期刊文献+
共找到7篇文章
< 1 >
每页显示 20 50 100
A Batch of Transmission and Substation Projects Approved
1
《Electricity》 2000年第2期47-48,共2页
关键词 LENGTH A Batch of Transmission and substation projects Approved LINE BANK
在线阅读 下载PDF
All the 330 kv Yulin-Shenmu power transmission and substation projects completed
2
《Electricity》 2001年第1期49-49,共1页
关键词 length All the 330 kv Yulin-Shenmu power transmission and substation projects completed
在线阅读 下载PDF
Shanghai 500-kV Jing’an transmission & substation project completed
3
作者 Liu Chunsheng 《Electricity》 2010年第2期3-,共1页
On April 16, the 500-kV Jing’an transmission & substation project in Shanghai, a super-large, multi-voltage level, all-underground, full digital intelligent substation, was completed and put into operation,
关键词 World GVA Shanghai 500-kV Jing an transmission substation project completed KV
在线阅读 下载PDF
Review on Commissioning Test of Three Gorges Power Transmission & Substation Project
4
作者 Yang Wankai1,Yin Yonghua1,Zeng Nanchao1,Wang Minxin1,Chong Zhiyi2,Ma Weimin2,Kang Jian3 1. China Electric Power Research Institute 2. State Grid Direct Current Project Construction Company Limited 3. Hubei Electric Power Test Research Institute Yang Xiaoli 《Electricity》 2009年第2期33-38,共6页
Holding the greatest power transmission capacity in China, Three Gorges power transmission and substation (T&S) project is an important landmark in the
关键词 AC DC TEST Review on Commissioning Test of Three Gorges Power Transmission substation Project TEST
在线阅读 下载PDF
The Zouxian-Mengyin Transmission and Substation Project Commissioned
5
《Electricity》 2000年第1期54-54,共1页
关键词 PROJECT The Zouxian-Mengyin Transmission and substation Project Commissioned LINE
在线阅读 下载PDF
Northeast China's largest transmission and substation project passed the acceptance test
6
《Electricity》 2001年第4期51-51,共1页
关键词 Northeast China’s largest transmission and substation project passed the acceptance test LINE
在线阅读 下载PDF
Study on Key 750-kV Transmission Technologies
7
作者 Lu Shirong Liu Bencui Jin Wen(Abridged and translated ) 《Electricity》 2006年第1期29-33,共5页
According to the special environment conditions and characteristics of high altitude in Northwest China, the study on key technologies of 750-kV transmission and substation projects has gained fruitful results which a... According to the special environment conditions and characteristics of high altitude in Northwest China, the study on key technologies of 750-kV transmission and substation projects has gained fruitful results which are imperative not only to the construction of 750-kV transmission demonstrative project first in China, but also has laid a solid foundation for future UHV transmission constructions. 展开更多
关键词 750 kV transmission and substation project special environment condition transmission technology
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部