The USMTArray was completed on June 27,2024,comprising a network of 1779 transportable long-period magnetotelluric(MT)stations(Fig.1)with nominal 70-km grid spacing spanning the conterminous United States,an area of 8...The USMTArray was completed on June 27,2024,comprising a network of 1779 transportable long-period magnetotelluric(MT)stations(Fig.1)with nominal 70-km grid spacing spanning the conterminous United States,an area of 8.1×10^(6)km^(2).Each station operated for weeksto-months,as required to meet data quality standards over the period band of 10–10000 s.The USMTArray shares similarities with the planned SinoProbe-II MT Array,with its 1-degree station spacing(~111 km in the latitudinal direction)spanning an area of 9.6×10^(6)km^(2).展开更多
文摘The USMTArray was completed on June 27,2024,comprising a network of 1779 transportable long-period magnetotelluric(MT)stations(Fig.1)with nominal 70-km grid spacing spanning the conterminous United States,an area of 8.1×10^(6)km^(2).Each station operated for weeksto-months,as required to meet data quality standards over the period band of 10–10000 s.The USMTArray shares similarities with the planned SinoProbe-II MT Array,with its 1-degree station spacing(~111 km in the latitudinal direction)spanning an area of 9.6×10^(6)km^(2).