期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
An Empirical Formula for Suspended Sediment Delivery Ratio of Main River after Confluence of Debris flow 被引量:1
1
作者 ZHANG Jin-shan CUI Peng 《Journal of Mountain Science》 SCIE CSCD 2013年第2期326-336,共11页
In order to calculate the suspended sediment discharge of the flood debris flows into the main river,a small scale flume test was designed to simulate the process of confluence of Jiangjia Ravine and Xiangjiang River ... In order to calculate the suspended sediment discharge of the flood debris flows into the main river,a small scale flume test was designed to simulate the process of confluence of Jiangjia Ravine and Xiangjiang River in Yunnan province,China.By test observation and data analysis,suspended sediment discharge of Debris flow after its entry into the main river was found to have a close relation with the bulk density,the confluence angle of the Debris flow and the main river,the ratio between per unit width discharge of Debris flow and main river.Based on the measured and simulated results,and statistical analysis,an empirical formula was proposed for the suspended SDR(Sediment Delivery Ratio) of the main river after the confluence of Debris flow.Compared with the observed results of Debris flow in 2009,the error between the data calculated by the empirical formula and the monitored data is only about 10%. 展开更多
关键词 Debris flow CONFLUENCE suspendedsediment Delivery Ratio (SDR) Jiangjia Ravine Xiaojiang River Model
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部