Large numbers of electric vehicles(EVs)charged in residential district parking lots may cause the overload of power grid distribution.The studies of EVs'charging characteristics are helpful to the intelligent sche...Large numbers of electric vehicles(EVs)charged in residential district parking lots may cause the overload of power grid distribution.The studies of EVs'charging characteristics are helpful to the intelligent schedule of EVs'charging so as to minimize its influence.展开更多
This paper studies the problem of the space station short-term mission planning, which aims to allocate the executing time of missions effectively, schedule the corresponding resources reasonably and arrange the time ...This paper studies the problem of the space station short-term mission planning, which aims to allocate the executing time of missions effectively, schedule the corresponding resources reasonably and arrange the time of the astronauts properly. A domain model is developed by using the ontology theory to describe the concepts, constraints and relations of the planning domain formally, abstractly and normatively. A method based on time iteration is adopted to solve the short-term planning problem. Meanwhile, the resolving strategies are proposed to resolve different kinds of conflicts induced by the constraints of power, heat, resource, astronaut and relationship. The proposed approach is evaluated in a test case with fifteen missions, thirteen resources and three astronauts. The results show that the developed domain ontology model is reasonable, and the time iteration method using the proposed resolving strategies can successfully obtain the plan satisfying all considered constraints.展开更多
An anisotropic geomechanical model for jointed rock mass is presented. Simultaneously with deriving the orthotropic anisotropy elastic parameters along the positive axis, the equivalent compliance matrix for the defle...An anisotropic geomechanical model for jointed rock mass is presented. Simultaneously with deriving the orthotropic anisotropy elastic parameters along the positive axis, the equivalent compliance matrix for the deflection axis orthotropic anisotropy was derived through a three- dimensional coordinate transformation. In addition, Singh's analysis of the stress concentration effects of intermittent joints was adopted, based on two groups of intermittent joints and a set of cross- cutting joints in the jointed rock mass. The stress concentration effects caused by intermittent joints and the coupling effect of cross-cutting joints along the deflection-axis are also considered. The proposed anisotropic mechanics parameters method is applied to determine the deformation parameters of jointed granite at the Taishan Nuclear Power Station. Combined with the deterministic mechanical parameters of rock blocks and joints, the deformation parameters and their variability in jointed rock masses are estimated quantitatively. The computed results show that jointed granite at the Taishan Nuclear Power Station exhibits typical anisotropic mechanical characteristics; the elastic moduli in the two horizontal directions were similar, but the elastic modulus in the vertical direction was much greater. Jointed rock elastic moduli in the two horizontal and vertical directions were respectively about 24% and 37% of the core of rock, showing weakly orthotropic anisotropy; the ratio of elastic moduli in the vertical and horizontal directions was 1.53, clearly indicating the transversely isotropic rock mass mechanical characteristics. The method can be popularized to solve other rock mechanics problems in nuclear power engineering.展开更多
In the power market environment, due to the uncertainty of the reservoir inflow and the pool purchase price, it is very important to research power generation risk dispatch of hydropower plants, taking into considerat...In the power market environment, due to the uncertainty of the reservoir inflow and the pool purchase price, it is very important to research power generation risk dispatch of hydropower plants, taking into consideration the benefits and risk control of both sides. This paper investigates power generation risk dispatch of hydropower plants in the market environment, and proposes a mathematical model which considers maximization of benefits and risk control, reflects control willingness of risk and benefits, resolves it with the PSO algorithm, finding more economic and reasonable results. The feasibility and validity of the model and resolving methods are verified by an example.展开更多
