This paper describes an application of combined model of extrapolation and correlation techniques for short term load forecasting of an Indian substation. Here effort has been given to improvise the accuracy of elec-t...This paper describes an application of combined model of extrapolation and correlation techniques for short term load forecasting of an Indian substation. Here effort has been given to improvise the accuracy of elec-trical load forecasting considering the factors, past data of the load, respective weather condition and finan-cial growth of the people. These factors are derived by curve fitting technique. Then simulation has been conducted using MATLAB tools. Here it has been suggested that consideration of 20 years data for a devel-oping country should be ignored as the development of a country is highly unpredictable. However, the im-portance of the past data should not be ignored. Here, just previous five years data are used to determine the above factors.展开更多
In this paper electric load is forecast for the classified power consumers of Shanghai urban area for the scheduled years in short term and in long term respectively. The monthly load in 1999 is forecast on the basis ...In this paper electric load is forecast for the classified power consumers of Shanghai urban area for the scheduled years in short term and in long term respectively. The monthly load in 1999 is forecast on the basis of the data during 1992~1998, and the approximate load in 2010 is forecast on the basis of the data during 1990~1998.展开更多
文摘This paper describes an application of combined model of extrapolation and correlation techniques for short term load forecasting of an Indian substation. Here effort has been given to improvise the accuracy of elec-trical load forecasting considering the factors, past data of the load, respective weather condition and finan-cial growth of the people. These factors are derived by curve fitting technique. Then simulation has been conducted using MATLAB tools. Here it has been suggested that consideration of 20 years data for a devel-oping country should be ignored as the development of a country is highly unpredictable. However, the im-portance of the past data should not be ignored. Here, just previous five years data are used to determine the above factors.
文摘In this paper electric load is forecast for the classified power consumers of Shanghai urban area for the scheduled years in short term and in long term respectively. The monthly load in 1999 is forecast on the basis of the data during 1992~1998, and the approximate load in 2010 is forecast on the basis of the data during 1990~1998.