期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Discussion on Land Use Mode Reform in Coal Opencast Mining
1
作者 Hong ZHANG Lin LIN 《Asian Agricultural Research》 2024年第1期25-28,共4页
The existing land supply mode of opencast mining is"land requisition first,then transfer",which lacks an effective recovery and withdrawal mechanism,and the reclaimed mining land is difficult to withdraw.Acc... The existing land supply mode of opencast mining is"land requisition first,then transfer",which lacks an effective recovery and withdrawal mechanism,and the reclaimed mining land is difficult to withdraw.According to the regular rules of coal opencast mining and the periodic characteristics of land use,this paper puts forward a new mode of temporary land use for coal opencast mining.It is conducive to im-proving the quality and scale of land use and reclamation utilization of opencast coal mining,and is of great significance for exploring and for-mulating reasonable land use policies for mineral resources development projects. 展开更多
关键词 Opencast mine temporary land use Land requisition RECLAMATION Withdrawal mechanism
在线阅读 下载PDF
Temporary Power Safety Supervision of Building Construction Site
2
作者 WANG Pengfei 《外文科技期刊数据库(文摘版)工程技术》 2021年第11期039-042,共6页
The housing construction project temporary power supply and distribution is different from the normal, and the construction of temporary power supply characteristics is a wide range of complex and changeable. The layo... The housing construction project temporary power supply and distribution is different from the normal, and the construction of temporary power supply characteristics is a wide range of complex and changeable. The layout of temporary power consumption is different in different construction stages, and the safety risks and management priorities are also different. Therefore, on-site temporary power management has been the difficult and weak link of on-site safety management. In this regard, the article analyzes the construction site temporary power management status, and combined with the actual management experience, in view of the temporary power management in the site difficulties put forward countermeasures, as far as possible to eliminate safety risks. 展开更多
关键词 temporary electricity use ENGINEERING electrical safety
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部