In the traditional environment, the factors for considering the location of the waste transfer station and the landfill are relatively fixed, and the scale of the problem is small. But in Internet of Things(IoT) envir...In the traditional environment, the factors for considering the location of the waste transfer station and the landfill are relatively fixed, and the scale of the problem is small. But in Internet of Things(IoT) environment, the waste storage in the household waste can be monitored in real time, the environmental data can be collected by means of emerging information technology, and the residents are more sensitive to the environmental pollution of the waste. Under such conditions, the method for location of traditional waste disposal facilities needs to be redeveloped to obtain a waste transfer station and landfill site that are suitable for the IoT environment. For this reason, a two-objective integer programming model is designed. The two objectives are lowest cost and minimum impact of waste on residents. The expectations of city managers and residents are considered into the modeling. Through the simulation experiments on different scale problems, the integration method for integer programming model and simulation system is verified to solve the location of waste transfer stations in IoT environment.展开更多
Sediment deposition in the pumping station has a huge negative impact on unit operation.The three-dimensional CFD method has been used to simulate inlet structure flow in pumping station based on the Eulerian solid- l...Sediment deposition in the pumping station has a huge negative impact on unit operation.The three-dimensional CFD method has been used to simulate inlet structure flow in pumping station based on the Eulerian solid- liquid two-phase flow model. The numerical results of the preliminary scheme show that sediment deposition occurs in the forebay of pumping station because of poor flow pattern therein. In order to improve hydraulic configuration in the forebay,one modified measure reconstructs water diversion weir shape,and another measure sets a water retaining sill in the approach channel. The simulation results of the modified scheme prove that back flow in the forebay has been eliminated and the sediment deposition region has also been reduced.展开更多
A simulation study on occupant evacuation in high-speed railway stations (HSRSs) was presented in China. Pathfinder was employed as the simulation platform and a typical HSRS in a medinm-sized city in China was sele...A simulation study on occupant evacuation in high-speed railway stations (HSRSs) was presented in China. Pathfinder was employed as the simulation platform and a typical HSRS in a medinm-sized city in China was selected for model development. The model was carefully calibrated and validated by comparing simulation results with field data. Evacuation efficiency could be improved with the increased door width while such effect decreased when the door width reached a marginal value. And the marginal value varied under different occupant densities. An exponential function between evacuation lime and occupant density was fitted, indicating that occupant density significantly affected evacuation efficiency. A set of different evacuation strategies were compared, in terms of their evacuation performances. It was found that a balanced door usage would result in more efficient evacuations in HSRSs. Thus occupant flows were suggested to be managed considering door capacity. To avoid potential safety issues caused by such strategy ( e. g. , more occupants could be evacuated from a smaller area designed with higher door capacity ), occupants needed to enhance their awareness of following evacuation guidance instead of panic escape in emergencies. Moreover, such safety issues could also be avoided during the design phase that the evacuation capacity was designed to be proportional to the room capacity for each floor. The results of this study provide valuable information for HSRS design and flow management in China.展开更多
Bus rapid transit (BRT) systems have been shown to have many advantages including affordability, high capacity vehicles, and reliable service. Due to these attractive advantages, many cities throughout the world are...Bus rapid transit (BRT) systems have been shown to have many advantages including affordability, high capacity vehicles, and reliable service. Due to these attractive advantages, many cities throughout the world are in the process of planning the construction of BRT systems. To improve the performance of BRT systems, many researchers study BRT operation and control, which include the study of dwell times at bus/BRT stations. To ensure the effectiveness of real-time control which aims to avoid bus/BRT vehicles congestion, accurate dwell time models are needed. We develop our models using data from a BRT vehicle survey conducted in Changzhou, China, where BRT lines are built along passenger corridors, and BRT stations are enclosed like light rails. This means that interactions between passengers traveling on the BRT system are more frequent than those in traditional transit system who use platform stations. We statistically analyze the BRT vehicle survey data, and based on this analysis, we are able to make the following conclusions: ( I ) The delay time per passenger at a BRT station is less than that at a non-BRT station, which implies that BRT stations are efficient in the sense that they are able to move passengers quickly. (II) The dwell time follows a logarithmic normal distribution with a mean of 2.56 and a variance of 0.53. (III) The