This paper investigates elastomer-toughened polypropylene(PP)insulation to meet the application requirements for green noncrosslinked PP cables in high-voltage direct current(HVDC)transmission.It focuses on the format...This paper investigates elastomer-toughened polypropylene(PP)insulation to meet the application requirements for green noncrosslinked PP cables in high-voltage direct current(HVDC)transmission.It focuses on the formation ofβ-crystals in isotactic polypropylene(iPP)by adding aβ-nucleator.It examines how varying concentrations ofβ-nucleator and elastomer(POE)impact the aggregation structure of PP insulation and its conductivity and breakdown characteristics in the DC field.The results indicated that at aβ-nucleator agent content of 0.1 wt%,the samples with various POE contents achieved the highest crystallinity,the maximum proportion ofβ-crystals and the most uniform elastomer distribution.The nucleating agent facilitates the formation ofβ-crystals in PP and enhances the order degree of the elastomer molecular chains,thereby improving their crystallization capabilities.Evaluations of DC performances and trap characteristics reveal that when the amount of theβ-nucleator is set at 0.1 wt%,the sample demonstrates the lowest trap density,an exceptional and lower electric field coefficient of conductivity at elevated electric fields and a superior DC field breakdown strength at 90°C.Compared to samples withoutβ-nucleator,the reduction of DC field breakdown strength for PPBx-0.1 from 25°C to 90°C is approximately 4.86%lower.This improvement is attributed to the ability of theβ-nucleator to improve the aggregation structure between PP and POE while optimising the stability of the two-phase interface.Thus,although DC electrical characteristics are maintained at normal temperatures,the DC characteristics are significantly improved at elevated temperatures.展开更多
Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similariti...Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similarities and differences of two kinds of decomposing methods classified by type of work and construction elements based on the discussion of international typical coding standards system designing. We then deduce the differential coefficient relation between project breakdown structure (PBS) and work breakdown structure (WBS). At the same time we constitute a comprehensive construction project breakdown system including element code and type of work code and make a further schematic presentation of the implementation of the system’s functions.展开更多
The results of experiments with rapidly exploding thin conductors inthe current-pause regime are presented.Copper wires 25mmin diameter and 12 mm in length serve as loads for a GVP pulsed generator based on a low-indu...The results of experiments with rapidly exploding thin conductors inthe current-pause regime are presented.Copper wires 25mmin diameter and 12 mm in length serve as loads for a GVP pulsed generator based on a low-inductance capacitor.The generator produces current pulses of up to 10 kA with dI/dt up to 50 A/ns.A 100–800-ns current-pause regime is obtained for charging voltages of 10–15 kV.The discharge channel structure is studied by shadow photography using 0.53-mm,10-ns second-harmonic pulses from aNd31:YAG laser.In the experiments,three types of secondary breakdown are observed,with different symmetry types,different current-pause durations,and different dependences on the energy deposited into the wire during its resistive heating.All of these breakdown types develop inside a tubular core that is produced in the current-pause stage and that remains almost undamaged by the breakdown.展开更多
基金supported by China Southern Power Grid Company Limited(Grant GDKJXM20222136).
文摘This paper investigates elastomer-toughened polypropylene(PP)insulation to meet the application requirements for green noncrosslinked PP cables in high-voltage direct current(HVDC)transmission.It focuses on the formation ofβ-crystals in isotactic polypropylene(iPP)by adding aβ-nucleator.It examines how varying concentrations ofβ-nucleator and elastomer(POE)impact the aggregation structure of PP insulation and its conductivity and breakdown characteristics in the DC field.The results indicated that at aβ-nucleator agent content of 0.1 wt%,the samples with various POE contents achieved the highest crystallinity,the maximum proportion ofβ-crystals and the most uniform elastomer distribution.The nucleating agent facilitates the formation ofβ-crystals in PP and enhances the order degree of the elastomer molecular chains,thereby improving their crystallization capabilities.Evaluations of DC performances and trap characteristics reveal that when the amount of theβ-nucleator is set at 0.1 wt%,the sample demonstrates the lowest trap density,an exceptional and lower electric field coefficient of conductivity at elevated electric fields and a superior DC field breakdown strength at 90°C.Compared to samples withoutβ-nucleator,the reduction of DC field breakdown strength for PPBx-0.1 from 25°C to 90°C is approximately 4.86%lower.This improvement is attributed to the ability of theβ-nucleator to improve the aggregation structure between PP and POE while optimising the stability of the two-phase interface.Thus,although DC electrical characteristics are maintained at normal temperatures,the DC characteristics are significantly improved at elevated temperatures.
文摘Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similarities and differences of two kinds of decomposing methods classified by type of work and construction elements based on the discussion of international typical coding standards system designing. We then deduce the differential coefficient relation between project breakdown structure (PBS) and work breakdown structure (WBS). At the same time we constitute a comprehensive construction project breakdown system including element code and type of work code and make a further schematic presentation of the implementation of the system’s functions.
基金This work was supported in part by the NNSA Stewardship Sciences Academic Programs through DOE Cooperative Agreement DE-NA0001836.
文摘The results of experiments with rapidly exploding thin conductors inthe current-pause regime are presented.Copper wires 25mmin diameter and 12 mm in length serve as loads for a GVP pulsed generator based on a low-inductance capacitor.The generator produces current pulses of up to 10 kA with dI/dt up to 50 A/ns.A 100–800-ns current-pause regime is obtained for charging voltages of 10–15 kV.The discharge channel structure is studied by shadow photography using 0.53-mm,10-ns second-harmonic pulses from aNd31:YAG laser.In the experiments,three types of secondary breakdown are observed,with different symmetry types,different current-pause durations,and different dependences on the energy deposited into the wire during its resistive heating.All of these breakdown types develop inside a tubular core that is produced in the current-pause stage and that remains almost undamaged by the breakdown.