考虑空间土拱效应的非饱和地层圆形基坑围护结构侧向土压力计算方法
14
作者 徐杰 张振光 李海祥 《岩土力学》 北大核心 2026年第1期245-254,共10页
为合理描述非饱和地层圆形基坑围护结构侧向土压力沿深度的大小、分布、合力及作用点高度,基于非饱和土的吸应力理论与极限平衡法,首先推导了对吸应力均匀/线性分布都适用的围护结构后方土体滑动面倾角,然后组合竖向土拱和环向土拱的不... 为合理描述非饱和地层圆形基坑围护结构侧向土压力沿深度的大小、分布、合力及作用点高度,基于非饱和土的吸应力理论与极限平衡法,首先推导了对吸应力均匀/线性分布都适用的围护结构后方土体滑动面倾角,然后组合竖向土拱和环向土拱的不同作用,建立了空间土拱效应下非饱和地层圆形基坑围护结构侧向土压力的计算方法,并对比已有理论解答和模型试验数据进行验证、分析相关因素的影响规律。研究结果表明:计算方法不仅与文献理论解答、模型试验数据吻合良好,验证了其准确性和合理性,而且有效解决了非饱和地层、空间土拱效应、结构-土体接触参数等对圆形基坑侧向土压力的综合影响,有助于实现圆形基坑的设计与施工优化,具有一定的理论意义和良好的应用前景;基坑侧向土压力合力随着地表吸应力的绝对值、环向应力系数、外黏聚力的增加而明显减小,而合力作用点高度的变化却不大;线性吸应力下的基坑侧向土压力大于均布吸应力下的,但均布吸应力下的侧向土压力变化更显著。 展开更多
关键词 圆形基坑 侧向土压力 空间土拱效应 吸应力 极限平衡法
原文传递
基于WBS-RBS和BWM-熵权-VIKOR的高原高寒山区钢管混凝土拱桥施工安全风险评估研究
15
作者 袁海粟 邢瑞 +3 位作者 赵丹 佟铭玉 陈昌浩 周凡 《工业安全与环保》 2026年第1期39-44,共6页
针对目前高原高寒山区钢管混凝土拱桥施工安全风险评价存在的不足,首先提出4M理论和WBS-RBS法相结合进行风险因素识别,构建以BWM法确定准则层主观权重和熵权法确定指标层客观权重相结合的组合赋权方法,建立基于考虑正、负理想解的改进B... 针对目前高原高寒山区钢管混凝土拱桥施工安全风险评价存在的不足,首先提出4M理论和WBS-RBS法相结合进行风险因素识别,构建以BWM法确定准则层主观权重和熵权法确定指标层客观权重相结合的组合赋权方法,建立基于考虑正、负理想解的改进BWM-熵权-VIKOR安全风险评价模型,最后以钢管混凝土拱桥施工桥台承台施工阶段为例建立评价指标体系并进行评估,结果表明,高原高寒气候下混凝土裂缝风险和承台基坑上边坡支护强度风险的综合风险值最高。 展开更多
关键词 WBS-RBS 钢管混凝土拱桥 改进BWM-熵权-VIKOR法 高原高寒山区
在线阅读 下载PDF
In-Plane Elastic Stability of Arches under a Radial Concentrated Load
16
作者 Yongjun Xu Xiaoming Gui +1 位作者 Bin Zhao Ruiqi Zhou 《Engineering(科研)》 2014年第9期572-583,共12页
This paper is concerned with the in-plane elastic stability of arches subjected to a radial concentrated load. The equilibrium equation for pin-ended circular arches is established by using energy method, and it is pr... This paper is concerned with the in-plane elastic stability of arches subjected to a radial concentrated load. The equilibrium equation for pin-ended circular arches is established by using energy method, and it is proved that the axial force is nearly a constant along the circumference of the circular arches. Based on force method, the equation for the primary eigen function is derived and solved, and the approximate analytical solution of critical instability load is obtained. Numerical examples are given and discussed. 展开更多
关键词 IN-PLANE ELASTIC Stability BUCKLING Critical Load Circular arch Force method
在线阅读 下载PDF
拱坝宏评M法 被引量:1
17
作者 李瓒 王民浩 +1 位作者 姚栓喜 李维耿 《西北水电》 2025年第2期1-5,共5页
安全且经济地利用水能资源是水电开发中永恒的主题和追求,拱坝是安全性和经济性均较优越的坝型,同时又是非常复杂的坝型,如何快速的评价拱坝结构安全性,以及在安全的前提下设计出经济性的拱坝,是坝工设计人员努力解决的问题。通过对全球... 安全且经济地利用水能资源是水电开发中永恒的主题和追求,拱坝是安全性和经济性均较优越的坝型,同时又是非常复杂的坝型,如何快速的评价拱坝结构安全性,以及在安全的前提下设计出经济性的拱坝,是坝工设计人员努力解决的问题。通过对全球240座拱坝的实际情况,求解出了一种安全性和经济性评估拱坝的M法,供各国坝工专家应用和评论。 展开更多
关键词 拱坝 柔度法 M法
在线阅读 下载PDF