greater the number of BRT lines serviced by a station, the longer the dwell time is. (IV) Daily travel demands are highest during the morning peak interval where the dwell time, the number of passengers boarding and alighting and the number of passengers on vehicles reach their maximum values. (V) The dwell time is highly positively correlated with the total number of passengers boarding and alighting. (VI) The delay per passenger is negatively correlated with the total number of passengers boarding and alighting. We propose two dwell time models for the BRT station. The first proposed model is a linear model while the second is nonlinear. We introduce the conflict between passengers boarding and alighting into our models. Finally, by comparing our models with the models of Rajbhandari and Chien et al., and TCQSM (Transit Capacity and Quality of Service Manual), we conclude that the proposed nonlinear model can better predict the dwell time at BRT stations.展开更多
Sunshine duration (S) based empirical equations have been employed in this study to estimate the daily global solar radiation on a horizontal surface (G) for six meteorological stations in Burundi. Those equations inc...Sunshine duration (S) based empirical equations have been employed in this study to estimate the daily global solar radiation on a horizontal surface (G) for six meteorological stations in Burundi. Those equations include the Ångström-Prescott linear model and four amongst its derivatives, i.e. logarithmic, exponential, power and quadratic functions. Monthly mean values of daily global solar radiation and sunshine duration data for a period of 20 to 23 years, from the Geographical Institute of Burundi (IGEBU), have been used. For any of the six stations, ten single or double linear regressions have been developed from the above-said five functions, to relate in terms of monthly mean values, the daily clearness index () to each of the next two kinds of relative sunshine duration (RSD): and . In those ratios, G<sub>0</sub>, S<sub>0 </sub>and stand for the extraterrestrial daily solar radiation on a horizontal surface, the day length and the modified day length taking into account the natural site’s horizon, respectively. According to the calculated mean values of the clearness index and the RSD, each station experiences a high number of fairly clear (or partially cloudy) days. Estimated values of the dependent variable (y) in each developed linear regression, have been compared to measured values in terms of the coefficients of correlation (R) and of determination (R<sub>2</sub>), the mean bias error (MBE), the root mean square error (RMSE) and the t-statistics. Mean values of these statistical indicators have been used to rank, according to decreasing performance level, firstly the ten developed equations per station on account of the overall six stations, secondly the six stations on account of the overall ten equations. Nevertheless, the obtained values of those indicators lay in the next ranges for all the developed sixty equations:;;;, with . These results lead to assert that any of the sixty developed linear regressions (and thus equations in terms of and ), fits very adequately measured data, and should be used to estimate monthly average daily global solar radiation with sunshine duration for the relevant station. It is also found that using as RSD, is slightly more advantageous than using for estimating the monthly average daily clearness index, . Moreover, values of statistical indicators of this study match adequately data from other works on the same kinds of empirical equations.展开更多
文摘Large numbers of electric vehicles(EVs)charged in residential district parking lots may cause the overload of power grid distribution.The studies of EVs'charging characteristics are helpful to the intelligent schedule of EVs'charging so as to minimize its influence.
基金supported by the National Natural Science Foundation of China(11402295)the Science Project of National University of Defense Technology(JC14-01-05)the Hunan Provincial Natural Science Foundation of China(2015JJ3020)
文摘This paper studies the problem of the space station short-term mission planning, which aims to allocate the executing time of missions effectively, schedule the corresponding resources reasonably and arrange the time of the astronauts properly. A domain model is developed by using the ontology theory to describe the concepts, constraints and relations of the planning domain formally, abstractly and normatively. A method based on time iteration is adopted to solve the short-term planning problem. Meanwhile, the resolving strategies are proposed to resolve different kinds of conflicts induced by the constraints of power, heat, resource, astronaut and relationship. The proposed approach is evaluated in a test case with fifteen missions, thirteen resources and three astronauts. The results show that the developed domain ontology model is reasonable, and the time iteration method using the proposed resolving strategies can successfully obtain the plan satisfying all considered constraints.
