期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Monitoring result analyses of high slope of five-step ship lock in the Three Gorges Project 被引量:5
1
作者 Qixiang Fan Hongbing Zhu Jun Gen 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第2期199-206,共8页
The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation... The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation in June 2003. The side slopes of the ship lock are characterized by great height(170 m), steepness (70 m in height of upright slope), and great length (over 7000 m in total length). Inassociation with the ship lock, the surrounding rocks in slope have a high potential to deform, withwhich the magnitude of deformation is restricted. Monitoring results show that the deformation of thefive-step ship lock high slopes of the TGP primarily occurred in excavation period, and deformationtended to be stable and convergent during operation period, suggesting the allowable ranges of deformation.At present, the slopes and lock chambers are stable, and the ship lock works well under normaloperation condition, enabling the social and economic benefits of the TGP. 2015 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting byElsevier B.V. All rights reserved. 展开更多
关键词 Three Gorges Project(tgp) five-step ship lock SLOPE Monitoring analysis
在线阅读 下载PDF
三峡五级船闸控制系统可靠性分析 被引量:4
2
作者 何军红 李皓 +1 位作者 康凤举 史忠科 《长江科学院院报》 EI CSCD 北大核心 2001年第2期45-47,共3页
为了分析三峡五级船闸控制系统的可靠性 ,采用了故障树分析法 ,建立了控制系统的故障树模型 ,并对该两冗余系统进行了定性及定量分析 ,由此计算出平均无故障时间 (MTBF)。在此基础上 ,进一步提出了通过增加仿真模型来改进并联冗余结构 。
关键词 船闸 故障树分析法 可靠性 控制系统 三峡工程
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部