Nonlinear dynamic behaviors of viscoelastic shallow arches
18
作者 易壮鹏 王连华 赵跃宇 《Applied Mathematics and Mechanics(English Edition)》 SCIE EI 2009年第6期771-777,共7页
The nonlinear dynamic behaviors of nonlinear viscoelastic shallow arches sub- jected to external excitation are investigated. Based on the d'Alembert principle and the Euler-Bernoulli assumption, the governing equati... The nonlinear dynamic behaviors of nonlinear viscoelastic shallow arches sub- jected to external excitation are investigated. Based on the d'Alembert principle and the Euler-Bernoulli assumption, the governing equation of a shallow arch is obtained, where the Leaderman constitutive relation is applied. The Galerkin method and numerical in- tegration are used to study the nonlinear dynamic properties of the viscoelastic shallow arches. Moreover, the effects of the rise, the material parameter and excitation on the nonlinear dynamic behaviors of the shallow arch viscoelastic shallow arches may appear to have a are investigated. The results show that chaotic motion for certain conditions. 展开更多
关键词 viscoelastic shallow arch Leaderman constitutive relation Galerkin method bifurcation CHAOS
在线阅读 下载PDF
上软下硬地层大跨暗挖地铁车站拱盖法施工力学效应研究 被引量:2
19
作者 麻凤海 张雨 《辽宁工程技术大学学报(自然科学版)》 北大核心 2025年第1期52-61,共10页
为研究上软下硬地层大跨暗挖地铁车站拱盖法施工的力学效应,以大连地铁4号线东南山站为研究背景,采用数值模拟和现场监测相结合的方法,运用MIDAS-GTS/NX有限元软件,研究地铁车站拱盖法施工全程的围岩变形及稳定性并与现场实测数据对比... 为研究上软下硬地层大跨暗挖地铁车站拱盖法施工的力学效应,以大连地铁4号线东南山站为研究背景,采用数值模拟和现场监测相结合的方法,运用MIDAS-GTS/NX有限元软件,研究地铁车站拱盖法施工全程的围岩变形及稳定性并与现场实测数据对比分析。研究结果表明:地表沉降由车站中线向两侧逐渐递减,影响区域约为车站开挖跨度的2倍;围岩变形和应力具有明显对称性,拱部围岩以沉降为主,高边墙以隆起为主,拱部跨中向隧道净空入侵,大拱脚向围岩入侵;围岩最大主应力均为压应力,拱脚尖角部位存在应力集中现象;围岩塑性区作用位置随车站施工不断变化,最终集中作用于高边墙位置处;通过Peck公式预测地表沉降,验证在上软下硬地层中采用拱盖法施工的可行性,为实际工程施工提供参考。 展开更多
关键词 暗挖地铁车站 拱盖法施工 围岩变形 Peck沉降预测 围岩塑性区 围岩最大主应力
原文传递
CRTSⅡ型轨道板上拱稳定性判别方法研究
20
作者 杨俊斌 杨荣山 +2 位作者 潘自立 姚远 刘恒 《中南大学学报(自然科学版)》 北大核心 2025年第6期2584-2596,共13页
基于解释结构模型理论,将涵盖设计、生产、施工、材料、线下基础、病害及环境这7方面共计15个影响因素的轨道板上拱稳定性系统转化成一个5级递阶有向图,构建各因素对轨道板上拱影响的层次结构,明晰各因素对轨道板上拱影响的性质类别。... 基于解释结构模型理论,将涵盖设计、生产、施工、材料、线下基础、病害及环境这7方面共计15个影响因素的轨道板上拱稳定性系统转化成一个5级递阶有向图,构建各因素对轨道板上拱影响的层次结构,明晰各因素对轨道板上拱影响的性质类别。在此基础上,建立几何尺寸表征各直接影响因素、计算结果可映射根本影响因素的轨道板上拱稳定性二维数值模型;以伤损实际状态、现行的铁路规范为依据,确定各直接影响因素的取值范围,并拟定体现多因素不同状态相互耦合效果的210组计算工况;以各工况、各工况条件下数值模型计算的轨道板上拱2 mm时的计算结果构成样本数据集,采用多元线性回归分析方法,建立以各直接影响因素为自变量、根本影响因素为因变量的分析模型;提出仅将回归模型的预测结果与实际值进行比较即可判别轨道板上拱稳定性的方法,并验证该判别方法的正确性;基于回归模型中的标准化系数,确定各直接影响因素对轨道板上拱稳定性影响程度的主次关系。研究结果表明:在诸多轨道板上拱稳定性的影响因素中,窄接缝伤损及初始弯曲是直接因素,温度是根本因素;轨道板初始弯曲、窄接缝破损高度及宽度这3个因素对轨道板上拱稳定性的影响程度是依次减弱的;提出的轨道板上拱稳定性判别方法的准确率达90%,说明该方法可较好地适用于板体上拱稳定性的判别。 展开更多
关键词 Ⅱ型轨道板 上拱 稳定性 判别方法 解释结构模型 回归分析
在线阅读 下载PDF