基金part of a key project carried out in 2009-2012financially supported by Guang Dong Electric Power Design Institute (No. KB-2009-109 and EV00711W)
文摘An anisotropic geomechanical model for jointed rock mass is presented. Simultaneously with deriving the orthotropic anisotropy elastic parameters along the positive axis, the equivalent compliance matrix for the deflection axis orthotropic anisotropy was derived through a three- dimensional coordinate transformation. In addition, Singh's analysis of the stress concentration effects of intermittent joints was adopted, based on two groups of intermittent joints and a set of cross- cutting joints in the jointed rock mass. The stress concentration effects caused by intermittent joints and the coupling effect of cross-cutting joints along the deflection-axis are also considered. The proposed anisotropic mechanics parameters method is applied to determine the deformation parameters of jointed granite at the Taishan Nuclear Power Station. Combined with the deterministic mechanical parameters of rock blocks and joints, the deformation parameters and their variability in jointed rock masses are estimated quantitatively. The computed results show that jointed granite at the Taishan Nuclear Power Station exhibits typical anisotropic mechanical characteristics; the elastic moduli in the two horizontal directions were similar, but the elastic modulus in the vertical direction was much greater. Jointed rock elastic moduli in the two horizontal and vertical directions were respectively about 24% and 37% of the core of rock, showing weakly orthotropic anisotropy; the ratio of elastic moduli in the vertical and horizontal directions was 1.53, clearly indicating the transversely isotropic rock mass mechanical characteristics. The method can be popularized to solve other rock mechanics problems in nuclear power engineering.
文摘In the power market environment, due to the uncertainty of the reservoir inflow and the pool purchase price, it is very important to research power generation risk dispatch of hydropower plants, taking into consideration the benefits and risk control of both sides. This paper investigates power generation risk dispatch of hydropower plants in the market environment, and proposes a mathematical model which considers maximization of benefits and risk control, reflects control willingness of risk and benefits, resolves it with the PSO algorithm, finding more economic and reasonable results. The feasibility and validity of the model and resolving methods are verified by an example.
基金Supported by the National Natural Science Foundation of China(71531009).
文摘In the traditional environment, the factors for considering the location of the waste transfer station and the landfill are relatively fixed, and the scale of the problem is small. But in Internet of Things(IoT) environment, the waste storage in the household waste can be monitored in real time, the environmental data can be collected by means of emerging information technology, and the residents are more sensitive to the environmental pollution of the waste. Under such conditions, the method for location of traditional waste disposal facilities needs to be redeveloped to obtain a waste transfer station and landfill site that are suitable for the IoT environment. For this reason, a two-objective integer programming model is designed. The two objectives are lowest cost and minimum impact of waste on residents. The expectations of city managers and residents are considered into the modeling. Through the simulation experiments on different scale problems, the integration method for integer programming model and simulation system is verified to solve the location of waste transfer stations in IoT environment.
基金Chinese National Foundation of Natural Science-Key Projects(51339005)
文摘Sediment deposition in the pumping station has a huge negative impact on unit operation.The three-dimensional CFD method has been used to simulate inlet structure flow in pumping station based on the Eulerian solid- liquid two-phase flow model. The numerical results of the preliminary scheme show that sediment deposition occurs in the forebay of pumping station because of poor flow pattern therein. In order to improve hydraulic configuration in the forebay,one modified measure reconstructs water diversion weir shape,and another measure sets a water retaining sill in the approach channel. The simulation results of the modified scheme prove that back flow in the forebay has been eliminated and the sediment deposition region has also been reduced.
基金Study of Emergency Management Technology of Integrated Passenger Transportation Hub in Jiangsu Province,China(No.2012R06)National Natural Science Foundation of China(No.51608114)Shanghai Pujiang Program,China(No.15PJC093)
文摘A simulation study on occupant evacuation in high-speed railway stations (HSRSs) was presented in China. Pathfinder was employed as the simulation platform and a typical HSRS in a medinm-sized city in China was selected for model development. The model was carefully calibrated and validated by comparing simulation results with field data. Evacuation efficiency could be improved with the increased door width while such effect decreased when the door width reached a marginal value. And the marginal value varied under different occupant densities. An exponential function between evacuation lime and occupant density was fitted, indicating that occupant density significantly affected evacuation efficiency. A set of different evacuation strategies were compared, in terms of their evacuation performances. It was found that a balanced door usage would result in more efficient evacuations in HSRSs. Thus occupant flows were suggested to be managed considering door capacity. To avoid potential safety issues caused by such strategy ( e. g. , more occupants could be evacuated from a smaller area designed with higher door capacity ), occupants needed to enhance their awareness of following evacuation guidance instead of panic escape in emergencies. Moreover, such safety issues could also be avoided during the design phase that the evacuation capacity was designed to be proportional to the room capacity for each floor. The results of this study provide valuable information for HSRS design and flow management in China.
基金supported by the National Scienceand Technology Support Program of China (No.2009BAG17B01)
文摘Bus rapid transit (BRT) systems have been shown to have many advantages including affordability, high capacity vehicles, and reliable service. Due to these attractive advantages, many cities throughout the world are in the process of planning the construction of BRT systems. To improve the performance of BRT systems, many researchers study BRT operation and control, which include the study of dwell times at bus/BRT stations. To ensure the effectiveness of real-time control which aims to avoid bus/BRT vehicles congestion, accurate dwell time models are needed. We develop our models using data from a BRT vehicle survey conducted in Changzhou, China, where BRT lines are built along passenger corridors, and BRT stations are enclosed like light rails. This means that interactions between passengers traveling on the BRT system are more frequent than those in traditional transit system who use platform stations. We statistically analyze the BRT vehicle survey data, and based on this analysis, we are able to make the following conclusions: ( I ) The delay time per passenger at a BRT station is less than that at a non-BRT station, which implies that BRT stations are efficient in the sense that they are able to move passengers quickly. (II) The dwell time follows a logarithmic normal distribution with a mean of 2.56 and a variance of 0.53. (III) The greater the number of BRT lines serviced by a station, the longer the dwell time is. (IV) Daily travel demands are highest during the morning peak interval where the dwell time, the number of passengers boarding and alighting and the number of passengers on vehicles reach their maximum values. (V) The dwell time is highly positively correlated with the total number of passengers boarding and alighting. (VI) The delay per passenger is negatively correlated with the total number of passengers boarding and alighting. We propose two dwell time models for the BRT station. The first proposed model is a linear model while the second is nonlinear. We introduce the conflict between passengers boarding and alighting into our models. Finally, by comparing our models with the models of Rajbhandari and Chien et al., and TCQSM (Transit Capacity and Quality of Service Manual), we conclude that the proposed nonlinear model can better predict the dwell time at BRT stations.
文摘Sunshine duration (S) based empirical equations have been employed in this study to estimate the daily global solar radiation on a horizontal surface (G) for six meteorological stations in Burundi. Those equations include the Ångström-Prescott linear model and four amongst its derivatives, i.e. logarithmic, exponential, power and quadratic functions. Monthly mean values of daily global solar radiation and sunshine duration data for a period of 20 to 23 years, from the Geographical Institute of Burundi (IGEBU), have been used. For any of the six stations, ten single or double linear regressions have been developed from the above-said five functions, to relate in terms of monthly mean values, the daily clearness index () to each of the next two kinds of relative sunshine duration (RSD): and . In those ratios, G<sub>0</sub>, S<sub>0 </sub>and stand for the extraterrestrial daily solar radiation on a horizontal surface, the day length and the modified day length taking into account the natural site’s horizon, respectively. According to the calculated mean values of the clearness index and the RSD, each station experiences a high number of fairly clear (or partially cloudy) days. Estimated values of the dependent variable (y) in each developed linear regression, have been compared to measured values in terms of the coefficients of correlation (R) and of determination (R<sub>2</sub>), the mean bias error (MBE), the root mean square error (RMSE) and the t-statistics. Mean values of these statistical indicators have been used to rank, according to decreasing performance level, firstly the ten developed equations per station on account of the overall six stations, secondly the six stations on account of the overall ten equations. Nevertheless, the obtained values of those indicators lay in the next ranges for all the developed sixty equations:;;;, with . These results lead to assert that any of the sixty developed linear regressions (and thus equations in terms of and ), fits very adequately measured data, and should be used to estimate monthly average daily global solar radiation with sunshine duration for the relevant station. It is also found that using as RSD, is slightly more advantageous than using for estimating the monthly average daily clearness index, . Moreover, values of statistical indicators of this study match adequately data from other works on the same kinds of empirical equations.